PUBLIC WORKSHOP VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis

advertisement
\\Mabos\projects\10512.00\GIS\project\Base_Overview_Handout.mxd
55
U
V
t
An
io
ch
W
as
h in
g
ton
St
Haymarket
W
29
H
Lee
U
V
wy
Manassas
Manassas National
National 234
Battlefield
Battlefield Park
Park
t
u
Balls Ford Rd
Balls Ford
Tho
roug
ley R
d
g to
nR
lle
n
Lomo
Rd
r
d
Av
e
ve
Grant A
Center
St
Rd
nt
Vi
ll R
Hi
0.75
1.5 Miles
Existing
Manassas
Park Station
Manassas
Park
Centreville
Manassas
Existing
Manassas Station
For more information contact us at 703.684.1001,
gotrains@vre.org, or check the VRE web site at www.vre.org
VRE Gainesville-Haymarket
Extension Feasibility Study/
Alternatives Analysis
Study Area Locus Map
Norfolk Southern B Line and
Existing VRE Manassas Line
Vanasse Hangen Brustlin, Inc.
0
Loch Lomond
Yorkshire
Park
Bull
Bull Run
Run
Regional
Regional Park
Park
r ia
Sudley
Li
be
Ben
Ben Lomond
Lomond
Regional
Regional Park
Park
's D
West Gate
d Dr
Bull Run
svi
Ha
stin
g
Manassas Regional/
Harry P Davis Field
ke
No
R
ton
mp
l
Co
ria
mo
Me
Close
rtis
9:00 p.m.
Cu
Small Group Report Outs
We
llin
28
U
V
66
8:30 p.m.
§
¦
¨
Small Group Discussions
Sud
e
hfar
234
U
V
7:30 p.m.
d
Q&A
Rd
Nissan
Nissan
Pavilion
gto Pavilion
nR
d
ll
7:15 p.m.
vil
le
ell
in
Ha
Project Presentation
ntr
e
Norfolk Southern ‘B’ Line
Lin
ton
Rd
Linton Hall
7:05 p.m.
Ce
Gainesville
Lake
Lake Manassas
Manassas
215
Welcome
r
Agenda
Existing Broad
Run Station
7:00 p.m.
in D
PUBLIC WORKSHOP
U
V
Bristow
Norfolk Southern Main Line
r
Open House
Go
dw
Jo hn Marshall Hwy
15
t
u
Vint
Vint Hill
Hill
Farms
Farms Station
Station
Source: ESRI Streetmap 9.1 (2005)
Bethlehem Rd
6:30 p.m.
rD
an
o
M
ey
dl
Su
VRE Gainesville-Haymarket Extension
Feasibility Study and Alternatives Analysis
Un
ive
Blv rsity
d
Stonewall Jackson High School
Wednesday, July 30th, 2008
6:30-9:00 p.m.
!
(
s M adison Hwy
me
Ja
Rd
lin
a
Ol
dC
aro
Rd
d
!
(
What is the Study?
Frequently Asked Questions
T
When will service begin?
he Virginia Railway Express (VRE) is conducting a Feasibility Study/Alternatives Analysis
for a proposed new branch of service, approximately eleven (11) miles in length. This
study
s
is being done to evaluate the feasibility and
desirability
of adding this new branch of service,
d
as
a well as to meet the requirements of the Federal
Transit
Administration (FTA) for potential project
T
funding.
This new branch may potentially run
f
from
the existing Manassas Station in the City
f
of
o Manassas to the Town of Haymarket, located
in Prince William County, Virginia, along Norfolk
Southern’s
“B” Line and may potentially include
S
up to three new stations.
VRE is in the early stages of researching the feasibility of adding this new branch of service.
As such, a date for the start of this proposed new service has not yet been determined.
Where will stations/stops be located?
VRE is in the process of conducting a feasibility study/alternatives analysis for adding
this new branch of service. This study involves creating screening criteria for evaluating
potential station/stop sites. The screening criteria are being established, but no sites have
been selected.
Is the project funded for construction?
As part of the feasibility study/alternatives analysis, VRE is exploring a variety of alternatives,
including cost estimates for each of these alternatives. Specific funding sources will be
identified once a preferred alternative is selected.
Project Schedule
Will new track be needed?
The project is scheduled to run from April 2008 to March 2009. In addition to the technical
studies and reviews, there will be several opportunities for your input.
There is existing track but there is a possibility that additional track may be needed. This
could be determined at the conclusion of the feasibility study/alternatives analysis.
Phase I – Data Collection (May – July 2008)
Will the extension
go to Dulles
International
Airport?
•
•
Stakeholder Interviews
Base Mapping and Land Use and Environmental Issues
Phase I – Formulate Project Goals and Objectives (June – July 2008)
•
•
•
Public Workshop
Evaluation Criteria
Study Goals and Objectives and Screening Process
Phase II – Definition and Evaluation of Alternatives (July – Dec. 2008)
•
•
•
Public Workshop
Final Set of Alternatives
Environmental Screening Report
Phase III – Conclusions and Recommendations (Jan. 2009 – March 2009)
•
•
Final Analysis
Final Report
No, an extension
of VRE to Dulles
International Airport
is out of the scope
of the study.
Download