Attachment 3.6.2

advertisement
MALAYSIA MARINE AND HEAVY ENGINEERING BHD.
MARINE REPAIR BUSINESS UNIT
Attachment 3.6.2: Minutes of Meeting (26)
Minutes of Meeting
Minutes of Meeting No.
:
26
Purpose of Meeting
:
Weekly QA Meeting
Date
:
20th July 2013
Time
:
0830am ~ 0930am
Location
: QA/QC Meeting Room
ATTENDED BY
Absentees if Any
Attendees
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
1.
2.
3.
4.
ZULAZFAR HILMI BIN OTHMAN
MOHAMAD FAHME BIN TAHIRAN
MOHD SAHID BIN ABDULLAH
ALNASSER BIN OMAR MARTENEZ
MOHD NADZIF BIN MISMAN
ABDUL RAHMAN BIN CHE’ ANI
SAIFFUL BAHRI BIN MD SALLEH
NURUL ASYIKIN BINTI HAMZAH
MOHD ALIZAN BIN ALI
RIZAL BIN MD YUSOF
REZUAN BIN KASSIM
DIMYATI BIN ABD MAJID @ HADJI MARZOEKI
MOHD SAPIEZEE BIN SAPAR
FATHUL ADZIM BIN MUHAMMAD ANUAR
RUZLIZA BAHAROM
MARIAH BINTI RAMLAN
CHE HUZAYLY BIN CHE HARUN
JOHARI BIN ABU BAKAR
FARAH SHAZWANI BINTI MOHD SALLEH
SYAHRUL AKRAM BIN AZHAR
MOHD HAFIDZULHADI BIN MD NOOR
PALANI SENDHIL KUMAR
MUHAMMAD HAZWAN BIN SALIKIN
MOHD RIZAL BIN ABD WAHAB
MUHAMMAD FARID BIN ABDUL HALIM
Attachment :
Note :
Abbreviations :
In Pursuit of Quality Excellence all Levels of Employees are Committed to Implement
and Promote Quality during all the Phases of the Companies Activities.
1 of 6
MALAYSIA MARINE AND HEAVY ENGINEERING BHD.
MARINE BUSINESS UNIT
Item
No.
Description
1.
Minutes
Remark/Action
from
previous
Action
By
Schedule
Date
the
meeting
Sapizee will chair the next QA/QC Meeting.
was confirmed by all
Alizan
27.07.2013
Zul
INFO
Dimyati/
9.07.2013
parties
2.
Finalized
list
Welders
received
PMT,
from
Welder
Qualification
Piping
and
WQT for Piping discipline for KBM1 & EP6 project, 12
pass over 17 candidates and which make 30 pax
qualified piping welder in overall MBU.
for
Status for 5 candidates who failed still pending by PMT.
Steel
Use previous welder as acceptance by Class surveyor.
Works.
Mr. Kumar highlighted to have all the weld maps for the
3. QA/QC Initiative
(weekly)
4. Weekly QA
several tanks.
Rizal W
Mr. Fathul has to come out with initiative as it was
Fathul
INFO
RIG as quality of workmanship was very poor
G01 / G02
INFO
frequently starting from this Monday at EP 6.
Surveillance
pending for 3 weeks.
2 surveillances carried out last week.
Surveillance
The group of surveillance has already been re-shuffled.
Mr. Kumar suggested to carry out more surveillance at
Frequency at least 1 number of surveillance every 2
weeks.
Mr. Kumar asks the group of surveillance to check the
weld profile and need to be come out with full report.
G02 has already submitted full report to Mr. Kumar.
2 of 6
MALAYSIA MARINE AND HEAVY ENGINEERING BHD.
MARINE BUSINESS UNIT
Item
No.
Description
5. QDD and QGP’s
Remark/Action
All QDD for Asset Management and Equipment
Action
By
Schedule
Date
Zul / Nurul
CLOSED
Fathul
INFO
NDT Team
15.07.2013
Fathul
22.07.2013
Fathul
22.07.2013
Rahman
22.07.2013
Operations has already been submitted to QHSE
central.
6. NDT Coordination
Some technicians do not give their cooperation by not
giving any follow-up activities without any information.
Generally, QA/QC teams are short of man power.
Mr. Kumar highlighted NDT ( MPI and DPI ) works to
be carried out by individual technicians , unless there is
a need to do the particular NDT with more than one
men.
Senior NDT team should have to assist and guide the
junior to be able to do job on their own.
Mr. Fathul highlighted the senior NDT team has already
teach and guide the junior NDT team.
The junior NDT team has already been able to do the
MPI and DPI.
Mr. Zul requested Mr. Fathul to give an assessment to
the junior NDT team to measure their understandingof
NDT application and task given
7. Nautica Muar
Final documentation has already been completed
except for the E&I.
Status on
20thJuly
2013, outstanding inspection report
for E&I and Piping.Mr. Rahman targeted the final
documentation will be out by next week.
3 of 6
MALAYSIA MARINE AND HEAVY ENGINEERING BHD.
MARINE BUSINESS UNIT
Item
No.
Description
8. Inspection Report
Action
By
Remark/Action
Schedule
Date
Mr. Kumar asks the QA/QC team to make reports for all
new jobs and it should be done within 1 / 2 days.
Soft
copy reports and RFI should also be provided to be
QA Reps
Starting from
“New
submitted to Mr. Kumar.
Challenge”
Mr. Kumar highlighted that QA/QC team have not been
submitted soft copy reports and RFI.
onwards
Mr. Alnasser raised a concerned on how to fill up
certain forms.
Mr. Kumar requested Mrs. Rusliza to take all the
Rusliza
related filled up forms to make an example to fill up the
forms.
Mr. Rezuan highlighted QA/QC team to have their own
QA/QC
Starting from
initiatives to take all the related filled up forms to make
team
22.07.2013
sample.
onwards
Mr. Nadzif suggested the QA/QC team to take out any
common forms.
Mr. Saifful suggested QA/QC team to print out any
related forms and paste it on the wall.
9. Update on Every
Vessels
Rizal
Puteri Zamrud
The vessel maybe will be come out today.
Wahab
KD Jebat
MPI requested tomorrow.
No inspection and RFI to be
Rizal Yusof
presented.
Thai Binh 01
The vessel has already been out.
Documentation has
already been prepared and done for the soft copy.
4 of 6
Rezuan
CLOSED
MALAYSIA MARINE AND HEAVY ENGINEERING BHD.
MARINE BUSINESS UNIT
Item
No.
Description
10. Practical Students
Action
By
Remark/Action
Schedule
Date
Mr. Kumar asks the IPT’s to be involved in the weekly
meeting.
They should bring out any matters regarding
the findings and recommendations during the training
session.
Mr. Nadzif urged IPT to be more proactive to achieve
QA/QC
the experiences. Staff will not have time to entertain
Staff/IPT
INFO
and feed any unless IPT taking initiatives to learn.
Farah suggested more computers should be provided
for the IPT’s in order to be done work more efficiently.
Syahrul mentioned that he would not be able to get
QA/QC
more knowledge by not going on board.
team
Mr. Nadzif highlighted the IPT’s to plan and schedule
IPT’s
INFO
their daily activities.
Other Matters
1. Mr. Fathul has been received 2 calibrated
cables for night work.
Fathul
CLOSED
Liza
Starting from
Mr. Kumar asks Mr.
Fathul to get spotlight / portable light to do the
night work by next week.
2. Mr. Zul will consult Mrs. Ruzliza to help doing
the RFI reports and improve productivity.
08.06.2013
3. QA members should making copies of key to
onwards
enter the cabin for documentation matter in
case of emergency.
4. Mr. Zul urged the QA team to claim overtime
minimum of 1.0 hour.
QA team
INFO
QA team
INFO
QA Reps.
22.07.2013
QA/QC
Starting from
Overtime claim under
1.0 hour will not be accepted.
5. Mr. Alnasser urged the QA/QC team to submit
all the project performance and QA/QC project
report to Project Manager 1 day after the
vessel has been out.
6. Mr. Alnasser raised a concern on 5s practice
5 of 6
MALAYSIA MARINE AND HEAVY ENGINEERING BHD.
MARINE BUSINESS UNIT
Item
No.
Description
Remark/Action
guideline.
QA/QC team need to practice the
Action
By
Schedule
Date
team
next week
onwards
5s guideline as before.
7. Mr. Nadzif asks Mr. Fathul to check out the
Fathul
available leave for foreign worker before
applying leave for them.
8. Mr. Nadzif urged the QA/QC team to provide
information to Mr. Zul or any QA/QC members.
This will help others to overcome the upcoming
matters or problems.
Minutes recorded by: Mohd Alizan bin Ali & Farah Shazwani Mohd Salleh.
Minutes vetted and approved by: Palani Sendhil Kumar
6 of 6
QA/QC
Starting from
team
next week
onwards