CLIC TRANSPORT AND INSTALLATION –review of options CES WORKING GROUP 11 JUNE 2008 K KERSHAW Contents • STATEMENT OF PROBLEM • COMMENTS ON SOLUTIONS USED ELSEWHERE • PROPOSAL • SUMMARY STATEMENT OF PROBLEM Transport and transfer/install : • 20,000 modules and their supports along the CLIC tunnel • Install magnets etc on tunnel roof • Install magnets etc between main beam line and tunnel roof • Install magnets in turn arounds • Install other things like dump lines and services • WHAT WE NEED NOW IS TO RESERVE SPACE AND DEFINE INTERFACES CLIC – Typical Cross Section CLIC – CV issues Monorail ? No. & Diameter of CV pipes needs to modified Floor stability to be studied Transversal Ventilation ? Overall module dimensions (April 2008) New configuration Alexandre.Samochkine @ cern.ch MB: sealed acc. structures in disk DB: PETS with “mini-tank” Quadrupole - updated 3D model Schematic CLIC Module layout Accelerating structures: based on CLIC-G disk damped and sealed long version - in-out WG for 4 structures - 980 mm, including 20 mm for interconnection MB front cradle hidden 7 LHC dipole installation with transfer tables LHC cryodipole installation with transfer table -2 LEP Installation “Lobster” LEP installation “Lobster” 2 However • No room for transfer tables or lobster frame below modules K Kershaw, 5 March 2007 However Lose a lot of height below monorail for: • Rolling chassis • Rotation elements • Depth of lift arm structure Centre of gravity of load MUST be under centre of rail during transport (this is an unknown for the modules) Collimator installation with trailer mounted crane DUMONT HERA Tunnel section with TRAM However • No room for stabilisers below modules • Need space above handled loads for spreader beams and arm structure CLIC module transport configuration? Module in transport configuration with beams HERA TRAM in CLIC Tunnel Arm operating zone Guide rail/anchor Summary - 1 • Need to determine module / support transport configuration • Transport zone needs to be wider than modules /supports in transport configuration • Need to consider transport and installation • Transport solution should not require space under modules (simple interfaces and passage zone) • Need to reduce cycle times • Consider transfer lines, turn arounds and beam dump lines Summary - 2 HERA TRAM – type solution • Transport and transfer/installation combined • Deals with roof-mounted magnets • Possible to adapt for transfer over modules to beam dump line?