MALAYSIA MARINE AND HEAVY ENGINEERING BHD. MARINE REPAIR BUSINESS UNIT Attachment 3.5.4: Minutes of Meeting (25) Minutes of Meeting Minutes of Meeting No. : 25 Purpose of Meeting : Weekly QA Meeting Date : 13th July 2013 Time : 0830am ~ 0930am Location : QA/QC Meeting Room ATTENDED BY Absentees if Any Attendees 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 1. 2. 3. 4. 5. 6. 7. PALANI SENDHIL KUMAR ZULAZFAR HILMI BIN OTHMAN MOHAMAD FAHME BIN TAHIRAN MOHD SAHID BIN ABDULLAH ALNASSER BIN OMAR MARTENEZ SAIFFUL BAHRI BIN MD SALLEH MOHD ALIZAN BIN ALI RIZAL BIN MD YUSOF REZUAN BIN KASSIM FATHUL ADZIM BIN MUHAMMAD ANUAR RUZLIZA BAHAROM MARIAH BINTI RAMLAN CHE HUZAYLY BIN CHE HARUN JOHARI BIN ABU BAKAR FARAH SHAZWANI BINTI MOHD SALLEH MUHAMMAD FARID BIN ABDUL HALIM SYAHRUL AKRAM BIN AZHAR MD HAFIDZAN SYAFIEE BIN MD FAIZAL MOHD HAFIDZULHADI BIN MD NOOR MOHD NADZIF BIN MISMAN ABDUL RAHMAN BIN CHE’ ANI NURUL ASYIKIN BINTI HAMZAH MUHAMMAD HAZWAN BIN SALIKIN DIMYATI BIN ABD MAJID @ HADJI MARZOEKI MOHD RIZAL BIN ABD WAHAB MOHD SAPIZEE BIN SAPAR Attachment : Note : Abbreviations : In Pursuit of Quality Excellence all Levels of Employees are Committed to Implement and Promote Quality during all the Phases of the Companies Activities. 1 of 5 MALAYSIA MARINE AND HEAVY ENGINEERING BHD. MARINE BUSINESS UNIT Item No. Description 1. Minutes Remark/Action from previous Action By Schedule Date the meeting Alizan will chair the next QA/QC Meeting. was confirmed by all Alizan 20.07.2013 Zul INFO Dimyati/ 9.07.2013 parties 2. Finalized list Welders received PMT, from Welder Qualification Piping and for All WQT’s with proper supporting documentation need to be updated by end of this month. Proper supporting documentation for all WQT’s have already been completed. Steel Works. CCS welders list and documents along with the welding machines qualification need to be registered with QA/QC. QA/QC to talk with CCS for their handover of their documents. WQT for Piping discipline for KBM1 & EP6 project, 12 pass over 17 candidates and which make 30 pax qualified piping welder in overall MBU. Status for 5 candidates who failed either need to retest/leave as it is will be follow up by Dimyati/Rizal Rizal W Wahab. WQT for SAW for EP6, 2 out of 3 have already done and 1 failed for the SAW. Zul INFO Sahid 15.07.2013 Fathul 13.07.2013 Zul 13.07.2013 Mr. Kumar highlighted to have all the weld maps for the several tanks. 3. QA/QC Initiative (weekly) Mr. Fathul raised that NDT equipment needs to be covered up with plastic bags. Cupboards should be provided to put all the NDT equipment. Workshop surrounding will be the suitable area for NDT equipment to prevent mixture with document. Zul to provide the space for NDT equipment and utilities for preservations. 2 of 5 MALAYSIA MARINE AND HEAVY ENGINEERING BHD. MARINE BUSINESS UNIT Item No. Description Remark/Action Mr. Fathul has already put the documentation upstairs Action By Fathul Schedule Date INFO in the cabin. 4. Weekly QA Surveillance 1surveillance carried out last week. QA Surveillance is planned next week. The group of surveillance has already been re-shuffled. G01 / G02 Mr. Kumar suggested to carry out more surveillance at Surveillance INFO Zul / Nurul 09.07.2013 Fathul INFO RIG as quality of workmanship was very poor frequently starting from this Monday at EP 6. Frequency at least 1 number of surveillance every 2 weeks. Mr. Kumar asks the group of surveillance to check the weld profile and need to be come out with full report. 5. QDD and QGP’s 6 Nos of QDD of Asset Management and Equipment Operations were approved and will be uploaded in EPortal. All QDD for Asset Management and Equipment Operations has already been submitted to us last Saturday and will be submitted to QHSE central. All QDD for Asset Management and Equipment Operations has already been submitted to QHSE central. 6. NDT Coordination Some technicians do not give their cooperation by not giving any follow-up activities without any information. Generally, QA/QC teams are short of man power. Mr. Kumar highlighted NDT ( MPI and DP ) works to be carried out by individual technicians , unless there is a need to do the particular NDT with more than one men. 3 of 5 MALAYSIA MARINE AND HEAVY ENGINEERING BHD. MARINE BUSINESS UNIT Item No. Description Action By Remark/Action Senior NDT team should have to assist and guide the Schedule Date NDT Team 15.07.2013 Rahman 06.07.2013 QA Reps Starting from junior to be able to do job on their own. 7. Nautica Muar Final documentation has already been completed except for the E&I. Status on 29thJune 2013, outstanding inspection report for E&I and Piping. 8. Inspection Report Mr. Kumar asks the QA/QC team to make reports for all new jobs and it should be done within 1 / 2 days. Soft copy reports and RFI should also be provided to be “New submitted to Mr. Kumar. Challenge” Mr. Kumar highlighted that QA/QC team have not been submitted soft copy reports and RFI. onwards Mr. Alnasser raised a concerned on how to fill up certain forms. Mr. Kumar requested Mrs. Rusliza to take all the Rusliza related filled up forms to make an example to fill up the forms. 9. Practical Students Mr. Kumar asks the IPT’s to be involved in the weekly meeting. They should bring out any matters regarding the findings and recommendations during the training session. Mr. Nadzif urged IPT to be more proactive to achieve QA/QC the experiences. Staff will not have time to entertain Staff/IPT and feed any unless IPT taking initiatives to learn. Farah suggested more computers should be provided for the IPT’s in order to be done work more efficiently. 4 of 5 INFO MALAYSIA MARINE AND HEAVY ENGINEERING BHD. MARINE BUSINESS UNIT Item No. Description Other Matters Remark/Action 1. Mr. Fathul has been received 2 calibrated Action By Schedule Date Fathul 08.07.2013 Liza Starting from cables for night work. Mr. Kumar asks Mr. Fathul to get spotlight / portable light to do the night work by next week. 2. Mr. Zul will consult Mrs. Rusliza to help doing the RFI reports and improve 08.07.2013 productivity. onwards 3. QA members should making copies of key QA team INFO QA team INFO to enter the cabin for documentation matter in case of emergency. 4. Mr. Zul urged the QA team to claim overtime minimum of 1.0 hour. Overtime claim under 1.0 hour will not be accepted. Minutes recorded by: Mohd Sahid Abdullah & Farah Shazwani Mohd Salleh. Minutes vetted and approved by: Palani Sendhil Kumar 5 of 5