2.16
2.17
2.18
COMPRESSED AIR
A.
Downstream of the Construction Contractor-installed utility connection point inside
the pit, provide a discharge pressure relief valve to regulate pressure of shopsupplied compressed air to Manufacturer’s air pressure requirements. Provide
filter and lubricator if required by Manufacturer’s design.
B.
Construction Contractor shall furnish and install safety shutdown devices
including, but not limited to, low oil pressure and high oil temperature devices, as
part of the overall shop compressed air system installation. Safety valves shall be
installed by Construction Contractor on the compressor and the air receiver.
Construction Contractor and Manufacturer shall furnish and install isolation valves
in the piping in the areas applicable to their respective scopes of work.
C.
Construction Contractor and Manufacturer shall furnish and install vibration
isolation to the structure and piping in the areas applicable to their respective
scopes of work.
D.
Provide an automatic drain valve at the low point of the compressed air system in
the pit to allow for purging of water and oil.
PIPE, FITTINGS, VALVES AND ACCESSORIES
A.
Provide compressed air piping as required.
B.
Provide piping, fittings, valves, connections, etc., of a type and size in accordance
with approved shop drawings and installation instructions that will properly
interface with the piped services.
C.
All piping, valves, fittings, conduits, and wiring required for the equipment
installation shall be in accordance with requirements specified in Contract
documents and approved shop drawings.
D.
Design and provide all interconnecting piping sized for the flow rates as indicated.
ELECTRICAL REQUIREMENTS
A.
A single electrical service operating at 480 V/3PH/60 HZ shall be supplied by the
Construction Contractor to the equipment main electrical panel, with conduit sizes
and amperage rating in accordance with Manufacturer’s shop drawings. The
Manufacturer shall provide transformers operation of the system. Two (2)
separate 120 V/1 PH/ 60 HZ power supplies shall be provided for the machine
indicating lights.
B.
The Manufacturer shall provide transformers as required to step down the
specified supply voltage to provide low voltage for controls and accessories and to
provide voltage compatible with equipment as required.