NJDOT 2009 Design Summit BUREAU OF PROGRAM SYSTEMS MANAGEMENT ENGINEERING DOCUMENTS UNIT Edward Myzie, P.E., Manager Bureau of Program Systems Management PROGRAM SYSTEMS MANAGEMENT ENGINEERING DOCUMENTS PLANS SPECS. FALCON SYSTEMS PRS ESTIMATION SCHED. TORT TRNS*PORT TORT JURISDICTION CES PES/LAS EXPEDITE SITE MGR 1. 2. 3. 4. DRAWINGS ON CAD STAMP & SIGN SUBMIT 7 COPIES RECEIVED BY DEPT. 1. NO CHANGE 2. NO CHANGE 3. GENERATE FILE 4. SUBMIT ELEC. 4A. CONVERT TO PDF & ADD TO FALCON 5. CIRCULATE COPIES FOR REVIEW 5. ROUTE ELEC. 6. DEPT. APPROVES 6. DEPT. APPROVES CURRENT PROCESS USING FALCON Submit documents to individuals for Review / Approval Generates a Transmittal document that reflects all of the documents submitted. Maintains current information at the time of the submittal. (ie. Revision, Rev Date) Maintains a tracking history of who received documents and when. Project Team reviews / approves documents. Transmittal Database logs the Project Team Process. DETERMINE FILE TRANSFER OPTIONS WITH THE OFFICE OF INFORMATION TECHNOLOGY PICK APPROPRIATE MARKUP UTILITYExploring Adobe Reader & CutePDF SET-UP PARC ROOM W/EQUIPMENT LEGAL REVIEW INITIATE SYSTEM FOR WORKING DRAWINGS INVESTIGATE PARALLEL ROUTING VS. SERIAL ROUTING UTILIZE FOR ALL CONSTRUCTION PLANS Thank You