QUICK SPEC STRUCTURAL CONCRETE – ROOF MATE NOTE: The following “Quick Spec” is an abbreviated specification and is not meant to replace the detailed specification. Read the entire 3-Part CSI System Specification prior to starting the project. Method Spray, roller, or brush Requirements Moisture survey recommended. Roof must be clean, dry, and tight. Adhesion test required to ensure proper adhesion to substrate(s). Apply at 50°F (10°C) and rising with no rain or freezing temperatures in forecast for 24 hours. Concrete must be fully cured (typically 28 days). Application Instructions 1. 2. Conduct moisture survey to ensure concrete contains less than 8% moisture. Repair or replace damaged or deteriorated sections with like materials, allowing cementitious products to cure properly. Power-wash roof. It is recommended to use United Cleaning Concentrate (UCC) to clean the roof. Allow the roof to completely dry. Prime per the chart below. Treat structural joints with backer rod and urethane or silicone sealant, then treat with Roof Mate Butter Grade Flashing and Roof Mate Fabric. Treat all roof penetrations, drains, curbs, and scuppers with Roof Mate Butter Grade Flashing and Roof Mate Fabric. Apply coating per the chart below. 3. 4. 5. 6. 7. STRUCTURAL CONCRETE SPECIFICATION ROOF MATE Primer Product Epoxy Primer Primer (Gal/Sq) 0.50 10 Year Epoxy Primer Epoxy Primer 15 Year 0.50 0.50 Product (Choose one) 1st Coat Coating 2nd Coat 1.50 Warranty Limited Emerald Diamond Warranty Pledge Pledge Coating (Gal/Sq) DFT* 1.50 3.00 25.5 Yes Yes No 1.50 1.50 3.00 25 Yes Yes No Roof Mate Roof Mate QS 1.50 1.50 1.50 4.50 38 Yes Yes No Roof Mate Roof Mate QS Roof Mate HT Roof Mate TCM 3rd Coat Epoxy Primer 0.50 Roof Mate HT 1.50 1.50 1.50 4.50 37.5 Yes Yes No Epoxy Primer 0.50 Roof Mate TCM 1.50 1.50 1.00 4.00 40 Yes Yes No * Dry Film Thickness (DFT) does not include Primer, uses the average % solids by volume between the two coatings, is rounded to nearest mil, and is theoretical. Actual DFT will vary dependent on substrate profile, application technique & waste factor.