MALAYSIA MARINE AND HEAVY ENGINEERING BHD. MARINE REPAIR BUSINESS UNIT Attachment 3.6.2: Minutes of Meeting (26) Minutes of Meeting Minutes of Meeting No. : 26 Purpose of Meeting : Weekly QA Meeting Date : 20th July 2013 Time : 0830am ~ 0930am Location : QA/QC Meeting Room ATTENDED BY Absentees if Any Attendees 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 1. 2. 3. 4. ZULAZFAR HILMI BIN OTHMAN MOHAMAD FAHME BIN TAHIRAN MOHD SAHID BIN ABDULLAH ALNASSER BIN OMAR MARTENEZ MOHD NADZIF BIN MISMAN ABDUL RAHMAN BIN CHE’ ANI SAIFFUL BAHRI BIN MD SALLEH NURUL ASYIKIN BINTI HAMZAH MOHD ALIZAN BIN ALI RIZAL BIN MD YUSOF REZUAN BIN KASSIM DIMYATI BIN ABD MAJID @ HADJI MARZOEKI MOHD SAPIEZEE BIN SAPAR FATHUL ADZIM BIN MUHAMMAD ANUAR RUZLIZA BAHAROM MARIAH BINTI RAMLAN CHE HUZAYLY BIN CHE HARUN JOHARI BIN ABU BAKAR FARAH SHAZWANI BINTI MOHD SALLEH SYAHRUL AKRAM BIN AZHAR MOHD HAFIDZULHADI BIN MD NOOR PALANI SENDHIL KUMAR MUHAMMAD HAZWAN BIN SALIKIN MOHD RIZAL BIN ABD WAHAB MUHAMMAD FARID BIN ABDUL HALIM Attachment : Note : Abbreviations : In Pursuit of Quality Excellence all Levels of Employees are Committed to Implement and Promote Quality during all the Phases of the Companies Activities. 1 of 6 MALAYSIA MARINE AND HEAVY ENGINEERING BHD. MARINE BUSINESS UNIT Item No. Description 1. Minutes Remark/Action from previous Action By Schedule Date the meeting Sapizee will chair the next QA/QC Meeting. was confirmed by all Alizan 27.07.2013 Zul INFO Dimyati/ 9.07.2013 parties 2. Finalized list Welders received PMT, from Welder Qualification Piping and WQT for Piping discipline for KBM1 & EP6 project, 12 pass over 17 candidates and which make 30 pax qualified piping welder in overall MBU. for Status for 5 candidates who failed still pending by PMT. Steel Use previous welder as acceptance by Class surveyor. Works. Mr. Kumar highlighted to have all the weld maps for the 3. QA/QC Initiative (weekly) 4. Weekly QA several tanks. Rizal W Mr. Fathul has to come out with initiative as it was Fathul INFO RIG as quality of workmanship was very poor G01 / G02 INFO frequently starting from this Monday at EP 6. Surveillance pending for 3 weeks. 2 surveillances carried out last week. Surveillance The group of surveillance has already been re-shuffled. Mr. Kumar suggested to carry out more surveillance at Frequency at least 1 number of surveillance every 2 weeks. Mr. Kumar asks the group of surveillance to check the weld profile and need to be come out with full report. G02 has already submitted full report to Mr. Kumar. 2 of 6 MALAYSIA MARINE AND HEAVY ENGINEERING BHD. MARINE BUSINESS UNIT Item No. Description 5. QDD and QGP’s Remark/Action All QDD for Asset Management and Equipment Action By Schedule Date Zul / Nurul CLOSED Fathul INFO NDT Team 15.07.2013 Fathul 22.07.2013 Fathul 22.07.2013 Rahman 22.07.2013 Operations has already been submitted to QHSE central. 6. NDT Coordination Some technicians do not give their cooperation by not giving any follow-up activities without any information. Generally, QA/QC teams are short of man power. Mr. Kumar highlighted NDT ( MPI and DPI ) works to be carried out by individual technicians , unless there is a need to do the particular NDT with more than one men. Senior NDT team should have to assist and guide the junior to be able to do job on their own. Mr. Fathul highlighted the senior NDT team has already teach and guide the junior NDT team. The junior NDT team has already been able to do the MPI and DPI. Mr. Zul requested Mr. Fathul to give an assessment to the junior NDT team to measure their understandingof NDT application and task given 7. Nautica Muar Final documentation has already been completed except for the E&I. Status on 20thJuly 2013, outstanding inspection report for E&I and Piping.Mr. Rahman targeted the final documentation will be out by next week. 3 of 6 MALAYSIA MARINE AND HEAVY ENGINEERING BHD. MARINE BUSINESS UNIT Item No. Description 8. Inspection Report Action By Remark/Action Schedule Date Mr. Kumar asks the QA/QC team to make reports for all new jobs and it should be done within 1 / 2 days. Soft copy reports and RFI should also be provided to be QA Reps Starting from “New submitted to Mr. Kumar. Challenge” Mr. Kumar highlighted that QA/QC team have not been submitted soft copy reports and RFI. onwards Mr. Alnasser raised a concerned on how to fill up certain forms. Mr. Kumar requested Mrs. Rusliza to take all the Rusliza related filled up forms to make an example to fill up the forms. Mr. Rezuan highlighted QA/QC team to have their own QA/QC Starting from initiatives to take all the related filled up forms to make team 22.07.2013 sample. onwards Mr. Nadzif suggested the QA/QC team to take out any common forms. Mr. Saifful suggested QA/QC team to print out any related forms and paste it on the wall. 9. Update on Every Vessels Rizal Puteri Zamrud The vessel maybe will be come out today. Wahab KD Jebat MPI requested tomorrow. No inspection and RFI to be Rizal Yusof presented. Thai Binh 01 The vessel has already been out. Documentation has already been prepared and done for the soft copy. 4 of 6 Rezuan CLOSED MALAYSIA MARINE AND HEAVY ENGINEERING BHD. MARINE BUSINESS UNIT Item No. Description 10. Practical Students Action By Remark/Action Schedule Date Mr. Kumar asks the IPT’s to be involved in the weekly meeting. They should bring out any matters regarding the findings and recommendations during the training session. Mr. Nadzif urged IPT to be more proactive to achieve QA/QC the experiences. Staff will not have time to entertain Staff/IPT INFO and feed any unless IPT taking initiatives to learn. Farah suggested more computers should be provided for the IPT’s in order to be done work more efficiently. Syahrul mentioned that he would not be able to get QA/QC more knowledge by not going on board. team Mr. Nadzif highlighted the IPT’s to plan and schedule IPT’s INFO their daily activities. Other Matters 1. Mr. Fathul has been received 2 calibrated cables for night work. Fathul CLOSED Liza Starting from Mr. Kumar asks Mr. Fathul to get spotlight / portable light to do the night work by next week. 2. Mr. Zul will consult Mrs. Ruzliza to help doing the RFI reports and improve productivity. 08.06.2013 3. QA members should making copies of key to onwards enter the cabin for documentation matter in case of emergency. 4. Mr. Zul urged the QA team to claim overtime minimum of 1.0 hour. QA team INFO QA team INFO QA Reps. 22.07.2013 QA/QC Starting from Overtime claim under 1.0 hour will not be accepted. 5. Mr. Alnasser urged the QA/QC team to submit all the project performance and QA/QC project report to Project Manager 1 day after the vessel has been out. 6. Mr. Alnasser raised a concern on 5s practice 5 of 6 MALAYSIA MARINE AND HEAVY ENGINEERING BHD. MARINE BUSINESS UNIT Item No. Description Remark/Action guideline. QA/QC team need to practice the Action By Schedule Date team next week onwards 5s guideline as before. 7. Mr. Nadzif asks Mr. Fathul to check out the Fathul available leave for foreign worker before applying leave for them. 8. Mr. Nadzif urged the QA/QC team to provide information to Mr. Zul or any QA/QC members. This will help others to overcome the upcoming matters or problems. Minutes recorded by: Mohd Alizan bin Ali & Farah Shazwani Mohd Salleh. Minutes vetted and approved by: Palani Sendhil Kumar 6 of 6 QA/QC Starting from team next week onwards