Risk Assessment – Green Lancaster Exodus Project Project Details Exodus Re-Use Project Summer 2013 (June to September inclusive) Please see below for the risks associated with this project. The event will be organised by staff from Green Lancaster. “Green Lancaster Member” refers to any representative of Green Lancaster; Staff members, student staff or volunteers. Ongoing Assessment The Risk Assessment process must be ‘on-going’ and ‘dynamic’. In other words, professional judgements and decisions regarding safety will need to be made during the activity. If the control measures aren’t sufficient, the activity must not proceed. GL Project Coordinator: Darren Axe (01524 593681) GL Additional Point of Contact: BASE Contact Date(s) and Time(s) of Activity: University Contact Points Sarah Hinton, LUSU Involve Manager (01524 593693) Lancaster University Security: 01524 65201 Project Start: 19/6/2013 Review Date: 18/6/2014 If you have any concerns that cannot be resolved by the staff or volunteers on the activity please contact Lancaster University Security office on: 01524 594541. Page 1 of 7 22/03/2016 Risk Assessment – Green Lancaster Exodus Project Section 1: PEOPLE & SAFEGUARDING 1.3: Competence of Staff & Volunteers (Training and Experience) Control Risk Level Responsible for maintaining control Poorly trained GL members Injury caused by lack of training or understanding of tasks All GL members to be issued with a safe participation statement by e-mail before starting work on the project. There will be a project briefing, including safety considerations at the team training on 19/06/13. Low Project Coordinator Manual handling Injury caused by lack of awareness of safe manual handling All GL members will take part in a safe manual handling training session on 19/6/2013. This will take place prior to any GL member commencing work on the project. Low Project Coordinator Control Risk Level Responsible for maintaining control GL members are to make the Project Coordinator aware if they have any needs that may restrict their ability to complete tasks associated with the project. GL members should inform the project coordinator at the training session or as soon as possible by email following the briefing session of any specific needs or difficulties they may have with the proposed activity. The Project Coordinator will make arrangements to ensure that GL members with difficulties or needs are able to participate in tasks within their capabilities. Low Possible Hazards Associated Risk (including who is affected) 1.5: Support Needs (SEN / Medical / Other) Possible Hazards Volunteers with SEN/ Medical/ Other needs getting into difficulty whilst undertaking tasks Associated Risk (including who is affected) Injury to staff Page 2 of 7 GL members Project Coordinator 22/03/2016 Risk Assessment – Green Lancaster Exodus Project Section 2: CONTEXT 2.1: Activities & Equipment Possible Associated Risk (including who is affected) Hazards Heavy or bulky items Sharp or dangerous items placed in donation crates or bags Dirt or other unhygienic substances contacting skin Control Risk Level Injury to staff member or back strain due to liftingheavy items GL members will always work as part of a team of 2 or 3 members. Staff will be trained in safe manual handling procedures and will adopt the principles of safe manual handling when lifting and transporting heavy or bulky items. A manual handling assessment has been completed for the movement of all heavy and bulky items and is attached to this Risk Assessment document. Moderate Injury or cut to staff member GL members will wear disposable nitrile gloves when handling donations to minimise contact of dangerous items with skin. Tough rubberised palm gloves or nitrile gauntlet gloves will be worn if handling broken glass or other sharp items such as knives. Low GL members Injury/ infection to staff member GL members will wear disposable nitrile gloves when handling donations to minimise contact of dangerous items with skin. These will be disposed of after each shift and hands will be cleaned with anti-septic wipes. Low GL members Medical/ hygiene items such as subscription tablets Injury or infection risk to staff member Needles or syringes Injury or infection risk to staff member If any medical items are discovered with the donations, the GL member will wear nitrile gloves if the items need to be handled. The items will be placed in a yellow clinical waste disposal bag and temporarily stored in the yellow medical items disposal box in the container. A regular collection from the container will be arranged through the Safety Office (01524 510617). If any needles/ syringes are discovered among the donations, they will not be handled by members of the staff team. If any needles/ syringes or needle containers are found, these will be reported at the nearest porters’ lodge for the porter to arrange for safe disposal. If necessary, the donation point will be cordoned off until the items have been removed and the area sterilised. If any team member comes into inadvertent physical contact with needles/ syringes, immediate medical advice will be sought at Lancaster Royal Infirmary. Page 3 of 7 Responsible for maintaining control Project Coordinator GL members Project Coordinator Moderate GL members Project Coordinator Moderate GL members 22/03/2016 Risk Assessment – Green Lancaster Exodus Project Section 2: CONTEXT 2.2: Physical Environment (Venue) Possible Hazards Associated Risk Work Site Injury to staff due to unsafe or unsuitable site for work. (including who is affected) Control Risk Level Responsible for maintaining control The majority of work associated with the project is taking place at Lancaster University campus which is a low risk site. GL members working at sites other than Lancaster University campus will be informed on the daily task sheet of any site specific hazards and safety precautions. Low Project Coordinator Risk Level Responsible for maintaining control Moderate GL members 2.3: Travel/ Transport Possible Hazards Associated Risk (including who is affected) Traffic Injury to staff due to collisions Driving Road traffic incident, injury Travelling in vehicles Road traffic incident, injury Parking/ manoeuvring the vehicle Road traffic incident, injury Control Interaction with traffic will be minimal as most of the work will take place on campus which is largely pedestrianised and 20mph speed limit is in force on all roads. When crossing roads, GL members will use crossings where available or choose safe and appropriate crossing locations. Vehicles will only be used by GL members 21 years of age or above. Designated drivers must fill out a Driver Declaration Form which will be kept on file by the Project Coordinator. Speed limits will be observed at all times. The vehicle log form must be filled out at the start and end of each shift. All GL members will wear seatbelts at all times when travelling in vehicles. Passengers will not distract the driver and the designated navigator will give directions to the driver. When the driver is manoeuvring/ parking the vehicle, one of the passengers will assist the driver by standing well back to the rear of the vehicle and communicating with the driver with clear hand signals. This team member will wear a hi-viz vest at all times and stay clear of other vehicles and traffic. Page 4 of 7 Project Coordinator Moderate GL members Moderate GL members Moderate GL members 22/03/2016 Risk Assessment – Green Lancaster Exodus Project Section 3: ORGANISATION 3.1: Emergency Procedures Possible Hazards Associated Risk (including who is affected) Lack of First Aid assistance Increased or prolonged effect of injuries Litigation following injury / incident Organisation involved in legal proceedings Fire in buildings Injury, burning Control First Aid assistance is available on campus through the security office. First Aid assistance will be summoned at the nearest porters’ lodge, where if qualified, the porter will assist with First Aid. If the nearest porter is not qualified, or additional emergency assistance is required security will be called on 01524 65201. Telephones are available in all porter lodges. Incident report forms will be kept in a file on the desk in the sorting container and must completed for all injuries, incidents and first aid treatment. These will always be reported back via the Project Coordinator to the LUSU Involve Director/ Assistant Director and kept on file. A copy of all first aid treatment MUST be given to University Security. GL members will ensure they are aware of fire evacuation procedures for the buildings they enter on campus. Fire Action signs in all buildings inform building users of escape routes and assembly points. Page 5 of 7 Risk Level Responsible for maintaining control Low Project Coordinator Lead Volunteer Low Project Coordinator Moderate GL members 22/03/2016 Risk Assessment – Green Lancaster Exodus Project The undersigned believe this assessment to cover all significant risks associated with the above activity and accept their responsibilities for ensuring associated controls are in place. Section 5: Authorisation and Communication 5.1: Authorisation Position Print Name Project Coordinator: Darren Axe LUSU Involve Deputy Director: Sign Date 18/6/14 Sarah Hinton Please detail how this risk assessment will be communicated to volunteers and other parties who must comply: 5.2 Communication Who needs to understand this assessment? Project Staff How and when will this be communicated to them? By Who? Project Staff to be briefed and issued with a Safe Participation Statement prior to commencing work on the project on Wed 19th June 2013. Project Coordinator Page 6 of 7 22/03/2016 Risk Assessment – Green Lancaster Exodus Project Appendix 2: Risk Rating Guide Below is a simple guide to help risk assessors determine the risk rating of each hazard identified. This guide is intended to help you and to try and implement/maintain some consistency between individuals when assessing risks; it is not meant to be a burden which confuses and complicates matters. A Risk Assessment should be ‘Suitable and Sufficient’. That is to say: It should identify the risks arising in connection with the activity. The level of detail included should be proportionate to the risk. It must consider all those who might be affected i.e. staff, pupils, other instructors etc. It should be appropriate to the activity and should identify the period of time for which it is likely to remain valid. It should enable management to determine the level of control measures necessary All project activity has potential hazards and risk to staff and pupils, therefore the control measures identified should be sufficient to reduce the risk to acceptable levels. If the control measures aren’t sufficient, consideration must be given to absolute ‘cut off criteria’ and the activity must not proceed. In addition, there must always be an alternative activity (Plan B), prepared and risk assessed. The control measures identified on a form are the written evidence that the six key areas above have been considered. Risk Rating = Likelihood x Severity Likelihood: Severity: Risk Level Matrix: 1 Improbable 1 No or trivial injury/illness 2 Unlikely 2 Minor Injury/Illness 3 Even Chance 3 3+ Days Lost Time Injury/Illness 4 Likely 4 Major Injury/Severe Incapacity 5 Almost Certain 5 Death(s) L i k e l i h o o d Key 5 5 10 15 20 25 Insignificant 4 4 8 12 16 20 Low 3 3 6 9 12 15 2 2 4 6 8 10 High 1 1 2 3 4 5 Intolerable 1 2 3 4 Severity 5 Page 7 of 7 - Moderate 22/03/2016