Project Close-out SPS Round Table January 17, 2006 1 Did you know? There are over 3,300 active sponsored projects! We are contractually and legally bound to submit final reports and failure to do so can result in loss of future funding. For example: NSF will not review a new proposal if the PI or Co-PI has any outstanding final technical reports. 2 Which Reports Are Required? FDP FINAL REPORT REQUIREMENTS1 Technical Reports are submitted by the Principal Investigator to the Grants Officer unless otherwise specified. OSP should always receive a copy of the Technical Report transmittal letter or cover page. Financial Reports are submitted by Sponsored Funds Accounting and reported to OSP via a monthly log. Equipment Reports are submitted by Cornell’s Government Property Control Office. OSP receives a copy of the report or transmittal page. Patent Reports are submitted by OSP after contacting both the Principle Investigator and the Patents & Technology Marketing Office. Report Types FDP Participating Agencies DOE 90 days O + 24 EPA 90 days O+2 NASA 90 days Original5 NIH 90 days O+2 60 days ARMY2 60 days ARO 18 + SF298 90 days 90 days 90 days 90 days Equipment None None None None Patent Annual + 60 days DD 882 180 days DD 882 None None Technical AFOSR As requested Fiscal ONR3 As requested 90 days NSF 90 days Original 98A None 90 days USDA 90 days O+2 AD-421 90 days Annual6 + 60 days None None 90 days7 None Annual + 30 days 90 days HHS 568 None 90 days DD 882 None osp.djc.11/1/94 revised.vad.12/10/02; 2/26/03 1 2 3 4 5 6 7 as of May 31, 1994 Report requirements and distribution copies are as specified on the individual awards. Usually the requirements are as listed above. Report requirements and distribution copies are as specified on the individual awards. Usually the requirements are as listed above. Final reports must be accompanied by two copies of DOE Form 241.1 (Formally DOE Form 1332.15) Original submission is to the Grants Officer, copy to the NASA Technical Officer and Microreproducible copy to CASI. Submitted by Inventory Control on Government Furnished Equipment only on October 31 each year. Awards with a “J” do not need final equipment reports (N00014-XX-J-XXXX) 3 Who is responsible? • Technical – the scientific report or deliverable prepared by PI which describes the results of the project. • Equipment – Federal regulations define how universities can use equipment purchased with government funds. Handled by SFA staff. • Financial – the final financial report prepared by SFA staff provides the sponsor with a final accounting of the expenditures on the award. • Patent – aka, invention reporting. Handled by SPS staff. 4 Final Technical Reports Once a month SPS will send email reminder to PI indicating the final technical report is due or past due. Either PI or authorized departmental personnel can input final technical reports. Good idea to run Brio report for outstanding reports to follow-up with PI. Ex: awards terming within 30 days, active/pending awards past end date. 5 Technical Reports Sent Technical Report Requests Sent 600 500 Count 400 300 200 100 0 10/25/2004 12/24/2004 2/22/2005 4/23/2005 6/22/2005 8/21/2005 Date Reports PIs • Backlog of past due technical reports has decreased by 45% since inception of monthly notifications to PIs 6 No Cost Extension Under FDP authority, we can initiate a one-time extension up to 12 months at no additional cost. Notification must be sent to the sponsoring agency within 10 days prior to the term of the project. Otherwise, extensions must be requested in writing before the project ends (usually within 45 days before term). 7 No Cost Extension Requests Submit change request in Portal: Include the new term date, unobligated balance of the remaining dollars, and justification. Having money left over is not a valid reason to request extension. OR: PI may draft letter to sponsor and GCO will provide institutional concurrence. Please be sure to notify SFA so the account won’t be processed for close out. 8 Subcontract Close-out • Subawards can be closed prior to term of prime award but not vice versa. • All reports must be received by Cornell prior to payment of final invoice. • Final patent and equipment reports must be sent to SPS on agency specific forms. • SPS will address any Small Business Plans and A-133 reporting issues. 9 Closeout Status • AAC-AWARD AWAITING CLOSEOUT (was HHolding): The award period has ended, no amendments are pending. OSP is waiting for notification that final deliverables have been provided to the sponsor. • ACOSP-AWARD CLOSED BY OSP: The award period has ended and all deliverables have been submitted except the technical report. The hardcopy award file is archived. • AC-AWARD CLOSED (T-Terminated): The award period has ended and all deliverables have been submitted. The hardcopy award file is archived. 10 Retention Records should be retained in accordance with University and applicable sponsor regulations. Cornell’s record retention policy can be found at http://www.univco.cornell.edu/policy/RR.for.html OMB Circular A-110 also includes guidelines at http://www.whitehouse.gov/omb/circulars/a110/a110.html Federal regulations (OMB A-110, Section 3) indicates federally funded projects must be retained for three years following submission of the final expenditures or financial report. For New York funded projects, SPS retain projects up to six years. 11 Questions? When in doubt; contact your friendly SPS office. We’re here to help! 12