\\Mabos\projects\10512.00\GIS\project\Base_Overview_Handout.mxd 55 U V t An io ch W as h in g ton St Haymarket W 29 H Lee U V wy Manassas Manassas National National 234 Battlefield Battlefield Park Park t u Balls Ford Rd Balls Ford Tho roug ley R d g to nR lle n Lomo Rd r d Av e ve Grant A Center St Rd nt Vi ll R Hi 0.75 1.5 Miles Existing Manassas Park Station Manassas Park Centreville Manassas Existing Manassas Station For more information contact us at 703.684.1001, gotrains@vre.org, or check the VRE web site at www.vre.org VRE Gainesville-Haymarket Extension Feasibility Study/ Alternatives Analysis Study Area Locus Map Norfolk Southern B Line and Existing VRE Manassas Line Vanasse Hangen Brustlin, Inc. 0 Loch Lomond Yorkshire Park Bull Bull Run Run Regional Regional Park Park r ia Sudley Li be Ben Ben Lomond Lomond Regional Regional Park Park 's D West Gate d Dr Bull Run svi Ha stin g Manassas Regional/ Harry P Davis Field ke No R ton mp l Co ria mo Me Close rtis 9:00 p.m. Cu Small Group Report Outs We llin 28 U V 66 8:30 p.m. § ¦ ¨ Small Group Discussions Sud e hfar 234 U V 7:30 p.m. d Q&A Rd Nissan Nissan Pavilion gto Pavilion nR d ll 7:15 p.m. vil le ell in Ha Project Presentation ntr e Norfolk Southern ‘B’ Line Lin ton Rd Linton Hall 7:05 p.m. Ce Gainesville Lake Lake Manassas Manassas 215 Welcome r Agenda Existing Broad Run Station 7:00 p.m. in D PUBLIC WORKSHOP U V Bristow Norfolk Southern Main Line r Open House Go dw Jo hn Marshall Hwy 15 t u Vint Vint Hill Hill Farms Farms Station Station Source: ESRI Streetmap 9.1 (2005) Bethlehem Rd 6:30 p.m. rD an o M ey dl Su VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Un ive Blv rsity d Stonewall Jackson High School Wednesday, July 30th, 2008 6:30-9:00 p.m. ! ( s M adison Hwy me Ja Rd lin a Ol dC aro Rd d ! ( What is the Study? Frequently Asked Questions T When will service begin? he Virginia Railway Express (VRE) is conducting a Feasibility Study/Alternatives Analysis for a proposed new branch of service, approximately eleven (11) miles in length. This study s is being done to evaluate the feasibility and desirability of adding this new branch of service, d as a well as to meet the requirements of the Federal Transit Administration (FTA) for potential project T funding. This new branch may potentially run f from the existing Manassas Station in the City f of o Manassas to the Town of Haymarket, located in Prince William County, Virginia, along Norfolk Southern’s “B” Line and may potentially include S up to three new stations. VRE is in the early stages of researching the feasibility of adding this new branch of service. As such, a date for the start of this proposed new service has not yet been determined. Where will stations/stops be located? VRE is in the process of conducting a feasibility study/alternatives analysis for adding this new branch of service. This study involves creating screening criteria for evaluating potential station/stop sites. The screening criteria are being established, but no sites have been selected. Is the project funded for construction? As part of the feasibility study/alternatives analysis, VRE is exploring a variety of alternatives, including cost estimates for each of these alternatives. Specific funding sources will be identified once a preferred alternative is selected. Project Schedule Will new track be needed? The project is scheduled to run from April 2008 to March 2009. In addition to the technical studies and reviews, there will be several opportunities for your input. There is existing track but there is a possibility that additional track may be needed. This could be determined at the conclusion of the feasibility study/alternatives analysis. Phase I – Data Collection (May – July 2008) Will the extension go to Dulles International Airport? • • Stakeholder Interviews Base Mapping and Land Use and Environmental Issues Phase I – Formulate Project Goals and Objectives (June – July 2008) • • • Public Workshop Evaluation Criteria Study Goals and Objectives and Screening Process Phase II – Definition and Evaluation of Alternatives (July – Dec. 2008) • • • Public Workshop Final Set of Alternatives Environmental Screening Report Phase III – Conclusions and Recommendations (Jan. 2009 – March 2009) • • Final Analysis Final Report No, an extension of VRE to Dulles International Airport is out of the scope of the study.