TremmelDesignGroup, LLC 201 E. Las Animas Street, Suite 113 Colorado Springs, Colorado 80903 719 623-5641 June 25, 2014 Project: Dwire Hall SPA Remodel – Phase I University of Colorado at Colorado Springs 1420 Austin Bluffs Parkway Colorado Springs, CO Addendum #1 - Response to submitted questions and questions from the Pre-Bid Walk. 1.) Have the drawings been submitted to Colorado Springs Fire Department for their review? No but it has been reviewed by the State code reviewer. Sheet CS under Notes who is responsible for Fire Dept. permits and inspection fees. 2.) On sheet M-2, there is a notation of Phase 1-Second Floor Demo Plan; is this correct? No, the Second Floor work is considered Phase IV per the Architectural Drawings. 3.) On Sheet M-3, all the floor plans are labeled "demo"; is this correct? No, M-3 is for all new work. M-2 is for all demolition work. 4.) On Sheet M-3, there is a floor plan called Phase 1-Second Floor Demo Plan; is this correct? No, the floor plan called Phase I-Second Floor Demo Plan should be Phase IV- New Work Plan. 5.) Is the contractor supposed to take the drawings through the Fire Review? Who pays for the Fire review? The contractor is supposed to take the drawings through for Fire Review. There should be no fee for the review as UCCS has already paid for the State Review. The G.C. is responsible for any fees if required. 6.) Is the mechanical system supposed to be rebalanced? Yes, per the mechanical drawings M-1 General Notes and M-3 in all SheetNotes. 7.) A question of whether or not they could use the existing dumpster out back or if they need to use their own. If they use their own, where could it be located? The contractor is to provide their own dumpster. UCCS Public Safety will give them permit to use the 15 min parking spot to locate the contractor’s supplied dumpster. Parking fees apply. 8.) Where is the electrical panel for the spaces located? There is an electrical panel for half the building on the third floor in Hall 300B-6 on the west wall outside the Women’s Restroom 3R-2. There is also an electrical panel in Hall 300F opposite the door to COB Office 320. 9.) Ceiling Plan Note 8, Sht. A1.5 says we are to match building standards for the new down lights. Please provide a cut sheet for the building standard down light fixture to be used. Information from the original electrical drawing is as follows: Description: 7” aperture recessed fluorescent downlight with clear specular reflector, cross baffle and electronic ballast. Lamps: (2) 26W quad tube, 35000k, 82CRI Volt Amps: 52 Manufacturer: Zumtobel, Omega, Prescolite Catalogue No: S5D7704-U-7703T-C Voltage: 277 Finish: Specular Mounting: Recessed Recess: 6-1/8” If an emergency light is required, the additional information was noted. Description: Similar to the above, except with emergency battery ballast Catalogue No. S5D-U-7703T-C Please note that it is still the responsibility of the contractor to verify and match the existing fixture. 10.) Will UCCS want to salvage the wall mounted podium box noted in Demolition Plan Note 11, Sheet A1.2? Please advise. UCCS does not want to salvage the wall mounted podium box. 11.) Do you know how much rolled carpet is left? Or should we price carpet tile? If so what style do they want? I know they usually use Interface Cubic…but not sure if they are sticking with that for this building? Please review sheet A1.6 which indicates which rooms are to receive carpet tile and which has existing carpet that is to remain. Please also see sheet A1.7, Finish Schedule which indicates the manufacturer, style, color and installation. Noted comments from the Pre-Bid Site Walk 1.) UCCS will have all the rooms empty for construction process. Furniture will be moved by UCCS to other rooms prior to construction. 2.) For the wall dividing Room 358A and 358B, a gypsum board jog will be required at the window mullion. This should match the existing similar detail at the wall to be removed. A detail can be provided if necessary prior to construction. 3.) The cabinetry in the existing Room 356G will be removed and returned to the Owner. 4.) Any new doors are to match the existing doors with half height vision panels. 2