Keynsham Timeline Sub Committee Thursday 4 June 2015, 2.00pm Keynsham Town Council offices Brian Vowles, Cllr Lisa O’Brien (Chair), Iris Lerpiniere, Judy Grant, Jo Swift, Ann Cullis In attendance – Diana Hatton (project manager); David Mackie MINUTES 1. Apologies Cllr Clive Fricker; Abigail Branagan (project manager) 2. Minutes of meeting 5 May 2015 One amendment: Minute 4 – BV does not wish to present at the KTC meeting 23 June. With this amendment, the minutes were approved. 3. Matters arising from minutes unless covered by agenda items JG stated that she was uncertain about whether KTC should be approached for a contribution to the project. LOB reminded the meeting that this would be discussed in more detail under agenda item 6, and the comment was noted. 4. Quotes from suppliers – DH/AC and DM AC summarised the quotes which have been received. In some cases these are estimates, not formal quotes. Four suppliers were approached and three have responded, as shown in the table on the next page. The table shows the suppliers in order of preference, based on the quality of their work and their relevant experience. CF was thanked in his absence for his time and effort in discussing the project with Robbin Engineering. They considered our request and thanked us for the opportunity, but in the end declined to quote because the project is too complex for their type of manufacturing – they would have to sub-contract and this would increase their costs (and therefore ours). DH noted that the estimate received from Parc Signs has been negotiated down from an initial figure which was considerably higher. DM, DH & AC opinion is that Parc Signs and Cut-Tec are both good, and their joint recommendation is Parc Signs. Supplier Ranked in order of preference, based on quality and experience 1/ Parc Signs NB estimate, not formal quote 2/ Cut-tec Fabricate & deliver Installation Total (figures rounded up) £55,645 + vat Est. £1,000 £57,000 £50,000 + vat Est. £1,000 £51,000 3/ Culzean Engraving £36,675 + vat NB anodised aluminium: a lower-quality material: not preferred - Delivery tbc; installation est. £1,000 £38,000 - No quote: see note below 4/ Robbin Engineering The AAG discussed whether there were any options for reducing costs: for example, by slightly reducing the size of the panels, or deferring Panel 9 (maps) to a later date. Following discussion it was agreed that the AAG do not wish to make any changes to the size or number of the panels, and that the group re-confirms the decisions made at the 17 March 2015 meeting when the designs were signed-off: Stainless steel, laser-etched – no change Designs as signed-off – no change Size of panels – no change LOB noted that we previously agreed the need for small panels or roundels at the end of each planter, with the name of the school and the century/period for each panel. LOB requested DM to consider design of these. The group discussed what type of introductory interpretation panel was needed at pavement level (to right as you face the steps, where the path starts). Following discussion, it was agreed that this should include the list of all seven schools, the dates of the project (2014-16) and the age-groups of the children involved. Any further interpretation would be provided in a leaflet. LOB asked DM to consider the font for this panel. It was noted that the interpretation panel could be manufactured locally. LOB asked DH to enquire whether the timber needs any treatment if there is to be delay before the panels are fixed on to it. Action DH to contact Jake Williams in B&NES Project Management Action AC to update Derek Quilter of the reasons for delay to the project and the planned fund-raising. 5. Budget and fundraising AC noted that DM’s fee will be £6,000 to produce CAD drawings and to oversee the fabrication and installation. LOB reminded the meeting that B&NES Council has already contributed £100K to the Clocktower project, and £30K for the Timeline. LOB stated that in her view it is not realistic or appropriate for B&NES Council to contribute anything more than this. If we select Parc Signs, the costs are: £57,000 including installation £6,000 artist fee Total = £63,000 The amount to be raised is therefore £33,000 and LOB suggested that this is rounded-up to £35,000 to allow contingency. DH and AC indicated that there are a number of options for applying for external funding, including Heritage Lottery Fund and Awards for All. The £30K already set aside by B&NES is an excellent basis for any application. DH advised that applications could be made in the name of KTC in partnership with Keynsham Civic Society and Keynsham Local History Society. AC can research and write the applications. LOB suggested approaches also be made to: Quartet Community Foundation, the Roper Family Trust, and landfill companies’ charitable trusts. KTC may be able to make a small contribution, and this will be considered at the KTC meeting on 23 June. DH noted that a contribution from KTC would increase the chances of gaining lottery funding, as they look for evidence of local commitment to a project. Fund-raising work will take some time. Applications can be researched and written June-December, aiming to achieve all the budget needed by March 2016. The Timeline could then be fabricate and installed in spring/early summer 2016 – putting back the project about 9 months from our original timescale. Action AC to research and plan fund-raising AC noted that we cannot place an order with a supplier until we have secured all the budget required. AC’s opinion is that all suppliers are likely to hold their quotes at or very close to current prices, unless there is an unexpected increase in raw materials costs. Action DH to contact Parc Signs to confirm our serious interest and indicate our timescale. 6. Report to Keynsham Town Council 23 June The draft report was circulated with the agenda. Following discussion a number of amendments to the draft were suggested and agreed. Action AC amend the report and send to JS on 5.6 The report will be presented by JS. AC will attend the meeting in case of any detailed or technical queries. DH and DM do not need to attend. LOB will bring the portfolio of designs for reference. 7. AOB Schools It was suggested that we should update the head-teachers about the revised timescales. Action DH draft letter to schools for LOB to send Press release LOB and JS will work on a press release for The Voice to go out after the KTC meeting 23.6. The press release will say that the designs have been signed off, fund-raising is in hand, and installation will be in 2016. Action LOB/JS draft press release 8. Date of next meeting It was agreed that there is no need for a meeting until September. Date of next meeting tbc Minutes - Keynsham Timeline sub-cmtee 040615