55 \\Mabos\projects\10512.00\GIS\project\Base_Overview_Handout.mxd John Marshall Hwy ch tio An 15 hfa roug Tho Wa s hi n g ton St W Nissan Nissan ell i n gto Pavilion Pavilion nR d Ha ll Norfolk Southern ‘B’ Line Lin ton Rd Linton Hall 29 H Lee wy Manassas Manassas National National 234 Battlefield Battlefield Park Park Balls Ford Rd Balls Ford 234 Existing Broad Run Station We lling ton R 28 d kes No Rd r sD r Sudley d Loch Lomond Center St Manassas nt Vi Hi Existing Manassas Station ll R 1.5 Miles Existing Manassas Park Station 0.75 VRE Gainesville-Haymarket Extension Feasibility Study/ Alternatives Analysis Study Area Locus Map Norfolk Southern B Line and Existing VRE Manassas Line Vanasse Hangen Brustlin, Inc. 0 For more information contact us at 703.684.1001 gotrains@vre.org, or check the VRE web site at www.vre.org Manassas Park Centreville Close Yorkshire Park Av e West Gate Lib er ia Bull Bull Run Run Regional Regional Park Park nR pto Com rial mo Me rtis Cu Q&A Ben Ben Lomond Lomond Regional Regional Park Park Ha stin g' ville nd D Lomo Bull Run 66 Manassas Regional/ Harry P Davis Field Small Group Discussions ve Grant A Bristow Rd Lake Lake Manassas Manassas Gainesville Haymarket 2 PUBLIC WORKSHOP 215 Battlefield High School Wednesday, October 22nd, 2008 6:30-9:00 p.m. Norfolk Southern Main Line ley Sud d re R Vint Vint Hill Hill Farms Farms Station Station Source: ESRI Streetmap 9.1 (2005) Welcome Dr Small Group Report Outs Rd vil le Ce ntr e Tier 1 Alternatives Analysis Presentation r in D Go dw Open House an or Su dl ey M Agenda Bet hlehem Rd VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Un ive Blv rs ity d nd s M adiso n Hwy me Ja d ina R rol Ca Old Rd d What is the Study? Frequently Asked Questions T When will service begin? he Virginia Railway Express (VRE) is conducting a Feasibility Study/Alternatives Analysis for a proposed new branch of service, approximately eleven (11) miles in length. This study is being done to evaluate the feasibility and desirability of adding this new branch of service, as well as to meet the requirements of the Federal Transit Administration (FTA) for potential project funding. This new branch may potentially run from the existing Manassas Station in the City of Manassas to the Town of Haymarket, located in Prince William County, Virginia, along Norfolk Southern’s “B” Line and may potentially include up to three new stations. The study is currently focused on the Alternatives Analysis, which is a requirement of the FTA for eligibility of federal funding, and includes reviewing potential transportation strategies that fulfill the Purpose and Need of the project. Project Schedule The project is scheduled to run from April 2008 to March 2009. In addition to the technical studies and reviews, there will be several opportunities for your input. Phase I – May 2008 – July 2008 • • • • Data Collection Goals and Objectives Public Workshop Evaluation Criteria Phase II – July 2008 – December 2008 • Define/Evaluate Alternatives • Environmental Report • Public Workshop Phase III – January 2009 – March 2009 • Final Analysis and Report • Public Workshop • Select Locally Preferred Alternatives VRE is in the early stages of researching the feasibility of adding this new branch of service. As such, a date for the start of this proposed new service has not yet been determined. Where will stations/stops be located? VRE is in the process of conducting a feasibility study/alternatives analysis for adding this new branch of service. This study involves creating screening criteria for evaluating potential station/stop sites. The screening criteria are being established, but no sites have been selected. Is the project funded for construction? As part of the feasibility study/alternatives analysis, VRE is exploring a variety of alternatives, including cost estimates for each of these alternatives. Specific funding sources will be identified once a preferred alternative is selected. Will new track line be needed? There is existing track but there is a possibility that additional track may be needed. This could be determined at the conclusion of the feasibility study/alternatives analysis. Will the extension go to Dulles International Airport? No, an extension of VRE to Dulles International Airport is out of the scope of the study.