Title Page URBAN WIND TURBINE SENIOR DESIGN PROJECT FINAL REPORT By: Michael Austin Cody Bateman Torrey Roberts Mirai Takayama Prepared For ME 480 Senior Design Boise State University Mechanical Engineering Department May 5, 2005 Executive Summary The goal of this senior design project was to determine the optimal location for an urban wind turbine system on top of one of the Boise State University (BSU) College of Engineering Buildings (COEN). We selected a turbine system from potential vendors that would perform efficiently at the location. We have determined that the center of the Micron Engineering Center (MEC) building at a height of 20-30 ft above the rooftop is the optimal location for a wind turbine. The Bergey XL1 is a 1kW turbine that could be purchased and installed at this location. This turbine has an 8.2 foot diameter and would produce approximately 370 kW-hr/year at this location. Our decisions were based upon months of wind flow analysis, wind data analysis, and turbine performance analysis which is explained in the pursuing sections. From an economic stand point, a turbine installation on the MEC building would be a very poor choice. A break-even point would never be reached for the 20 to 30 year life span because of the low average wind speeds. However, the wind turbine could be used for research and observation by BSU faculty and students. ii Table of Contents Title Page ............................................................................................................................. i Executive Summary ............................................................................................................ ii Table of Contents............................................................................................................... iii Introduction......................................................................................................................... 1 Objectives ........................................................................................................................... 1 Background ......................................................................................................................... 2 Design Solution................................................................................................................... 4 Location ...................................................................................................................... 4 Turbine System Selection ......................................................................................... 11 Analysis............................................................................................................................. 12 Location .................................................................................................................... 12 Fluent Background.................................................................................................... 12 FloWorks Background .............................................................................................. 13 CFD Analysis............................................................................................................ 13 March Case Study ..................................................................................................... 19 Turbine System ......................................................................................................... 23 Safety Analysis ......................................................................................................... 26 Discussion ......................................................................................................................... 27 Conclusions....................................................................................................................... 27 Recommendations............................................................................................................. 28 References......................................................................................................................... 29 Appendix........................................................................................................................... 30 Turbine Power Curves .............................................................................................. 30 Turbine Cost Tables .................................................................................................. 32 FloWorks Wind Maps............................................................................................... 36 Fluent Wind Maps..................................................................................................... 38 Monthly Boise Airport Wind Rose ........................................................................... 40 iii Introduction Demand for power in urban areas is constantly increasing. Innovative ideas for generating power are needed. Wind turbines placed on top of existing or new structures present a possible solution. Past experience gained in installation of small wind turbines is now being used to create systems with better performance, lower costs, and higher reliability. Due to increased energy demand, urban wind turbines systems are under examination. The purpose of this senior design project was to determine the optimal location for a wind turbine on top of one of the College of Engineering (COEN) buildings and to select an appropriate turbine system that will operate efficiently and safely in an urban environment. The turbine would be used primarily for educational and observational purposes if installed. According to wind data from the Boise Airport, the average wind speeds from 1997 to 2003 were 7.6mph. Since, most wind turbines require minimum wind speeds of 8-10 mph to begin operating, turbines at this location will not generate significant amounts of power. However, average wind speeds for Boise in March are 8.8 mph. Installing a wind turbine on one of the COEN buildings is not a good economical choice; however it will enable the university to perform research regarding urban wind turbines. Information gathered from this research can be applied to other more economical turbine locations. The turbine needs to be installed in the optimal location to harvest the maximum amount of wind power available. In addition the turbine needs to fulfill the following user needs: • Operate in low wind speeds. • Monitored easily by faculty and students. • Accessed easily by faculty and students. • Include power storage and delivery system. • Safe to operate in an urban environment. Objectives Initially our objective was to install an operational wind turbine to power the Segway and COEN Electric Vehicle by the end of May 2005. Shortly after investigating the project scope, we concluded the task was far too vast for a single semester project and we needed to narrow our focus. The new scope consisted of determining the best wind turbine location at the COEN based on wind speed and selection a suitable wind turbine system by May 2005. A budget for this project was not provided by BSU. Therefore our only cost objective was to keep capital costs low. 1 Background Several factors have influenced a renewed and increased interest in wind energy. People want alternative forms of energy to reduce their dependency on fossil fuels. Additionally, wind turbines have continued to become more efficient, while at the same time becoming more cost effective. In Idaho, power is provided at one of the lowest rates in the country. However, with increasing pressure to sustain migratory fish restrictions and recent low water flows, power rates are sure to rise. This is driving consumers and the power industry to look for alternative form of energy. Ranked 13th out of 50 states for wind energy potential, Idaho has 7,370 km2 of class 3 or greater wind area (Figure 1). Over 8,000 mega watts of wind energy potential is available; unfortunately most of the high wind regions are not located near current transmission lines. The state provides a personal tax deduction of 40% of the cost of installing a solar, wind, or geothermal electric or heating system for the year of installation, and 20% for each year thereafter. Net metering is available for wind turbine systems less than 100kW. The Energy Division of the Idaho Department of Water Resources (IDWR) provides five year loans at 4% interest for wind and other renewable energy projects1. Figure 1 – Idaho Wind Classification Map http://rredc.nrel.gov/wind/pubs/atlas/maps/chap3/3-03m/html According to the Department of Energy (DOE), small privately owned wind turbines require wind speeds greater than 10 mph and the utility supplied electricity cost greater than 10 cents per kilowatt hour for economic viability2. According to Idaho Power’s website, the current small commercial rates are about 7.6 cents per kW-hr. 2 Other universities are also investigating the possibility of wind energy. The University of Massachusetts has installed an alternative energy system on the top of their engineering building; consisting of 3 different types of wind turbines and a set of solar panels. They connected the system to a 24V battery bank and to the grid with a 4kW trace inverter. The types of wind turbines installed included: a Bergey 1500W at 80’ (above ground), a World Power Technologies Mariner H500 at 45’, and a Southwest Windpower Air Marine 300 at 45’. Overall, the turbines produced 20% less power than expected, due to the underestimated turbulence of the environment. They installed the entire system for $52,000 in 1998; adjusted for inflation this would approximate $64,000 today. The most expensive part of the project was the engineering required to safely install the equipment on the roof of a public building3. The power that can be generated from wind is linearly dependant on the swept area of the turbine blades, but a function of the velocity cubed4. P = 0.5(Cp )( ρ )( A)(V )3 This means wind speeds of 12.6 mph have twice the energy of wind speeds at 10 mph (only 2.6 mph less). Therefore, small differences in wind speed can have a significant impact on the power generated by a wind turbine. Based on conservation of energy, the Betz limit states that the turbine blades cannot extract more than 59% of the total energy available in the wind. In other words, assuming the rest of the system operates at 100% efficiency, the maximum efficiency achievable is 59%. Most wind turbine systems operate within the range of 10% to 30% combined efficiency. Also, most wind turbines do not start to generate power until the wind reaches at least 7 to 8 mph. Urban wind turbine installations present certain concerns not found in rural wind farms. Traditionally noise produced by turbine blades has been bothersome to those living near wind turbines. Wind turbines typically produce some broadband noise as their revolving rotor blades encounter turbulence in passing air. This type of noise is described as a “whooshing” sound. However, most modern wind turbines are typically not any louder than passing traffic. Figure 2 shows wind turbine noise compared with noise from other activities. The noise level of smaller wind turbines can sometimes be higher because of the higher rotational speed. In addition, less money and research has been invested in reducing noise on smaller turbines than larger turbines5. Figure 2 – Typical Noise Levels www.gov.on.ca/.../ engineer/facts/03-047.htm 3 Safety is another concern when considering the installation of a wind turbine in an urban area. This is especially true when people are present near the base of the building. Turbulent locations also increase the chance of failure due to the increased load variation imposed on the system. Any failures resulting in falling objects would have catastrophic results and a negative impact on public confidence of urban wind energy systems. When placing an urban wind turbine, it is important to install and design for failure prevention and provide failsafe features to prevent injury. The turbine owner must follow a strict maintenance program. Tips of wind turbine rotor blades can reach speeds up to 300 mph4. Hail, dirt, and insects contacting the blades at theses speeds can cause premature wear to the blade edges causing extreme physical forces. Thrust and vibration loads also subject the bearings and tower to loads. The lifespan of these bearings depends on the wind conditions and level of maintenance. Turbine manufactures will usually specify activates and intervals required for maintenance. The entire wind system, including the tower, storage devices, and wiring should be inspected on a regular basis. If maintained properly a wind turbine system can last up to 20 to 30 years. Several different types of wind turbines have been proposed that can be categorized as being either vertical axis or horizontal axis. Vertical axis turbine designs eliminate the need to align the turbine with wind direction and reduce issues related to turbulence. Unfortunately the companies previously producing these turbines have all gone out of business. Vertical axis turbines were eliminated early on in our analysis, and several different brands of horizontal turbine manufactures were evaluated. Design Solution Location We determined the center of the MEC building as the optimal location for a wind turbine at the COEN. This location had the highest wind speeds according to our models and had adequate mounting characteristics. The location is also safer than placing a turbine near the edge of the building. It allows some protection for pedestrians below if a blade fails and allows safe access for a person observing or maintaining the turbine, not near any building edges. We created detailed and simplified solid model for analysis using SolidWorks, a computer aided drafting program (Figure 3). This model was used to determine wind flow patterns over the COEN Buildings in two separate Computational Fluid Dynamics (CFD) programs. Precise dimensions for the COEN buildings were obtained from the building architectural drawings and field measurements. The dimensions for overall locations and sizes of surrounding buildings were approximated from the Ada County Assessor’s aerial maps. 4 Figure 3 - COEN & Surrounding Area We applied Fluent and FloWorks, two CFD Modeling packages, to map the bipolar wind patterns over the BSU COEN buildings (major wind flow patterns vary from the Northwest and Southeast directions). Both programs indicated that the best location for the wind turbine was in the center of the Micron Engineering Center’s penthouse roof; where the maximum wind speed occurs at approximately 20 to 30 feet above the roof. Wind speed data generated from Fluent and FloWorks for both major wind patterns are indicated in Figure 4 through Figure 7. 8.0 MPH SE WIND ANALYSIS WITH FLUENT 170 Maximum Wind Speed =170 in/s at 10ft and 15 ft above MEC Rooftop 3500 inches from origin. 165 160 Velocity Magnitude, (in/s) 155 150 145 140 135 82 ft (0ft above MEC Roof) 87 ft (5ft above MEC Roof) 92 ft (10ft above MEC Roof) 97 ft (15ft above MEC Roof) 102 ft (20ft above MEC Roof) 107 ft (25ft above MEC Roof) 112 ft (30ft above MEC Roof) 117 ft (35ft above MEC Roof) 130 125 120 115 110 122 ft (40ft above MEC Roof) 127 ft (45ft above MEC Roof) 132 ft (50ft above MEC Roof) 105 100 -200 -150 -100 -500 0 0 0 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 Location, (in) Figure 4 - SE Fluent Wind Analysis 5 8.0 MPH SE WIND ANALYSIS WITH FLOWORKS 170 Maximum Wind Speed =167 in/s at 15ft and 20 ft above MEC Rooftop 3500 inches from origin. 165 160 155 150 Velocity (in/s) 145 140 135 130 125 82 ft (0ft above MEC Roof)4@Line1_1 87 ft (5 ft above MEC Roof)4@Line1_1 92 ft (10 ft above MEC Roof)4@Line1_1 97 ft (15 ft above MEC Roof)4@Line1_1 102 ft (20 ft above MEC Roof)4@Line1_1 107 ft (25 ft above MEC Roof)4@Line1_1 112 ft (30 ft above MEC Roof)4@Line1_1 117 ft (35 ft above MEC Roof)4@Line1_1 122 ft (40 ft above MEC Roof)4@Line1_1 127 ft (45 ft above MEC Roof)4@Line1_1 132 ft (50 ft above MEC Roof)4@Line1_1 120 115 110 105 100 -2000 -1500 -1000 -500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 Location (in) Figure 5 - SE FloWorks Analysis 8.0 MPH NW WIND ANALYSIS WITH FLUENT 170 Maximum Wind Speed =167 in/s at 15ft above MEC rooftop 3000 inches from origin. 160 Velocity Magnitude, (in/s) 150 140 130 120 110 82ft (0ft above MEC Roof) 87ft (5ft above MEC Roof) 92ft (10ft above MEC Roof) 97ft (15ft above MEC Roof) 102ft (20ft above MEC Roof) 107ft (25ft above MEC Roof) 112ft (30ft above MEC Roof) 117ft (35ft above MEC Roof) 122ft (40ft above MEC Roof) 127ft (50ft above MEC Roof) 132ft (0ft above MEC Roof) 100 -2000 -1500 -1000 -500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 Location, (in) Figure 6 – NW Fluent Wind Analysis 6 8.0 MPH NW WIND ANALYSIS FROM FLOWORKS 170 Maximum Wind Speed =162 in/s at 25ft above MEC rooftop approximately 3000 inches from origin. 160 Velocity (in/s) 150 140 130 120 110 82 ft (0ft above MEC Roof)4@Line1_1 87 ft (5 ft above MEC Roof)4@Line1_1 92 ft (10 ft above MEC Roof)4@Line1_1 97 ft (15 ft above MEC Roof)4@Line1_1 102 ft (20 ft above MEC Roof)4@Line1_1 107 ft (25 ft above MEC Roof)4@Line1_1 112 ft (30 ft above MEC Roof)4@Line1_1 117 ft (35 ft above MEC Roof)4@Line1_1 122 ft (40 ft above MEC Roof)4@Line1_1 127 ft (45 ft above MEC Roof)4@Line1_1 132 ft (50 ft above MEC Roof)4@Line1_1 100 -2000 -1500 -1000 -500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 Curve Length (in) Figure 7 - NW FloWorks Wind Analysis For each of these graphs, 0 inches represents the origin of the solid model generated with SolidWorks. The origin is located at the NW corner of the Engineering Technology (ET) building (reference Figure 8). The lines in the graph represent flow trajectories in a vertical plane 2100 inches (175 ft) southwest from the origin parallel to the NorthwestSoutheast directions. This is indicated in the top view of the model used in Figure 8 below. The solid red line represents the plane used in creating graphs above. The grid is in squares of 500 x 500 inches with coordinates at the corners of the map. Figure 8 – NW Wind Flow Plane Top View 7 There are some slight differences between both CFD Models. The Southeast wind graph generated using Fluent indicates a maximum wind speed of approximately 170 in/s (9.7 mph) 10 to 15 feet above the MEC penthouse rooftop 3400 inches from the origin. FloWorks indicates a maximum wind speed of 167 in/s (9.49 mph) 15 feet above the MEC penthouse rooftop at 3300 inches from the origin. Comparisons between the two models are shown in Table 1 through Table 4. The values in these tables represent the best wind power elevations. Table 1 – FloWorks vs. Fluent Velocity Profile Comparison 3300” From Origin SE Wind Elevation Above Rooftop 10ft 15ft 20ft 25ft 30ft 35ft FloWorks Fluent Velocity Velocity (in/s) (in/s) 163 167 166 165 161 158 160 166 166 167 166 164 % Difference -1.88% -0.60% 0.00% 1.20% 3.01% 3.66% Table 2 – FloWorks vs. Fluent Velocity Profile Comparison 3400” from Origin SE Wind Elevation Above Rooftop 10ft 15ft 20ft 25ft 30ft 35ft FloWorks Fluent Velocity Velocity (in/s) (in/s) 165 167 165 163 160 157 170 169 168 166 165 163 % Difference 2.94% 1.18% 1.79% 1.81% 3.03% 3.68% Table 3 – FloWorks vs. Fluent Velocity Profile Comparison 2700” from Origin NW Wind Elevation FloWorks Fluent % Above Velocity Velocity Difference Rooftop (in/s) (in/s) 10ft 147 161 8.46% 15ft 153 166 7.58% 20ft 160 165 3.27% 25ft 161 164 1.78% 30ft 159 163 2.08% 35ft 158 162 2.38% 8 Table 4 – FloWorks vs. Fluent Velocity Profile Comparison 3000”from Origin NW Wind Elevation FloWorks Fluent % Above Velocity Velocity Difference Rooftop (in/s) (in/s) 10ft 138 141 2.57% 15ft 149 152 2.38% 20ft 158 159 0.79% 25ft 162 161 -0.13% 30ft 161 162 0.87% 35ft 160 163 1.42% Wind isoline maps were generated using FloWorks and are shown in Figure 9 and Figure 10. The closely spaced orange isolines indicate that the location with the best wind speed is the center of the MEC building at this elevation. Figure 9 – FloWorks Wind Isolines 20 feet Above Top of MEC Building SE Wind 9 Figure 10 – FloWorks Wind Isolines 20 feet Above Top of MEC Building NW Wind Isolines were also generated using Fluent, and are as shown below. For Fluent, the velocity isolines are in m/s. Fluent and FloWorks gave similar solutions; the middle of the MEC is the best place to locate the turbine. Figure 11 – Fluent Wind Isolines 20 feet Above Top of MEC Building SE Wind 10 Figure 12 – Fluent Wind Isolines 20 feet Above MEC Building NW Wind Turbine System Selection According to our analysis, the Bergey XL1 1kW turbine system ranked 3rd in power output and was the least expensive. We recommend this system for the MEC building because of its low initial capital cost. The turbine has a rotor diameter of 8.2 feet. Bergey also provides a matching tower, generator, and power conversion system. Table 5 summarizes the parts and prices for the expandable system. Table 5 – Bergey Turbine System Price List ` Power Output : 1 kW Type : Battery Charging Company : Bergey Model : BWC XL 1-24 Product Turbine Turbine and PowerCenter multi-function controller Tower Tower (30 ft tilt-up) Tower wiring kit, 7 Circuit Batteries 5.3kWh Battery Bank Inverter 1,500 W Inverter System Installation Annual Profit & Loss Energy Generation O&M Payback Period Price $ 2,450 $ $ 950 600 $ 450 $ 1,044 $ 10,000 Total : $ 15,494 $ $ 29 (75) NA 11 Several types of turbines were analyzed to determine how they would perform in this area. We utilized the decision matrix in Table 6 to help select the best turbine. Table 6 – Turbine Decision Matrix Concept Alternatives SW Windpower Air X 400 W Criteria Number of School Days Operating Cost Safety kW-hrs per Year Reliability & Maintenance Aesthetics & Noise Availability Total Importance Weight (%) 32 20 15 12 10 7 4 100 Rating Weighted Rating 3 4 2 0 2 3 3 NA 0.96 0.8 0.3 0 0.2 0.21 0.12 2.59 Rating Unsatisfactory Just Tolerable Adequate Good Very Good Bergey 1 kW Rating Weighted Rating 4 4 4 2 4 3 4 NA 1.28 0.8 0.6 0.24 0.4 0.21 0.16 3.69 Bergey 7.5 kW Rating Weighted Rating 2 1 4 4 4 3 4 NA 0.64 0.2 0.6 0.48 0.4 0.21 0.16 2.69 Bergey 10 kW Rating Weighted Rating 2 2 4 0 4 3 4 NA 0.64 0.4 0.6 0 0.4 0.21 0.16 2.41 Proven Energy 600 W Proven Energy 2.5 kW Proven Energy 2.5 kW Battery Grid Rating Weighted Rating Rating Weighted Rating Rating Weighted Rating 4 4 3 0 2 3 2 NA 1.28 0.8 0.45 0 0.2 0.21 0.08 3.02 4 3 3 3 2 3 2 NA 1.28 0.6 0.45 0.36 0.2 0.21 0.08 3.18 4 3 3 3 2 3 2 NA 1.28 0.6 0.45 0.36 0.2 0.21 0.08 3.18 Value 0 1 2 3 4 Analysis Location Fluent and FloWorks were the two CFD modeling packages used to model the wind patterns over the BSU COEN Buildings. Using both modeling packages allowed us to verify our results. To ensure accuracy of the results, we used architectural drawings and Ada County Assessor maps to define elevations and locations of the COEN and surroundings to accurately define the solid model. After the solid model was defined, we imported it into both CFD packages for analysis. Fluent Background Fluent is the industry CFD software leader. It is a very robust and accurate software package. Fluent uses GAMBIT as its modeling and meshing program that enables the user to model complex geometry where the fluid flow analysis takes place. In our case we imported the model defined in SolidWorks as an IGES file into GAMBIT. The model was then broken up into an unstructured grid, called a mesh that consists of user defined shape elements. Smaller element shapes and sizes provide more accurate result. However, decreasing an elements size greatly increases the computation time. So, the solid model was simplified to allow a timely analysis of the wind flow patterns. The simplification of the solid model is shown in Figure 13 and Figure 14. 12 Figure 14 – Initial Model COEN & Surrounding Buildings Figure 13 – Simplified Model COEN & Surrounding Buildings This simplified model was analyzed in both FloWorks and Fluent to check precision between the two modeling packages. The result precision is tabulated in the “% Difference” column in Table 1 thru Table 4. The more complex initial model was used in SolidWorks for a March wind study when the average wind speeds increase to around 8.8 mph. FloWorks Background Fluent’s user interface requires extensive knowledge and experience to produce accurate results. For this reason, user friendly CFD packages like FloWorks are available to the average user. FloWorks is the CFD modeling package fully embedded within the SolidWorks Computer Aided Drafting Program. Its user interface is designed for the average design engineer who may not have the expertise required to operate Fluent. One of the drawbacks to its user friendliness involves lack of functionality. For example FloWorks does not have the ability to model two phase flows nor will it allow you to change the mesh elements shape like Fluent. However, you can control mesh element gap size represents, so more accurate results may be obtained. CFD Analysis The initial analysis of the wind flow patterns over the COEN Buildings involved both Fluent and FloWorks. Analyzing the same model with the same inputs allowed us to verify the accuracy of the results with respect to each CFD system. In this case, we imported the simplified model shown in Figure 13 into both Fluent and FloWorks. The input velocity for this analysis was 8.0 mph which is close to the spring time wind speed average. We did multiple studies in which we altered the wind direction between Northwest and Southeast. The parameters associated with the modeling can be found below in Table 7. Table 7 – CFD Modeling Parameters Modeling Parameters Fluent Floworks (Using Floworks Wizard) Time step size Time Frame Analyzed Unsteady Formulation Every 0.2 seconds 0 - 40 seconds 2nd order implicit Absolute OFF K-epsilon No slip shear condition Air Turbulent NA Steady State Steady State NA Velocity Formulation Energy Equation Viscous Model Boundary condition of the building surface Fluid Type Physical Features Analysis Type Velocity Parameters Pressure Temperature Result Resolution Gap Size NA Adiabatic (OFF) Default .06 in Surface Roughness Air Turbulent External (excluded internal spaces and excluded cavities without flow conditions) 8.0 mph (SE and NW directions) 8.0 mph (SE and NW directions) 101.3kPa (Default) 101.3 kPa (Default) 291K (Default) NA 3”-600” (at each edge of Tetrahedral) 291K (Default) 3 Default at 1088” (edges of parallelogram) Mesh Elements are approximately twice the size of Fluent 13 The difference in mesh sizes can be seen in the Figure 15 and Figure 16. Where Figure 15 represents the tetrahedral meshes made by Fluent and Figure 16 represents the rectangular prism meshes generated by FloWorks. Figure 17 and Figure 18 represent the NW velocity contour maps of the plane passing directly through the center of the MEC building. The location of the plane is 2100 inches from the origin and the plane is parallel to the SE direction. Figure 15 – Fluent Mesh Figure 16 – FloWorks Mesh 14 Figure 17 – NW Wind FloWorks Contour Map at 2100” from Origin Figure 18 – NW Wind Fluent Contour Map at 2100” from Origin The FloWorks output velocity is in inches/second whereas the Fluent output velocity is in m/s. Both of the color scale maximums are equal (i.e. 177 in/s = 4.5 m/s) so there is a direct correlation between the two color schemes. If both contour maps show the same color in the same area the wind speeds experienced in that area are similar. This is evident in the region directly above the center of the roof of the MEC building. Both contour maps show a trend of increased velocity over the top edge at about the same elevation. This is evident in Table 1 through Table 4. Alternatively, if the contour maps do not show the same color in the same area the conclusion could be made that the wind speeds are different for that area between the models. This phenomenon is evident in the tail section of the flow indicated in dark blue by the FloWorks model. There is a slight difference in the wind tail colors where the recirculation occurs. This is more than likely due to the different mesh sizes. The FloWorks mesh is approximately twice the size of the Fluent mesh. The mesh size difference was an oversight in the initial stages of the modeling project. However, the maximum wind speed results due not seem to differ by more than 3.2% in the attractive wind turbine placement elevations between 10-35 ft above the roof. This is apparent in the highlighted regions of the following tables. 15 Further analysis shows that there is a slight vertical component to the wind vectors in these areas. The following figures show that this vertical component is nearly the same between both modeling packages. Figure 19 – SE Wind Vector Gradient Map Figure 20 – SW Wind Vector Gradient Map 16 When looking at the graphs of the y-velocity vector vs. location, the magnitude of the yvelocity is negligible at the center of the MEC building (2800 to 3300 in). 8.0 mph NW Analysis with Floworks 60 82 ft (0ft above MEC Roof)4@Line1_1 87 ft (5 ft above MEC Roof)4@Line1_1 92 ft (10 ft above MEC Roof)4@Line1_1 97 ft (15 ft above MEC Roof)4@Line1_1 102 ft (20 ft above MEC Roof)4@Line1_1 107 ft (25 ft above MEC Roof)4@Line1_1 112 ft (30 ft above MEC Roof)4@Line1_1 117 ft (35 ft above MEC Roof)4@Line1_1 122 ft (40 ft above MEC Roof)4@Line1_1 127 ft (45 ft above MEC Roof)4@Line1_1 132 ft (50 ft above MEC Roof)4@Line1_1 55 50 45 40 35 Y-velocity (in/s) 30 25 20 15 10 5 0 -5 -10 -15 -20 -2000 -1500 -1000 -500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 Curve Length (in) Figure 21 – NW Vertical Velocity Analysis 8.0 mph NW Analysis with Fluent 70 82 ft (0ft above MEC Roof ) 87 ft (5ft above MEC Roof ) 92 ft (10ft above MEC Roof ) 97 ft (15ft above MEC Roof ) 102 ft (20ft above MEC Roof ) 107 ft (25ft above MEC Roof ) 112 ft (30ft above MEC Roof ) 117 ft (35ft above MEC Roof ) 122 ft (40ft above MEC Roof ) 127 ft (45ft above MEC Roof ) 132 ft (50ft above MEC Roof ) 60 50 Y-velocity (in) 40 30 20 10 0 -10 -20 -30 -2000 -1500 -1000 -500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 Location (in) Figure 22 – NW Vertical Velocity Analysis 17 8.0 mph SE Analysis with Floworks 50 40 30 Y-velocity (in/s) 20 10 0 82 ft (0ft above MEC Roof)4@Line1_1 87 ft (5 ft above MEC Roof)4@Line1_1 92 ft (10 ft above MEC Roof)4@Line1_1 97 ft (15 ft above MEC Roof)4@Line1_1 102 ft (20 ft above MEC Roof)4@Line1_1 107 ft (25 ft above MEC Roof)4@Line1_1 112 ft (30 ft above MEC Roof)4@Line1_1 117 ft (35 ft above MEC Roof)4@Line1_1 122 ft (40 ft above MEC Roof)4@Line1_1 127 ft (45 ft above MEC Roof)4@Line1_1 132 ft (50 ft above MEC Roof)4@Line1_1 -10 -20 -30 -2000 -1500 -1000 -500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 Curve Length (in) Figure 23 – SE Vertical Velocity Analysis 8.0 mph SE Analysis with Fluent 60 82 ft (0ft above MEC Roof ) 87 ft (5ft above MEC Roof ) 92 ft (10ft above MEC Roof ) 97 ft (15ft above MEC Roof ) 102 ft (20ft above MEC Roof ) 107 ft (25ft above MEC Roof ) 112 ft (30ft above MEC Roof ) 117 ft (35ft above MEC Roof ) 122 ft (40ft above MEC Roof ) 127 ft (45ft above MEC Roof ) 132 ft (50ft above MEC Roof ) 50 40 Y-velocity (in) 30 20 10 0 -10 -20 -30 -40 -2000 -1500 -1000 -500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 Location (in) Figure 24 – SE Vertical Velocity Analysis The following table analyzes the vertical vector magnitude at the center of the MEC building 3000 inches from the origin. The location can be seen in Figure 8. 18 Table 8 – Vertical Vector Magnitudes NW at 3000” from Origin Elevation Above FloWorks MEC (in/s) Rooftop 5.73 5ft 8.39 10ft 10.78 15ft 13.32 20ft 10.31 25ft 11.97 30ft 9.44 35ft 13.51 40ft 13.94 45ft 13.66 50ft Fluent (in/s) 0.15 1.94 5.89 8.00 9.07 8.17 7.86 10.87 8.47 11.12 Difference (in/s) 5.59 6.45 4.89 5.32 1.24 3.80 1.58 2.63 5.48 2.54 Table 9 – Vertical Vector Magnitudes SE at 3000” from Origin Elevation Above FloWorks MEC (in/s) Rooftop -4.64 5ft -3.20 10ft -2.11 15ft 1.40 20ft 2.94 25ft 2.59 30ft 4.21 35ft 5.51 40ft 6.48 45ft 7.46 50ft Fluent (in/s) -5.12 -3.75 -2.33 -0.74 0.80 0.01 0.53 3.77 2.52 5.55 Difference (in/s) 0.48 0.55 0.22 2.14 2.14 2.57 3.68 1.73 3.96 1.91 The data in the above tables shows that the maximum difference in vertical velocity magnitude in the NW direction is 5.59 in/s (.32 mph) and 3.96 in/s (.23 mph) in the SE direction. This is a small variation in the velocity in the y-direction so we can be assured that wind velocities experienced by turbine blades between the elevations of 20-35 ft will be mostly normal to the blades ensuring the optimum performance of the turbine. March Case Study We used the initial model shown in Figure 14 to run a March case study of wind speeds from the Northwest and Southeast at an average of 8.8 mph. Due to the complexity of the solid model, we chose to analyze the wind flow using FloWorks only. Time was not available to run the analysis with Fluent. 19 The FloWorks results indicated that the best location for the wind turbine is the center of the MEC building between 20ft and 30 ft above the penthouse rooftop. Figure 25 and Figure 26 shows vector gradient maps of these results. The vertical components of the velocity vectors are still approximately 10% of the vector magnitudes. So the results were very similar to that of the studies done with the simplified model discussed in the previous section. However, due to the increase in the initial wind speed the vertical components are slightly larger. Figure 25 – SE Wind Vector Gradient Map March Case Study Figure 26 – NW Wind Vector Gradient Map March Case Study 20 Evident from the above figures, the maximum wind speeds for the model are 180 in/sec. The figures above show the turbine blade axis 25 ft above the rooftop. The surrounding red color indicates this is a very suitable location for the turbine. Boise airport wind data from 1997 to 2003 was utilized to get a general idea of the wind characteristics in this area. This data indicated that, for an entire year, we could expect an average wind speed of 7.6 mph. Average wind speed for each month ranges from 6.7 mph low in January to an 8.8 mph high in March as shown in Figure 27. 10 Monthly Average Wind Speed (mph) 9 8 7 6 5 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Month Figure 27-Monthly Avg. Wind Data Boise Airport 1997-2003 The Boise airport wind data also indicated that the wind direction in our area is generally bi-polar; the wind typically blows from either the NW or the SE. A wind rose for the month of March is illustrated in Figure 28. Figure 28-Wind Rose Data March Boise Airport 21 Data from the wind anemometer and the Boise airport was compared in an attempt to determine the wind correlation factor. Figure 29 shows a correlation equation between wind speeds at the airport to wind speeds at the MEC roof top. According to our correlation, the MEC roof tops will have higher wind speeds than the Boise Airport for wind speeds greater than 6mph. Wind speeds below 6mph are in the non-operational range for our turbine. 35 MEC Roof-Top Wind Speed (mph) 30 25 y = 1.8601x - 6.0624 R2 = 0.8029 20 15 10 5 0 4 6 8 10 12 14 16 18 20 Airport Wind Speed (mph) Figure 29 – MEC and Boise Airport Wind Speed Correlation However, the wind direction between the MEC and Boise airport is similar about 23% of the time within a 22.5 degree range. The variation is greater from 12:00pm to 7:00pm than other times of the day. Wind speeds measured at the same time for the Boise airport and the MEC are shown in Figure 30. 35 30 Wind Speed, (mph) 25 20 15 10 5 0 12:50 2:50 3:50 4:40 5:50 6:50 8:50 9:50 10:50 11:50 12:50 2:50 3:50 4:50 5:50 6:50 7:50 8:50 9:50 10:50 11:50 AM AM AM AM AM AM AM AM AM AM PM PM PM PM PM PM PM PM PM PM PM Time Airport Wind speed MEC roof top Wind speed (mph) Figure 30 - Boise Airport/COEN Wind Speed Correlation Avg. 4/18/05 to 4/25/05 22 The entire COEN complex was measured in order to generate models of the buildings. This was done with a combination of field measurements and Architectural drawings. Wind measurements were taken with a hand held anemometer during the month of March to get a general feel for the wind characteristics on top of the building. Other wind measurements were collected from the airport and the tower mounted anemometer on the MEC east side. Table 10 shows some of the wind measurements recorded in March with a hand held anemometer at about 14.5 feet. Table 10 - MEC Wind Measurements 3/8/05 (left) & 3/10/05 (right) NW corner (10 feet from west side edge and 10 feet from north side edge) SW corner (10 feet from west side edge and 10 feet from south side edge) Max, (mph) Min, (mph) Average, (mph) 13.7 5.5 9.3 12.4 6.0 7.1 7.2 1.4 1.9 13.5 0.0 6.4 10.3 4.5 5.7 9.1 4.6 5.1 10.3 5.2 7.0 14.6 5.1 11.2 15.0 7.2 11.7 15.9 8.4 10.9 Time Direction, (degree) 4:18 315 4:24 315 4:26 315 4:29 295 4:33 280 4:35 310 4:37 300 4:39 300 4:41 310 4:43 310 7.6 305 Average of this period 4:18pm - 4:43pm North End (21feet from west side edge and 10 feet from north side edge) Time Direction, (degree) 4:46 310 4:48 285 4:50 280 4:52 295 4:54 295 4:55 290 4:57 310 5:00 300 5:02 310 5:03 320 9.9 300 NE corner (35 feet from west side edge and 10 feet from north side edge) 13.2 291 Average of this period 3:48pm - 4:03pm Max, (mph) Min, (mph) Average, (mph) 15.4 4.0 9.2 17.9 7.4 11.4 21.2 8.5 11.6 20.1 7.6 11.4 21.3 11.3 14.4 16.6 8.2 14.0 20.6 7.1 15.2 13.3 1.1 12.1 17.0 4.0 6.4 15.0 2.4 9.3 Time Direction, (degree) 4:10 280 4:12 280 4:13 290 4:15 285 4:17 280 4:18 285 4:20 280 4:22 270 4:24 270 4:26 270 11.5 279 Average of this period 4:10pm - 4:26pm SE corner (38 feet from west side edge and 10 feet from south side edge) Max, (mph) Min, (mph) Average, (mph) 13.0 6.8 9.6 12.3 4.3 4.9 6.5 0.0 4.7 10.3 5.0 6.3 12.2 2.6 7.7 14.1 8.0 9.3 14.1 4.5 10.8 12.6 6.5 9.9 14.3 6.9 10.4 13.9 5.0 8.5 Time Direction, (degree) 5:09 290 5:11 290 5:13 290 5:16 300 5:18 290 5:19 300 5:22 310 5:24 300 5:25 300 5:26 300 8.2 297 Average of this period 5:09pm - 5:26pm Time Direction, (degree) 3:48 320 3:50 300 3:52 290 3:54 290 3:56 285 3:58 300 3:59 290 4:01 270 4:03 270 South End (23feet from west side edge and 10 feet from south side edge) Max, (mph) Min, (mph) Average, (mph) 15.9 4.9 11.1 11.8 5.4 9.3 17.1 4.1 5.6 14.2 0.0 8.0 11.4 6.7 7.4 13.6 8.2 12.9 14.2 6.4 8.4 16.9 9.3 11.2 16.2 5.3 15.1 12.8 7.4 9.5 Average of this period 4:46pm - 5:03pm Max, (mph) Min, (mph) Average, (mph) 15.9 0.0 11.7 23.1 0.0 14.2 18.7 4.5 11.7 18.8 4.5 12.3 16.7 2.2 7.0 18.2 0.0 15.1 18.0 9.7 11.3 24.9 4.7 20.4 24.9 4.7 14.8 Max, (mph) Min, (mph) Average, (mph) 15.0 6.9 8.4 16.7 3.7 13.5 8.5 7.0 8.0 19.2 4.9 14.1 17.5 8.0 10.9 17.8 5.2 11.9 19.0 1.4 16.1 17.1 8.4 14.7 21.6 5.7 11.3 18.2 1.5 14.5 Time Direction, (degree) 4:29 290 4:31 290 4:33 280 4:35 275 4:36 270 4:39 270 4:40 280 4:43 280 4:45 285 4:47 280 12.3 280 Average of this period 4:29pm - 4:47pm Turbine System When analyzed at the MEC location, none of the turbines will produce enough energy to overcome annual overhead and maintenance costs. The greatest producing turbine will generate a mere $68 of energy per year, at an installation cost of approximately $50,000. A wind turbine installation on the BSU campus, and at nearly any location in the Boise metro area, does not meet economic justification. However, setting aside return on investment or other like investment comparators, we can use the initial cost estimates to aid in selecting a turbine. Educational purposes are the primary reason for this turbine installation, therefore we continued with our selection greatly based on the number of operating days per year, and the least costly method to achieve a working unit. 23 Manufactures data was used to create a performance curve for each horizontal axis turbine analyzed. With Microsoft Excel’s© curve fit function we were able to generate a polynomial function of power vs. wind speed for each turbine. The R-squared values for the curve fit were greater than 0.99 for all of the turbines. The average wind speed from each day for the past 7 years was then plugged into the polynomial functions to determine how the turbine would perform in this area. The graph in Figure 31 shows performance for several different brands of turbines through one year based on average wind speeds from 1997 to 2003. 6 5 Kilowatt Hours Per Day 4 3 2 1 Bergey Excel R 7.5kW Proven Energy WT600 0.6kW Bergey XL1 1kW Bergey Excel 10kW J D N O S A J J M A M F J 0 Proven Energy WT2500 2.5kW Southwest WP Air X 0.9kW Figure 31 – Predicted Turbine Power Output 15 Day Moving Average The 7.5 kW turbine manufactured by Bergey would produce the most power. At around $50,000 to install, the Bergey Excel 7.5 kW has a rotor diameter of 22 feet. Installing a turbine this expensive may not be a feasible solution. Table 11 summarizes the turbine types and cost. The 2nd and 3rd best power producers included a 2.5 kW turbine manufactured by Proven Energy and a 1 kW turbine manufactured by Bergey, respectively. Both of these turbines were much more cost effective and would operate for many more school days per year than the larger turbine. An example power curve that we used in the analysis is illustrated in Figure 32 for the Bergey XL1. 24 1400 1200 Power (W) 1000 800 600 400 200 0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 Wind Speed (mph) Figure 32 – Bergey XL1 Theoretical Power Curve To facilitate observation by facility and students, the turbine should operate on school days, even if the power produced is minimal. Table 11 summarizes turbine size, yearly estimated power produced, and number of school days the turbines operates. If the average wind speed for the day exceeded the minimum start up speed for the turbine, the turbine was considered to operate on that day. Table 11 – Turbine Performance Summary Turbine Type Bergey Excel-R Proven WT2500 Bergey XL1 Proven WT600 Bergey Excel Southwest WP Air X Rating 7.5kW 2.5kW 1kW 0.6kW 10kW 0.6kW Blade Diameter (m) 6.7 3.5 2.5 2.55 6.7 1.14 Power Produced Yearly (kW*hr) 882 580 373 124 106 27 Number School Days in Operation 122 247 247 247 122 187 Total System Cost $50,590 $22,141 $15,594 $17,172 $37,000 $12,191 Power produced by the turbine and generator must be conditioned into an acceptable format. The system could delivery power to a battery bank, to the municipal grid, or directly to the load (appliances, lighting, etc.). Lower voltage (12 to 48 V), direct current power is a good choice for battery charging and some low load residential requirements. Battery charging is more expensive, due to the high cost of the special batteries required. However, if the goals are to net meter and connect the power with the grid, a certified signal conditioner will be required. Net metering will require working with Idaho Power to complete the install. 25 Most turbine applications significantly benefit from towers, where the turbine is positioned into faster wind speed above the ground surface. Our turbine will be located on the roof top of the MEC building, already 80 ft above street level; a tower is mostly needed to overcome any turbulence effects of the roof structure. The MEC building’s height already helps position the turbine above the transition region of ground and surface objects. Existing towers and wiring packages from turbine manufactures can be purchased in sizes ranging from 20 to 100 ft. Our wind modeling analysis determined that using a tower 20 ft high on the MEC building would place the turbine above any ill effects of the building’s own turbulence. Any tower taller than 20 ft would not significantly improve wind harvesting capability over the cost incurred in the tower. Monitoring systems purchased from the turbine manufacturer are designed with the specific turbine performance and output in mind. We were able to locate the different types and costs for monitoring systems available; however, a more detailed user requirement study is needed to finalize a monitoring decision. Safety Analysis We considered the failure modes of turbines and possible design accommodations to identify and reduce the risk of injury from the wind turbine. A competent individual must inspect the turbine system on a regular basis to check for fatigue wear. In addition, most turbines will require yearly maintenance and upkeep to reduce the possibility of failure and extend the lifespan. Placing the turbine near the center of the building would increase the probability of a failed blade landing on the building structure and not striking a pedestrian. A structural and vibration analysis of the building at the install location should be performed. Local building codes will need to be meet in the installation and the turbine will probably have to be inspected by building code officials after installation. A permit may be required to erect the turbine. 24 22 Wind Speed, (mph) 20 18 16 14 12 10 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 Week 1 thru 52 Figure 33 - Maximum Avg. 2 min. Wind Gust 1997-2003 26 Figure 33 shows the maximum average 2 minute wind gust from 1997 to 2003. The highest wind speed for a 2 minute gust is around 21 mph. However, instantaneous gust were up to twice as high at the Boise airport (a few measurements on the MEC roof exceeded 100 mph, however these velocity measurements occurred during steady wind speeds of approximately 6mph so they were negated for this study). The turbine selected must have safety features to stop operation when the force from the wind speed will exceed design stresses. Most turbines stop operation via a brake or unfurling mechanism at about 40 mph. Discussion This project only encompassed a portion of the work that would need to be performed to complete a turbine installation on top of the MEC building. Safety and structural mounting conditions will have to be addressed as mentioned in the previous section. A joint effort between the mechanical and electrical engineering departments at BSU is imperative to the completion of a functioning wind turbine. Foot traffic, even in small amounts, on top of the MEC building will degrade the life of the roof and cause premature wear and failure. Precautions should be taken to minimize damage to the membrane roof, as it is not designed to handle foot traffic. Incorporating required structural features and safety features will encompass the majority of the installation cost. This design work could be used for another senior design project that builds on this one. Due to the poor economics of the project and the safety issues, we speculate that the turbine system will probably never reach installation. Installing urban wind turbines on existing building presents several problems, and the benefit achieved at this location simply is not very significant. Conclusions We have concluded that the best location for a wind turbine at the COEN is at the center of the MEC building 20-30 feet above the penthouse roof. This structure is approximately 80 feet high and appears to have the best wind characteristics of the three COEN buildings. The highest magnitude of wind velocity was also at the center of this building. Installing the turbine in the center enables easy access and the ability to tie off the turbine tower at more locations. The Bergey XL1 1 kW turbine appears to be the best turbine package that could be purchased and installed on the MEC roof. This turbine was the 3rd best performer and was by far the most cost effective. 27 Recommendations To complete the installation several important items will have to be performed, some of which are included below: • Structural analysis of roof structure where turbine is to be installed. • Contact the roofing contractor who performed the installation for the MEC roof to certify the warranty will not be in-validated and to have additional mounts installed as needed. • Safety needs to be further considered before installation. • Building permits may have to be obtained. • A vibration analysis of the structure and turbine should be performed to ensure that the turbine is not going to produce any undesirable vibrations that could create failure of the turbine or the structure. • Involving the electrical engineering department in the power connection would be beneficial. • Install a maintenance path to the turbine to avoid premature wear of the membrane roof. • If the wind tunnel in the HML high bay become operational in the near future. It could be used to perform scaled testing and verify the results of our models. This was part of our original plan; however the wind tunnel was not operation through out the semester. 28 References 1 Idaho Department of Water Resources. 15 February 2005. http://www.idwr.state.id.us/energy/Energy/ altenergy.htm 2 Small Wind Energy Systems for the Homeowner. U.S. Department of Energy. GO-10098-374. FS 135. January 1997. 3 Case Study of a Residential-Scale Hybrid Renewable Energy Power System in an Urban Setting. Z.M. Salameh and A.J. Davis. University of Massachusetts. 2003 4 Wind Energy Manual. 1 February 2005. http://www.energy.iastate.edu/renewable/wind/wem/wem01_print.html 5 Facts About Wind Energy and Noise. American Wind Energy Association. Washington, D.C. 2001 6 Engineering Design. Eggert, R. J., Prentice Hall, Inc., 2004, Englewood Cliffs, New Jersey 7 Specifications for Small Wind Turbines for Autonomous Energy Systems. C.G. Condaxakis. et.al. Wind Energy and Power Plant Synthesis Lab. Crete, Greece 29 Appendix Turbine Power Curves Bergey Excel-R 7.5kW 7000 6000 Power (W) 5000 4000 3000 2000 6 5 4 3 2 y = 0.0029x - 0.0976x + 0.2003x + 13.382x - 41.402x + 15.171x + 2.5 2 R = 0.9988 1000 0 0 2 4 6 8 10 12 14 16 18 20 30.0 35.0 40.0 45.0 50.0 Wind Speed (m/s) Bergey XL1 1kW 1400 1200 3 2 y = -0.1275x + 7.0907x - 60.187x + 136.88 2 R = 0.9953 Power (W) 1000 800 600 400 200 0 0.0 5.0 10.0 15.0 20.0 25.0 Wind Speed (mph) 30 Proven WT2500-2.5kW 3500 3 2 y = -2.77x + 74.138x - 321.27x + 392.01 2 R = 0.9998 3000 Power (W) 2500 2000 1500 1000 500 0 0 5 10 15 20 25 Wind Speed (m/s) Southwest WP Air X 700 600 3 2 y = -0.5848x + 17.073x - 95.006x + 149.44 2 R = 0.9986 Power (W) 500 400 300 200 100 0 0 5 10 15 20 25 30 Wind Speed (m/s) 31 Bergey BWC Excel-10kW 14000 3 2 y = -5.3868x + 196.9x - 1304.4x + 2419.8 2 R = 0.9976 12000 Power (W) 10000 8000 6000 4000 2000 0 0 5 10 15 20 25 30 35 Wind Speed (m/s) Turbine Cost Tables ` Power Output : 1 kW Type : Battery Charging Company : Bergey Model : BWC XL 1-24 Product Turbine Turbine and PowerCenter multi-function controller Tower Tower (30 ft tilt-up) Tower wiring kit, 7 Circuit Batteries 5.3kWh Battery Bank Inverter 1,500 W Inverter System Installation Annual Profit & Loss Energy Generation O&M Payback Period Price $ 2,450 $ $ 950 600 $ 450 $ 1,044 $ 10,000 Total : $ 15,494 $ $ 29 (75) NA 32 Power Output : 7.5 kW Type : Battery Charging Company : Bergey Model : BWC Excel-R/120 Product Price Turbine Turbine and PowerCenter multi-function controller Tower Tower (64 ft tilt-up) Tower wiring kit Batteries 84 kWh Battery Bank (5 string at $1,944 each) Inverter 11 kW Inverter System Power Center DC Power Center Option, 7 circuit Installation $ 19,900 $ $ 1,250 1,000 $ 9,720 $ 8,030 $ 690 $ 10,000 Total : $ 50,590 Annual Profit & Loss Energy Generation O&M $ $ Payback Period Power Output : 10 kW Type : Grid Connect NA Company : Bergey Model : BWC Excel-S/60 Product Price Turbine Turbine and PowerCenter multi-function controller w/ GridTek 10 Inverter Tower Tower (64 ft tilt-up) Tower wiring kit Batteries NA Inverter NA Power Center NA Installation Annual Profit & Loss Energy Generation O&M Payback Period 68 (75) $ 24,750 $ $ 1,250 1,000 $ - $ - $ - $ 10,000 Total : $ 37,000 $ $ 8 (100) NA 33 Power Output : 600 W Type : Battery Charging Company : Proven Energy Model : WT600/048 Product Price Turbine 600 Watt 48V wind turbine/generator Tower 100 ft. guyed-lattice tower kit $ 3,610 $ $ 2,163 - $ 410 $ - $ $ 665 323 $ 10,000 Total : $ 17,172 Batteries 5.3kWh Battery Bank (from Bergey) Inverter NA Power Center charge controller with HV control. Included MCB Isolator (No Meters). 48V Analogue Volt and Ammeters for use with ECM600 Controllers Installation Annual Profit & Loss Energy Generation O&M $ $ Payback Period Power Output : 2.5 kW Type : Battery Charging NA Company : Proven Energy Model : WT2500/048 Product Price Turbine 2.5 kWatt wind turbine/generator Tower Tilt-up self supporting wind turbine mast (6.5m). $ 7,152 $ 2,163 $ 820 $ - $ 2,005 $ 10,000 Total : $ 22,141 Batteries 10kWh Battery Bank (from Bergey) Inverter NA Power Center 2.5kW, 24 or 38V DC battery charging controller. Includes 2 DC and 3 AC divert load connections, V&I meters plus 8 system status indicators. Suitable for use with a DC system or DC/AC using an inverter. Installation Annual Profit & Loss Energy Generation O&M Payback Period 9 (75) $ $ 45 (75) NA 34 Power Output : 2.5 kW Type : Grid Connect Company : Proven Energy Model : WT2500/300 Product Price Turbine 600 Watt wind turbine/generator Tower Tilt-up self supporting wind turbine mast (6.5m). Batteries NA Inverter NA Power Center Isolation and rectification controller for use with grid connect inverter. Included V&I meters for perfomance monitoring. Installation Annual Profit & Loss Energy Generation O&M $ 7,152 $ 2,163 $ - $ - $ 1,018 $ 10,000 Total : $ 20,333 $ $ Payback Period Power Output : 400 W Type : Battery Charging Product Turbine 900 Watt wind turbine/generator Tower 45 ft. tower kit Batteries 5.3kWh Battery Bank (from Bergey) Inverter 1,500 W Inverter System (from Bergey) Power Center NA Installation Annual Profit & Loss Energy Generation O&M Payback Period 45 (100) NA Company : Southwest Windpower Model : Air X 24V Price $ 538 $ 199 $ 410 $ 1,044 $ - $ 10,000 Total : $ 12,191 $ $ 2 (75) NA 35 FloWorks Wind Maps FloWorks Wind Map 1 – NW Wind Velocity Path Lines Colored by Magnitude FloWorks Wind Map 2 – South Face MEC Building NW Wind Velocity Path Lines 36 FloWorks Wind Map 3 – SE Wind Velocity Path Lines Colored by Magnitude FloWorks Wind Map 4 - South Face MEC Building SE Wind Velocity Path Lines 37 Fluent Wind Maps Fluent Wind Maps 1 – NW Wind Velocity Path Lines Colored by Magnitude Fluent Wind Maps 2 – SE Wind Velocity Path Lines Colored by Magnitude 38 Fluent Wind Maps 3 – South Face MEC Building SE Wind Velocity Path Lines Fluent Wind Maps 4 – South Face MEC Building NW Wind Velocity Path Lines 39 Monthly Boise Airport Wind Rose January February March April May June 40 July August September October November December 41