VIRGINIA RAILWAY EXPRESS AMENDMENT OF SOLICITATION INVITATION FOR BIDS (IFB) ADDENDUM No. 5 Issued: March 9, 2016 IFB No.: 016-001 Caption: Drop Table System Contact: Gerri Hill Email: ghill@vre.org Telephone/Fax: (703) 838-5427 DESCRIPTION OF AMENDMENT The above numbered solicitation is amended as follows: 1. ATTACHMENT W.3 – TECHNICAL SPECIFICATIONS DELETE: Page 7R of 52 REPLACE WITH: Page 7RR of 52 attached herewith Except as specifically amended herein, all other terms and conditions of this solicitation remain unchanged and in full force and effect. Bidders must acknowledge receipt of this amendment by returning a signed original with the Bid package prior to the hour and date specified in the solicitation. Company________________________________________________________________ Address _________________________________________________________________ City _______________________State_______________________ Zip Code__________ Name of Person Authorized to Sign__________________________________________ Print Signature____________________________________Date________________________ Page 1 of 1 3. 4. 1.04 The Construction Contractor will be responsible for: a. Coordinating the testing and commissioning of the equipment by the Manufacturer, including but not limited to, making arrangements with VRE for employees, rail vehicles and classroom space, based upon requests from the Manufacturer. This is to ensure that testing and commissioning activities do not conflict with other LOU Facility construction activities. b. Constructing the equipment pit, installing embedded items and providing all required electrical-mechanical and connectivity services in the LOU Facility per the Manufacturer’s requirements, to ensure that the equipment offers an optimal performance. c. Coordinating with the Manufacturer, taking into account the dates for completion of scheduled manufacturing milestones, the delivery of the equipment in order to meet the Construction Contractor’s obligations and ensuring that the required pit, embedments and utilities are complete and ready for installation of the equipment. d. Providing a licensed construction surveyor. At the direction of the Drop Table Manufacturer, the Construction Contractor’s surveyor shall verify the location, sizes, distances, squareness, etc. before the Construction Contractor places concrete on installed forms and at other key intervals as described in SECTIONS 1.06E.2., 1.06G.1., 1.10C., 3.02D. and 3.05D. The surveyor shall develop drawings for the Manufacturer’s and engineer’s review and acceptance of the dimensions measured. All construction modifications needed, based on the dimensional information provided, are the responsibility of the Construction Contractor. The Construction Contractor will furnish and install the following (based upon the Drop Table Manufacturer’s design): a. Embedded shop rail up to the edge of pit, to be installed after machine rails are installed b. Anchor bolts for load beams c. Conduit with pull-wires for power and control wiring (embedded conduit only) d. 480V electrical power to a main panel/disconnect as designated by the Manufacturer on the shop drawings e. Galvanized steel curb angles for pit edges of the surrounding concrete shop floor that will be installed by the Construction Contractor to provide the specified gaps between Drop Table equipment and the shop floor. The edge angle shall be 2” x 2” x ¼” with welded Nelson studs spaced as required for durability. The Manufacturer shall provide detailed shop drawings of the curb angles. REFERENCES A. All equipment shall be manufactured and set up in accordance with all industrial and safety standards that apply to the work, to include the following. B. Standards and Regulations: 1. AAR - Association of American Railroads 2. ABMA 3. AFBMA - Anti-Friction Bearing Manufacturers Association 4. AISC - American Institute of Steel Construction - American Bearing Manufacturers Association IFB No. 016-001 DROP TABLE SYSTEM TECHNICAL SPECIFICATIONS Page 7RR of 52