ArunCheeckoly THEERTHAM, MELETH Tellycherry, Kannur (Kerala), India arun.c06@gmail.com 07736263060 PRESENT ADDRESS: FLAT NO.2074, FEDERAL CITY, KARAYAMPARAMBU, ANGAMALY-685372, KERALA PROFESSIONAL OBJECTIVE: A position in Engineering (Electrical & Control) department of the company and providing an opportunity to make a strong contribution to organizational goal through continued development of professional skills. I intend to secure a challenging position in the electrical and instrumentation field by working as a key player in challenging and creative environment and keeping up with the latest technology. EDUCATION Bachelor Degree (B. Tech.), Electrical & Electronics Engineering, from Govt. College of Engineering, Kannur. University of Kannur, India (2005) (60%)-Second class SUMMARY OF QUALIFICATIONS I am an Electrical Engineer with 7+ years of experience in the Consultancy Services for wide range of projects in commercial, infrastructural, industrial in India as well in abroad. My wealth of experience in general electrical design of various projects ranges from Master Plans to detailed design of developments, including pumping stations. I was also responsible for the technical, commercial and contractual management of the project whilst working on high pressuretime sensitive project. I have got experience in working wide range of projects in oil gas sector on various stages of deliverables like, FEED Stage, IFC Phase, IFT documents, Concept design, detailed design, shop drawings. CARRIER SUMMARY 1) Sr. Electrical Engineer, SEED Consultants Inc, Cochin – Sept 2014 to Present (5 Months) 2) Electrical Engineer, consultant Russell and Dawson LLC, Ahmedabad – Dec 2013 to Sept 2014 ( 10 Months ) 3) Electrical Engineer, MWH Global, Pune – June 2011 to Dec 2013 ( 2 Year, 6 Months ) ( 6 Months deputation to MWH, Perth Australia as an Sr. Electrical Engineer for an Oil and Gas Project) 4) Electrical Engineer, TCE consulting Engineers, through M/s Essae Digitronics Pvt Ltd(Payroll). – May2009 to April 2011 (2 Year , 4 Months ) 5) Electrical Design Engineer, PS Techcom Pvt Ltd – April 2008 to April 2009 (1 Year) 6) Electrical Design Engineer, Silicon Technologies Pty Ltd – Aug 2006 to March 2008 (1 Year, 8 Month) KEY RESPONSIBILITIES IN SUMMARY. Electrical System Design for various projects ranging from Industrial, Residential, Healthcare, Commercial Buildings like Malls, Multiplexes, Office Complexes and Mixed-Use Developments. Design and development of electrical system of 11kV, 22kV, 66kV system. Prepare and Check Engineering Calculations to establish electrical system sizing requirements confirming to applicable standards. Electrical Equipment & Switchgear Sizing / Illumination Design / Cable selection for Electrical system, Preparation of Load flow studies, Electrical distribution, controls Scheme, Lighting Reports and Analysis of Lightning strike, Risk assessment. Electrical System Design for various projects ranging from Industrial-commercials, Substation for Steel plants, Water/Waste water treatment plant projects, Switchyards for Industrial plants, Residential, Hotels, Commercial Buildings like Malls, Multiplexes, Office Complexes. Preparation of Main SLD, SLD's for PCC, MCC, Familiar with international and Indian design codes such as BS, IEC, Page 1 of 5 ArunCheeckoly IS, AS/NZs, NEC, NBC, DEWA, Kharamma, Oman Regulations Codes. Technical & commercial evaluation of invited quotations. Co-ordinate with other Engineering Disciplines and Architects to establish electrical systems. Inspection visits of equipment like Transformers, D.G. & Panels. Regular site visits and instructing the Contractor about design, quality and progress. Monitoring Contractor’s work regularly thereby keeping a check on the quality. Design Co-ordination with Construction Administration department; liaise with Construction Supervision team for construction issues, Reviewing RFI’s/Submittals as per the PMP, tracking daily construction progress. PROFESSIONAL EXPERIENCE ( 7 YEARS) Worked as Lead Electrical Engineer with SEED Consultants Pvt Ltd ( Sept. 2014 to Present) - Responsible of complete electrical design review & delivery from concept to final GFC stage. - Mentoring and guiding junior engineers (Team Size: 4 Eng. & 10 CAD Tech). Refer Organogram - Scheduling & budgeting all projects, leading / attending design coordination meetings. Project Worked : 5 Star Hotel and commercial space: Dar es salaam, Tanzania. 60000Sq. Mt space with 21 Story building. Role: Sr. Electrical engineer who is responsible for design and detailing of whole building. Project coordination of all MEP service. The Project has 33 kV switchyard with 10 MVA 33/.4kV TR with Dry type, 1500 kVA 2 nos and 3nos of 2MVA. Dist. TR(11/0.433 kV) for Phase-1. With 1 no of 400kVA UPS for 700 Computer space for office. Architect: Al Hatmy Design & Engineering Consultancy Contractor : CRJE( East Africa) Limited. Marriot Hotel, Addis Abbaba. Concept design engineering for Marriot group of hotel, A state of the art Laboratory building, with B+11 floors and total built-up area of 22000 Sq. Mt. Client: Sunshine Inverstment Lead Architectural Consultant: Dimensions engineering consultants. Worked as Sr. Electrical engineer in Russel and Dawson LLC, (Dec 2013 to September 2014). Infrastructure Development & Internal Electrification of Township for Jade Jeans commercial buildings. Preparing Conceptual Design Reports for Approval, Electrical Equipments sizing calculations, Preparing preliminary/tender drawings, Preparing detailed tender documents including specification of each equipment as per the design. Preparing detailed BOQ along with the cost estimates. Preparing Execution Drawings. Co-coordinating with US clients and the Execution agencies & check the quality of work as per the specifications & drawings issued. Preparing Inquiry Specifications, Evaluation of Techno – Commercial Offers, Review of Vendor Drawings I am involved in preparing the Electrical calculations as: Load Calculation / Transformer Sizing / D.G. Set Sizing / Cable Sizing /Panel Board Design / Switchgear Rating / Fault Level Calculations.UPS Sizing / Battery Sizing. Project Worked : Hampton inn, hotels –Concept Design for largest and most advanced 700000 Sq. Ft. Exhibition and Convention Center and a limited group of hotel at Fairfield inn and Hampton inn, US. Architect: engineer. Russell and Dawson LLC Client: Marriot and International Exhibition Worked as an electrical Jade Jeans Commercial complex.-Worked as an electrical engineer in designing riser diagram and preparing panel schedule. I worked as Electrical Engineer (P2) in Building Services Department & involved to work with M & E (Mechanical & Electrical) Services mainly to support US offices work share projects. Page 2 of 5 ArunCheeckoly Responsible to select switchgear/luminaries/cables as per the requirement & keeping in view of various regulatory guidelines (viz. CIBSE Lighting Guidelines, BS, Building regulations, NFPA, ADDC guidelines etc.) & Standard Selection Procedure. Admin & Control Building for Aghada Power Station (UK) for Alstom, France. Client: JUKL, Reading Office. Role: Electrical Design Engineer Concept Design & Detail Design for Office Building at KHOR AL RAHA, PLOT 101 – Abu Dhabi. Client: AABAR Properties PJSC Role: Lead Electrical Engineer / Electrical Design Engineer Worked as Electrical Engineer in MWH GLOBAL, Pune (June 2011 to Dec 2013). Major projects handled : Project Name : APLNG Irrigation Project, Origin Energy (2012 – 2014) Position : Electrical and Control Engineer (Work Package Coordinator – Farm Power Supply) Project Description: Australian Pacific Liquefied Natural Gas project aims to convert Coal Seam Gas to LNG. The project located in Central Queensland. It is managed by Australian Pacific LNG Pty Ltd. The project consists of 1. The construction of infrastructure facilitating the extraction and processing of CNG. 2. The construction of high Pressure gas pipeline from central Queensland to Gladstone and 3. The management, construction and operations of CSG to LNG Processing facilities. My Responsibilities: Supporting and working collaboratively and in partnership with the Design Manager. Confirming the technical delivery methodology (Basis of Design). Worked in full capacity of Electrical and I&C Engineer on Condabri central WTF and Reedy creek WTF for developing engineering documents – Cable Block diagram, Instrumentation Loop diagrams, PLC wiring diagrams, Data Sheets, P&I diagrams, Installation diagrams, Data sheets, Specifications for instruments etc. Project Name : Upgrade 1– ERP Expansion Project Electrical Works (Client: Aurora Algae Pty Ltd, 2012-2013) Position : Electrical Engineer, An onsite Job about 6 months.( MWH Perth and Brisbane) I have got an opportunity to work in offshore at Perth, Western Australia to undertake the responsibility of an Electrical Engineer with MWH, Perth. I was responsible for the new additional electrical loadings and design an electrical supply for the scheme, including: Determine most appropriate load centre and Single Line Diagram Cable Calculations & Cable Schedule; Design of the required power and control panels and interface including: Typical Instrument Loop Diagrams; Electrical and Control Interconnection System Design for the various packages; Electrical Works Specification including 5 No new Power Distribution and 2 No Instrumentation Panels and interconnection of the new systems to the existing site DCS. Preparing Scope of Work Document to enable Aurora to obtain quotations for the work. I am also responsible for Panel inspection and commissioning. Project Name : Luggage point inlet screen Upgrade (Client: Queensland United Utilities, 2011-2012) Position : Project coordinator (Electrical) from MWH, Pune. Responsibilities: I was Responsible for Preparing the electrical wiring, panel schematics, cable routing layout in AutoCAD software. Coordinated with Cad Designer, Pune office to complete the job in specified time/Budget limit. I have coordinated with other Aus./Nz discipline lead to ensure efficient production of CAD designs and drawings within scheduled Page 3 of 5 ArunCheeckoly time. Prepared Relay coordination chart and studied protection schemes in PowerCAD. Worked as Electrical Engineer in ESSAE DIGITRONICS PVT LTD, BANGALORE (2009 TO 2011) MAJOR PROJECTS AND SUMMARY OF RESPONSIBILITIES HANDLED : Project Name : 10.0 MTPA hot metal expansion project, ( Client: Tata Steel Ltd, 2010-2011) Principal Consultant: Tata Consulting Engineers, Kolkatta. In HOT Metal Expansion Project for TATA Steel Limited, I worked as a project engineer (Electrical) Involved in the preparation of Basic study and Detailed Engineering, Tender Specifications, Bid Analysis and Purchase Recommendation, cost estimation, resolving engineering issues and controlling job schedules for timely completion of Industrial Projects for 2800TPH Iron Ore load out Plant of Tata Steel. I worked with Tata Consulting Engineers for entire project design and execution, prepared design drawing complying with TISCO standards. This project has largest conveyor, MV/ LV substation and fully automatic load out system controlled via Allen Bradley PLC. I have designed and detailed Electrical and Instrumentation part, and involved in full potential of a project engineer interacted with vendor on Procurement, installation, execution and commissioning stage, Project Name: Eastern mining & industrial supply-Coal mining Zone,(Client: EMTA, Bangal 2009-11) Position : Project Engineer (Electrical) from Essae, Bangalore-Pakur. Responsibility : Involved in the preparation of Basic study and Detailed Engineering, Tender Specifications, Bid Analysis and Purchase Recommendation, cost estimation, resolving engineering issues and controlling job schedules for timely completion of Industrial Projects for 3600TPH Iron Ore load out. Worked as Design Engineer in PS Techcom Pty Ltd, Bangalore (2008 to 2009) MAJOR PROJECTS AND SUMMARY OF RESPONSIBILITIES HANDLED : Project Name : 6.3MTPT steel expansion of LBSS Building, Vizag Steel Plant Client Rashtriya ISPAT nigam limited, Vizag Steel Plant, Vishakapatnam. : Principal Consultant: M.N. Dastur and Co Ltd, Kolkatta. Position : Electrical and Control Engineer, PS Techcom Pvt Ltd ( Sub contractor) Project info: This is an expansion for production of steel in Vizag steel plant. Vizag steel was expanding their annual turnover of production from 3.0 MTPA to 6.3 MTPT. PS Techcom was deployed as Turnkey contractor for the design, detailing, installation, and commissioning package. My role was junior engineer under project manager involved in Tendering, BOQ, design, estimation, getting approval from Consultants, local authority, attending meeting with consultants, daily interaction with sub contractor, vendor for installation and smooth running of project execution, testing and commissioning of panels and electrical system. Project Name : FAST BREEDER REACTOR PROJECT 230 KV INDOOR GIS SWITCHYARD PACKAGE (Fire fighting system for 500MWe proto type Fast breeder Reactor 230 KV indoor GIS switchyard), 2007-2008 Client : Bharatiya Nabhikiya Vidyut Nigam LTD, Kalpakam Principal Consultant Position : : MN Dastur and Co, Bangalore. Electrical Engineer, PS Techcom Pvt Ltd ( Sub contractor) JOB SUMMARY I was responsible for design and detailed engineering of electrical system for GIS Switchyard and LV distribution for substation. I have experienced in preparing design basis report, cost estimation, drawings and specifications. Also responsible for equipment layout drawings, cable routing, as built drawing preparation, scheduling, and involved in designing extra Low Voltage Services (Fire Detection and Alarm, Access Control, CCTV, Intruder Alarm, Structured IT/Telephony Cabling etc.). Also My responsibilities as an E&I engineer included review of design proposals and Page 4 of 5 ArunCheeckoly technical submissions from the contractor for the electrical and I&C equipment of the project such as motors, transformer, MV / LV switchgear, lighting design, PLC/SCADA system, piping and instrumentation drawings, field instruments, MV/LV cable, variable frequency drives, motors, DC supply system etc. Worked as Design Engineer in Silicon Technologies Pvt Ltd, Bangalore (2007 to 2008) My responsibilities as design engineer preparing layouts, making control schemes for electrical and I&C division. Design & draughting of building service drawings including as-built & shop. Preparation of basic calculation documents with the assistance of lead engineers . Provide Drawings, Site instruction, Modifications to the Sub-contractors on any revision of Electrical Works other than documents issued for Construction, and keep updating their accomplishments daily. Prepare Estimation, Build of quantities (BOQ), and Tender. SOFTWARE KNOWLEDGE Skills in Powercad -5/N, Version : 5.074.2. It’s a leading electrical engineering design software solution for consulting engineers. It is used for designing LV and MV distribution networks. AGi32Version 14. It’s a comprehensive lighting calculation software ease of modeling, and fast, high quality rendering for any interior or exterior environment including day lighting. AVEVA Instrument Designer Software tool handled during a project life cycle.- eases following Creation of CAD drawings, drawing list management, updating of revisions and printing of CAD files for loop diagrams, termination diagrams and Hook-ups etc. AVEVA wiring manager tool related to detailed cable wiring and termination design ( JB’s, Terminal loops, Relays, I/O racks, cable creation and termination, cross patching wiring etc. Autocad 2011 and AutoCAD Electrical 2011 :I have got trained in Autocad Electrical and have good experience in making control schematics and wiring schemes in ACADE. I have good working knowledge in ACAD since 2005. Developed skills in Revit and BIM tools. Personal Profile: Name: Arun Cheeckoly Age: 30 (DOB : 11-01-1984) Marital Status : Married. Nationality : Indian Name of Father: Kottarathil Mukundan Name of Mother: Vanaja Cheeckoly Contact Mode: +917736263060. Permanent addr: Theertham, Manakara, Panniyannur(PO:), Tellycherry, Kannur, Kerala -670107 Passport No. H5113384 Language Known : English, Hindi, Malayalam, Tamil, Kannada, Declaration: I hereby declare that the particulars furnished above are true and correct to the best of my knowledge Page 5 of 5