noorul asif.k

advertisement
RESUME
NOORUL ASIF.K
+91-9994595597
noorulasif@gmail.com
Job Objective
Seeking for the job of Electrical and Instrument Engineer in Construction and Commissioning and
Operational & Maintenance of Process control & Instrumentation in Power, Petro chemical, Oil and gas Plant
environments where I can enrich my technical knowledge and put my efforts to attain goal of the company or
Project.
Education
(Jul’2007-May’2010) Bachelors of Engineering (Electronics & Instrumentation Engineering)
M.A.M College of Engineering(Anna University), India
Completed with First class( 72% ).
(Jun2004-Apr2007)
Diploma of Electronic’sand Communication Engineering
Krishnasamymemorial Polytechnic college - Cuddalore in India.
Completed with First class(79.5).
Professional Summary
3yrs 11months experience in Execution, Installation & Project Management activities in the field of Process
Control & instrumentation with Oil and Gas plant in Kuwait and also Maintenance in Instrument contract in
India. Possess excellent managerial capability in handling large projects and maintaining good relationship &
coordination with customer/client as per their requirements & technical specifications
Involved in Construction and Pre-commissioning of our projects, package for Field Instruments and Balance
of plant works
Key skills and Competencies













Able to study and interpret all IFC construction drawings which belongs to Instruments discipline such
as P&ID's, Instrument Specification Sheets, Loop Drawing, Hook up, Cable schedule, wiring diagram,
control room layout, I/O list and to execute the project by providing technical support & able to work
in multi-discipline teams.
Hands of experience on Oil and Gas plant project.
Engineering Co ordination for developing of Detail engineering activities such as Cable schedule,
Routing Schedule, Routing layout and Drumming Schedule.
Able to lead a team of technical as well as to maintain harmonious working relationships with client
satisfaction.
Hands of field experience with Calibration,Execution & Commissioning of various types of Instruments
like Transmitters (ABB, Honeywell , Yokogawa, Rosemount), Detectors(Honeywell,Detcon)control
valves (Severn)shut-off valve .
Involved technically to assist for procure the Project materials as a part of senior engg , technical team,
i.e Instrument Cables, Cable glands, terminal lugs, Project tools and other miscellaneous.
Gained exposure in KOC and KNPC standards and international standards for Instrumentation.
Co-ordinating the permit work and discuss the work with the Permit Issuer.
Preparation of Project reports, material inspection for procured items as per standards and international
codes.
Managed & lead team members on the erection and calibration activities and been a part of precommissioning team.
Invite client / contractor for witness and hold points in inspection/ Test.
Ensure the effective co-ordination with the client related to inspection.
Coordinate with the client for punch list closure and final acceptance.
1
Major Projects
PROJECT HANDLED
NAME OF THE PROJECT
LOCATION
CLIENT
CONTRACTOR
(DEC 2011- JULY 2014)
:
:
:
:
:
INSTALLATION OF LOW SULPHUR FUEL OIL,FUEL GAS
AND GAS OIL PIPELINE FROM MINA AL-AHMADI TO
SABIYA AND DOHAPOWER STATIONS.
GAS BOOSTER STATION&
TIE IN PROJECT IN K.N.P.C
MINA AL-AHAMADI,KUWAIT
KUWAIT OIL COMPANY (K.O.C)
HYUNDAI ENGG AND CONSTRUCTION.
KHARAFI NATIONAL, KUWAIT.
MAINTANCE
NAME OF THE COMPANY
LOCATION
(JUN 2011-OCT 2012)
:
:
E.I.D PARRY'S INDIA PVT LTD
NELLIKUPPAM, CUDDALORE(DIST).INDIA
Professional Experience
PRESENT EMPLOYERDURATION
KHARAFI NATIONAL ,KUWAIT
(Dec ’2011 – July 2014)
PREVIOUS EMPLOYERDURATION
E.I.D PARRY'S PVT LTD, INDIA
(Jun’2010 – Oct’2011)
Functional Details, Responsibilities & Expertise
1.
Instrumentation Supervisor
kharafi National , Kuwait
(Dec’2011 –July 2014)
 Working as a Site Supervison-Instrumentation.
 Preparation of Daily Scheduled of the working activities.
 Tie-in Project in live Plant in KNPC.
 Execute and lead a team to carry out the activities of cable tray installation, cable laying,
continuity &Megger test, Hook ups, and termination as per IFC Drawings.
 Lead the group of Instrument technicians to ensure the following Instrumentation precommissioning work will be properly executed.
 Loop Checking a Loop Testing of Instrument.
 Pre-planning of erection and Pre-commissioning of field instruments using piping and
instrumentation drawings.
 Analyzing site progress weekly/monthly report, resolving of site erection/commissioning problems
with project manager/construction manager.
 Installation of Panels Frames and JB .
 Knowledge in working according to P&ID, Hookup drawing ,Location drawing,
Wiring/Interconnection drawing, Tubing /Piping diagram/Panel wiring ,Cable schedule ,Cable tray
layout drawings
 Planning, Organizing, Executing, Monitoring & Controlling of all the Instrumentation and control
activities throughout Project.
 Prepare the Progress status report of respective areas to measure the achievement of execution &
attend progress and site co-ordination meetings with clients.
 Pre-Commissioning of Instrument Air Compressor Packages, Metering Skids, and




2
Analyzer Systems with Vendor.
Testing of Fire and Gas Detection System
Attend and witness site acceptance tests (SAT), other testing and acceptance activities as
required.
Reports to Commissioning Manager regarding the Pre-commissioning activities.
Manage the identification of Instrumentation system.
 Monitor construction/completion activities and pre-commissioning to ensure compliance
with commissioning expectations.
 Provide supervision and guidance during the pre- commissioning of discipline related
activities.Execute and lead a team to carry out the activities of Instruments bench calibration,
Loop checking of DCS,functional test of field Instrument & Control valves, MOV, Panel,
Console, Monitors of CCR, Control desk and field instrument installation etc.

2.
Review, evaluate and give my recommendation/comments to any modification or changes
to the construction design submitted by the contractor for approval of my Senior Engr. and
Site Manager and also successfully completion of Projects with time and Safety and
Quality Standards.
Instrumentation Supervisor(Maintance)
E.I.D Parry's pvt Ltd ,India





(Jun’2010 – Oct’2011)
Prepare shift schedule for contract persons.
Assign their activates of their work .
co-ordination for Technical Queries, material submittal approved.
Maintain a document and follow the safety conscience.
Coordinating with technicanes during calibration time.
Achievements

Have successfully completed Portion 1 of the Projects within particular time.
IT Credentials
Operating systems
:
Windows8. MSOffice.
:
:
:
J0856481
23.06.2010
22.06.2020
:
:
:
:
:
:
:
Indian
Islam
English, Tamil, Hindi.
21/09/1987
J0856481
+91 9952744715.
No.46/21 New Street,
Passport Details
Passport No
Date of Issue
Date of Expiry
Personal Details
Nationality
Religion
Language known
Date of Birth
Passport No
Permanent Phone
Permanent address
Nellikuppam,
Cuddalore-Dist
Tamil Nadu- 607 105
India.
Declaration
I hereby declare that the above written particulars are true to the best of my knowledge and belief.
Date:
Place:
Yours faithfully,
(Noorul Asif.K)
3
Download