Work Breakdown Structure Project Name: Department: Focus Area: Product/Process: Prepared By Document Owner(s) Project/Organization Role Project Closure Report Version Control Version Date Author Change Description Created document. Confidential Document1 Last printed 3/24/2016 6:55:00 AM Work Breakdown Structure Work Breakdown Structure Purpose and Limitations [Replace this text with a statement of the purpose and limitations of this worksheet, or use the following sample.] The purpose of this worksheet is to: Identify the work to be done. Identify the types of resources required for the work. Develop estimates for each work element. Identify storage locations. This worksheet does not address: Who will perform the work. When the work will be completed. Confidential Page 2 3/24/2016 Work Breakdown Structure Work Breakdown Structure Organization Chart 1.0 Automated Software System 1.1 Prime Mission Product 1.1.1 Subsystem 1… (Specify Names) Confidential 1.2 Platform Integration 1.1.2 PMP Application Software 1.3 Systems Eng/ Program Mgt 1.1.3 PMP System Software 1.4 System Test & Evaluation 1.5 Training 1.6 Data 1.5.1 Equipment 1.5.2 Services 1.5.3 Facilities Page 3 1.7 Peculiar Support Equip 1.8 Common Support Equip 1.8.1 Test & Measure Equip 1.8.2 Support & Handling Equip 3/24/2016 Work Breakdown Structure Work Breakdown Structure Worksheet Work ID Work Name Description Include (Completion Criteria) Customer Asset Type Complexity Estimated Effort Skill Required Dependency Hand Off To Storage/Location 1.0 1.1 1.1.1 1.1.2 1.1.3 2.0 2.1 2.1.1 2.1.2 Confidential Page 4 3/24/2016