Work Breakdown Structure Project Name: Soif Department: L’ SPAWNS Focus Area: Develop, produce, market and distribute a fruit flavored juice beverage without sugars, preservatives or additives in a renewable container. Product/Process: Fruit juice beverage. Prepared By Document Owner(s) Project/Organization Role Konstantinos (Dino) Liolios Soif Soif Soif Project Closure Report Version Control Version Date Author Change Description 2.0 5/6/2011 Konstantinos (Dino) Liolios Created document. Confidential Документ1 Last printed 4/9/2020 6:33:00 PM Work Breakdown Structure Work Breakdown Structure Purpose and Limitations The purpose of this worksheet is to: Identify the work to be done. Identify the types of resources required for the work. Develop estimates for each work element. Identify storage locations. This worksheet does not address: Who will perform the work. When the work will be completed. Confidential Page 2 4/9/2020 Work Breakdown Structure Work Breakdown Structure Organization Chart 1.0 Soif Juice Beverage 1.1 Market Research 1.2 R&D 1.2.1 Select costeffective ingredients 1.1.1 Identify Market Niche Confidential 1.1.2 Accept/Approve submitted recipes 1.3 Marketing 1.2.2 Refine mass production techniques 1.1.3 Commit/Evalua te Pilot Free Public Testing 1.2.3 Improve recipes 1.4.1 Get ingredients 1.3.1 Make a case why a juice drink is better Page 3 1.4 Manufact uring 1.4.2 Bottling 1.4.3 Distributi on 1.3.2 Refine mass production techniques 4/9/2020 Work Breakdown Structure Work Breakdown Structure Worksheet Work ID Work Name Description Include (Completion Criteria) Customer Asset Type Complexity Estimated Effort Skill Required Dependency Hand Off To Storage/Location 1.0 1.1 1.1.1 1.1.2 1.1.3 2.0 2.1 2.1.1 2.1.2 Confidential Page 4 4/9/2020