Organization of production of steel welded pipes with diameter Ø 273 – 630 мм
Project cost: USD 32 mln.
Location: Pavlodar, industrial zone.
Implementation period: 2016-2018
Project scope:
- the development of industrial non-oil sector of the country, the
market of metal products ;
- increasing the supply of domestic products in the steel market;
- decline in imports of tubular goods (import substitution);
- increase exports of finished products in CIS countries;
- New workplaces creation (from 154 to 352 )
Finished product:
- Welded Steel Pipes with diameter Ø 273 – 630 мм.
Production capacity:
- 100 thous.t. in first year, 200 thous.t. in 2nd year, then 250
and 300 thousand tons annual
Potential markets: CIS countries
Provision of land and premises: availability of basic
warehouse space in the city of Astana in the property of LLP
"Steel Trade-NA" with a total area of 2.5 hectares;
Required financing: USD 32 mln.
Required investor type:
☑ Equity
☐ Debt
Project initiator
Company
name
LLP "Steel
Trade-NA"
Year of
establishment
2002 year
Presence on
the market
Developed
brands
Current
operation
☑ Technology transfer
☑ Other
Project profitability
Project
Project profitability
profitability for
for the
the period
period of
of 85 years
years (in
(in th.
th. USD)
USD) (Рентабельность проекта за 8 лет)
Indicator
Year 1
Year 2
Year 3
Year 4
Year 5
Revenue
6 484
26 400
37 125
47 025
49 500
COGS
Net profit
2 326
564
9 471
7 556
13 318
10 988
16 870
14 732
17 757
15 639
Project profitability
Project NPV (5 years)
Project IRR
Project profitability
Payback Period : 1,4 years
18 934 mln. tenge
93%
Payback Period disc.: 1,6 years
Contact
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
CONFIDENTIAL
E-mail: alimova@kaznexinvest.kz
Project initiator’s contacts:
LLP "Steel Trade-NA"
1
Project information
The construction of ferroalloy plant in Kyzylorda region
Project cost: USD 228,1 mln.
Location: Kyzylorda region
Implementation period: 2016-2021г.
Project scope:
-Development of metallurgical sector in region
Finished product:
- Low aluminum ferrosilicon.
Production capacity:
- 162 thousand tons annual
Potential markets: domestic market, CIS, China, export
Provision of land and premises: land is available:
50 ha on industrial zone of Kyzylorda region
Required financing: USD 228,1 mln.
Project initiator
Company name
JSC «NC «SEC
«Baikonur»
Year of
establishment
Presence on the
market:
Developed
brands:
Current
operation:
Required investor type:
☑ Equity
☐ Debt
☑ Technology transfer
☑ Other
Contact
Project profitability
Project profitability for the period of 7 years (in th. USD)
Indicator
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Revenue
0
198 291,3
1 359 713
15 21 582
15 21 582
15 21 582
15 21 582
COGS
0
103 285
397 529,8
437 289,7
15 21 582
15 21 582
15 21 582
0
-36 773,2
96 698
-10 687,9
12 041,2
676 943,9
10 846,7
767 679,4
9 652,3
772 591,8
8 457,8
777 504,3
7 263,4
782 416,6
Taxes
Net profit
Project profitability
Project capex
USD 18,7mln.
Payback Period 4 years
Project NPV (10 years)
USD 2 255,1 mln.
Payback Period disc. 4 years
Project IRR
80%
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
CONFIDENTIAL
E-mail: alimova@kaznexinvest.kz
Project initiator’s contacts:
JSC «NC «SEC «Baikonur»
2
«Organization of copper pipes production»
Project information
Project initiator
Project cost: USD 66,5 mln.
Location: Karaganda, Industrial zone
Implementation period: 2016-2020
Project scope:
-Development of metallurgical sector and copper pipe
production;
Finished product:
- Copper pipes.
Production capacity:
- 13 thousand tons annual
Potential markets: Kazakhstan and China
Provision of land and premises: Free Economic Zone of
Karaganda region, 12 ha. Energy and water supply.
Required financing: USD 66,5 mln.
Company
name:
LLP «Iron and
copper»
«SMS MEER»
Year of
establishment
1991
Current
operation:
manufacturing
from
raw
materials (strips)
electric-welded
pipes
Required investor type:
☑ Equity
☑ Debt
☑ Technology transfer
☑ Other
Project profitability
Project profitability for the period of 7 years (in mln. USD)
Indicator
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Revenue
50,044 652
145,844 415
171,581 664
171,581 664
171,581 664
171,581 664
171,581
664
COGS
19,382 017
56,484 735
66,452 629
66,452 629
66,452 629
66,452 629
66,452 629
Taxes
Net profit
2,175 973
9,393 265
4,807 564
19,230 254
6,883 644
27,534 576
7,415 644
29,662 576
9,255 477
37,021 909
9,255477
37,021 909
7,712 761
38,564 626
Project profitability
Project NPV (10 years)
Contact
Project IRR
Payback Period: 4,5 year
USD 37 mln.
Payback Period disc. 4 years
27%
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
CONFIDENTIAL
E-mail: alimova@kaznexinvest.kz
Project initiator’s contacts:
LLP «Iron and copper» and «SMS MEER»
3
Project information
Exploration, mining and processing of kaolin, quartz-feldspar ore deposits Bisembaevskyiy
Project cost: USD 918,5 mln.
Location: Kostanay region
Implementation period: 2015-2045
Project scope:
-Detailed exploration identified with the production of
industrial reserves of complex ores;
Finished product:
- On the unique holdings of deposits it is advisable to build
plants for the production of facing products (ceramic tiles,
porcelain tiles), glass, facing facing bricks, tiles, packaging
materials, mineral fertilizers.
Production capacity:
- Facing products - 26 million sq. M. m, the glass - 20 million
sq. m. m, cardboard and gypsum board 700 ths. tons of
aluminum - 500 thous. tons of cement - 2600 thousand tons
of bricks - 50 million units and other types of products
Potential markets: Kazakhstan and Export
Provision of land and premises: mining ore deposit
Required financing: USD 918,5 mln.
Required investor type:
Project profitability
☑ Equity
☑ Debt
Project initiator
Company name
LLP «NEGS
GeoSphere» and
SEC «Tobol»
Year of
establishment:
Presence on the
market:
Developed
brands:
Current
operation:
☑ Technology transfer
☑ Other
The distance to the train station - 25 km, the presence near the paved roads, power transmission
lines 200 and 500 passes through a portion of the gas pipeline "Bukhara-Ural" - 3 km away from
the field, the proximity to settlements with a developed area for the extraction and processing of
mineral raw materials (r. Zhitikara, Rudny, Lisakovsk)
Project profitability
Payback Period
63 months
Annual Production (tenge)
175950000
Contact
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
E-mail: alimova@kaznexinvest.kz
CONFIDENTIAL
Project initiator’s contacts:
LLP «NEGS GeoSphere» and SEC «Tobol»
4
Project information
Release of phosphorus concentrate from iron ore to pig iron production
Project cost: USD 165 mln.
Location: Aktobe region
Implementation period: 2015-2018
Project scope:
-Release of phosphorus concentrate from iron ore to produce
iron.
Finished product: - Cast/crude iron
Production capacity: - 8 mln ton of concentrate annual
Potential markets: China, Russia, Europe.
Provision of land and premises: land and rights for mining
documentation is available on Kokbulak iron ore deposit in
Kostanay region
Required financing: USD 165 mln.
Project initiator
Company name:
LLP «Aktobe
steel
production»
and SEC
«Aktobe»
Year of
establishment
Presence on the
market
Developed brands
Required investor type:
Current operation
Project profitability
☑ Equity
☐ Debt
☑ Technology transfer
☑ Other
Feasibility study of the project, signed approvals, conducted exploration.
Contracts-intent with suppliers and consumers. Conducted exploration work, including - drilling,
sampling, laboratory studies under the Contract №3734-TPI. Feasibility study of the project. There is
an agreement with the Chinese company "Xin Yan Science and Industry and Trade Company"
(Xinjiang) on the development of technology for production of concentrate and co-investment
project.
Contact information
Project initiator’s contacts:
LLP «Aktobe steel production» and SEC «Aktobe»
Contact
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
E-mail: alimova@kaznexinvest.kz
CONFIDENTIAL
5
Iron ore deposit development with construction of mining processing plant
Project information
Project initiator
Project cost: USD 133 mln.
Location: Aktobe region
Implementation period: 2018-2020
Project scope:
- Production of iron concentrate
- Construction of Mining Processing Plant
Finished product:
- Iron concentrate
Production capacity:
- 1 mln ton of iron concentrate annual
Potential markets: domestic market and export
Required financing: USD 133 mln.
Required investor type:
Company
name:
LLP «Aktobe –
Temir ВС».
Year of
establishment:
Presence on the
market:
Developed
brands:
Current
operation:
Project profitability
☑ Equity
☑ Debt
☑ Technology transfer
☑ Other
in March 2014 he signed a contract for development of TEO with an international company to
conduct technical audit "SRK Consulting Limited". On the recommendation of "SRK Consulting
Limited" was sent 1 500 samples ores Velihovskoe South, the laboratory LLP «SGS Vostok
Limited" Chita, for technological research on the recoverability of mineral components. Report
enrichment received. For drawing up the feasibility study is also required before studying the
market demand for concentrate. For these purposes, the company entered into an agreement with a
Russian consulting company "B2B Connect", which explores the global market and provides
forecast prices for titanium-vanadium concentrate (TCE) to 2030. On the basis of the report on
enrichment and report on the study of world prices for TCE will be prepared before the feasibility
study, the company "SRK Consulting Limited".
receipt of the feasibility study will be planned
Project Upon
profitability
before further action on the investment project.
Contact
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
E-mail: alimova@kaznexinvest.kz
CONFIDENTIAL
Project initiator’s contacts:
LLP «Aktobe – Temir ВС»
6
Project information
Plant for the production of steel strip packaging
Project cost: USD 13,51 mln.
Location: Karaganda, Industrial zone
Implementation period: 2016-2018
Project scope:
- production of steel strip packaging for various needs of
enterprises;
Finished product:
- steel strip packaging
Production capacity:
- 15000-20000 tons annual
Potential markets: domestic market, CIS countries, export.
Project initiator
Company
name:
LLP «S-Tape»
Year of
establishment:
2011 year
Presence on the
market:
Developed
brands:
Required financing: USD 13,51 mln.
Current
operation:
Required investor type:
☐ Debt
☑ Technology transfer
☑ Other
Project profitability
☑ Equity
Contact
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
E-mail: alimova@kaznexinvest.kz
CONFIDENTIAL
Project initiator’s contacts:
LLP «S-Tape»
7
Mastering Velihovskogo iron ore deposit with the construction of processing factory
Project information
Project initiator
Project cost: USD 133 mln.
Location: Aktobe region
Implementation period (Период реализации): 2018-2018
Project scope:
- Construction of Mining Processing Plant in Kargaly
Finished product: - Iron concentrate
Production capacity: - 1 mln ton annual
Potential markets: domestic market
Required financing: USD 32 mln.
Company
name:
LLP "Steel
Trade-NA"
Year of
establishment:
2003 year
Presence on
the market:
Developed
brands:
Required investor type:
Current
operation:
Project profitability
☑ Equity
Project profitability
☐ Debt
☑ Technology transfer
☑ Other
Payback Period : 10 years
Payback Period disc.: 3 years
Contact
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
E-mail: alimova@kaznexinvest.kz
CONFIDENTIAL
Project initiator’s contacts:
LLP "Steel Trade-NA"
8
Project information
Production of copper cathode
Project cost: USD 20 mln.
Location: Aktobe region
Implementation period: 2015-2017
Project scope: - To increase production of copper cathode;
Finished product: - copper cathode
Production capacity:
- increase the volume of production of cathode copper content
of 99.9% from 5000 tonnes to 10 000 tonnes annual
Potential markets: domestic market and export CIS countries
Required financing: USD 20 mln.
Project initiator
Company
name:
LLP
«KazCopper»
Year of
establishment:
Presence on
the market:
Developed
brands:
Current
operation:
Required investor type:
☐ Debt
☑ Technology transfer
☑ Other
Project profitability
☑ Equity
Contact
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
E-mail: alimova@kaznexinvest.kz
CONFIDENTIAL
Project initiator’s contacts:
LLP «KazCopper»
9
Project information
Construction of the factory hot dip galvanizing of steel structures
Project cost: USD 10 mln.
Location: Atyrau
Implementation period:
Project scope:
- the development of the market of metal products ;
Finished product: - zinc metal
Production capacity: - 24,000 tones of zinc metal per year
Potential markets: domestic market and export
Provision of land and premises: not available yet
Required financing: USD 10 mln.
Project initiator
Company
name:
LLP «Logic
Services
Centrasia»
Year of
establishment:
Presence on the
market:
Developed
brands:
Current
operation:
Required investor type:
☑ Debt
☑ Technology transfer
☑ Other
Project profitability
☑ Equity
Contact
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
E-mail: alimova@kaznexinvest.kz
CONFIDENTIAL
Project initiator’s contacts:
LLP «Logic Services Centrasia»
1
0
Project information
Construction of electric plant
Project cost: USD 275,7 mln.
Location: Aktobe region
Implementation period: 2016-2019
Project scope:
- the development of industrial non-oil sector of the country, the
market of metal products ;
- increasing the supply of domestic products in the steel market;
- Building-mill due to the need for rail and plant raw materials
of high quality domestic production.
Finished product:
- Production of rail steel based on recycled scrap processing
and direct reduced iron
Production capacity:
- 533 thousand tons annual
Potential markets: CIS countries
Provision of land and premises: Raw materials: scrap and hot
briquetted iron (HBI)
Applied technology: being selected from 3-European suppliers
are the main technological equipment Siemens VAI, Danieli,
SMS-Concast
Required financing: USD 257,7 mln.
Required investor type:
☑ Debt
Company
name:
LLP «Аktobe
Generation»
Year of
establishment:
Presence on
the market:
Developed
brands:
Current
operation:
☑ Technology transfer
☑ Other
Project profitability
☑ Equity
Project initiator
Contact
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
E-mail: alimova@kaznexinvest.kz
CONFIDENTIAL
Project initiator’s contacts:
LLP «Аktobe Generation»
1
1
Titanium zirconium ores
Project initiator
Project information
Project cost: USD 40 mln.
Location: Pavlodar, industrial zone.
Implementation period: 2016-2017
Company
name:
Project scope:
- the development of industrial non-oil sector of the country, the
market of ilmenite, rutile, zircon products ;
- increasing the supply of domestic products in the rutile, zircon
market;
- decline in imports of tubular goods (import substitution);
Finished product:
- ilmenite, rutile, zircon
LLP «EXPOengineering»
Year of
establishment:
Presence on the
market:
Developed
brands:
Production capacity:
- 2017 – from 60000 to 160000 tones annual
Potential markets: domestic market and export
Required financing: USD 32 mln.
Current
operation:
Required investor type:
☐ Debt
☑ Technology transfer
☑ Other
Project profitability
☑ Equity
Contact
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
E-mail: alimova@kaznexinvest.kz
CONFIDENTIAL
Project initiator’s contacts:
LLP «EXPO-engineering»
1
2
Project information
Organization of production of steel welded pipes with diameter Ø 273 – 630 мм
Project cost: USD 32 mln.
Location: Pavlodar, industrial zone.
Implementation period: 2016-2018
Project scope:
- the development of industrial non-oil sector of the country, the
market of metal products ;
- increasing the supply of domestic products in the steel market;
- decline in imports of tubular goods (import substitution);
- increase exports of finished products in CIS countries;
- New workplaces creation (from 154 to 352 )
Finished product:
- Welded Steel Pipes with diameter Ø 273 – 630 мм.
Production capacity:
- 100 thous.t. in first year, 200 thous.t. in 2nd year, then 250
and 300 thousand tons annual
Potential markets: CIS countries
Provision of land and premises: availability of basic
warehouse space in the city of Astana in the property of LLP
"Steel Trade-NA" with a total area of 2.5 hectares;
Required financing: USD 32 mln.
Required investor type:
☑ Equity
☐ Debt
Project initiator
LLP «EXPO –
engineering»
Company
name:
Year of
establishment:
Presence on
the market:
Developed
brands:
Current
operation:
☑ Technology transfer
☑ Other
Project profitability
Project
Project profitability
profitability for
for the
the period
period of
of 85 years
years (in
(in th.
th. USD)
USD) (Рентабельность проекта за 8 лет)
Indicator
Year 1
Year 2
Year 3
Year 4
Year 5
Revenue
6 484
26 400
37 125
47 025
49 500
COGS
Net profit
2 326
564
9 471
7 556
13 318
10 988
16 870
14 732
17 757
15 639
Project profitability
Project NPV (5 years)
Project IRR
Period : 1,4 years
18 934 mln. tenge
Project Payback
profitability
93%
Payback Period disc.: 1,6 years
Contact
Contact information
Alimova Shynar
Specialist at Sectoral department for mining and metallurgy,
“KAZNEX INVEST” JSC
Tel.: +7 717 2 91 90 40 (1064)
E-mail: alimova@kaznexinvest.kz
CONFIDENTIAL
Project initiator’s contacts:
LLP «EXPO-engineering»
1
3
Download