Siemens controls increase output of GE gas turbines at Gresik power plant Turbine Controls Reference Instrumentation, Controls & Electrical SPPA-R3000 Turbine Controls replaces the installed GE Mark II turbine control and protection system of two crucial GE Frame 5 black start units. The new redundant and failsafe Siemens solution improves the power output, reliability and flexibility of gas turbines. The Result ■ Increased power output ■ Enhanced flexibility, reliability and operational safety ■ Operation based on ecofriendly biofuel feasible without any controller logic reoptimization The Plant Owned by PT Pembangkitan Jawa-Bali (PJB) and located in Indonesia, the Gresik power station operates 5 gas plants, 4 steam plants and 3 combined cycle plants with a total installed capacity of 2,280 MW. In case of emergency, two GE gas turbines power up the entire internal Gresik grid, crucial for this plant operating since 1978. The Task Replace the old and outdated GE Mark II turbine control and protection system for 2 GE MS5001 (Frame5) 22 MW gas turbines, upgrading the black start units to main generating units. This includes vibration monitoring, AVR & Autosynchronizer and partial replacement of field instrumentation with new cabling. From the customer’s perspective, the key drivers behind the modernization project were the decreasing availability of spare parts, an increasing failure rate and inadequate fault analysis capability, along with the need to run the turbine on biofuel instead of using diesel with the same power output. Our Solution The installed control system (GE Mark II) was replaced by a state-of-the-art redundant and failsafe SPPA-R3000 solution for Dual Fuel Firing. The new Siemens control system incorporates the latest innovation in terms of turbine technology and control algorithm. This proven technology is standardized and scalable, with electrical solutions, process engineering and comprehensive automation functions. The system features local touch-screen operation panels as well as remote operation plus full integration of the generator protection and AVR scheme, achieving total compliance with the safety requirements of the regulatory authorities. A new digital auto-paralleling device ensures fault-free synchronization with the grid. New gas turbine exhaust temperature cables and junction boxes provide excellent control accuracy. To meet the stringent requirements for control quality, accuracy and reliability, all speed and vibration sensors were replaced by new state-of-the-art Siemens controls. SPPA-R3000 Turbine Controls increase power output at PJB Gresik GE Frame 5 Unit in Indonesia Combined turbine control and electrical panel (customized design) Answers for energy. Published by and copyright © 2012: Siemens AG, Energy Sector Freyeslebenstrasse 1 91058 Erlangen, Germany For more information contact sppa-r3000.energy@siemens.com www.siemens.com/energy/sppa-r3000 Siemens Energy, Inc. Instrumentation, Controls, & Electrical 1345 Ridgeland Parkway, Suite 116 Alpharetta, GA 30004, USA R3M1_FR_Gresik_e_V2-0 Order no. E50001-G230-A232-X-4A00 Printed in Germany Dispo 05401, c4bs-Nr. 7465 Printed on elementary chlorine-free bleached paper. All rights reserved. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. Subject to change without prior notice. The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract.