Page 1 Cameron University Banner Project Meeting Agenda and Notes May 29, 2016 Banner Technical Team Committee/Meeting Name February 9, 2009 10:00 am Date Time Convened Time Terminated 11:40 am Julie Duncan Location Admin 201 Recorder Sherry Hendrix, Dawne Massey, Julie Duncan, Debbie Goode, Angela Melton, Kelly Simon, Greg Duncan, Kurt Jn Marie, Members Present Chase Bailey Rick Clyburn, Cheryl Davis Members Absent Visitors Topics Minutes from Feb 2 Next meeting Reboot time of SBI systems during spring break Higher One Updates from Sherry Discussion, Information Action Taken, Decisions, Recommendations, Time Line No change February 16 Thursday, March 19 from 8:00 to noon: • Shutdown/restart IFAS (sunfire) Monday, March 16 and Tuesday, March 17 Sunray (test system) – downtime to reinstall enterprise Oracle license Also patching/rebooting linux systems during spring break. CU is implementing Higher One for refunds to students Rick will need a tracking field in SBI for designating student biographical info transmitted to Higher One for contact by Higher One – more requirements for tracking fields may be required as this moves forward Data standards had initially planned on looking at holds but this should be addressed by the functional areas. Conversion Round 2: any changes? Be thinking if there is anything different that we need to do before June. Jamie Glover inquired whether ITS could do the tape load for ACT/EOS. Discussion was that the issues have been Might be able to do the AID update if not already done by this time. Will use the same instance of the current sunray ifas database instead of reloading from the live side unless we decide otherwise. The refund will go to higher one and there will be several options for the students to get their money. The kickoff starts tomorrow for this project. Start in the summer and will be in full production for fall. They will need to figure out policy on checks put on hold and the length of time it takes to get the checks. Find out the status regarding the financial conversion and its issues. Debbie will email Jamie to see if she would like to discuss the tape load process. Page 2 Topics Outstanding issues for SGHE Security Setup Upcoming Events Cameron University Banner Project Meeting Agenda and Notes Discussion, Information with the birthdate being blank and this isn’t something that IT could do. IT may need to discuss this with Jamie so that she understands the issue. Chase is working on this and it’s going along well. There are some classes that are missing. When testing comes into play we’ll find the forms that users need more access to. Date Time 2/9/09 2/11/09 1-4:30 1-5 2/12/09 1-5 2/13/09 1-5 2/23/09 2/23/09 2/24/09 2/24/09 2/24/09 2/25/09 2/25/09 2/25/09 2/25/09 2/26/09 2/26/09 2/26/09 8:30-4:30 1-4 8:30-4:30 8:30-4:30 8:30-4:30 8:30-4:30 8:30-4:30 8:30-4:30 12:30-4:30 8:30-4:30 8:30-12 1-4 Functional Area FI ST, FA, FI, HR/Payroll ST, FA, FI, HR/Payroll ST, FA, FI, HR/Payroll HR/PY -lib AD FI HR/PY ST FI HR/PY ST AD ST FI AD May 29, 2016 Action Taken, Decisions, Recommendations, Time Line Sherry indicated that users shouldn’t be calling during training asking for access. They should be checking access to screens before training occurs. She will address this at the next ILT meeting. Decision was made to not copy TEST to TRNG until a later point. TRAIN01-20 will be removed from TRNG and all training will be done on TEST. IT will still be able to login to TRNG and TEST. Debbie will email functional leads to request that IT setup be the same as the power users on each module. Description Maintaining Chart of Accounts Population Selection and Letter Generation Population Selection and Letter Generation Population Selection and Letter Generation Postings/Hiring Employees Managing AD Individuals - virtual Consult, Process Journal Vouchers, Manual Encumbrances - onsite Postings/Hiring Employees Workshop - onsite Consult, Process Journal Vouchers, Manual Encumbrances - onsite Workshop - onsite Managing AD Organizations – virtual Workshop – onsite Consult, Process Journal Vouchers, Manual Encumbrances – onsite Managing AD Individuals – virtual Page 3 Cameron University Banner Project Meeting Agenda and Notes Topics Discussion, Information 2/27/09 1-4 AD May 29, 2016 Action Taken, Decisions, Recommendations, Time Line Managing AD Individuals – virtual Highlighted training events may occur in CETES II. The conference center can be divided into two parts and Keith feels that it would be easier to use these instead of Howell Hall and Admin Board Room. Comments/Concer ns from Training Patch Installations From Laurene: I checked with the team to be sure and the general consensus was that this would be a perfect time to go ahead with the upgrades/patches for 8.1, being that we just completed a conversion cycle. You should be current on all releases so as we move forward we won't risk needing the upgrade patch in the middle of a conversion cycle and/or CRP. I only ask that we keep in communication on the scheduled timing of the above, as we don't want to thwart any consulting or training that may be going on at the time. 2/4/09 email from Greg to tech team: Listed are the installed Banner versions and the current updates available. We will need to review the upgrade documentation for each module to determine what additional steps each area will have to perform. Accounts Receivable 8.0 Advancement 8.0 Finance 8.0 Financial Aid 8.2 General 8.0 Human Resources 8.0 18-JUN-2008 18-JUN-2008 18-JUN-2008 25-SEP-2008 16-JUN-2008 18-JUN-2008 Would like to have Doreen included in the registration training so that questions regarding AR can be addressed. Sherry will also mention this to Mike that this seems to be a weak link in that the consultants can’t answer the AR questions that arise in other trainings. Techs should take a look at all the documentation for their module by Friday and indicate the priority of it to Chase/Greg. The functional users should take a look at the 8.1 user guides. Page 4 Topics Cameron University Banner Project Meeting Agenda and Notes Discussion, Information Position Control 8.0 18-JUN-2008 Student 8.0.1 25-SEP-2008 Student Self Service 8.0 Web Tailor 8.0 Workflow Patch information is located on the Banner website: https://connect.sungardhe.com Customer Support Center Documentation & Download Center Select Product. (ie. Banner-Advancement) Click List Releases. Select 8x-Releases. Click List Files. A list of files will appear click on View to see readme file. Download the *d.trz file to review the documentation for the upgrade. For a quick review click on the View option to see an overview of the file. From the Banner matrix appears we can update to the following versions: Accounts Receivable 8.0 Advancement 8.1 Finance 8.1.1 Financial Aid 8.3 General 8.1 Human Resources 8.1.1 Position Control Student 8.1.1 SSB Web Tailor 8.1 May 29, 2016 Action Taken, Decisions, Recommendations, Time Line Page 5 Topics Cameron University Banner Project Meeting Agenda and Notes Discussion, Information Workflow AR no 8.1 listed (no updates). Advancement adv80100u (8.1). Possibly additional patches required b_0109_c and p1-4e5xnv (fixes job submission broken in 8.1). Finance fin80100u (8.1), fin80101u (8.1.1), fin80200u (8.2) Financial Aid res80300d (8.3) 2009-2010 Winter Reg. Update General gen80100u (8.1) Human Resources pay80100u (8.1) , pay80101u (8.1.1) Position Control pos80100u (8.1) Student stu80100u (8.1) , stu80101u (8.1.1) SSB bws80001 (8.0.1), bws80100u (8.1), bws80101u (8.1.1) Web Tailor twb80100 (8.1), twb80101u (8.1.1) Patch Management after 8.1 From Sherry: Installation of New Releases (Patch Management) during migration phase: Anyone may request installation of releases or patches. Requests are to be made through EduServe PM. o The request includes a description of the patch and affected modules. o Either the request (requestor) or the approval/denial (Sherry) needs to be communicated to the team leads. o The process must also include Laurene Farley (Team Lead) to facilitate the request and for information. She may be the originator of the request as well. We want to ensure the patch will not adversely affect anything else during the course of the implementation. Sherry will be responsible for scheduling the installation window and tasks. o The DBA will do patch installations. o Generally, upgrades are applied to the SEED database first, then rolled out to the other May 29, 2016 Action Taken, Decisions, Recommendations, Time Line Page 6 Topics Cameron University Banner Project Meeting Agenda and Notes Discussion, Information May 29, 2016 Action Taken, Decisions, Recommendations, Time Line databases. We should allow 1 day down per database, so crosscheck training and testing schedules and who is using what databases for what purposes. The DBA will communicate installation results to Sherry and/or the team leads. From Greg: Created a form for the university forms file with the following instructions: (form below) Steps for Patch Management AFTER Go Live: -------------------------------1. Complete form. Form requires signatures requestor, team lead, and project manager. 2. Check Banner UDC Compatiblity Matrix. Upgrades must be compatible with existing module versions. 3. Install any upgrade/patch in TEST. 4. Users will need to test the upgrade/patch. 5. An email from the Team Lead to ITS that testing has been completed and the upgrade/patch is acceptable. 6. Schedule date/time for upgrade/patch. 7. Install upgrade/patch to SEED and production (PROD). 8. Email Team Lead of install of upgrade/patch to production. New users needing access to Banner Recommendations from IT regarding General Person Data Synchronization SOW Recommendations from IT regarding Modifications to New users should complete the CBT, receive training on data standards manual, and possible module specific training before they receive the Banner mousepad. Quote was $25,000 to do the dual entry synchronization by Banner. Could ask Megan to do something online for the data standards manual. Sherry will ask her. Cameron University is committed to using SunGard Banner without university-invoked modification – we do not modify Banner baseline code, forms or processes. When a new Sherry will take this to Glen. Recommendation is to not accept the SOW. Other options are to do the interface ourselves or designate 1-3 people to do the dual entry. Page 7 Topics Banner baseline code FICE Codes Ethnicity Codes Preliminary Enrollment Reporting HR – state job code Cameron University Banner Project Meeting Agenda and Notes Discussion, Information process is created, evaluation is first done to see if Banner delivers a method for the process in baseline; baseline logic is used whenever possible. OSRHE mandate FICE codes for students’ former institutions will no longer be allowed in UDS reporting. FICE codes are no longer officially maintained by any federal entity and must be crosswalked to IPEDS codes. Our current semester, Spring 2009 student data will be the last semester OSRHE will accept the FICE code in this field. I.T. will work with Registrar’s Office for a decision. OSRHE mandate adoption of new race/ethnic codes beginning Fall 2010 for student and human resource UDS data. The Data Standards team referred this back to I.T. and Data Standards will accept whatever decision I.T. makes. I.T. will work with Admission’s Office for a decision. OSRHE mandate a change in preliminary enrollment reporting. The current process is being replaced with an early run of the UDS Student and Class data report to allow for improved timelines and detail of institutional information early in the Fall and Spring semesters. Tom will add a section on support and data distribution in the Data Standards Manual. This is required to report to the state and there doesn’t seem to be a place to put this in Banner. But this field is blank on several new employees and they are still being paid. Task Lists Sandra Beaulac Sherry forwarded the input from Linda and Donald re: OU Nursing Debbie E-mailed OBU 1/26/09 re: dual entry of general person Greg, Julie, Margot, Sherry, Blackboard integration w/ Banner May 29, 2016 Action Taken, Decisions, Recommendations, Time Line 316 conflicts between ETS High School codes and the PEC database. It’s possible we may not be using these conflicting codes and Dawne is going to do more investigation. Places have been identified in biographic_mst and changes will move forward on screen changes and application changes. Reporting issues need to be discussed for in house reporting and FA reporting. Julie will talk to Tom on inhouse reporting. Kurt is researching equivalents for Cameron code and the state job codes and will discuss this with UCO to see what they do with the state job codes. Page 8 Cameron University Banner Project Meeting Agenda and Notes May 29, 2016 Debbie Sherry Tech Team & ITL Tech Team & Functional Areas Debbie Following up on Nolij Transfer for management of multiple PIDMs through her sources Continue to update: W:\workgrps\its_share\Banner\BANNER Data handling.docx Data cleanup - ongoing process Rick & Angie Inform everyone of proposed date for internet outage during Spring Break. – tentative 3/17/09 – not confirmed IFAS 2008 year end release Sherry Rick provided input re: Finance Bridges to Sherry - fwd: to Mike Pfeifer Tech Team & Functional Areas Identify suggested timelines in project schedule for: Early Alert; Bb Transaction Card System; Bb eLearning; Library; TMA; XAP App; Higher One Additional GPA, placement/forgiveness customization: Waiting to review what SHGE provides to TCC Document FICE code scenario and send to Kurt, Kelly and Julie for DS team Done. ST Dawne Debbie Dawne Contact Jamie Jackson @ XAP re: race code changes mandates by OSRHE & IPEDS – Jamie Jackson suggests to get that going late April or May – they have already made changes for other schools – Sent to Jamie, Zoe, Brenda: 2/5/09. OSRHE mandate change in preliminary enrollment reporting. Chase Security setup Debbie Sherry Quotes for Intellechek $24,000 & FormFusion $31,200 received & fwd to tech team Take Intellechek & FormFusion quotes to Glen Debbie Training in CETES II instead of the rooms below: Debbie Work w/ HD to get HH 107 setup for networking for 6 laptop connections Debbie Work w/ HD to get Admin 201 networked for 4 desktops + trainer’s laptop Done and a meeting will be scheduled next week. Sherry will double check with Ninette to make sure we still want Intellechek.