Instrumentation, Controls & Electrical GEPC sets Standards in Decision Support SPPA-M3000 Cockpit The recently opened Guohua Enterprise Information Center provides a decisive competitive advantage for GEPC. At its center is the Siemens Cockpit deployed for the very first time in a customer’s environment. The Task Guohua Electric Power Corporation (GEPC) operates 24 power plants with a total capacity of 6,000 MW. To effectively meet the increasing requirements of the liberalized energy market, GEPC implemented an “Enterprise Information Center” at its Beijing headquarters. In the so-called “Decision Room” the data of the whole fleet have to be provided online in overviews and in detail to allow fast response to events. Our Solution Published by and Copyright © 2008 Siemens AG Energy Freyeslebenstraße 1 D-91058 Erlangen Siemens AG Energy Fossil Power Generation Instrumentation, Controls & Electrical Siemensallee 84 D-76187 Karlsruhe sppa-m3000.pg@siemens.com www.siemens.com/sppa-m3000 We installed the Siemens “Cockpit” at the headquarters and in currently 3 power plants. The Cockpit integrates all subsystems and offers easy access from all work-stations via a userfriendly, well-structured user interface. Process information from the DCS as well as other data from all departments, such as fuel management, maintenance, accounting, quality management facilitate a comprehensive view of the company’s situation. M3CO_FR_GEPC_e_V1-2 Order No. A96001-S90-B359-X-4A00 All rights reserved. Subject to change without prior notice. Printed on paper treated with chlorinefree bleach. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. GEPC Decision Room: Managers now receive information on the operating condition of the whole fleet – better and faster than ever. “Cockpit provides detailed data for in-depth analyses and high-quality information overviews for fast management decisions – both are very important for success in China’s future deregulated energy market.” Li Wei, CIO, Guohua The Result Fast and sound decisions due to comprehensive view of the enterprise Cross-departmental analyses and benchmarks due to parallel visualization of information from various departments Fast reaction to inconsistencies Long-term data archiving allows long-term analysis The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract. CIO Li Wei presents the Cockpit on the large screen of the new Decision Center. Guohua now is the destination of many high-level delegations. Energy Management Suite References Answers for energy.