Department of the Air Force Military Construction and Family Housing Program Fiscal Year (FY) 2001 Budget Estimates Justification Data Submitted to Congress February 2000 Table of Contents Table Of Contents Fiscal Year (FY) 2001 President’s Budget Page Number General Table of Contents ................................................................ 1 Program Summary .............................................................. 3 Militarv Construction State Summary (List of Projects) ....................................... 5 New Mission/Current Mission Exhibit .............................. 13 Installation Index ................................................................ 21 Special Program Considerations: Statements ......................................................................... 23 Congressional Reporting Requirements ........................ 24 Research and Development ............................................. 26 Third Party Financing ..................................................... 27 Appropriation Language .................................................... 29 Inside the United States Construction Projects.. .............. 31 Outside the United States Construction Projects.. ........... 231 Unspecified Minor Construction ....................................... 259 Planning and Design ........................................................... 261 Working Capital Funds Construction Projects.. .............. 263 1 12. DATE MILITARY CONSTRUCTION PROGRAM I I I (computer generated) IAIR FORCE AND LOCATION 14. COMMAND 15. AREA CONSTI 13. INSTALLATION COST INDEX! IAIR FORCE IDSEGO GARCIA, BRITISH INDIAN OCEAN I 2.45 SPACE COMMAND /TERRITORY 16. PERSONNEL PERMANENT STUDENTS 1 SUPPORTED L 1 OFF1 ENL 1 CIV OFF1 ENL ICIVl OFF] ENL ICIVl TOTAL STRENGTH I 241 la. As of 30 SEP 99 1 41 191 11 I Ill II 241 41 19 1 11 lb. End FY 2005 7. INVENTORY DATA ($000) ( 0) la- Total Acreage: (30 SEP 99) 0 Inventory Total As Of: Not Yet In Inventory: 0 Jb. Authorization 1:: Authorization Requested In This Program: 5,475 e. Authorization Included In Following Program: (FY 2002) 0 In Next Three Program Years: 0 If- Planned Deficiency: 500 1% Remaining Ih. Grand Total: 5,975 L 18. PROJECTS REQUESTED IN THIS PROGRAM: FY 2001 ICATEGORY COST DESIGN STATUS i CODE PROJECT TITLE SCOPE ($000) START ~ ___ -CMPL ( II 1422-264 MUNITIONS STORAGE IGLOOS 876 SM 5,475 FEB 99 SEP 001 TOTAL: 5,475 9a. Future Projects: Included in the Following Program (FY 2002) NONE 9b. Future Projects: Typical Planned Next Three Years: 110. Mission or Major Functions: The host squadron provides facilities, Imunitions, vehicles, aerospace ground equipment, supplies and aviation Ifuel to sustain contingency and wartime sortie operations. Additionally, la space operations detachment and a space surveillance detachment are Ilocated at the installation. Ill. Outstanding pollution and safety (OSHA) deficiencies: 11. COMPONENT\ FY 2001 I / 112. I Air pollution: Water pollution: C. Occupational safety d. Other Environmental: Real Property Maintenance 0 0 0 0 0 E: DD FORM 1390, 1 DEC 76 and Previous health: Backlog editions This Installation are obsolete. Page No 231 12. DATE 1 Il. COMPONENT1 FY 2001 MILITARY CONSTRUCTION PROJECT DATA I I I (AIR FORCE (computer qenerated) 13. INSTALLATION AND LOCATION 14. PROJECT TITLE (DIEGO GARCIA, BRITISH INDIAN OCEAN I [MUNITIONS STORAGE IGLOOS 1TERRITORY 5. PROGRAM ELEMENT16. CATEGORY CODE17. PROJECT NUMBER 18. PROJECT COST($OOO) I I I I 5,475 SGER013001 2.80.31 422-264 9. COST ESTIMATES I I I UNIT I COST ITEM IU/M[QUANTITY[ COST I ($000) 4,134 MUNITIONS STORAGE IGLOOS 876 1 4,7191 ISM 1 SUPPORTING FACILITIES I 1,005 I I UTILITIES 1 ( 275) ILS I PAVEMENTS 450) ILS I SITE IMPROVEMENTS 280) ILS I SUBTOTAL I I TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD (6.5%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) I I I L Rej 110. Description of Proposed Construction: inforced concrete munitions [storage igloos, including security measures and all necessary support. Ill. REQUIREMENT: 876 SM ADEQUATE: 0 SUBSTANDARD: 0 IPROJECT: Construct munitions storage igloos. (New Mission) IREQUIREMENT: Adequate storage facilities are required for prepositioning Iprecision-guided munitions to support the bomber Air Expeditionary Force These assets must be stored and maintained ready for use on 1 (A=?) . Iminimal notice in order to support theater objectives requiring bomber AEF [employment. ICURRENT SITUATION: There are no adequate facilities available for Ilong-term storage of precision-guided munitions. The existing USAF (munitions storage site has 36 open-air, bermed magazines, many of them Iwith badly corroded structures due to the salt air environment. Secure, (weatherproof facilities are essential for execution of the AEF operating (concept. IIMPACT IF NOT PROVIDED: Adequate facilities will not be available for lprepositioning of the munitions necessary for employment of the AEF. (Without adequate storage facilities, increased transportation demands will [impede US capability to successfully execute contingency plans requiring IAEF employment. IADDITIONAL: This project meets the criteria/scope specified in Air Force IHandbook 32-1084, "Facility Requirements." All known alternatives were (considered during development of this project. No other option meets the (mission requirements. Therefore, no economic analysis was needed or /performed. A Certificate of Exception has been prepared. PUBLIC WORKS (OFFICER: Cdr Macias,Oll-246-370-4500. Munitions Storage Igloos: 876 SM = 19,429 SF DD FORM 1391, DEC 76 Previous editions are obsolete. Page No 232 t -L Il. COMPONENT/ I I IAIR 13. FY 2001 CONSTRUCTION PROJECT DATA I generated) : AND LOCATION I IDIEGO GARCIA, BRITISH 14. PROJECT TITLE MUNITIONS MILITARY (computer FORCE INSTALLATION DATE 12. I STORAGE INDIAN OCEAN I 1 TERRITORY 15. PROJECT NUMBER I SGER013001 IGLOOS : 112. I a. SUPPLEMENTAL Estimated (1) (2) DATA: Design Data: Status: (a) Date Design Started Parametric Cost Estimates used to develop (b) Percent Complete as of Jan 2000 * (cl Date 35% Designed. *Id) (e) Date Design Complete Energy Study/Life-Cycle analysis was/will (f) Basis: Standard or Definitive Design (b) Where Design Was Most Recently (a) (3) 99 FEB 22 Y 35% 99 DEC 20 00 SEP 01 N be performed costs NO N/A Used - I I ($000) I Total Cost (c) = (a) + (b) or (d) + (e) : Production of Plans and Specifications (a) (b) All Other Design Costs Total (c) (d) Contract In-house (e) 328 1 165 493 411 82 (4) Construction Start 01 MAR (5) Construction Completion 02 SEP * Indicates completion of Project Definition with Parametric Cost Estimate which is comparable to traditional 35% design to ensure valid scope and cost and executability. IIb. /other Equipment associated with appropriations: N/A DD FORM 1391C, DEC 76 this Previous project editions will be provided are obsolete. from Page No 233 11. COMPONENT1 I I IAIR FORCE 13. INSTALLATION 12. DATE I ) MILITARY CONSTRUCTION PROGRAM I (computer qenerated) 15. AREA CONSTI AND LOCATION 14. COMMAND IUNITED STATES AIR I COST INDEX1 I 1.33 IFORCES IN EUROPE IAVIANO AIR BASE, ITALY I 1 SUPPORTED PERMANENT STUDENTS 16. PERSONNEL STRENGTH 1 OFF1 ENL 1 CIV ) OFF1 ENL ICIVl OFF] ENL ]CIV] TOTAL 1 a. As of 30 SEP 99 1 3751 33241 5711 I I I 1101 59911721 5,151 1 110) 59911721 5,127 b. End FY 2005 1 372) 33161 558) 7. INVENTORY DATA ($000) 1,199) Total Acreage: ( la. lb. Inventory Total As Of: (30 SEP 99) 1,385,057 Authorization Not Yet In Inventory: 0 IcId. Authorization Requested In This Program: 8,000 (FY 2002) 12,300 Included In Following Program: le. Authorization If. Planned In Next Three Program Years: 8,300 lg. Remaining Deficiency: 29,750 ]h. Grand Total: 1,443,407 18. PROJECTS REQUESTED IN THIS PROGRAM: FY 2001 (CATEGORY COST DESIGN STATUS ( PROJECT TITLE SCOPE CMPL 1 ~($000) ~START FY 2001 I 1721-312 DORMITORY 102 RM 8,000 JAN 99 SEP 001 TOTAL: 8,000 19a. Future Projects: Included in the Following Program (FY 2002) 1171-475 INDOOR FIRING RANGE 4,100 1,483 SM 1721-312 DORMITORY (102 RM) 102 RM 8,200 I 12,300 TOTAL : (9b.Future Projects: Typical Planned Next Three Years: J 721-312 DORMITORY (102 RM) 102 RM 8,300 110. Mission or Major Functions: The host fighter wing supports two [permanently assigned F-16 squadrons, multiservice/multinational forces in Isupport of OPERATION JOINT GUARD/DELIBERATE GUARD, and hosts Head Quarters I ISixteenth Air Force. 111. Outstanding pollution and safety (OSHA) deficiencies: I Air pollution: 0 Water pollution: 0 Occupational safety and health: 0 d. Other Environmental: 0 112. Real Property Maintenance Backlog This Installation 31,957 I DD FORM 1390, 1 DEC 76 Previous editions are obsolete. Page No 234 Il. COMPONENT1 I I IAIR FORCE (3. INSTALLATION 12. DATE FY 2001 MILITARY CONSTRUCTION PROJECT DATA (computer generated) , PROJECT TITLE AND LOCATION 14. I I I I I I IAVIANO AIR BASE, ITALY (5. PROGRAM ELEMENT(6. CATEGORY CODE(7. I 721-312 2.75.96 IDORMITORY (102 RM) PROJECT NUMBER (8. PROJECT I ASHE013003A 9. COST ESTIMATES I ITEM (FCF BUDGET RATE USED: I IU/M~QUANTITY~ IDORMITORY (102 RM) ( DORMITORY 1 FORCE PROTECTION/ANTITERRORISM [SUPPORTING FAcILrTrEs UTILITIES PAVEMENTS/PARKING SITE IMPROVEMENTS ISUBTOTAL ITOTAL CONTRACT COST INSPECTION AND OVERHEAD (6.5%) ISUPERVISION, (TOTAL REQUEST [TOTAL REQUEST (ROUNDED) ITALIAN LI- ILS I I=-' 1 3,396 ILS I I I ILS I ILS I ILS I I I I I 1 1 1 I / I 1 I 1,932.:900 COST($OOO) I ( 8,000 COST ) I ($000) I I 5,998 1 (5,800) 1 I UNIT I COST I ( 1,708( 1 ( 198) ) I I ) 1,471 ( ( 597) I ( 498) 1 1 ( 7,469376) I1 7,469 1 485 7,954 8,000 1 ' i 110. Description of Proposed Construction: Three-story facility with Ireinforced concrete foundation and floor slabs, masonry walls and pitched Iroof. Includes room-bath/kitchen-room modules, laundry room, storage Iroom, lounge areas, all supporting utilities, and site improvements to /include parking. Force protection measures include laminated glass, Istand-off construction, reinforced walls, and exterior lighting. IAir Conditioning: 150 KW. Grade Mix: 102 El-E4. (11. REQUIREMENT: 1,201 RM ADEQUATE: 404 RM SUBSTANDARD: 0 IPROJECT: Construct a dormitory. (Current Mission) (REQUIREMENT: A major Air Force objective provides unaccompanied enlisted Ipersonnel with housing conducive to their proper rest, relaxation and Ipersonal well-being. Properly designed and furnished quarters providing (some degree of individual privacy are essential to the successful [accomplishment of the increasingly complicated jobs these people must Iperform. As an overseas location with a sensitive mission, the dormitory Imust also be constructed to deter terrorist activity and protect occupants (from terrorist attack. This project is in accordance with the Air Force /Dormitory Master Plan. ICURRENT SITUATION: As verified by the Air Force Dormitory Master Plan, (the base has insufficient facilities to adequately accomodate permanent lparty unaccompanied enlisted personnel required to live on-base per Air IForce policy. [IMPACT IF NOT PROVIDED: Adequate living quarters will continue to be (unavailable resulting in degradation of morale, productivity, and career (satisfaction for unaccompanied enlisted personnel. Lowered morale will (contribute to retention difficulties for the Air Force. DD FORM 1391, DEC 76 Previous editions are obsolete. Page No : - 235 I Il. I IAIR 13. 12. DATE COMPONENT1 FY 2001 MILITARY CONSTRUCTION (computer qenerated) AND LOCATION I FORCE INSTALLATION I IAVIANO AIR 14. PROJECT BASE, TITLE PROJECT DATA ITALY 15. I DORMITORY (102 RM) PROJECT NUMBER DEC 76 Previous editions are obsolete. 1 ASHE013003A IADDITIONAL: This project meets the criteria/scope specified in the new Iuniform barracks standard known as "one-plus-one" established by OSD. IThis project is not NATO eligible because NATO beddown requirements are (currently met or programmed for construction. All known alternatives were [considered during the development of this project. No other option could lmeet mission requirements. Therefore, no economic analysis was needed or Iperformed. FY 1998 Unaccompanied Housing RPM Conducted: $2X. FY 1999 /Unaccompanied Housing RPM Conducted: $2,649K. Future Unaccompanied IHousing RPM requirements (Estimated): FY00=$38K; FY01=$42K; FY02=$80K; IFY03=$85K; BASE CIVIL ENGINEER: Lt Co1 Mark Correll, 011-39-434-66-7500. IDormitory: 3,396 SM = 36,541 SF. I DD FORM 1391C, 1 I I ( I Page No 236 (1. 12. DATE COMPONENT1 FY 2001 MILITARY CONSTRUCTION (computer generated) AND LOCATION I I IAIR FORCE 13. INSTALLATION PROJECT DATA I I [AVIANO AIR 14. PROJECT BASE, TITLE ITALY 15. I I IDORMITORY (102 RM) SUPPLEMENTAL DATA: Estimated Design Data: (1) (2) NUMBER 1 ASHE013003A Design, Bid, Build Status: Date Design Started (a) (b) Parametric Cost Estimates used to develop Percent Complete as of Jan 2000 * (cl Date 35% Designed. *(d) Date Design Complete. (e) (f) Energy Study/Life-Cycle analysis was/will Basis: (a) Standard or (b) Where Design PROJECT Definitive Was Most Design Recently 99 JAN 26 Y 15% 99 DEC 15 00 SEP 01 Y be performed costs YES AVIANO Used - ( I ($000) I Total Cost (c) = (a) + (b) or (d) + (e) : Production of Plans and Specifications (a) (b) All Other Design Costs Total (c) Contract (d) In-house (e) c3a) Construction Contract Award Date Construction Start (4) (3) (5) Construction 480 1 240 1 720 600 120 01 MAY 01 JUN 02 AUG Completion * Indicates completion of Project Definition with Parametric Cost Estimate which is comparable to traditional 35% design to ensure valid scope and cost and executability. lother Equipment associated with appropriations: N/A DD FORM 1391C, DEC 76 this Previous project editions will be provided are obsolete. from Page No 237 Il. I /AIR 13. 12. COMPONENT1 FY 2001 I FORCE INSTALLATION MILITARY CONSTRUCTION (computer AND LOCATION I IKUNSAN AIR BASE, 1‘3. PERSONNEL STRENGTH a. As of 30 SEP 14. COMMAND KOREA PERMANENT 1 OFF1 ENL 1 CIV IN THIS PROGRAM: 15. AREA CONST I COST INDEX 1.07 PACIFIC AIR FORCES STUDENTS 1 SUPPORTED OFF/ ENL (CIVI OFF] ENL ICIVl 99 REQUESTED 1 I 1 131 131 PROJECT TOTAL 1531 131 1531 131 3,044 3,002 : (FY 2002) 0 6,400 0 6,900 0 9,500,905 1841-165 ($000) TITLE DESIGN ~START STATUS -CMPL UPGRADE SYSTEM WATER DISTRIBUTION LS 6,400 JAN 99 AUG TOTAL: 6,400 Future Projects: Included in the Following Program (FY 2002) NONE 1:;: Future Projects: Typical Planned Next Three Years: 1721-312 DORMITORY 100 RM 6,900 110. The host fighter wing supports two F-16 Mission or Major Functions: [squadrons. A joint use agreement with Korea permits use of the runway by (Korean civil air carriers. Ill. Outstanding pollution and safety (OSHA) deficiencies: I I 112. 1 FY 2001 1 I I / 1 9,487,605 COST (CODE I generated) 1 2151 23051 3451 1 3441 b. End FY 2005 1 2081 22711 7. INVENTORY DATA ($000) ( 2,557) la. Total Acreage: lb. Inventory Total As Of: (30 SEP 99) Not Yet In Inventory: Ic- Authorization Id. Authorization Requested In This Program: Included In Following Program: le. Authorization If. Planned In Next Three Program Years: lg. Remaining Deficiency: Ih. Grand Total: 18. PROJECTS ICATEGORY DATE I PROGRAM Air pollution: Water pollution: safety and health: c- Occupational d. Other Environmental: Real Property Maintenance Backlog This 0 0 0 0 b. a* DD FORM 1390, 1 DEC 76 Previous editions Installation are obsolete. 70,405 Page No 238 OOi I I Il. I IAIR 13. 12. COMPONENT1 FY 2001 I FORCE INSTALLATION I IKUNSAN AIR 15. PROGRAM 2.75.96 MILITARY CONSTRUCTION (computer PROJECT DATA 14. BASE, KOREA ELEMENT16. CATEGORY I 841-165 PROJECT TITLE IUPGRADE WATER DISTRIBUTION [SYSTEM PROJECT NUMBER 18. PROJECT COST($OOO) CODE17. I COST I I ITEM IUPGRADE WATER DISTRIBUTION SYSTEM 1 NEW WATER MAINS 1 WATER STORAGE TANK 1 PRESEDIMENTATION BASIN [SUPPORTING FACILITIES 1 SITE IMPROVEMENTS 1 PAVEMENTS FORCE PROTECTION I ANTITERRORISM / SUBTOTAL (TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD TOTAL REQUEST TOTAL REQUEST (ROUNDED) RATE USED: 1 UNIT 1 U/MIQUANTITYj : Is I LM KL ml 1 13,777 I 1,893 620 COST I 1 1 1 : 193 1,264 1,176 I LS I LS I LS I I (6.5%) 1 1 I I I Won 1, 149.8000 I I I I COST ($000) 5,781 (2,659) (2,393) ( 729) 257 ( 100) ( 105) (--.- 52) 6,038 6,038 ___392 6,430 6,400 i Description of Proposed Construction: Construct elevated water : 10. storage tank and presedimentation basin in existing plant complex, replace existing mains and install new mains in aircraft parking areas and along I perimeter road. Antiterrorism force protection measures in accordance Force Protection Guide. All necessary support. 1 with the USAF Installation 11. REQUIREMENT: As required. PROJECT: Upgrade water distribution system. (Current Mission) REQUIREMENT: A reliable and survivable water supply is essential to support the mission of this warfighting base. Additional water mains and hydrants are necessary to provide fire protection for parked aircraft. Additional water storage is required to provide adequate storage capacity (and pressure for firefighting. A new supply line and presedimentation /basin are needed to improve reliability, quantity, and quality of treated (water available to meet mission requirements. Antiterrorism force Iprotection measures are based on a joint staff-directed vulnerability (assessment. (CURRENT SITUATION: Existing water capacity is well below needed (quantities for normal use plus emergency contingency requirements. There [are no hydrants in the hardened aircraft parking areas for firefighting. IIMPACT IF NOT PROVIDED: Water supply and distribution deficiencies will [continue to compromise safety, placing personnel and aircraft at risk and (jeopardizing mission accomplishment. [ADDITIONAL: This project meets scope/criteria specified in Air Force (Handbook 32-1084, "Facility Requirements." This project was submitted (unsuccessfully for host nation funding. Only $30M is available annually (for host nation funded construction. A host-nation funded project Iprogrammed for CY99 will replace existing deteriorated water mains. This DD FORM 1391, DEC 76 Previous editions are obsolete. c 1 6,400 MLWR013105 ESTIMATES I BUDGET I generated) AND LOCATION 9. FCF DATE Page No 239 1 Il. I IAIR 13. I COMPONENT1 12. FY 2001 MILITARY CONSTRUCTION (computer generated) AND LOCATION I FORCE INSTALLATION IKUNSAN AIR 14. PROJECT BASE, TITLE PROJECT DATA DATE I I KOREA UPGRADE WATER DISTRIBUTION (5. I SYSTEM PROJECT NUMBER ( MLWR013105 [project adds a vital flightline fire protection capability and improves )the reliability of the water supply system. A preliminary analysis of /options for satisfying this requirement indicates that only one option (will meet mission needs. Therefore a complete economic analysis was not [performed. A certificate of exception has been prepared. BASE CIVIL IENGINEER: Lt Co1 Desport 011-82-654-470-5400. New Water Mains: 13,777 LM I= 45,200 LF; Water Storage Tank: 1,893 KL = 500,000 GAL; Presedimentation IBasin: 620 KL I DD FORM 1391C, DEC 76 Previous editions are obsolete. Page No 240 Il. 12. COMPONENT1 FY 2001 MILITARY CONSTRUCTION PROJECT I I (computer generated) .' JAIR FORCE 13. INSTALLATION AND LOCATION I JKUNSAN AIR BASE, KOREA 14. PROJECT TITLE DATA I IUPGRADE WATER DISTRIBUTION 15. DATE I PROJECT I 1 NUMBER I I MLwR013105 SYSTEM I I 112. SUPPLEMENTAL Estimated / DATA: Design Design, Bid, Build Data: a (1) Status: Date Design Started (a) Parametric Cost Estimates used to develop (b) Percent Complete as of Jan 2000 * (cl Date 35% Designed. *(d) Date Design Complete (e) Energy Study/Life-Cycle analysis was/will (f) 99 JAN 29 1 y I costs 15% 99 DEC 30 00 AUG 15 Y be performed / (2) Basis: (a) Standard or Definitive Design (b) Where Design Was Most Recently NO N/A Used - ($000 1 384 192 576 476 100 00 DEC 01 JAN 1 (3) Total Cost (c) = (a) + (b) or (d) + (e): (a) Production of Plans and Specifications (b) All Other Design Costs (c) Total (d) Contract In-house (e) (3a) Construction Contract Award Date Construction Start (4) (5) Construction Completion 02 AUG 1 * Indicates completion of Project Definition with Parametric Cost Estimate which is comparable to traditional 35% design to ensure valid scope and cost and executability. /b. lother Equipment associated with appropriations: N/A DD FORM 1391C, DEC 76 this Previous project editions will are be provided obsolete. from Page No 241 Il. COMPONENT1 I I (AIR FORCE 13. INSTALLATION 12. FY 2001 MILITARY CONSTRUCTION (computer qenerated) PROGRAM 14. COMMAND DATE I 15. AREA CONST COST INDEX I 1.06 PACIFIC AIR FORCES IOSAN AIR BASE, KOREA ) SUPPORTED PERMANENT STUDENTS 16. PERSONNEL L OFF1 ENL ]CIVl OFF1 ENL ICIVl TOTAL 1 OFF1 ENL 1 CIV STRENGTH 1 5771 47161 6701 a. As of 30 SEP 99 I I 110841 483815951 12,480 110841 483815951 12,221 1 5501 44931 6611 b. End FY 2005 7. INVENTORY DATA ($000) ( 1,777) la. Total Acreage: 3,671,893 (30 SEP 99) lb. Inventory Total As Of: 0 Not Yet In Inventory: lc- Authorization 21,948 Id. Authorization Requested In This Program: (FY 2002) 12,000 Included In Following Program: le. Authorization If. Planned In Next Three Program Years: 25,800 0 lg. Remaining Deficiency: Ih. Grand Total: 3,731,641 18. PROJECTS REQUESTED IN THIS PROGRAM: FY 2001 : [CATEGORY COST DESIGN STATUS I PROJECT TITLE SCOPE -($000) ~START -CMPL 1721-312 1841-165 I AND LOCATION DORMITORY UPGRADE WATER DISTRIBUTION SYSTEM 156 RM LS I 11,348 10,600 JAN 99 JAN 99 AUG 001 AUG 001 TOTAL: 21,948 Following Program (FY 2002) 156 RM 12,000 TOTAL : 12,000 19b. Future Projects: Typical Planned Next Three Years: 1721-312 DORMITORY 156 RM 12,900 1721-312 DORMITORY 156 RM 12,900 110. Mission or Major Functions: The host fighter wing supports an F-16 Isquadron, and an A/OA-10 squadron. The installation also hosts /Headquarters, Seventh Air Force and a special operations squadron 1 (MH-53J). Other major activities include a civil engineering heavy repair Isquadron (RED HORSE), an Air Mobility Command air mobility support Isquadron; an Air Combat Command reconnaissance squadron, and an intelligence squadron. 111. Outstanding pollution and safety (OSHA) deficiencies: 19a. Future Projects: (721-312 DORMITORY I I 1 (12. Included Air pollution: Water pollution: C. Occupational safety b. d. Other Environmental: Real Property Maintenance in the a. DD FORM 1390, 1 DEC 76 0 0 0 0 and health: Previous Backlog editions This Installation are obsolete. I I / 75,650 Page No I I 242 Il. COMPONENT1 I I [AIR FORCE INSTALLATION 13. I IOSAN 15. FY 2001 MILITARY CONSTRUCTION (computer CATEGORY TITLE 14. PROJECT I [DORMITORY (156 RM) PROJECT NUMBER'l8. PROJECT CODE17. I I 721-312 2.75.96 9. COST 12. I DATA DATE qenerated) AND LOCATION AIR BASE, KOREA PROGRAM ELEMENT16. PROJECT COST($OOO) 1 I sMyu973011 ESTIMATES 11,348 L I I ITEM IDORMITORY (156 RM) ISUPPORTING FACILITIES 1 UTILITIES/PAVEMENTS SITE IMPROVEMENTS DEMOLITION/ASBESTOS REMOVAL COMMUNICATIONS ANTITERRORISM/NBC FORCE PROTECTION SUBTOTAL TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD TOTAL REQUEST TOTAL REQUEST (ROUNDED) IU/MIQUANTITYI ISM I IILS ILS I I I I I I I UNIT 5,460 1 I cosT 1,7391 I ( I I ( (6.5%) : 250 110 100 100 ILS I ILS I I I COST ($000) 9,495 1,160 600 I 10,655 10,655 693 11,348 11,348 / FCF BUDGET RATE USED: Won 1,149.8000 l- 110. Description of Proposed Construction: A four-story facility with [reinforced concrete foundation and floor slabs, masonry walls and roof. IIncludes room-bath/kitchen-room modules, laundries, storage and lounge Iarea and all supporting facilities. Antiterrorism force protection (measures in accordance with the USAF Installation Force Protection Guide. IAir Conditioning: 400 KW. Grade Mix: 156 El-E4. I (11. REQUIREMENT: 5,114 RM ADEQUATE: [PROJECT: Construct a dormitory (Current IREQUIREMENT: A major Air Force objective 3,856 RM SUBSTANDARD: 0 Mission) is to provide unaccompanied lenlisted personnel with housing conducive to their proper rest, relaxation land personal well-being. Properly designed and furnished quarters Iproviding some degree of individual privacy are essential to the Isuccessful accomplishment of the increasingly complicated and important (jobs these people must perform. This project is in accordance with the (Air Force Dormitory Master Plan. Antiterrorism force protection Irequirements are based on a joint staff-directed installation Ivulnerability assessment. [CURRENT SITUATION: As verified by the Air Force Dormitory Master Plan, ]the The base has insufficient facilities to adequately accommodate Ipermanent party unaccompanied enlisted personnel required to live on-base [per Air Force policy. IIMPACT IF NOT PROVIDED: Adequate living quarters will continue to be Iunavailable resulting in degradation of morale, productivity, and career Isatisfaction for unaccompanied enlisted personnel. Low morale will Icontribute to retention difficulties for the Air Force. IADDITIONAL: This Project meets the criteria/scope specified in the new DD FORM 1391, DEC 76 Previous editions are obsolete. Page No 243 11. COMPONENT1 FY 2001 MILITARY CONSTRUCTION I I (computer generated) IAIR FORCE INSTALLATION AND LOCATION 13. I IOSAN AIR BASE, KOREA (156 RM) 14. PROJECT TITLE I IDORMITORY 12. PROJECT DATA 15. DATE I PROJECT NUMBER I 1 I SMYU973011 I Iuniform barracks construction standard, known as "one plus one," This project is eligible for host nation funding. To Iestablished by OSD. Iconstruct the needed dormitories in a reasonable time this dorm is Isubmitted in the MILCON program. All known alternatives were considered Iduring the development of this project. No other option could meet Imission requirements, therefore no economic analysis was performed. A FY 1998 Unaccompanied Housing Icertificate of exception has been prepared. [RPM conducted:$2,248K. FY 1999 Unaccompanied Housing RPM conducted: 1$825~. Future Unaccompanied Housing RPM requirements (estimated): FYOO: I$~,sIEK; FYOl: $2,40OK; FY02: $2,453K; FY03: $2,507K. BASE CIVIL IENGINEER: Lt co1 Hicks, 011-82-333-661-4312. Domitory: 5,460 SM = 58,400 DD FORM 1391C, DEC 76 Previous editions are obsolete. Page No 244 I PROJECT :- DATA 15. I I IDORMITORY 112. a. (I56 DATE 12. Il. COMPONENT1 FY 2001 MILITARY CONSTRUCTION I I (computer generated) JAIR FORCE 13. INSTALLATION AND LOCATION I IOSAN AIR BASE, KOREA 14. PROJECT TITLE RM) SUPPLEMENTAL DATA: Estimated Design Data: I PROJECT NUMBER 1 sMYU973011 Design, Bid, Build 1 (1) (2) Status: (a) Date Design Started (b) Parametric Cost Estimates used to develop Percent Complete as of Jan 2000 l (cl Date 35% Designed. *(d) Date Design Complete (e) Energy Study/Life-Cycle analysis was/will (f) Basis: (a) Standard or (b) Where Design Definitive Was Most Design Recently 99 JAN 29 1 Y I 15% 99 DEC 30 00 AUG 15 Y be performed costs Used - (3) Total Cost (c) = (a) + (b) or (d) + (e): Production of Plans and Specifications (a) (b) All Other Design Costs (c) Total (d) Contract In-house (e) @a) Construction Contract Award Date Construction Start (4) (5) Construction Completion YES OSAN ($000) 681 340 1021 I 921 1 100 I OONOV * Indicates completion of Project Definition with Parametric Cost Estimate which is comparable to traditional 35% design to ensure valid scope and cost and executability. . lb. Equipment associated with this project will be provided from lother appropriations: N/A DD FORM 1391C, DEC 76 Previous editions are obsolete. 1 00 DEC 1 I 02 DEC 1 Page No 245 Il. COMPONENT1 I I IAIR FORCE 13. INSTALLATION FY 2001 MILITARY CONSTRUCTION PROGRAM (computer generated) AND LOCATION 14. COMMAND I 16. PERSONNEL PERMANENT STUDENTS ) OFF1 ENL 1 CIV OFF! ENL lCIV[ STRENGTH I la. As of 30 SEP 99 1 5771 47161 6701 1 1 ib. End FY 2005 1 550j 44931 6611 7. INVENTORY DATA ($000) J 1,777) Acreage: 1 la. Total lb. Inventory Total As Of: (30 SEP 99) Not Yet In Inventory: Ice Authorization Id. Authorization Requested In This Program: (FY Included In Following Program: le. Authorization If. Planned In Next Three Program Years: lg. Remaining Deficiency: Ih. Grand Total: 18. PROJECTS REQUESTED IN THIS PROGRAM: FY 2001 ICATEGORY SCOPE PROJECT TITLE I- CODE 1721-312 1841-165 DORMITORY UPGRADE WATER DISTRIBUTION SYSTEM I 19a. Future Projects: 1721-312 DORMITORY Included in 156 RM LS (2. I DATE 15. AREA CONST( I COST INDEX\ 1 SUPPORTED OFF! ENL (CIVI 110841 483815951 )1084[ 483815951 TOTAL I 12,4801 12,221 1 : 3,671,893 0 2002) 21,948 12,000 25,800 0 1 3,731,641 COST ($000) DESIGN STATUS START CMPL - 11,348 10,600 JAN 99 JAN 99 I AUG 001 AUG 001 I the Following Program (FY 2002) 156 RM 12,000 TOTAL: 12,000 )9b. Future Projects: Typical Planned Next Three Years: 156 RM 12,900 1721-312 DORMITORY 1721-312 DORMITORY 156 RM 12,900 110. Mission or Major Functions: The host fighter wing supports an F-16 Isquadron, and an A/OA-10 squadron. The installation also hosts IHeadquarters, Seventh Air Force and a special operations squadron 1 (MH-53J). Other major activities include a civil engineering heavy repair Isquadron (RED HORSE), an Air Mobility Command air mobility support Isquadron; an Air Combat Command reconnaissance squadron, and an intelliqence squadron. Ill. Outstanding pollution and safety (OSHA) deficiencies: I I I 112. Air pollution: Water pollution: C. Occupational safety d. Other Environmental: Real Property Maintenance 0 0 0 0 it: DD FORM 1390, 1 DEC 76 and health: Previous Backlog editions This Installation are obsolete. 75,650 Page No 246 I Il. I IAIR 13. (2. COMPONENT1 I FORCE INSTALLATION FY 2001 CONSTRUCTION (computer I 2.75.96 CATEGORY PROJECT I 9. COST IUPGRADE WATER DISTRIBUTION SYSTEM REPLACE WATER DISTRIBUTION MAINS NEW WATER DISTRIBUTION MAINS ADD/ALTER WATER TREATMENT PLANT JSUPPORTING FACILITIES 1 ANTITERRORISM FORCE PROTECTION 1SUBTOTAL ITOTAL CONTRACT COST ISUPERVISION, INSPECTION AND OVERHEAD ITOTAL REQUEST ITOTAL REQUEST (ROUNDED) FCF BUDGET RATE USED: DATE I TITLE 14. PROJECT (UPGRADE WATER DISTRIBUTION ISYSTEM PROJECT NUMBER 18. PROJECT COST($OOO) CODE17. 841-165 DATA generated) AND LOCATION I IOSAN AIR BASE, KOREA 15. PROGRAM ELEMENT16. I 1 MILITARY 10,600 sMYu973040 ESTIMATE; s UNIT COST I I I:U/MjQUANTITY LS I LM 1 61,162 MI SM I I LS I COST ($000) 9,945 140 140 1,026 1,400 1,156 ( ( 8,563) 196) ( 1,186) ( 100 100) 10,045 10,045 653 (6.5%) 1 10,698 10,600 Won 1,149.8000 I I I I I I Description of Proposed Construction: Replace distribution lines, [valves and hydrants, extend mains to north end of runway with new valves, and connections. Ihydrants, Add to and alter the existing water treatment including addition of automated water treatment controls. I plant, IAntiterrorism measures are in accordance with the USAF Installation Force IProtection Guide. Ill. REQUIREMENT: As required. [PROJECT: Upgrade water distribution system. (Current Mission) IREQUIREMENT: A reliable, survivable water supply is essential to support [the mission of this warfighting base. The system extension to the north lend of the runway is needed to provide firefighting capability to Patriot /missile sites. Antiterrorism requirements are based on a joint Istaff-directed installation vulnerability assessment. ICURRENT SITUATION: The existing system is 43 years old and does not have ladequate capacity to meet current firefighting flow requirements. Patriot Imissile sites north of the runway have no water for firefighting, Jequipment, or drinking. Pipes weakened by age and corrosion cannot /withstand incoming water pressures, fail frequently, and cause lengthy [outages. An insufficient number of isolation valves causes large areas of /the base to lose service during repairs. IIMPACT IF NOT PROVIDED: Fire protection will continue to be compromised /in peacetime and remain inadequate for warfighting, placing personnel and [assets at risk and jeopardizing mission accomplishment. IADDITIONAL: This project meets the scope/criteria specified in Air Force /Handbook 32-1084, "Facility Requirements." A preliminary analysis of Ioptions for satisfying this requirement was completed. Only one option satifies mission requirements. Therefore, a full economic analysis was DEC 76 Previous editions I I 110. DD FORM 1391, 1 I I are obsolete. I I I ( 1 Page No 247 (1. COMPONENT1 FY 2001 MILITARY CONSTRUCTION I I IAIR FORCE (computer qenerated) INSTALLATION AND LOCATION 13. I IOSAN AIR BASE, KOREA 14. PROJECT TITLE PROJECT DATA 15. 12. DATE I PROJECT NUMBER 1 I UPGRADE WATER DISTRIBUTION SYSTEM sMYu973040 lnot performed. A certificate of exception has been prepared. Host-nation [funded projects will replace most of the existing system by FY03. Greater [water demand from new construction and base growth increases the need to Iupgrade the deteriorated system. Host-nation funding at an annual level lof $30M is inadequate for timely completion. BASE CIVIL ENGINEER: Lt Co1 [Hicks, 011-82-333-661-4312. Replace Water Mains: 61,162 LM = 200,000 LF; [New Water Mains: 1,400 LM = 4578 LF; Add/alter Water Treatment Plant: 11,156 SM = 12,370 SF. DD FORM 1391C, DEC 76 Previous editions are obsolete. Page No I 1 I I ) 248 Il. I IAIR 13. jOSAN 14. COMPONENT1 FY 2001 I MILITARY CONSTRUCTION (computer FORCE INSTALLATION PROJECT generated) DATA 112. I a AND LOCATION WATER Estimated (34 (5) SYSTEM DATA: Design PROJECT t I I sMYu973040 Design, Bid, Build Basis: (a) Standard or Definitive Design Where Design Was Most Recently (b) 99 JAN 29 Y costs 15% 99 DEC 30 00 AUG 15 Y be performed NO N/A Used - Total Cost (c) = (a) + (b) or (d) + (e): (a) Production of Plans and Specifications (b) All Other Design Costs (c) Total (d) Contract In-house (e) Construction Contract Award Date Construction Start Construction NUMBER Data: Status: (a) Date Design Started Parametric Cost Estimates used to develop (b) Percent Complete as of Jan 2000 * (cl Date 35% Designed. *(d) Date Design Complete (e) Energy Study/Life-Cycle analysis was/will (f) (3) (4) ’ I DISTRIBUTION SUPPLEMENTAL (2) I 15. I (1) I - AIR BASE, KOREA PROJECT TITLE I IUPGRADE DATE 12. I ($000) 636 318 954 854 100 00 DEC 01 Completion JAN 03 JAN * Indicates completion of Project Definition with Parametric Cost Estimate which is comparable to traditional 35% design to ensure valid scope and cost and executability. lb* lother Equipment associated with appropriations: N/A this project will be provided from I DD FORM 1391C, DEC 76 Previous editions are obsolete. Page No 249 Il. COMPONENT1 I I IAIR FORCE 13. INSTALLATION I IROTA NAVAL AIR 16. PERSONNEL STRENGTH a.Asof30SEP99 b. End FY 2005 12. I FY 2001 DATE MILITARY CONSTRUCTION PROGRAM (computer generated) 15. AREA CONST AND LOCATION 14. COMMAND COST INDEX I IAIR MOBILITY I 1.12 ) COMMAND STATION, SPAIN 1 PERMANENT STUDENTS 1 SUPPORTED 1 OFF1 ENL 1 CIV 1 OFF1 ENL ]CIVl OFF1 ENL ]CIVl TOTAL 130 ( 51 1231 21 I Ill II 130 51 1231 21 7. INVENTORY DATA ($000) Total Acreage: ( 0) Ia. 0 lb. Inventory Total As Of: (30 SEP 99) Authorization Not Yet In Inventory: 0 ICId. Authorization Requested In This Program: 5,052 Included In Following Program: (FY 2002) 34,500 le. Authorization If. Planned In Next Three Program Years: 14,100 lg. Remaining Deficiency: 98,700 Ih. Grand Total: 152,352 IS. PROJECTS REQUESTED IN THIS PROGRAM: FY 2001 ICATEGORY DESIGN STATUS COST CODE PROJECT TITLE START SCOPE ($000) -CMPL I(211-174 ENHANCED ROTA, VARIOUS LS 5,052 MAY 99 SEP 00 FACILITIES I TOTAL : 5,052 19a. Future Projects: Included in the Following Program (FY 2002) 1113-321 AIRCRAFT PARKING APRON,1 LS 34,500 PHASE 1 I TOTAL: 34,500 19b. Future Projects: Typical Planned Next Three Years: 1113-321 AIRCRAFT PARKING APRON, LS 14,100 PHASE 2 110. Mission or Major Functions: Enroute support for airlift and tanker laircraft. AMC air mobility support squadron and medical detachment are [assigned. Ill. Outstanding pollution and safety (OSHA) deficiencies: I I a- Air pollution: Water pollution: C. Occupational safety d. Other Environmental: Real Property Maintenance 0 0 0 0 0 b. 112. DD FORM 1390, 1 DEC 76 and health: Previous Backlog editions This Installation are obsolete. Page No 250 12. DATE FY 2001 MILITARY CONSTRUCTION PROJECT DATA I I I (computer generated) JAIR FORCE 14. PROJECT TITLE 13. INSTALLATION AND LOCATION IENHANCED ROTA, vARIous I IFACILITIES IROTA NAVAL STATION, SPAIN COMPONENT! Il. Is* PROGRAM ELEMENT16. CATEGORY I 4.18.96 CODE17. PROJECT NUMBER I I I ISM I=' ISM I=' 1 1 ISM ISM INSPECTION AND OVERHEAD (6.5%) 738 7251 1,4011 459 164 111 4501 1,578) 6881 I I ILS I 1 I ( I I / Peseta 165.3000 1 1 COST 3,542 620) ( 535) ( 643) 74) ( ( 50) (1,300) I ( 320) 1,202 (1,202) 4,744 4,744 308 5,052 5,052 ( 4511 / I FCF BUDGET RATE USED: 1 ($000) 1,480i REQUEST [TOTAL REQUEST (ROUNDED) 1 COST 419 824 465 ISM IMPROVEMENTS UNIT I I LS SUPPORTING FACILITIES [TOTAL 5,052 /U/M(QUANTITY ITEM 1 IENHANCED ROTA, VARIOUS FACILITIES AIRCRAFT MAINTENANCE FORWARD SUPPLY WAREHOUSE . POL OPERATIONS FUEL FILTER FACILITY TRUCK REFUEL FACILITY FLEET POST OFFICE AERO CLUB HANGAR (SUPERVISION, COST($OOO) ASKE013001 ESTIMATES COST I UTILITIES/PAVEMENTS/SITE SUBTOTAL TOTAL CONTRACT COST PROJECT I 211-174 9. 18. I I- Description of Proposed Construction: All architectural, civil, Imechanical and electrical work necessary to construct flightline Imaintenance, forward supply warehouse, POL operations, filter shelter, Masonry ltruck refuel facility, fleet post office, and aero club hangar. Jwalls, metal roof. Includes concrete foundations and all supporting Iutilities, pavements, and site prep. 111. REQUIREMENT: As required. IPROJECT: Construct various facilities. (New Mission) /REQUIREMENT: This project is required to replace 7 facilities which are [located on the site of aircraft parking planned for construction in FY02 land FY03. This project supports a two-phase plan to construct 16 aircraft [parking spots with hydrant refueling. The Air Mobility Support Squadron lflightline maintenance facility and the forward supply location warehouse Iwill be relocated adjacent to the flightline and include parking. The POL loperations facility and ancillary structures, the truck refuel facility land the filter shelter will include provisions for a roadway and truck [parking. The fleet post office includes parking. The aero club hangar Iwill replace existing hangar space to be demolished in the second phase of [the apron construction. These 7 facilities must be complete prior to Idemolition of the existing facilities. ICURRENT SITUATION: Rota's 5 widebody aircraft parking spaces cannot meet [projected mission demands for strategic mobility through the Southern [European region. An interservice study of peacetime and contingency plans /determined a need for 16 widebody (2 for dangerous cargo) parking spots [with hydrant refueling. Additionally, current aircraft parking violates /airfield safety criteria and operations are under a waiver. The expansion [of the apron to accommodate the parkinq spots requires the demolition of 7 110. DD FORM 1391, DEC 76 Previous editions are obsolete. 1 Page No 251 Il. COMPONENT1 FY 2001 MILITARY CONSTRUCTION I I (computer qenerated) (AIR FORCE 13. INSTALLATION AND LOCATION I IROTA NAVAL STATION, SPAIN 14. PROJECT TITLE ENHANCED ROTA, VARIOUS PROJECT DATA 15. I FACILITIES 12. I DATE PROJECT NUMBER ASKE013001 I facilities. IIMPACT IF NOT PROVIDED: The existing parking apron at Rota will be Iinsufficient to handle projected peacetime aircraft sorties (10 per day) lor contingency aircraft sorties (up to 40 a day). Aircraft will be towed land refueled by truck, resulting in delayed missions and increased sortie Igeneration time. Widebody aircraft will continue to operate under waivers lfor runway and taxiway safety clearance zones. This project meets the criteria/scope specified in Air Force IADDITIONAL: [Handbook 32-1084, "Facility Requirements.~~ A preliminary analysis of Ireasonable options for accomplishing this project was done. It indicates Ithat new construction is the only option that will meet operational Idemands. Because of this, a full economic analysis was not performed. A [certificate of exception was prepared. The European En-Route Steering (Committee, jointly chaired by EUCOM/J4 and TRANSCOM/J5, validated this This project is not currently eligible for NATO funding, but Iproject. /will be submitted to NATO with a prefinancing statement. Director of /Public Works: CMDR Michael Doyle 011-34-956-82-2343. A/C Maint: 419 SM = 14510 SF;Supply Warehouse: 738 SM = 7944 SF; POL Ops: 459 SM = 4491 SF; IFuel Filter Fat: 164 SM = 1765 SF; Truck RefuelFac: 164 SM = 1765 SF; 465 SM = 5,005 SF IPost Office: 824 SM = 8869 SF; Aero Club: DD FORM 1391C, DEC 76 Previous editions are obsolete. 1 Page No 252 I I I Il. COMPONENT\ FY 2001 MILITARY CONSTRUCTION PROJECT I I (computer generated) IAIR FORCE 13. INSTALLATION AND LOCATION I (ROTA NAVAL STATION, SPAIN 14. PROJECT TITLE ENHANCED 112. ROTA, VARIOUS SUPPLEMENTAL a. Estimated (1) (2) 12. DATA 15. I FACILITIES I PROJECT NUMBER 1 ASKE013001 DATA: Design Design,Bid, Build Data: Status: (a) Date Design Started Parametric Cost Estimates used to develop (b) * (cl Percent Complete as of Jan 2000 Date 35% Designed. *(d) (e) Date Design Complete Energy Study/Life-Cycle analysis was/will (f) Basis: Standard or Definitive Design (a) (b) Where Design Was Most Recently I 99 MAY ( y I 00 00 JAN SEP 15% 30 30 I 1 1 Y I be performed NO N/A Used - Total Cost (c) = (a) + (b) or (d) + (e): (a) Production of Plans and Specifications (b) All Other Design Costs (c) Total (d) Contract In-house (e) (3a) Construction Contract Award Date Construction Start (4) Construction 11 costs ($000) 1 318 1 159 1 (3) (5) DATE 477 357 120 01 APR OlMAY 1 1 ( I ( I Completion 02 MAY 1 * Indicates completion of Project Definition with Parametric Cost Estimate which is comparable to traditional 35% design to ensure valid scope and cost and executability. lb /other I Equipment associated with appropriations: N/A DD FORM 1391C, DEC 76 this Previous project editions will are be provided obsolete. from Page No 253 12. DATE MILITARY CONSTRUCTION PROGRAM I (computer generated) AND LOCATION 14. COMMAND 15. AREA CONSTI (UNITED STATES AIR COST INDEX1 I I ~INCIRLIK AIR BASE, TURKEY IFORCES IN EUROPE 0.91 16. PERSONNEL PERMANENT STUDENTS 1 SUPPORTED STRENGTH 1 OFF1 ENL 1 CIV 1 OFF1 ENL ICIV( OFF! ENL ICIVl TOTAL I la. As of 30 SEP 99 1 1341 12221 2551 I I 1 2111 105412121 3,0881 lb. End FY 2005 1 128) 12461 2551 1 2111 105412121 3,106 7. INVENTORY DATA ($000) Total Acreage: ( 3,328) la. Inventory Total As Of: (30 SEP 99) 1,978,989 c. Authorization Not Yet In Inventory: 0 Ib. Authorization Requested In This Program: 1,000 Included In Following Program: (FY 2002) 5,200 Id.e. Authorization If. Planned In Next Three Program Years: 5,100 lg. Remaining Deficiency: 0 Lh. Grand Total: 1,990,289 18. PROJECTS REQUESTED IN THIS PROGRAM: FY 2001 ICATEGORY COST DESIGN STATUS 1 PROJECT TITLE SCOPE ($000) ~START -CMPL 1 Il. COMPONENT1 I I IAIR FORCE 13. INSTALLATION 1179-511 FY 2001 I FIRE TRAINING 19a. Future Projects: 1442-758 BASE SUPPLY FACILITY LS Included WAREHOUSE in the 1,000 JAN 99 TOTAL : 1,000 Following Program (FY 2002) 7,440 SM 5,200 TOTAL: 5,200 Next Three Years: 2,150 SM 2,100 SEP OOi 19b. Future Projects: Typical Planned 1131-111 CONSOLIDATED COMMUNICATIONS FACILITY I 1872-247 FORCE PROTECTION PERIMETER 80,000 SM 3,000 IMPROVEMENTS 110. Mission or Major Functions: The host wing provides command and Icontrol and logistics support for US forces deployed to Turkey and supports multinational forces in support of 0PmmIoN NoRTHEm WATCH. Ill. Outstanding pollution and safety (OSHA) deficiencies: I 112. Air pollution: Water pollution: Occupational safety d. Other Environmental: Real Property Maintenance and 0 0 0 0 health: Backlog This Installation I 14,808 I DD FORM 1390, I 1 DEC 76 Previous editions are obsolete. Page No 254 Il. 12. COMPONENT1 FY 2001 MILITARY CONSTRUCTION PROJECT DATA I I I (computer generated) [AIR FORCE TITLE 13. INSTALLATION AND LOCATION 14. PROJECT I I ~INCIRLIK AIR BASE, TURKEY IFIRE TRAINING FACILITY 15. PROGRAM ELEMENT16. CATEGORY CODE17. PROJECT NUMBER 18. PROJECT I 1 I I 2.74.56 179-511 9. COST ITEM LJYc003005 ESTIMATES I 1U/M 1,000 I 1UNIT 1 QUANTITY COST I= I ILS ILS ILS ILS I I 1SUBTOTAL ITOTAL CONTRACT COST INSPECTION AND OVERHEAD COST($OOO)I I IFIRE TRAINING FACILITY ISUPPORTING FACILITIES UTILITIES PAVEMENTS SITE IMPROVEMENTS DEMOLITION ISUPERVISION, ITOTAL REQUEST ITOTAL REQUEST DATE (6.5%) (ROUNDED) I COST ($000) i ( 1 ( 1 I 723 231 60) 66) 80) 25) 1 1 ) 1 954 954 II I 62 1,016 / I 1,000 I I FCF BUDGET RATE USED: TURKISH LIRA I I 518,220.OOOO I I I 110. Description of Proposed Construction: Construct a fire training [facility to include: a double lined and environmentally-acceptable fire Itraining pit, aircraft mockup, tank for propane gas, pumps, piping, and Istorage system for fuel and water, lighting, fencing, roads, and all /necessary support. Ill. REQUIREMENT: 1 LS ADEQUATE: 0 SUBSTANDARD: 1 LS [PROJECT: Construct a fire training facility. (Current Mission) [REQUIREMENT: This is a Level I environmental compliance requirement. A [live fire training facility is required to simulate aircraft fires for Ifire training in accordance with Air Force policy. Air Force policy [requires an environmentally acceptable fire training facility at [installations with a flying mission. The policy further prohibits use of Iexisting fire training facilities which do not provide protection against Icontamination of land, water, and air resources. Acceptable fire training Ifacilities include a double-lined impermeable fire pit with a leak Idetection system under the burn area and a water conservation system to Iprevent contamination of land and ground water. Live fire training is an IAir Force and Federal Aviation Administration (FAA) requirement for fire [fighters to maintain a high level of proficiency. [CURRENT SITUATION: The existing facility has been closed since 1993; thus Ilive fire training cannot currently be conducted. Only minimal fire Itraining is conducted using existing mock up structures with no fire or Iheat capability. This training does not fulfill Air Force or FAA Irequirements. There are no other environmentally approved live fire [training facilities in the local area. Long-term off-base training is not Iacceptable because flying and support missions at Incirlik require full jfirefighting capability to respond to base emergencies. DD FORM 1391, DEC 76 Previous editions are obsolete. Page No t -L 255 Il. COMPONENT1 FY 2001 MILITARY CONSTRUCTION I I (computer generated) IAIR FORCE INSTALLATION AND LOCATION 13. I IINCIRLIK AIR BASE, TURKEY 14. PROJECT TITLE FIRE TRAINING PROJECT -. 15. FACILITY DEC 76 12. DATE I PROJECT NUMBER 1 I LJYc003005 IIMPACT IF NOT PROVIDED: Fire fighters will not land FAA quarterly training requirements to remain lcrash fire fighting and rescue techniques. The Ifirefighters and aircraft accident victims will Iby lack of proper training. IADDITIONAL: This project meets the criteria/scope [Handbook 32-1024, "Facility Requirements." This /for NATO funding because fire fighting training Iresponsibility. Base Civil Engineer: Maj Glenn 1011-90-332-346-3657 DD FORM 1391C, DATA Previous editions are be able to meet Air Force proficient in aircraft safety of both the continue to be compromised 1 specified in Air Force project is not eligible is a user-nation Pappas obsolete. Page No 2% Il. COMPONENT\ I I IAIR FORCE 13. INSTALLATION I FY 2001 MILITARY CONSTRUCTION (computer generated) AND LOCATION IINCIRLIK AIR BASE, 14. PROJECT TITLE I 15. SUPPLEMENTAL DATA: Estimated Design Data: (3) @a) (4) (5) FACILITY PROJECT NUMBER ( Design, Bid, Build I Status: (a) Date Design Started Parametric Cost Estimates used to develop (b) Percent Complete as of Jan 2000 * (c) Date 35% Designed. *(d) (e) Date Design Complete Energy Study/Life-Cycle analysis was/will (f) Basis: Standard or (a) Where Design (b) Definitive Was Most Design Recently 99 JAN 26 Y 15% 00 JAN 15 00 SEP 01 be performed costs - NO Used - N/A Total Cost (c) = (a) + (b) or (d) + (e): (a) Production of Plans and Specifications (b) All Other Design Costs Total (c) Contract (d) In-house (e) Construction Contract Award Date Construction Start Construction Equipment associated appropriations: ($000) 60 30 90 75 15 00 DEC 01 JAN Completion 01 AUG * Indicates completion of Project Definition Cost Estimate which is comparable to traditional to ensure valid scope and cost and executability. lother I LJYc003005 112. (2) DATE I TRAINING (1) 12. I DATA TURKEY IFIRE a. PROJECT with N/A this project will with Parametric 35% design be provided from I DD FORM 1391C, DEC 76 Previous editions are obsolete. Page No 257