MICHIGAN TECH KEWEENAW COMMONS UPGRADE HOUGHTON, MICHIGAN

advertisement
1
2
3
4
5
MICHIGAN TECH
KEWEENAW COMMONS UPGRADE
HOUGHTON, MICHIGAN
D
ENGINEERING
ARCHITECTURE
PLANNING
SURVEYING
ENVIRONMENTAL
D
100 PORTAGE STREET
HOUGHTON, MI 49931
(906) 482-4810
2906 N. STEPHENSON AVE. SUITE 2
IRON MOUNTAIN, MI 49801
(906) 563-5407
424 SOUTH PINE STREET
ISHPEMING, MI 49849
(906) 485-1011
707 ASHMUN ST.
SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE B
MARINETTE, WI 54143
(715) 732-4188
PROJECT TITLE:
KEWEENAW
COMMONS
UPGRADE
C
OWNER:
.
PROJECT VICINITY MAP
C
MICHIGAN TECH
PROJECT LOCATION:
HOUGHTON,
MICHIGAN
SHEET INDEX
NUMBER
G001
A101
A102
A501
SHEET NAME
COVER SHEET
DEMOLITION PLAN
GROUND LEVEL PLAN
DETAILS
B
B
PROJECT LOCATION
PROJECT NO:
DESIGNED BY:
DRAWN BY:
CHECKED:
APPROVED:
PROJECT LOCATION - GROUND LEVEL - SHADED AREA
M40-16275
MEL
MEL
MEL
TSP
COVER SHEET
BUILDING KEY
G001
1
2
3
4
5
A
© U.P. Engineers & Architects, Inc.
4/27/2016 8:46:01 AM
A
4/27/2016
4/22/2016
Issue Date
DATE:
P:\M40-16275 MTU-MUB Commons Finishes 2016\Dwgs\M40-16275.rvt
BID / CONSTRUCTION
PRELIMINARY
Project Status
ISSUED FOR:
1
2
3
4
5
ENGINEERING
ARCHITECTURE
PLANNING
SURVEYING
ENVIRONMENTAL
D7
D
D8
UP
D1
SECTION 6
100 PORTAGE STREET
HOUGHTON, MI 49931
(906) 482-4810
D2
2906 N. STEPHENSON AVE. SUITE 2
IRON MOUNTAIN, MI 49801
(906) 563-5407
D7
D2
D2
D7
D2
D2
424 SOUTH PINE STREET
ISHPEMING, MI 49849
(906) 485-1011
D7
UP
EXISTING
TO REMAIN
D7
D9
707 ASHMUN ST.
SAULT STE. MARIE, MI 49783
(906) 635-0511
D1
D2
D2
D2
SECTION 5
D1
D1
1701 DUNLAP AVE. SUITE B
MARINETTE, WI 54143
(715) 732-4188
D8
D2
D5
D7
D2
DEMOLITION PLAN KEYED NOTES
D2
D2
D2
D2
D1
D3
UP
D2
EXIST'G CONC.
COLUMN
4"
D2
D2
3'
-
UP
D2
D1
D2
D2
D2
D7
D3
D2
D1
D10
D2
D2
EXISTING EXP. JNT.
D4
D5
D5
C
UP
D2
D2
UP
D4
D8
D8
D5
D6
EXIST'G STL. COL.
D7
SECTION 4
UP
D8
D9
D10
D2
D2
D2
D2
D
D2
D2
D2
D2
D11
D8
REMOVE EXISTING CARPET OR VCT. CONTRACTOR SHALL CLEAN ADHESIVE
AND PREPARE FLOOR FOR NEW FINISH. (ENTIRE ROOM WHERESHOWN,
U.N.O.)
PREP WALL FOR VINYL WAINSCOT: SALVAGE DEVICES INCLUDING, BUT NOT
LIMITED TO RECEPTACLES, SIGNAGE, FIRE EXTINGUISHER BOX, ELECTRICAL
PANEL COVER, FIRE ALARM, THERMOSTAT, ETC. (ENTIRE WALL TO CORNERS).
REMOVE EXISTING WALL BASE.
REMOVE CMU WALL TO 54" A.F.F. (MAIN LEVEL), INCLUDING WIRING, OUTLETS,
SWITCHES, ITC. PROVIDE CLEAN DEMOLITION CUTS WHERE ADJACENT
WORK TO REMAIN. PREPARE FOR NEW FINISHES TO MATCH FINISHED WORK.
REMOVE SECURITY GATE END TRACK
REMOVE COVERINGS ON STRUCT COLUMN: CARPET, WOOD TRIM, PLYWOOD
SHEATHING, WOOD FRAMING & WALL BASE. TAKE CARE NOT TO DAMAGE
FIRE-RATED COATING. PREPARE ADJACENT SURFACES FOR NEW FINISH.
REMOVE COVERINGS ON DUCTWORK ENCLOSURE: CARPET, WOOD TRIM,
AND WALL BASE PREPARE SURFACE FOR NEW FINISHES.
REMOVE WALL BASE & ADHESIVE. PREPARE FOR NEW FINISH. ENTIRE
LENGTH OF WALL TO CORNERS.
REMOVE STAIRTREAD COVERING & ADHESIVE. PREPARE FOR NEW FINISH.
REMOVE WINDOW & FRAME. PROVIDE CLEAN OPENING FOR NEW WORK.
DEMO CABINET, SINK & FAUCET. PIPING TO REMAIN FOR NEW SINK AND
FAUCET IN COUNTERTOP.
DEMO CERAMIC TILE TREADS
DN
D2
D11
SECTION 3
D2
D2
D6
KEWEENAW
COMMONS
UPGRADE
OWNER:
C
MICHIGAN TECH
PROJECT LOCATION:
HOUGHTON,
MICHIGAN
D1
UP D8
PROJECT TITLE:
DUCTWORK
ENCLOSURE
D7
D2
D2
D2
DN
D1
D1
D7
GENERAL DEMOLITION NOTES:
R/F
D2
D2
D2
SECTION 2
D2
REPAIR / REPLACE ANY FIRE RESISTANT COATING ON STRUCTURAL COLUMNS AND
RELATED AREAS THAT IS DAMAGED OR MISSING FROM DEMOLITION.
2.
WHERE CALLED FOR REMOVAL, REMOVE EXISTING CMU WALL TO STRUCTURE.
THIS INCLUDES ALL ATTACHMENTS; ELECTRICAL DEVICES, ETC.
3.
CONTRACTOR SHALL REMOVE FROM SITE ALL DEMOLISHED ITEMS INCLUDING
EQUIPMENT, PIPING AND SUPPLIES.
4.
ALL INFORMATION SHOWN ON PLAN IS DIAGRAMMATIC. CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITIONS PRIOR TO BID.
5.
ALL DEMOLITION WORK SHALL BE SCHEDULED AND COORDINATED TO MINIMIZE
DUST, NOISE AND INTERFERENCE WITH CURRENT ACTIVITIES WITHIN BUILDING.
6.
ALL AREAS OF DEMOLITION SHALL BE CLEANED DAILY IN AREAS TO BE OCCUPIED
THE FOLLOWING DAY.
7.
ALL EXISTING SYSTEMS SHALL REMAIN IN OPERATION UNLESS APPROVED BY THE
OWNER AND ENGINEER.
8.
CONTRACTOR SHALL REMOVE ALL GUARD RAILS AND HANDRAILS AT RAMPS AND
STAIRS ON EXISTING HALF WALLS AND TRANSPORT THEM TO PENINSULA POWDER
COATING IN BARAGA, MICHIGAN.
9.
OWNER IS RESPONSIBLE FOR REMOVING, STORING AND RE-INSTALLING EXISTING
FURNITURE IN COMMONS AREA.
10.
PLUMBING WORK BY SEPARATE CONTRACTOR, HIRED BY OWNER
"
21
D2
1.
X
D7
"
60
D2
DN
D2
D1
D2
B
D2
D2
SECTION 1
PART OF
SERVERY
PROJECT
COORDINATE LIMITS OF
FLOORING REMOVAL IN
THIS AREA WITH OWNER &
CONTRACTOR WORKING
ON RENOVATION PROJECT
IN THIS AREA
D7
D7
D7
E
TO XIS
R TIN
EM G
AI
N
E
TO XIS
R TIN
EM G
AI
N
D7
B
BID / CONSTRUCTION
PRELIMINARY
Project Status
ISSUED FOR:
4/27/2016
4/22/2016
Issue Date
DATE:
R
R
R
-4
"
PROJECT NO:
DESIGNED BY:
DRAWN BY:
CHECKED:
APPROVED:
REF.
A
46
'-
M40-16275
MEL
MEL
MEL
TSP
A
6"
A1
GROUND LEVEL DEMOLITION PLAN
1/8" = 1'-0"
1
A101
2
3
4
5
© U.P. Engineers & Architects, Inc.
4/27/2016 8:44:50 AM
DEMOLITION PLAN
P:\M40-16275 MTU-MUB Commons Finishes 2016\Dwgs\M40-16275.rvt
'
29
1
2
3
4
5
GENERAL NOTES:
76' - 4"
WAINSCOT HEIGHT SHALL MATCH FROM SECTION 5 SOUTH, 70" ABOVE
MAIN FLOOR LEVEL. WAINSCOT IN SECTION 6 SHALL BE 54" A.F.F..
WAINSCOT IN CORRIDOR TO NORTHWEST EXIT IS 48" A.F.F.
3.
RADIANT PANEL COLOR TO MATCH ADJACENT SURFACE:
WAINSCOT - 70" ABOVE MAIN LEVEL FLOOR
ACCENT PAINT (NORTH WALL)
GWB SURFACE.
4.
GC SHALL RE-INSTALL PAINTED GUARD RAILS ON WOOD CAPS AT
HALF WALLS AND HANDRAILS ON WALLS. RAILS WILL BE DELIVERED
TO THE SITE BY PENINSULA POWDER COATING FOR REINSTALLATION.
5.
GWB GLUED DIRECTLY TO CMU SHALL BE IMPACT RESISTANT 1/2".
PAINT EX. GWB WALL - ACCENT WALL PNT 4
29
SECTION 6
'12
22' - 1"
6"
R1
'9"
GLUE IMPACT
RESISTANT 1/2"
GWB TO EX. CMU
WALL - PAINT
21' - 0"
4"
2"
R1
PROJECT TITLE:
4"
'2"
10' - 0"
NEW IMPACT RES. 1/2"
GWB GLUED ATTACHED
TO EX. CMU WALL PAINT - TYPICAL
UP
21
P.LAM
COUNTERTOP
DET.D1/A501
'-
'-
25
26' - 4"
END WALL DETAIL D2/A502 - TYPICAL
SEE DETAIL B5/A501
FOR SOFFIT WHERE
WALL REMOVED
0"
EXP. JNT. - TYP. SEE
DET. C3/A501
NEW IMPACT RES. 1/2" GWB
GLUED ATTACHED TO EX.
CMU WALL - PAINT TYPICAL (ALL WALLS IN
CONCOURSE UP TO DOOR)
OWNER:
R2
25
"
-0
6"
3'
A501
NEW SINK BY OTHERS.
COORDINATE CUTOUT
WITH OWNER
EGRESS PATH IN GRAY SEE SPECIFICATION FOR
WEEK OF INSTALLATION
WORK
3'
-
22' - 4"
D2
D1
KEWEENAW
COMMONS
UPGRADE
UP
A501
A501
21' - 9"
R2
PROVIDE BULLNOSE
SCORED CMU TO MATCH
EXIST'G @ END WALL
WHERE PORTION OF
WALL REMOVED
UP
A1
1701 DUNLAP AVE. SUITE B
MARINETTE, WI 54143
(715) 732-4188
6"
'-
31
SECTION 5
707 ASHMUN ST.
SAULT STE. MARIE, MI 49783
(906) 635-0511
'-
15
'-
FE
NEW IMPACT RES. 1/2"
GWB GLUED ATTACHED
TO EX. CMU WALL - PAINT
- TYPICAL
32
50' - 8"
UP
UP
20
'-
TRIM AROUND EX.
ELEC. PANEL
6"
UP
PROJECT LOCATION:
R3
'-
2"
NEW IMPACT RES. 1/2"
GWB GLUED ATTACHED
TO EX. CMU WALL - PAINT
50
D5
UP
'1"
SECTION 3
28' - 4"
1"
'-
A501
UP
INTERIOR FINISHES LEGEND
19
'12' - 8"
C5
A501
B
D4
A501
'-
52
RADIANT
HEAT PANEL PAINT TO
MATCH WALL
RESILIENT
R1
MANUF.:
STYLE:
COLOR:
SIZE:
R1
TYPICAL @ ALL
HALF WALLS
UP
COORDINATE THIS
LINE WITH OTHER
CONTRACATOR
30' - 4"
0"
SECTION 1
R2
MANUF.:
STYLE:
COLOR:
SIZE:
R3
MANUF:MANNINGTON, AMTICO
STYLE:
WOOD - WARM
COLOR:
SUGAR MAPLE AROW8020
SIZE:
4 1/2" x 36"
CPT 1
R2
FLOOR TRANSITIONS:
JOHNSONITE CTA-XX-A ADAPTOR,
COLOR 47 BROWN
MANNINGTON, AMTICO
WOOD - NEUTRAL
AGED OAK AROW7710
4 1/2" x 36"
WALLS:
PAINT
9'
"
-9
R4
MANUF.:
STYLE:
COLOR:
6'
NEW 1/2" IMPACT
RESISTANT GWB
RADIANT
HEAT PANEL PAINT TO
MATCH WALL
"
-6
CARPET/CARPET TILE
CPT 1
CPT 2
CPT 3
A
CPT 4
PNT 1 SOFFITS
NORA
NORAMENT SATURA STAIR TREAD PNT 2 ABOVE WAINSCOT
PNT 3 FULL HT GWB WALLS
5108 INDUS
PNT 4 ACCENT WALL (N) &
RADIANT PANELS
MANUF.: MOHAWK INDUSTRIES - LEES
STYLE: FLAMESTITCH III
COLOR: 897 NEEDLE POINT
TYPE:
MODULAR 24x24
INSTALLATION: DIRECT GLUE DOWN, ASHLAR
MANUF.: MOHAWK INDUSTRIES - LEES
STYLE: ZIP IT
COLOR: 989 EASY
TYPE:
MODULAR 12x36
INSTALLATION: DIRECT GLUE DOWN,
1/8" = 1'-0"
BID / CONSTRUCTION
PRELIMINARY
Project Status
ISSUED FOR:
4/27/2016
4/22/2016
Issue Date
DATE:
PAINT ABREVIATIONS:
EG
SG
FL
EP
EGG SHELL FINISH
SEMI-GLOSS
FLAT
EPOXY
PLASTIC LAMINATE (COUNTERTOP)
PLAM. MANUF.:FORMICA
COLOR: KERALA GRANITE
FINISH: MATTE
PATTERN: 6272-58
MANUF.: MOHAWK INDUSTRIES - LEES
STYLE: HEM
COLOR: 989 EASY
TYPE:
MODULAR 12x36
INSTALLATION: DIRECT GLUE DOWN
WALL PROTECTION
INPRO, BEAD BOARD, COLOR HONEY NUT
MANUF.: MOHAWK INDUSTRIES - LEES
STYLE: COLORBEAT GT298
COLOR: 1142 GROUND TUMERIC
TYPE:
MODULAR 12x36
TACKABLE SURFACE:
D.L. COUCH
SOURCE ONE ACOUSTICAL
PATTERN: ENLIGHTEN
AEN-07
COLORWAY: CINNAMON, 23 OZ.
1/4" THICK CORK SUBSTRATE
D.L. COUCH, AMORIM CORK
#710227
REF.
FIRST FLOOR PLAN
B
NORA
BASE & ACCESSORIES:
NORAPLAN 925 SERRA
B1
4" RUBBER, NORA,
4925 JUNIPER BERRIES
6264 COFFEE BEAN
39.53" x 19.76", THICKNESS .14"
PROJECT NO:
DESIGNED BY:
DRAWN BY:
CHECKED:
APPROVED:
M40-16275
MEL
MEL
MEL
TSP
GROUND LEVEL PLAN
A102
1
2
3
4
5
A
© U.P. Engineers & Architects, Inc.
P:\M40-16275 MTU-MUB Commons Finishes 2016\Dwgs\M40-16275.rvt
4"
FLOORS:
SECTION 2
4/27/2016 8:45:21 AM
35
11
'-
'-
2"
9"
NEW IMPACT RES. 1/2" GWB
GLUED ATTACHED TO EX.
CMU WALL - PAINT TYPICAL (ALL WALLS IN
CONCOURSE UP TO DOOR)
C1
R1
RADIANT
HEAT PANEL PAINT TO
MATCH WALL
R2
HOUGHTON,
MICHIGAN
18
16
16' - 11"
UP
12
6'
21
'-
-4
"
2"
A501
C
MICHIGAN TECH
PROVIDE NEW FRP
COLUMN WRAP ON
EXIST'G STL. COL.
SEE DET. C1/A503
SECTION 4
UP
100 PORTAGE STREET
HOUGHTON, MI 49931
(906) 482-4810
424 SOUTH PINE STREET
ISHPEMING, MI 49849
(906) 485-1011
16" SQ. CONC. COLUMN VERIFY SIZE IN FIELD
PRIOR TO ORDERING
NEW FRP ENCLOSURE.
SEE DET X/A501 FOR
FINISH
38
41' - 4"
D
2906 N. STEPHENSON AVE. SUITE 2
IRON MOUNTAIN, MI 49801
(906) 563-5407
INFILL OPENING W/ MTL.
STUDS @ 16" O.C. W/ GWB
EACH SIDE - EA. FACE FLUSH
W/ ADJ. WALL
0"
'CPT 2,3,4,5
ENGINEERING
ARCHITECTURE
PLANNING
SURVEYING
ENVIRONMENTAL
8' - 11"
RECESSED RADIANT HEAT PANEL
COVER - PAINT TO MATCH WALL TYPICAL
6' - 4"
A1
2.
"
-2
UP
C
MEANS OF EGRESS SHALL BE MAINTAINED DURING CONSTRUCTION.
THE ONLY EXCEPTION IS JUNE 3-8, 2016 WORK IN THIS AREA SHALL
BE COMPLETED DURING THIS TIME.
4' - 4"
0'
13
11' - 11"
D
1.
1
2
3
4
5
INSTALL METAL
GAURD RAIL
1x3 MAPLE TRIM
WALL PROTECTION
WAINSCOT
WALL PROTECTION
WAINSCOT
COORDINATE PLUMBING
WORK BY OTHERS WITH
OWNER
SEALANT
1/2" MDF W/
MAPLE VENEER
ENGINEERING
ARCHITECTURE
PLANNING
SURVEYING
ENVIRONMENTAL
1x BLOCKING
1x3 MAPLE
TRIM BD.
PLASTIC
LAMINATE W/
WATERFALL EDGE
MIN. CLR.
MAPLE VENEER ON 3/4"
PLYWD. ENCLOSURE
2' - 5"
2' - 10"
1x MAPLE APRON
1/2" MDF W/
MAPLE VENEER
COUNTERTOP
BRACKET @
30" O.C.
RUBBER BASE
SECTION @ SINK
1/2" = 1'-0"
SECTION @ COUNTERTOP
D2
1/2" = 1'-0"
D3
END WALL DETAIL
D4
1 1/2" = 1'-0"
EXISTING CMU COLUMN PAINT LIGONIER TAN
1x3 HORIZ. TRIM BOARD
2906 N. STEPHENSON AVE. SUITE 2
IRON MOUNTAIN, MI 49801
(906) 563-5407
VINYL WALL
PROTECTION ADHERED
TO EX. CMU COLUMN
SECTION @ HALF HIGH WALL
1 1/2" = 1'-0"
D5
D
100 PORTAGE STREET
HOUGHTON, MI 49931
(906) 482-4810
1x2 VERT. TRIM BOARD
EX. CMU
WALL
1x3 MAPLE
TRIM BD.
EX. CMU
WALL
HEIGHT OF WAINSCOT 70"
ABOVE MAIN FLOOR LEVEL
(ALL TRIM BD HTS TO MATCH
THROUGHOUT COMMONS
AREA)
VINYL WALL
PROTECTION
4' - 0"
4' - 0"
P.LAM COUNTERTOP W/
WATERFALL EDGE & 4"
BACKSPLASH
D1
1x BLOCKING
1x3 MAPLE
TRIM BD.
VINYL WALL
PROTECTION
2' - 10"
D
1x3 MAPLE TRIM W/
EASED EDGE
NATURAL FINISH.
424 SOUTH PINE STREET
ISHPEMING, MI 49849
(906) 485-1011
TYPICAL COLUMN DETAIL
1/2" = 1'-0"
707 ASHMUN ST.
SAULT STE. MARIE, MI 49783
(906) 635-0511
1701 DUNLAP AVE. SUITE B
MARINETTE, WI 54143
(715) 732-4188
PROJECT TITLE:
PAINT EX. WALL
LIGONIER TAN
MAPLE TRIM
1x TRIM @ 70" A.F.F. - BUTT INTO
WALL / WINDOW FRAME
EXISTING CMU WRAPPED COLUMN
KEWEENAW
COMMONS
UPGRADE
OWNER:
C
PAINT EX. WALL
TACKABLE SURFACE ON
1/4" CORK SUBSTRATE ADHERE TO WALL PER
MANUF. RECOMMENDATIONS
Floor Finish
(by Others)
1x3 MAPLE TRIM w/
EASED EDGES, CLEAR
FINISH
1
7_"
2
[191mm]
VINYL WALL PROTECTION
1
_"
8
[3mm]
NOTCH TRIM
ADHERE VINYL WALL
PROTECTION TO EX.
CMU PER WALL
PROTECTION
RECOMMENDATIONS
WALL SUBSTRATE
C1
1/2" = 1'-0"
Flat Head Concrete
Sleeve Anchor (JK020)
(7 per Frame @ 18" O.C.)
PROJECT LOCATION:
2"
[51mm]
V.I.F.
HOUGHTON,
MICHIGAN
AT HORIZONTAL JOINTS ONLY
RUBBER BASE
LG. COLUMN ELEVATION
MICHIGAN TECH
2"
[51mm]
1
_"
8
[4mm]
VINYL DIVIDER BAR
Continuous Aluminum
Floor Plate (J8C801)
C2
WOOD TRIM DETAIL
C3
3/4" = 1'-0"
C
VINYL DIVIDER DETAIL
C4
6" = 1'-0"
EXPANSION JOINT DETAIL
3" = 1'-0"
C5
DETAIL @ PERIMETER COLUMNS
3/4" = 1'-0"
ATTACH MET. STUD TO
STRUCTURE ABOVE
5/8" GWB - PAINT
EXTRA WHITE,
FLAT SW 7006
B
B
PAINT NOTE: (TYPICAL)
FULL HT. GWB WALL (IN CONCOURSE) - FRAGILE BEAUTY
WALL ABOVE WAINSCOT - LEGONIER TAN
ACCENT WALL - (BACK WALL OF SECTION 6, N. & E.) CAVERN CLAY
PAINT RADIENT PANELS TO MATCH ADJACENT WALL
REINSTALL
EX. CLG. TILE
REINSTALL, OR PROVIDE
PERIMETER TRIM
REINSTALL
EX. CLG. TILE
REINSTALL, OR PROVIDE
PERIMETER TRIM
WIDTH & HEIGHT TO MATCH
EXISTING ADJACENT SOFFIT
B5
SOFFIT DETAIL
BID / CONSTRUCTION
PRELIMINARY
Project Status
ISSUED FOR:
1 1/2" = 1'-0"
4/27/2016
4/22/2016
Issue Date
DATE:
D2
A501
PLASTIC
LAMINATE
COUNTERTOP
PAINT EX. WALL ABOVE WAINSCOT,
LIGONIER TAN
1x3 MAPLE TRIM
PROJECT NO:
DESIGNED BY:
DRAWN BY:
CHECKED:
APPROVED:
WALL PROTECTION
RUBBER BASE
M40-16275
MEL
MEL
MEL
TSP
A
4' - 0"
COUNTER BRACKETS @ 30" O.C.
A.M. HARDWARE OR EQUAL FOR 1000 LBS.
TYPICAL
DETAILS
ELEVATION
1/2" = 1'-0"
A501
1
2
3
4
5
© U.P. Engineers & Architects, Inc.
4/27/2016 8:45:55 AM
A1
TYPICAL
P:\M40-16275 MTU-MUB Commons Finishes 2016\Dwgs\M40-16275.rvt
A
ADA COUNTER HT.
2' - 10"
4' - 0"
1x2 MAPLE TRIM
(VERITCAL)
Download