THEMIS Mission PDR Project Overview and Status Peter R. Harvey University of California - Berkeley THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Agenda Agenda • • • • • Science Overview Mission Overview Programmatic Overview Organization Review THEMIS Mission PDR/CAR 2 UCB, November 12-14, 2003 Science Overview Science Overview • Purpose To understand the onset and macroscale (1-10 Re) evolution of magnetospheric substorms. • Capabilities Will provide the first measurements of substorm starting location Will provide the first measurements of substorm evolution • Collaborating Institutions (Hardware) University of California (UCB, UCLA) Swales Aerospace Inc. (SAI) Goddard Space Flight Center (GSFC) University of Colorado (LASP) THEMIS Mission PDR/CAR Technical University of Braunschweig (TU-BS) Institut fur Weltraumforschung der OAW (IWF) CETP University of Calgary University of Alberta 3 UCB, November 12-14, 2003 Mission Overview Mission Overview • Launch Vehicle: Injection: Date: • Space Segment Spacecraft: Instruments: Orbit Period(s): Orientation: • 5 Spinning probes with fuel for orbit/attitude adjust 3-Axis E-Field, B-Field 3-D Ion & Electron Particle Detectors 1, 2 and 4 days Ecliptic normal Ground Segment Observatories: • Delta II, Eastern Range 1.1 x 12 Re, 9 degrees inclination August 2006 20 Northern of All Sky Imaging and Mag Field Operations Phases: Lifetime: THEMIS Mission PDR/CAR I&T, L&EO (2 mo), Campaigns (Dec-Mar), Deorbit 2 years 4 UCB, November 12-14, 2003 Programmatic Overview Programmatic Overview • PI Mode PI Team Provides Space, Ground, Data Segments PI Team Provides Cost, Schedule, Performance Assurance PI Team Provides Education/Public Outreach • Cost and Schedule Caps Single Cost Cap for the Mission Launch no later than March 2007 • Performance Assurance MIDEX Quality Requirements Implementation Strategy Use Heritage Instrumentation Coordinate Common Buy Parts Keep Probe/Probe Carrier Simple and Robust THEMIS Mission PDR/CAR 5 UCB, November 12-14, 2003 Organization Explorers Office Frank Snow, Mission Mgr U.C. Berkeley KSC Vassilis Angelopoulos, PI Peter Harvey, PM Tammy Harrington, Mission Integ Mgr Swales Aerospace Mike Cully U.Colo/LASP Bob Ergun CETP Alain Roux B. De la Porte GSFC/GNCD Karen Richon TU-BS Uli Auster Univ of Calgary Eric Donovan Univ of Alberta J. Samson IWF Werner Magnes THEMIS Mission PDR/CAR UCLA Chris Russell THEMIS Organization Chart Subcontracts/Agreements Phases BCD 6 UCB, November 12-14, 2003 Organization THEMIS Project 1. Management, Science, Systems Eng. 2. Space Segment Development 1.1 Management 2.1 Instruments 1.2 Science 2.2 Spacecraft 1.3 Systems Engineering 3. Ground Segment Development 3.1 Mission Operations Center 3.2 Science Operations Center 4. Mission Ops & Data Analysis 5. Education & Public Outreach 4.1 Mission Operations 4.2 Data Analysis 3.3 Ground Based Observatories THEMIS Work Breakdown Structure THEMIS Mission PDR/CAR 7 UCB, November 12-14, 2003 Organization Management, Science and Systems Engineering Program Management Peter Harvey Management Support K. Harps Finances M. Larson Purchasing M. Giordano Documentation D. Meilhan Scheduling A. Shutkin Administration Facility Support J. Cooks Contracts J. Keenan Purchasing G. Davis Accounting J. Williams Travel J. Jones Personnel UCB Sponsored Projects D. Weldon Contracting Systems Engineering Science V. Angelopoulos Ellen Taylor Electrical Ellen Taylor Mechanical /Thermal Paul Turin Chris Smith EMC/ESC/MAG Robert Snare (UCLA) Quality & Safety Ron Jackson Science Support Bonnell, John Carlson, Chuck Delory, Gregory Frey, Harald Hull, Art Larson, Davin Lin, Robert Mende, Steven Moreau, Thomas Mozer, Forrest Parks, George Peticolas, Laura Phan, Tai Temerin, Michael Parts Jorg Fischer THEMIS WBS 1.0 THEMIS Mission PDR/CAR 8 UCB, November 12-14, 2003 Organization Instruments Instrument Data Processor Unit (IDPU) Electric Field Instrument (EFI) Robert Abiad Peter Berg Heath Bersch Dorothy Gordon Frank Harvey Selda Heavner Jim Lewis Jeanine Potts Chris Scholz Kathy Walden Forrest Mozer John Bonnell Greg Delory Art Hull Bill Donakowski Greg Dalton Robert Duck Mark Pankow Dan Schickele Stu Harris Hilary Richard ElectroStatic Analyser (ESA) Charles Carlson M. Marckwardt Bill Elliott Ron Herman Solid State Telescope (SST) Fluxgate Mag (FGM) Robert Lin Davin Larson Ron Canario Robert Lee T. Moreau TUBS/IWF Uli Auster K.H. Glassmeier W. Magnes Mag Booms Search Coil Mag (SCM) CETP Alain Roux Bertran de la Porte Olivier Le Contel Christophe Coillot Abdel Bouabdellah Instrument I&T Rick Sterling LASP Robert Ergun Aref Nammari Ken Stevens Jim Westfall Hari Dharan Y. Kim Tien Tan Bill Tyler THEMIS WBS 2.1 THEMIS Mission PDR/CAR 9 UCB, November 12-14, 2003 Organization Ground Segment Mission Ops Science Ops (Mission Planning) Manfred Bester Mark Lewis Tim Quinn Sabine Frey Tai Phan John Bonnell Laura Peticolas GSFC/GCND David Sibeck Mark Beckman Bob DeFazio David Folta Rick Harman Ground Based Observatories All Sky Imagers Stephen Mende Stu Harris Steve Geller Harald Frey Ground Magnetometers Fielding & Operation (UC&UA) UCLA Chris Russell Joe Means Dave Pierce UC Eric Donovan UA J. Samson THEMIS WBS 3 THEMIS Mission PDR/CAR 10 UCB, November 12-14, 2003 Top Level Schedule GODDARD SPACE FLIGHT CENTER MISSION MGR. : FRANK SNOW MILESTONES THEMIS TOP LEVEL SCHEDULE STATUS AS OF: 11/06/03 CY 2003 CY 2004 CY 2005 CY 2006 J F M AM J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O PDR. MAJOR REVIEWS SRR. 1 IDPU DEVELOPMENT CONF. REV (HQ) 11/12-14 1/15 DSG COMPL. CDR. 4/06-07 BOX ETU ASSY I&T 12/08 4/01 4/16 7/16 MCRR 12/08-09 IDPU ETU DESIGN, FAB, I&T & FLIGHT 2 EFI SPB / AXB DEVELOPMENT 1 23 4 5 6 FLT I&T COMPL 8/18 7/13 7/28 8/11 7/21 8/04 ETU TEST DSG COMPL.. 3 4 5 6 1 2 FLT I&T COMPL 6/08 7/06 8/03 8/31 9/28 10/12 EFI SPB & AXB DESIGN, FAB, I&T 11/26 3 ESA DEVELOPMENT 2/12 FLT ASSY 16 ETU ETU H/W DSG COMPL.. FAB TESTS FAB ESA ETU DESIGN, FAB, I&T & FLIGHT 1/22 4 SST DEVELOPMENT 4/30 2/27 3/05 ETU DSG COMPL. FAB Slack Legend INSTRUMENT SLACK -PROBE -CARRIER & BUS SLACK MISSION SLACK -- 1-6 FLT I&T COMPL 6/25 8/27 ETU I&T FLT 1-6 FAB 1 COMPL. 3/02 7/06 2 3 4 5 6 SST ETU DESIGN, FAB, I&T & FLIGHT FLT I&T COMPL 12/16 5 FGM DEVELOPMENT DSG COMPL. FGM ETU DESIGN, FAB, I&T & FLIGHT 9/29 ETU FAB DSG COMPL.. SCM EM DESIGN, FAB, I&T & FLIGHT SCM EM DESIGN, FAB, I&T & FLIGHT FLT 1-5 FGE FAB & TEST FGE ETU ETU TEST I&T (GERM. ) 12/29 1/26 2/23 ETU PROC/FA B 6 SCM DEVELOPMENT 7 SCM/FGM BOOM DEVELOPMENT 1/06 ETU I&T 12/10 3/08 FLT 1-2 5/31 3-5 FLT I&T COMPL 10/18 7/26 ETU I&T FLT 1-6 FAB COMPL. 4/16 7/30 1/21 DSG COMPL.. 8/06 8/24 9/28 11/02 9/10 10/15 FAB HINGES & TUBES 2-3 1 4-6 FLT I&T COMPL 9/24 10/25 11/30 1 2 34 5 6 FLT I&T COMPL 8 FLIGHT PLATFORM & HARNESS 6/14 8/24 9/07 9/21 8/31 9/14 9/28 1 2 3 4 5 6 FLT HARNESS COMPL 8/03 8/31 9/28 8/17 9/14 10/12 F1 F2 F3 F4 F5 F6 ETU I&T 9 INSTRUMENT I&T ETU & FLIGHT 1 - 5 INTEGRATION & TEST 7/13 11/16 12/23 1/20 10/26 11/30 1/06 F5 SLACK (120 days) INSTRUMENT DELIVERY TO SWALES F1 SLACK (95 days) F1 10 PROBE CARRIER 3/10 F1 SLACK (40 days) PROBE CARRIER DESIGN, FAB, TEST F2 4/06 F3 F4 F5 6/06 5/04 5/04 6/29 F5 SLACK (64 days) 9/28 DSG & PROCURE FAB COMPL.. I&T COMPLETE 11 SPACECRAFT PROBES LONG LEAD PROCUREMENT, SUBSYSTEM DESIGN, FAB & BUS I&T F1 2/16 12 PROBE & INSTRUMENT I&T 8/09 F2-3 F4 F5 6/24 PROBE F1 SLACK (60 days) 5/11 PROBE I&T with INSTRUMENTS 6/27 PROBE CARRIER SLACK (60 days) 8/10 8/03 PROBE F5SLACK (40 days) 10/05 F1 F2-3 F4 F5 8/25 13 PROBE CARRIER ASSY I & T 9/15 10/19 12/05 11/23 INTEGRATION & ENVIRINMENTAL TESTS 3/15 14 LAUNCH OPERATIONS SHIP & LAUNCH PROCESSING LAUNCH PROCESSING/LAUNCH THEMIS Mission PDR/CAR 5/25 MISSION SLACK (60 days) 8/21 11 UCB, November 12-14, 2003 Review Process Review Requirements and Plans • • THEMIS_IIRP (7/31/03) meets GPG8700.6 THM-CDRL011C-EPRP (9/29/03) meets GPG8700.4 Team Selection • • • • • • • Chairman through which all RFAs will flow Electrical Expert Mechanical Expert One or Two Sensor or Instrumentation Experts GSFC Oversight (as always) encouraged EPRP Instructions given to team members LLIS Instructions & pre-selected items given to the teams Results • • • Plenty of recommendations! Not many substantive action items Not a single LLIS “hit” (at least not identified as such) THEMIS Mission PDR/CAR 12 UCB, November 12-14, 2003 Review Teams Peer Review Team Composition System SCM System FGM System EFI System ESA Name Jeff Preble Jim Slavin Jose Merayo Dave Everett Mike Sholl Name Jeff Preble Jim Slavin Henry-Claude Seran Dave Everett Mike Sholl Name Jeff Preble John Wygant Robert Pfaff Henry Heetderks Mike Sholl Name Jeff Preble Ed Shelley Mike McCarthy Henry Heetderks Mike Sholl THEMIS Mission PDR/CAR Function Review Chairman Magnetics Expert Magnetics Expert Electrical Mechanical Function Review Chairman Magnetics Expert Magnetics Expert Electrical Mechanical Function Review Chairman Electric Fields Expert Electric Fields Expert Electrical Mechanical Function Review Chairman ESA/SST Expert ESA/SST Expert Electrical Mechanical Organization SpaceWorks GSFC Danish Tech Univ GSFC UCB SNAP Organization SpaceWorks GSFC Orlean, France GSFC UCB SNAP Organization SpaceWorks Univ of Minnesota GSFC UCB SNAP UCB SNAP Organization SpaceWorks Lockheed Palo Alto (Retired) Univ Washington UCB SNAP UCB SNAP 13 UCB, November 12-14, 2003 Review Teams Peer Review Team Composition System SST System IDPU System GBO System MO Name Jeff Preble Ed Shelley Mike McCarthy Henry Heetderks Mike Sholl Name Jeff Preble John Wygant Robert Pfaff Ed Shelley Don Mitchell Henry Heetderks Mike Sholl Name Gary Swensen Hans Nielsen Rick Sterling Bill Davis Dennis Lee Name Karen Richon Rick Harmon Osvaldo Cuevas THEMIS Mission PDR/CAR Function Review Chairman ESA/SST Expert ESA/SST Expert Electrical Mechanical Function Review Chairman Electric Fields Expert Electric Fields Expert ESA/SST Expert ESA/SST Expert Electrical Mechanical Function Review Chairman Ground Based Obs Remote Site Fielding Systems Systems Function Review Chairman ACS Ops, Orbit Dyn 14 Organization SpaceWorks Lockheed Palo Alto (Retired) Univ Washington UCB SNAP UCB SNAP Organization SpaceWorks Univ of Minnesota GSFC Code 600 Lockheed Palo Alto (Retired) Johns Hopkins UCB SNAP UCB SNAP Organization University of Illinois Univ of Alaska UCB Penguin GSFC Explorers GSFC Explorers Organization GSFC GNCD GSFC GNCD GSFC GNCD UCB, November 12-14, 2003 RFA Status Overall RFA Status Review Systems Requirements Probe and Probe Carrier Fluxgate Magnetometer Search Coil Magnetometer ElectroStatic Analyser Solid State Telescope Electric Field Instrument Instrument Data Processor Magnetometer Booms Ground Based Observatories Schedule Mission Operations Date July 2003 Oct 2003 Oct 2003 Oct 2003 Oct 2003 Oct 2003 Oct 2003 Oct 2003 Oct 2003 Oct 2003 Oct 2003 Nov 2003 RFAs Given Submitted 26 25 41 18 2 1 3 0 2 0 2 0 2 0 4 0 0 0 14 0 1 1 18 0 All Responses are submitted to Explorer’s Office & kept on the THEMIS ftp site. THEMIS Mission PDR/CAR 15 UCB, November 12-14, 2003 SRR RFAs SRR RFA Status RFA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Originator Title Lead Status Killough Requirements Flow-Down for Automated TestHarvey Equipment Submitted Killough State or Mode Dependent Requirements Krauter Submitted Killough Review MRD with Regard to Resolution, Accuracy Brenneman & Position Submitted Killough/BarrowmanRequirements Dealing with Time Synchronization, Angelopoulos MET, Time tagging Submitted Killough Clarify Types of Spacecraft Numbers and Identifiers Krauter-Bester Submitted F. Martin Use GSFC Standard Practice for Margins and Taylor Margin History Submitted F. Martin/Bolek Spacecraft Visibility with Ground/TDRS Taylor Submitted F. Martin Add I&T requirements Flow-Down for the Payload Taylor-Brenneman Carrier Submitted B.Taylor Assigning Responsibility for Assuring Requirements Taylor Compliance Submitted B.Taylor Compliance to Interface Control Documents Ajluni Submitted B.Taylor Schedule to Release/Baseline of Level II/III Requirements Harvey Documents Submitted B.Taylor Requirements Testing with the Ground System Taylor-Bester Submitted Schnurr Document Control, Signoff and Management Harvey Submitted Schnurr Provide Flow-down of Safety/Inhibits for Separation Ajluni and Propulsion Submitted Bolek/Glubke Process for replacing a Failed Probe with a Replacement Bester-Bonnell probe Bolek Flux Gate Magnetometer requirements Taylor Submitted Bolek C&DH Capability for Writing and Retrieving from Krauter Memory Submitted Hair/Mark Add Z-Axis Center of Gravity Requirement forLashley PCA Submitted Hair Set Limitations on the Placement of the MAGTaylor and EFI Instruments Submitted Hair Add Functional Requirements to IN.BOOM Requirements Taylor Submitted Hair Add Carrier De-Spin Requirement to the Launch Taylor Vehicle Requirements Submitted Hair Adding Deployment Signal/Command Requirements Ajluni Submitted Hair Provide Clearer Connection Between ScienceAngelopoulos and Mission Requirements Submitted Fantano Specify Temperature Requirements for all Sensitive Taylor Hardware Submitted Fantano Specify Verification Test Requirements Brenneman Submitted Fantano Specify Minimum and Maximum Allowable Transmitter Ajluni On TimesSubmitted THEMIS Mission PDR/CAR 16 UCB, November 12-14, 2003 SRR Recommendations SRR Recommendation Status Rec Rec Rec Rec Rec Rec Rec Rec Rec Rec Rec Rec Rec Rec Rec Rec Rec Rec Rec Originator Davis Fantano Fantano Glubke Hair Hair Hair Hair J.B. Joyce J.B. Joyce J.B. Joyce J.B. Joyce/ Mark J.B. Joyce/Mark Killough Killough/Mark Schnurr Schnurr Schnurr THEMIS Mission PDR/CAR Title Lead Implement Continuous Nitrogen Purge Taylor Re-evaluate Temperature Telemetry requirements Ajluni Suggested Change to PB.THM-16 Taylor Impact of Extended Mission Mission Life Angelopoulos Deployable Torque Ratio Pankow Deployment of magnetometer Booms Pankow MRD Configuration Management Taylor Assessment of Lunar Shadows Bester-Frey Detail the Processes for Orbit Determination Bester Provide Optimized Ground Station Strategy Bester Science End Product Requirements Angelopoulos Add Mission Operations Requirement Regarding Taylor Probe GRI Implementing a Solid State Recorder Harvey Add Pre-Launch Mission Mode Constraints Ajluni Probe Bus EPS Requirements ModificationsKrauter Compliance with Orbital Debris requirementsAjluni Need an End-to-End Data Analysis Bester 17 Status Submitted Submitted Submitted Submitted Submitted Submitted Submitted Submitted Submitted Submitted UCB, November 12-14, 2003 Instrument RFAs RFA FGM-1 FGM-2 System FGM FGM Title Implementing Magnetic Cleanliness Program Add Anti-Aliasing Filtering Resp Status Taylor OPEN Angelopolous Submitted RFA SCM-1 SCM-2 SCM-3 System SCM SCM SCM Title Implementing Magnetic Cleanliness Program Review Parts Lists, Provide Parts As Needed Define Sensor Alignment Budget Resp Taylor Fisher Turin Status OPEN OPEN OPEN RFA UCB-1 UCB-2 UCB-3 UCB-4 UCB-5 UCB-6 UCB-7 UCB-8 UCB-9 UCB-10 System Systems ESA ESA/SST Systems Systems SST SST EFI EFI Systems Title Develop Configuration Control System Incorporate Beam Monitor in ESA Calibration Develop Nanomuscle Test Plan Manage Mass and Power Develop Mechanism Life Cycle Testing Plan Reduce Operating Temperature Consider Design Trades [Sweep Magnet,etc] Develop More Detailed ESC Plan Develop More Detailed EMI Plan Develop More Detailed I&T Plan Resp Taylor Carlson Turin Taylor Turin Smith Larson Taylor Taylor Harvey Status OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN THEMIS Mission PDR/CAR 18 UCB, November 12-14, 2003 Ground Based Obs RFAs RFA GBO-1 GBO-2 GBO-3 GBO-4 GBO-5 GBO-6 GBO-7 GBO-8 GBO-9 GBO-10 GBO-11 GBO-12 GBO-13 GBO-14 System Title Systems Classify data Resp quality (haze), and not necessarily only from star images Fielding Contract (pay) a local caretaker for remote maintenance, including snow removal. Fielding Bury cables (rodents play havoc). Fielding Important note. Power in many Alaska and Canadian sites are unreliable, including intermittency, variable voltage, and variable frequency. Fielding Keep a formal log of maintenance beyond the monitoring parameters. I.e.-when has the station been worked on? What was done? update systems SOC A Keogram for each ASI (1 minute temporal resolution is ok) ASI Synchronize sampling at the different observatories. ASI Selectable retrieval of raw image data ASI Consider PC104-type Industrial SBCs ASI Consider UPS with automatic boot ASI Study trading more insulation .v. more heaters Systems Provide Systems Requirements Document Systems Document Interfaces Between Major Components Systems Provide Systems Test Plan THEMIS Mission PDR/CAR 19 Status Reviewer OPEN Hans Neislsen (U of Alaska) OPEN OPEN Hans Neislsen (U of Alaska) Hans Neislsen (U of Alaska) OPEN Hans Neislsen (U of Alaska) OPEN Hans Neislsen (U of Alaska) OPEN Hans Neislsen (U of Alaska) Rick Sterling Rick Sterling Rick Sterling Rick Sterling OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN Rick Sterling Davis/Lee Davis/Lee Davis/Lee UCB, November 12-14, 2003 Flight Dynamics/Msn Ops RFAs RFA FDMO-1 FDMO-2 FDMO-3 FDMO-4 System Rationale Reviewer Resp Investigate monthly lunar perturbation Lunar perturbations can be used to Richon Frey effects to determine optimal time reduce fuel required if judicious during month to launch selection of launch date is made. However, lunar perts can also increase fuel req’d by decreasing orbit energy & negatively impacting orbit inclination. Also reduces the amt of detailed Decide on one pre-injection Currently probes are designated as Richon Bester, nomenclature for each probe. Should “Themis 1, Themis-2,…”, Taylor, not be names associated with integers “red,green…”, and “A,BC…”. Ajluni 1-5 since the probes will be numbered Multiple names for same probe Probe 1, Probe 2, etc. post-launch causes confusion & according to their final orbit positions misidentification of specific probes. (similar to TDRSS). Resolve Time Tag issue Harman Taylor & Ajluni rd Needed for orbit injection analysis. If Richon Ajluni to Get initial 3 -stage separation states provide (attitude & orbit) for each probe from Delta PMA is being done, these states should be available soon. to Frey Boeing Title THEMIS Mission PDR/CAR 20 Status OPEN OPEN OPEN OPEN UCB, November 12-14, 2003 Flight Dynamics/Msn Ops RFAs RFA FDMO-5 FDMO-6 FDMO-7 FDMO-8 FDMO-9 FDMO-10 System Title GMAN modeling issues: define each ‘maneuver mode’ incl type of mnvr, which thrusters used, pulsed/continuous, etc.. Then determine if GMAN can model mnvr correctly. Determine ground station contact tracking requirements such as pass frequency & duration, # stations, for mnvr planning & recovery vs regular OD, etc. Determine UCB station capabilities incl support for perigee passes. Rationale Several questions regarding whether GMAN can be used to model finite mnvrs in all maneuver configurations. Reviewer Resp Status Richon Bonnell OPEN & DeFazi o Bester OPEN & Beckm an Mission depends heavily on UCB Bester OPEN antenna for tracking. Need to know & if orbit determination constraints can Beckm be met. an ITOS-to-MSASS interface code to Harman used successfully for xx Richon Bester OPEN UCB mission & Harman Real time attitude determination-is this Harman Bester, OPEN a requirement? If so, what s/w? Taylor Possibly use MTASS w/modifications et al Multi-satellite critical operations: need to have at least 2 prime workstations supporting, plus at least 1 hot backup for emergencies THEMIS Mission PDR/CAR Normally have 1 prime and 1 Richon Bester backup for any critical operation for et al a single-satellite mission. Will have to be able to support multiple satellite critical ops 21 OPEN UCB, November 12-14, 2003 Flight Dynamics/Msn Ops RFAs RFA FDMO-11 FDMO-12 FDMO-13 FDMO-14 FDMO-15 System Title Rationale MSASS not capable of performing magnetometer alignment. Determine if need to acquire MTASS in addition to MSASS for this function. Include Pre-Launch Operations (Simulation planning & support, launch preparations) in future FD&MO reviews Provide access to latest mission information to peer panel at least 2 weeks before review Maneuver Calibration Procedures need to be documented. Reviewer Resp Status Harman Bester to OPEN work with Harman & Beckman Ensure resource requirements are identified & included in planning Richon Bester OPEN Richon Angelopol OPEN ous Each orbit & attitude maneuver Richon Richon, OPEN should be analyzed post-maneuver DeFazio for efficiency & accuracy. Results to provide should be applied to future GSFC maneuver planning. Also needed for FDAB bookkeeping fuel used. sample procedure s to Bester Document who is responsible for fuel- One entity should have responsibility Richon Angelopol OPEN used bookkeeping (propulsion for this function. It is particularly ous & engineer or Flt Dynamics Eng or other critical at end of life when probes Bester FOT member) must perform controlled reentry. THEMIS Mission PDR/CAR 22 UCB, November 12-14, 2003 Flight Dynamics/Msn Ops RFAs RFA FDMO-16 FDMO-17 FDMO-18 System Title Rationale Best practices. Reduces risk. Institute Command Authorization Meetings (CAMs) for all orbit & attitude maneuvers. Rquires participation & ‘signoff’ from all relevant subsystems & systems (FOT, flt dyn, thermal, power, C&DH, scientists, etc) Provide MAP Anomalous Forces Outgassing of instruments & other technical paper to UCB h/w may introduce anomalous force creating torques on probe(s) Provide JON/WBS to 595 for Themis Code 595 Flt Dynamics engineers support can not support Themis without charge number THEMIS Mission PDR/CAR 23 Reviewer Resp Status Richon Bester OPEN Richon Richon OPEN Angelo Snow poulos & Richon OPEN UCB, November 12-14, 2003 Summary Summary Stable Science and Mission Concept and Requirements No Significant Changes in Requirements or Concept No Show Stoppers Identified Development or Review Teams Organization is Active in All Development Areas Successful Staffing at UCB and Swales Staff Already in Place at Foreign Collaborators Weekly and bi-weekly Telecons Active in all Major Areas Systems Engineering in High Gear Plans Documented, In Place and in Practice Space Segment ICD’s in Signoff, Ground Segment coming up Active Review Process in Place Technical Expertise Provided in Comments and RFA process Expect These Inputs will Help Shape Detailed Designs THEMIS Mission PDR/CAR 24 UCB, November 12-14, 2003