Instrument Status • On/Off Cycle: 27 – +1 because of S/C fault in S33 – This was S/C safing #5 since launch • Hours On: ~65,000 hours – Continuous operations from 1/15/2005 (probe relay) to 9/11/2007 (S/C safing) • HDAC Filament Modulation: – Filament 1: 100.28 hours – Filament 2: 12.22 hours – Last: 2006/255 UVIS TEAM MEETING 1/2008 1 FSW Issues • None since last meeting UVIS TEAM MEETING 1/2008 2 GSW Issues • None since last meeting • See DAPS presentation UVIS TEAM MEETING 1/2008 3 UVIS Operational Issues • None since last meeting UVIS TEAM MEETING 1/2008 4 JPL Operational Issues • In S34: Wrong command file send to the S/C and commanding was continued. • In S34: Duct tool and MRO addresses in ALFtool not compatible with new CDS S/W. • In S35: Approved sequence did not contain the IVP vectors. UVIS TEAM MEETING 1/2008 5 Planning/Sequencing Issues • No DSN allocation until late in the sequence development – Getting better • RBOT analysis – JPL is trying to minimize the time the RWs are under 300 rpm. – Late pointing design modification • Getting worst. In S38 we are doing changes for the PSIV2 input port. UVIS TEAM MEETING 1/2008 6 Data Corruption • First reported on 2006/336 • Caused by 1 faulty sub module on SSR-A • Should be over since S35 – Faulty sub module is skipped in new CDS S/W – Still some lingering effects • Some corrupted data is tagged in the future • Developed code to filter this data before ingesting in DAPS UVIS TEAM MEETING 1/2008 7 Sun Occ Port • Since S30 we are flying with the sun occultation port in the open position • Process in place to check if the Sun is “near” the occultation port – We are closing the Sun occultation port if not doing a Sun experiment. • Several instances with Occ port open and a mesa. • Several instances of a bright spot on the middle of the lower half of the detector. UVIS TEAM MEETING 1/2008 8