2 PUBLIC WORKSHOP VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis

advertisement
55
\\Mabos\projects\10512.00\GIS\project\Base_Overview_Handout.mxd
John Marshall Hwy
ch
tio
An
15
hfa
roug
Tho
Wa
s
hi
n
g
ton
St
W
Nissan
Nissan
ell
i
n
gto Pavilion
Pavilion
nR
d
Ha
ll
Norfolk Southern ‘B’ Line
Lin
ton
Rd
Linton Hall
29
H
Lee
wy
Manassas
Manassas National
National 234
Battlefield
Battlefield Park
Park
Balls Ford Rd
Balls Ford
234
Existing Broad
Run Station
We
lling
ton
R
28
d
kes
No
Rd
r
sD
r
Sudley
d
Loch Lomond
Center
St
Manassas
nt
Vi
Hi
Existing
Manassas Station
ll R
1.5 Miles
Existing
Manassas
Park Station
0.75
VRE Gainesville-Haymarket
Extension Feasibility Study/
Alternatives Analysis
Study Area Locus Map
Norfolk Southern B Line and
Existing VRE Manassas Line
Vanasse Hangen Brustlin, Inc.
0
For more information contact us at 703.684.1001
gotrains@vre.org, or check the VRE web site at www.vre.org
Manassas
Park
Centreville
Close
Yorkshire
Park
Av
e
West Gate
Lib
er
ia
Bull
Bull Run
Run
Regional
Regional Park
Park
nR
pto
Com rial
mo
Me
rtis
Cu
Q&A
Ben
Ben Lomond
Lomond
Regional
Regional Park
Park
Ha
stin
g'
ville
nd D
Lomo
Bull Run
66
Manassas Regional/
Harry P Davis Field
Small Group Discussions
ve
Grant A
Bristow
Rd
Lake
Lake Manassas
Manassas
Gainesville
Haymarket
2 PUBLIC WORKSHOP
215
Battlefield High School
Wednesday, October 22nd, 2008
6:30-9:00 p.m.
Norfolk Southern Main Line
ley
Sud
d
re R
Vint
Vint Hill
Hill
Farms
Farms Station
Station
Source: ESRI Streetmap 9.1 (2005)
Welcome
Dr
Small Group Report Outs
Rd
vil
le
Ce
ntr
e
Tier 1 Alternatives Analysis Presentation
r
in D
Go
dw
Open House
an
or
Su
dl
ey
M
Agenda
Bet hlehem Rd
VRE Gainesville-Haymarket Extension
Feasibility Study and Alternatives Analysis
Un
ive
Blv rs ity
d
nd
s M adiso n Hwy
me
Ja
d
ina
R
rol
Ca
Old
Rd
d
What is the Study?
Frequently Asked Questions
T
When will service begin?
he Virginia Railway Express (VRE) is conducting a Feasibility Study/Alternatives Analysis
for a proposed new branch of service, approximately eleven (11) miles in length. This
study is being done to evaluate the feasibility and
desirability of adding this new branch of service,
as well as to meet the requirements of the Federal
Transit Administration (FTA) for potential project
funding. This new branch may potentially run
from the existing Manassas Station in the City
of Manassas to the Town of Haymarket, located
in Prince William County, Virginia, along Norfolk
Southern’s “B” Line and may potentially include
up to three new stations.
The study is currently focused on the Alternatives
Analysis, which is a requirement of the FTA for
eligibility of federal funding, and includes reviewing potential transportation strategies that
fulfill the Purpose and Need of the project.
Project Schedule
The project is scheduled to run from April 2008 to March 2009. In addition to the technical
studies and reviews, there will be several opportunities for your input.
Phase I – May 2008 – July 2008
•
•
•
•
Data Collection
Goals and Objectives
Public Workshop
Evaluation Criteria
Phase II – July 2008 – December 2008
• Define/Evaluate Alternatives
• Environmental Report
• Public Workshop
Phase III – January 2009 – March 2009
• Final Analysis and Report
• Public Workshop
• Select Locally Preferred Alternatives
VRE is in the early stages of researching the feasibility of adding this new branch of service.
As such, a date for the start of this proposed new service has not yet been determined.
Where will stations/stops be located?
VRE is in the process of conducting a feasibility study/alternatives analysis for adding
this new branch of service. This study involves creating screening criteria for evaluating
potential station/stop sites. The screening criteria are being established, but no sites have
been selected.
Is the project funded for construction?
As part of the feasibility study/alternatives analysis, VRE is exploring a variety of alternatives,
including cost estimates for each of these alternatives. Specific funding sources will be
identified once a preferred alternative is selected.
Will new track line be needed?
There is existing track but there is a possibility that additional track may be needed. This
could be determined at the conclusion of the feasibility study/alternatives analysis.
Will the extension
go to Dulles
International
Airport?
No, an extension
of VRE to Dulles
International Airport
is out of the scope
of the study.