Welcome Working Advisory Group March 20, 2012 Today’s Agenda 1. Selected Alternative 2. Casey Project Design Schedule 3. 25% Design Phase • Key Elements • Schedule 4. Continued Community Participation Process The Alternative Selected For Design …. At Grade – Removal of overpass – Reconnect neighborhoods and open space Welcome to the Casey Arborway Project WAGDAG – Next Phase: Design • Maintain guiding principles, goals and objectives • Integral to developing designs and addressing operational issues • Continue to balance mobility needs with livability opportunities • Continue to challenge the design team to incorporate new ideas based on local concerns Key Issues • Construction Management – Logistics, traffic management, protection of neighborhoods, commuters, business and transit • Strategies to protect neighborhoods from cut through traffic • MBTA bus trips travel time – during and post construction • Coordination with small businesses before and during demolition and construction • Arborway Yard and the ABP program Casey Arborway Project Design & Construction Schedule Accelerated Bridge Program Opportunity Project Schedule 25% Design Submission by September 2012 75% Design Submission by March 2013 Final Design July 2013 Construction Completion Advertise October 2013 October 2016 PLANNING STUDY 2011 25% DESIGN 2012 TO FINAL DESIGN 2013 DEMOLITION AND CONSTRUCTION 2014 2015 Community Involvement Throughout Project Select Alternative 25% To Final Design Review Construction Staging & Traffic Management Planning and Phasing Construction Management Meetings 2016 Design Phase For the Casey Arborway Project Key Elements & Schedule Design Process • Planning stage - COMPLETED • 25% design – Identifies design parameters: – Horizontal and vertical alignments – Signal phasing – Urban design and landscaping – File the environmental notification form (ENF) • 75% design – Includes additional design detail (plans/specifications) based on 25% review • Plans, Specifications and Estimates (PSE) – Finalizes all construction-related documents Design – Key Elements • Open space and landscaping • Signalization details and roadway configuration • Pedestrian and bicycle connections • Parking & pick-up/drop-off (including school buses) • Non-peak design variations • Upper busway/Washington Street • Shea Square and Morton Street • Construction staging and traffic management • Sustainable design D D Public Meeting & We Are Here N D J F D D M A M D J Advertise D O Submit PS&E Design D S 2013 J A S O PS&E Design Public Meeting W A Receive All Comments J Submit 75% Design J 75% Design Public Meeting M 25% Design Public Hearing Receive All Comments A 2012 MEPA Site Meeting Submit 25% Design M 25% Design Begins File ENF Casey Arborway Project esign dvisory roup – DRAFT Design Schedule Meeting Topics DAG 1 - Design: (Shea Circle & Asticou Rd/Washington St) DAG 2 - Design Charrette: (SWCP, MBTA Plaza & Franklin Park) DAG 3 - Design: Traffic (roadway cross sections & operations) DAG 4 - Construction and Traffic Management DAG 5-7 - Agenda to be determined W = WAG Meeting D = DAG Meeting Continued Community Participation Process For 25% Design WAGDAG Design Advisory Group Technical Focus Proposed DAG Meetings 25% Design Phase - Meeting Topics • Construction Management • Logistics and plans • Traffic plans and management for all modes, • Cut through traffic, business access • Livability • Urban Design – gateways • Landscaping and open space • Mobility • Roadway and intersection design, signalization, medians and non-peak hour designs Proposed DAG Meetings 25% Design Phase MOBILITY Integration of all modes to achieve safe and accessible network – balancing of needs. Corridor Wide (N/S & E/W) and subarea focus: New Washington, upper busway/Washington St, and Morton St/ Shea Circle • Signalization • Roadway design • Intersection design and operations • Use of adjacent spaces for multi-modal access • Peak/non-peak design concepts Mobility Focus Areas Proposed DAG Meetings 25% Design Phase LIVABILITY Corridor Wide Issues: • Open space, landscaping, sustainability, architecture and urban design Charrette in Spring: (Series of Break Out Groups) • Franklin Park Entrance, SW Corridor Park, MBTA Plaza Regroup in Summer: • Results and Designs Livability Focus Areas Proposed DAG Meetings 25% Design Phase CONSTRUCTION MANAGEMENT • Demolition and construction phases • • • • • • • • Traffic (maintain access/minimize cut through traffic) Address business needs Pedestrian and bicycle Transit Operations Available space for construction Laydown area(s) Traffic Management Plans (TMPs) Preliminary construction schedule D E S I G N M E E T I N G S Casey Arborway Project esign dvisory roup DRAFT Schedule 25% Design Begins Submit 25% Receive All Design for 25% Design Comments Review File ENF MAR APR MAY JUN JUL WAG1 DAG DAG 1 DAG 2 DAG 3 DAG4 Public Meeting AUG MEPA Site Meeting Meeting Topics DAG1 Design: (Shea Circle & Asticou Rd/Washington St) DAG2 Design Charrette: (SWCP, MBTA Plaza & Franklin Park) DAG3 Design: Traffic (roadway cross sections & operations) DAG4 Construction and Traffic Management SEP OCT 25% Design Public Hearing Casey Arborway Project Discussion