BRIEFING TO THE SELECT COMMITTEE ON SOCIAL SERVICES BRIEFING THE TITLE SELECT COMMITTEE ON SOCIAL PRESENTATION SERVICES Presented by: ON Name Surname THE PROVISION OF BULK POTABLE WATER Directorate PROGRESS ON THE PROVISION OF POTABLE BULK WATER SERVICES BY9 WATER THE WATER Date SERVICES BY THE BOARDS BOARDS Presented by: Ms M Diedricks Director-General 19 May 2015 Presentation by DIRECTOR- GENERAL Ms M Diedericks 19 MAY 2015 1 POLICY AND LEGISLATIVE MANDATES Policy & Legislation Description White Paper on Water & Sanitation, 1997 Recognised a need for water boards and public sector entities . Water Services Act , Act No 108 0f 1997 Give Minister the powers to establish and disestablish water boards and outline the procedure for appointing Board members. Strategic Framework for Water Services Recommended the Institutional Reforms in the sector. Public Finance Management Act , Act No.1 of 1999 National Public Entities listed as Schedule 3B under PFMA. National Water Resource Chapter 8 on Water Management Institutions including Strategy-2 plan to establish Regional Water Utilities Raw Water Pricing Strategy, 2007 Defines Water Resource Management functions to be charged to users National Development Plan, 2012 Regional Water Utilities , CMAs and National Infrastructure Agency to be created . 2 Overview of water boards • Water Boards are public entities and they conduct their primary business in accordance with a mandate derived from legislation and government/sector policies and protocols. • Water boards are key strategic entities as all socioeconomic development within their designated area of supply is linked to the delivery of reliable, healthy and cost effective bulk services. • There are a total of 9 water boards in South Africa at present. 3 Overview continued Minister Water Boards (Schedule 3B of the PFMA) Amatola Water Bloem Water Lepelle Water Magalies Water Mhlathuze Water Overberg Water Rand Water Sedibeng Water Umgeni Water Financial year : 1 Jul to 30 Jun 4 Water boards establishment dates WATER BOARD ESTABLISHED AGE Amatola Water 1997 17 years Bloem Water 1991 23 years Lepelle Northern Water 1997 17 years Magalies Water 1969 45 years Mhlathuze Water 1980 34 years Overberg Water 1993 21 years Rand Water 1904 110 years Sedibeng Water 1979 35 years Umgeni Water 1974 40 years Botshelo Water merged with Sedibeng Water 1998 Disestablished Namakwa Water merged with Sedibeng Water 1978 Bushbuckridge Water merged with Rand Water 1997 Pelladrift Water merged with Sedibeng Water 1997 Albany Coast Water merged with Amatola Water 1982 Inkangala Water 5 The key role of Water Sector Institutions is to support South Africa as a developmental state to deliver on Government Developmental . Objectives through : 1. Using water for promoting socio-economic developmental agenda . Relevant Advantages of Water Institutions 2.Reducing inequality through access to water and job creation . 3.Leveraging additional investments for infrastructure development 4.Enabling rural communities to use water for rural livelihoods. 5.Promoting greater citizen participation in decision making 6.Allowing for innovation and knowledge generation. 6 Lepelle Northern Magalies Rand Sedibeng Bloem Umhlathuze Umgeni Amatola Overberg (not regional) 7 Governance protocol for entities • Minister meets with Chairpersons of entities to outline the Strategic Intent which is used to articulate her Strategic vision and her expectations of the entities. intent statement / • The DWS Strategic Plan is a guide to entities in terms of vision and strategic direction DWS strategic plan Shareholder compact Corporate plan • Minister and The Boards conclude a shareholder compact annually (Treasury Regulation 29.2) . • Documents the mandated key performance measures and indicators to be attained by the entity in delivering the desired outcomes and objectives as agreed between the entity Board and the Minister • Entities submit corporate plans and budgets annually to Minister and National Treasury at least one month before the start of financial year (PFMA Sec 52). • Entities corporate plan must contain implementation details to attain the key performance measures and indicators outlined in shareholder compact and desired outcomes and objectives outlined in the strategic intent statement. • • Performance • monitoring & • evaluation Quarterly reporting Annual Reports including financial statements submitted by end of November every year. Tariff Submissions to Parliament by 15 March every year. Reporting to Portfolio Committee –once a year . 9 Relationship between institutions and DWS Parliament Portfolio Committee reviews reports and plans (hearings, visits) Minister DWS Minister appoints boards; approves shareholder compacts, Corporate Plans & Annual Reports (1) Oversee institutional establishment; (2) Oversee governance (manage board appointment processes, training etc.); (3) Oversee shareholder compact; (4) Oversee business plans, quarterly performance reports and financial statements etc. Public institutions report to the public and Parliament through Annual Reports and Annual Financial Statements and to the Department with quarterly performance reports TCTA CMA 1 CMA 2 Water board 1 WB 2 WB 9 10 WRC Contribution to government outcomes 6 Efficient economic infrastructu re 9 responsive, accountable, effective & efficient local government 4 Employment & inclusive growth Effective water resources management critical foundation to achieve the above outcomes 11 Selected objectives & indicators for water boards Performance Objective Alignment Ministerial Outcomes DWS Strategic Plan SO 2.5 & 3.4 1. Water Quality Compliance 2.Non Revenue Water MO A, OP1, Ta) & c). MO B, OP2, Ta) MO A, OP1, T a) MO B,OP2, T a) 3. Reliability of supply MO A > G OP1, Ta), b) & c). OP2, Ta) So1.1, 1.2&1.3 4. Financial Reporting Compliance 5. Increased Access to Services MO A > G SO 6.5 & 6.6 MO A, B &D OP1, Ta), b) & c). OP2, Ta) SO 1.1,1.2, 1.3,2.2 and 4.1 12 SO2.2, 2.5, 2.6,&2.7 Outcomes /Impact Indicators Water quality standards met Reduced levels of unaccounted for water (UAW) No unplanned interruptions to supply exceeding 24 hours Measure Test results, SANS 241 Water lost as a % of total water produced % number of days supply disrupted divided by total number of possible supply days unqualified audit report Annual external audit % compliance Contribution to national objectives CAPEX spend or number of expansion projects CAPEX spend /projects % % Qualified/ Unqualified OVERVIEW OF ENTITIES Water Board characteristics: % operational expenses and volumes Water Boards Amatola Bloem Bostshelo Bushbuckridge Lepelle North Magalies Mhlathuze Overberg Pelladrift Rand Sedibeng Umgeni TOTAL Total Operational Expenses R000's 253 082 352 827 58 265 132 448 441 931 268 224 225 873 35 876 16 788 4 692 584 562 094 1 440 321 8 480 313 Volumes supplied kl 000's 41 630 94 850 6 200 25 283 97 637 75 503 112 340 6 112 4 772 1610 745 92 345 439 544 2 606 963 % x total Volumes supplied 1.6 3.6 0.2 1.0 3.7 2.9 4.3 0.2 0.2 61.9 3.5 16.9 100% 13 CONSOLIDATED PERFORMANCE (Cont) Consolidated Revenue: % Spread % x total Revenues 14% 2% 3% 1% 1% 3% 2% 3% 0% 0% Amatola Bloem Botshelo Bushbuckridge Lepelle North 5% Magalies Mhlathuze Overberg Pelladrift Rand 66% Sedibeng Umgeni 14 OVERVIEW OF ENTITIES 15 Variability in Size Volumes supplied kl 000 1600000 1400000 1200000 1000000 800000 600000 400000 200000 0 15 CONSOLIDATED Budget vs projected Income PERFORMANCE Projections Budget Statement June 2015 (R000's) Volume sold Sales Cost of sales Gross profit Other income Operating cost Direct labour Energy Maintenance material Chemical/purification Depreciation General expenses Other expenses Operating surplus (deficit) Net interest Other comprehensive income (cost) Net surplus (deficit) for period 16 Variance Variance % 2 606 962 666 13 128 083 4 333 789 8 794 294 1 626 378 8 480 313 2 547 656 20 21 955 282 895 395 786 657 326 1 794 729 779 926 1 940 359 252 399 26 33 475 900 14 722 609 6 079 022 8 643 587 181 280 7 309 201 2292 078 2 31 992 293 611 477 286 685 924 1 412 869 115 441 1 515 666 140 326 (26 513 234) ( 1 594 526) 17 452 33 150 707 1 432 343 (1 171 112) (255 578) 9 997 10 716 81 500 28 598 (381 860) (664 485) 424 693 112 073 (1.0) (10.8) 28.7 1.7 797.2 (16.0) (11.2) 0.5 3.6 17.1 4.2 (27.0) (575.6) 28.0 79.9 144 478 2 337 236 (17 755) 1 638 237 162 233 698 999 (913.7) 42.7 Selected indicators for Water Boards 14/15 Name of Water Board Volumes Sold Million cu m/yr Revenue Capex Staff Amatola 38 361 148 379 Bloem 94 463 49 273 Lepelle 94 530 66 320 Magalies 83 395 867 250 Mhlathuze 134 344 107 175 Overberg 46 39 5 63 1 495 9 541 3 900 3 006 96 660 377 469 416 2 062 1 700 816 2 496 14 395 7 219 5996 Rand Sedibeng Umgeni Total 17 CONSOLIDATED ConsolidatedCont. CAPEX Spend PERFORMANCE WATER BOARD Amatola ACTUALS BUDGET 2013/14 2013/14 R OVER (UNDER) SPEND % OVER BUDGET (UNDER 2014/15 ) SPEND BUDGET 2015/16 BUDGET 2016/17 BUDGET 2017/18 BUDGET 2018/19 10 404 43 363 (32 959) (76.0) 71 440 81 696 62 752 65 000 65 000 Bloem 102 444 137 100 (34 656) (25.3) 49 701 99 200 47 321 52 177 57 531 Lepelle North 73 264 235 893 (162 629) (68.9) 105 433 221 576 129 284 38 251 37 600 Magalies 27 943 442 991 (415 048) (93.7) 933 284 1 244 524 1 121 105 496 174 219 444 125 197 120 542 4 655 3.9 145 816 74 906 26 184 55 000 87 900 Overberg 2 037 705 1 332 188.9 2 668 7 523 16 478 1 380 1 965 Rand 2 244 027 2 892 670 (648 643) (22.4) 2 750 000 2 766 000 2 929 400 2 988 000 2 306 000 71 255 118 342 (47 087) (39.8) 157 721 59 100 53 380 58 466 65 266 Mhlathuze Sedibeng 1 683 1 559 1 406 652 131 Note: Figures are based on the figures from599 the Water 299 Board 613AR cash TOTALS 437 4 872 5 899 113 5 792assets. 4 406 statements3 relating to Acquisition PP and E and6 intangible (1 434 423) of (29.4) 928 351 662 824 517 579 Umgeni 18 779 001 880 745 (101 744) (11.6) 633 164 flow 3 473 870 Overview of water boards Medium Term Budget Medium term budget Rand 2014/15 thousand 2015/16 2016/17 Water Boards 2017/18 Water Boards 15 738 659 15 394 534 19 248 522 21 204 516 TOTAL 15 738 659 15 394 534 19 248 522 21 204 516 19 Jobs created and Estimated 2014/15 and 2015/16 Entity Jobs Created 2014/15 Estimated 2015/16 1. Amatola Water 50 1546 2. Bloem Water 716 1963 3. Lepelle Northern Water 15 120 4. Magalies Water 539 570 5. Mhlathuze Water 597 588 6. Overberg Water 6 15 7. Rand Water 8. Sedibeng Water 3556 371 8870 750 9. Umgeni Water 1847 600 10. Breede CMA 0 0 11. Inkomati CMA 15 10 12. TCTA 3242 2309 13. WRC 5 14 Total 10 959 17 355 20 Debt owed to water boards by municipalities – end Feb 14/15 Name of water board Amatola Bloem Water Botshelo Water Bushbuckridge Water Lepelle Northern Water Magalies Water Mhlathuze Water Overberg Water Pelladrift Water OUTSTANDI NG BALANCE CURRENT DAYS 30 DAYS 60 DAYS 90 DAYS 120+ ARREARS 24 963 541 24 208 020 755 521 0 0 0 755 521 118 306 039 42 533 515 4 322 442 1 412 751 11 745 904 58 291 427 75 772 524 191 207 118 7 875 274 7 539 436 6 720 622 5 991 714 163 080 072 183 331 844 397 868 143 20 230 683 18 396 624 16 806 660 16 806 660 325 627 516 377 637 460 369 861 590 61 688 151 26 049 776 1 885 481 673 826 43 465 809 26 024 391 17 988 832 1 421 738 252 875 12 742 111 12 914 141 7 294 854 3 038 153 8 060 944 0 62 430 61 630 217 006 203 945 8 974 774 5 410 374 0 60 915 0 291 764 755 19 920 379 0 278 768 0 1 150 481 463 61 443 288 65 126 903 44 926 444 48 799 706 930 185 122 326 395 781 35 663 760 8 060 944 463 743 420 951 1 089 038 175 Rand Water 941 702 148 915 159 923 0 0 26 542 225 Umgeni Water 206 493 547 193 090 793 13 140 137 71 465 93 261 1 374 326 487 172 218 462 88 851 990 117 433 759 97 891 1 792 873 314 13 402 754 2 171 377 525 50.56% 61.24% 21 Sedibeng Water TOTAL DEBTORS AGE ANALYSIS 3 545 704 012 100.00% 38.76% 26 390 979 4.86% 151 246 2.51% 3.31% PRESENTATION TITLE Presented by: Name Surname Directorate Rand Water Date 22 Rand Water Rand Water’s previous and extended area of operations PRESENTATION TITLE Presented by: Name Surname Directorate Date Rand Water’s Extended Area of Operations includes - 27 new local councils - Gauteng - Limpopo (Greater Groblersdal and Great Mable Hall - North West (Rustenberg and Madibeng areas) - Mpumalanga - Northern Free State (Boundary of the Upper Vaal WMA) – Maluti-a-Phofung, Dihlabeng, Nketoana, etc Current New Total Population 12 million 4 – 7 million 16 – 19 million Economy (% of GDP) 34% 7 – 16% 41 – 50% The exact numbers are difficult to calculate because the extended area incorporates portions of Limpopo, North West and Free State. Only Mpumalanga and Gauteng are included in total. 23 Rand Water Customer and Sales Profile Mines 4% Greater Johannesbur g Metro 37% Emfuleni 6% Tshwane Metro 16% 4,095 4,200 3,925 4% 4,205 4,309 2% 3% 4% 2.4% 5% 3% 1% 0% 2010 2011 2012 Total volumes per day 2013 Eikenhof Supply System Zwartkopjes Supply System Palmiet Supply System Mapleton Supply System 4% 2% 3,600 Booster Systems 4,413 4,400 3,800 Rand Water Ekurhuleni Metro 23% Ml/day 4,600 4,000 Note: Primary = Raw Water + Vereeniging + Zuikerbosch Industries 1% 2014 incr in Volume Sold % Primary Systems Other municipalitie s 13% Corporate System Vereeniging Purification System Zuikerbosch Purification System Raw Water Supply System 24 Five Year Capital Expenditure Plan 2015-2019 (R13.5 Billion) 5-year Capital Expenditure (2015/19) R13,5 Billion For Continuing Business Top 5 Augmentation projects over the 5-year period Project System Eikenhof Mapleton Palmiet Primary Zwartkopjes Mpumalanga Total Augmentation Renewal (Rm) (Rm) 492 956 2,106 3,641 453 253 (60%) 7,900 694 734 929 2,096 954 168 Total (Rm) Planned spend R(m) 2015 - 2019 2015 Annual 2,770 58 972 350 422 142 1 Zuikerbosch scheme (System 5) 1,690 2 O6 Palmiet Klipfontein augmentation 3,035 3 Hydro power 4 Mpumalanga Bushbuckridge 253 63 5 B17 Zuikerbosch Palmiet pipeline 223 223 Total 4,640 836 Proportion of total augmentation spend 61% 1,186 5,737 1,407 421 (40%) (100%) 5,576 13,476 System Primary Palmiet All Mpumalanga Palmiet 25 Contribution to government and Minister’s performance agreement (cont.) Outcome No. 4: Outcome No. 5: Decent employment through inclusive growth. A skilled and capable workforce to support an inclusive growth path. Job Creation and Training (2014 – 2018) – Total Jobs Created = 21 801 Year 2014 2015 New staff employed by RW Contractors Temporary Staff (indirect) by Rand Water Foundation Permanent New Jobs Rand Water Within Rand Water Academy Training 1 500 1 600 1 900 2 650 100 100 56 120 2016 1 750 2 500 100 150 2017 2018 1 800 1 800 2 450 2 450 50 50 200 225 Total 8 450 11 950 400 1 001 26 PRESENTATION TITLE Presented by: Name Surname Directorate Mhlathuze Water Date 27 GRAPHICAL AREA OF SUPPLY 28 Mhlathuze Water Projects Project Name Total Budget 2014/15 2015/16 2016/17 Jozini Bulk Water Supply R1.4 bn R360mil R90mil R45mil Hlabisa Bulk Water Supply R205 mil 45mil Dukuduku R143 mil Resettlement ProjectWater Supply R660 mil not approved R17m Hluhluwe Bulk water Supply R96 mil R96 mil Nsezi Pump Station R94 mil Weir upgrade Eskhaleni R6 mil Total R1.9 bil R518 mil R660 mil not yet approved R90mil R45mil 29 PRESENTATION TITLE Presented by: Name Surname Directorate Umgeni Water Date 30 Current Supply Area iLembe Umgungundlovu eThekwini WSA Harry Gwala eThekwini Ugu 3 442 361 Ugu 722 484 Msunduzi 618 536 iLembe 606 809 Harry Gwala DM 461 419 Umgungundlovu 399 227 TOTAL: 31 Population 6 250 836 CAPEX for eThekwini MM Nagle Aqueduct refurbishment Hazelmere system - various Major Projects eThekwini Mgeni system - various Nungwane pipeline replacement Objective Augmentation Asset Condition Asset Condition Asset Condition Asset Condition Augmentation Augmentation 32 Project Description Durban Heights WW - various Wiggins WW - various Project Cost 2014 5-Year (R’m) (R’m) (R’m) Mgeni system (various) 587 52 359 Nagle Aqueducts - Refurbishment 171 28 82 Durban Heights WW (various) 452 49 258 Wiggins WW (various) 103 20 38 Nungwane pipeline replacement 69 2 66 Hazelmere system (various) 295 97 114 Mkomazi Water Project 2 704 2 20 Total 4 381 250 937 CAPEX for Umgungundlovu DM Msunduzi LM Greater Mpofana BWSS Major Projects uMshwathi Pipeline Umgungundlovu Mgeni system various Darvill WWW various Richmond Pipeline Greater Eston BWSS Objective Augmentation Augmentation Development Development Development Development 33 Project Description Mgeni system (various) Darvill WWW (various) Greater Mpofana BWS Scheme uMshwathi Regional Pipeline Richmond Pipeline Greater Eston BWS Scheme Total Project Cost (R’m) 587 739 471 773 224 202 2 996 2014 (R’m) 52 83 1 39 81 58 314 5-Year (R’m) 359 590 278 164 85 41 1 517 Maphumulo BWSS Phase 2 CAPEX for iLembe DM Major Projects uMshwathi Pipeline Lower Thukela BWSS iLembe Southern Ndwedwe BWSS Hazelmere system various Objective Project Description Augmentation Development Dev. / Aug. Development Development Hazelmere system (various) Maphumulo BWS Scheme Phase 2 Lower Thukela BWS Scheme Southern Ndwedwe BWS Scheme uMshwathi Regional Pipeline Total Project Cost (R’m) 295 224 1 575 390 773 3 257 2014 (R’m) 5-Year (R’m) 97 107 384 4 39 631 114 92 865 47 164 1 282 CAPEX for UGU DM Nungwane Raw Water Pipeline Major Projects Mhlabatshane BWSS Objective Augmentation Development Asset Condition Consolidation Augmentation Augmentation Quarry Reservoir upgrade Ugu Project Description Ellingham Link Pipeline Mhlabatshane BWS Scheme Phase 1 & 2 Nungwane Raw Water Aqueduct Quarry Reservoir Upgrade Lower Mkomazi BWSS South Coast Pipeline Phase 2b Total Ellingham Link Pipeline Project Cost (R’m) 37 511 69 21 1 143 172 1 953 2014 (R’m) 5-Year (R’m) 15 67 2 18 2 1 105 20 102 66 110 171 469 CAPEX for Harry Gwala DM Greater Bulwer/Donnybrook BWSS Major Projects Harry Gwala 4 New Regional Schemes Planning and Implementation Objective Project Description Ixopo various Project Cost (R’m) 2014 (R’m) 5-Year (R’m) Development Greater Bulwer/Donnybrook BWS Scheme 20 0 20 Consolidation Ixopo WWW various 34 3 27 36 PRESENTATION TITLE Presented by: Name Surname Directorate Magalies Water Date 37 MAP OF SERVICE AREA 38 PROJECTS TO BE COMPLETED IN THE NEXT 12 MONTHS (Cont.) Pilanesberg North Water Supply Scheme Local Authorities Moses Kotane LM Thabazimbi LM New Mines Platmin Pilanesberg South Water Supply Scheme Local Authorities Moses Kotane LM Rustenburg LM Royal Bafokeng Authority New Mines Maseve Bakubung Upgrade and Extension of Vaalkop Water Treatment Plant November 2015 Increase plant capacity by (30+30) Ml/d Increase distribution capacity by 70Ml/d (New Highlift Pumpstation; 43 km 950mm diameter pipeline; 20 Ml LaPatrie Reservoir) Transfer water from November 2015 the Pilanesberg (excluding North Scheme to the Mafenya new Mafenya Reservoir) Reservoir (43 km 1000mm diameter; 8.5 km 650mm diameter; 50Ml New 40 Mafenya Reservoir MAGALIES PROJECTS Plant Projected Expenditure (R’000) Project Name 2015/16 Head Office Vaalkop Water Treatment Plant Scientific Services relocation and Project Management Unit 6 238 Pipeline Refurbishment, Upgrade and Repair 5 752 Cathodic Protection 21 176 Construction of a Bethanie Pipeline 2016/17 2017/18 2018/19 2019/20 317 4 800 Pilanesberg Bulk Water Supply (North Scheme) 354 158 682 052 98 963 113 514 147 736 Pilanesberg Bulk Water Supply (South Scheme) 226 030 633 396 227 860 250 000 55 000 41 MAGALIES PROJECTS (Cont.) Wallmannsthal Water Treatment Plant Water Treatment Works upgrade, capacity increase, 25ML resevoir and existing pipeline upgrade 325 154 398 782 Klipdrift Water Treatment Plant Infrastructure upgrades, 10ML resevoir, pipeline upgrade Plant refurbishment, upgrade of pumpstation and pipeline capacity improvement 18 945 12 195 1 012 619 1 801 896 Cullinan Water Treatment Plant 50 366 75 144 59 869 88 349 69 839 826 502 919 276 139 086 1 213 194 1 371 139 411 661 TOTAL 42 PRESENTATION TITLE Presented by: Name Surname Directorate Lepelle Northern Water (LNW) Date 43 Area of Supply Infrastructure • Operates 12 purification schemes – ranging from 3 – 74 Ml/day Potable Water • 140 Ml/day in Phalaborwa industries • Bulk pipeline length of 1062 km with varying sizes of up to 1.2m • The pipelines caters for 263 Ml/day Potable & 140 Ml/day Industrial water. 44 Realignment Schemes: Nandoni Vondo Malamulele East Xikundu Middle Letaba Public Works operated Plant? LNW CAPITAL EXPENDITURE 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 R'000 R'000 R'000 R'000 R'000 R'000 Phalaborwa 30 267 38 160 26 600 29 550 25 760 26 480 Ebenezer 45 588 48 848 6 950 7 100 6 900 6 000 Olifantspoort 26 035 25 131 850 560 400 400 Politsi 7 280 35 355 173 500 87 000 390 0 Doorndraai 6 830 6 218 7 400 0 0 0 13 009 17 438 2 801 3 616 3 367 3 695 67 993 17 942 2 375 710 585 590 1 796 1 826 770 320 770 320 198 798 190 918 221 246 128 856 38 172 37 485 Risk & Quality Technical services IT TOTAL 45 Non-LNW Capex Flag Boshielo 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 R'000 R'000 R'000 R'000 R'000 R'000 36 288 46 414 127 400 88 200 0 0 Marble-hall WTW 5 030 4 384 0 0 0 0 Tubatse 7 342 5 456 310 0 0 0 Modjadji 5 690 3 342 0 0 0 0 Nkowankowa 7 119 6 036 0 0 0 0 61 469 65 632 127 710 88 200 0 TOTAL 46 0 Projects Implemented for DWS PROGRAM PROJECT /BENEFICIAL MUNICIPALITY RBIG Mametja-Sekororo pipeline, (In Maruleng Municipality: Mopani district) Giyani Drought Relief (Nandoni-Nsami pipeline: Mopani district) MWIG Mopani - Ba-Phalaborwa, Greater Giyani, Greater Letaba, Greater Tzaneen, Maruleng Sekhukhune - Elias Motsoaledi, Fetakgomo, Greater Tubatse, Makhuduthamaga, Ephraim Mogale Vhembe -Makhado, Musina, Mutale, Thulamela Emergency Interventions 1. Mopani (Giyani) intervention, 2. Kgapane intervention 3. Polokwane Intervention • Olifantspoort, Ebenezer, Boreholes, Waste Water reclamation, WCDM 4. Flag Boshielo Scheme Intervention in Sekhukhune 47 District. Projects Implemented for DWS (Cont.) Special Intervention: Acceleration of W&S project Borehole and Scheme rehabilitation, Groblersdal Luckau RWS IWR: Infrastructure Water Resources Babanana pipeline, Nkambako WTW, Nwamitwa Dam Sanitation Household sanitation –in all Limpopo WSA’s RRU Province wide - RBIG project management, Water Schemes refurbishment, “hotspot interventions” PRESENTATION TITLE Presented by: Name Surname Directorate Bloem Water Date 49 Area of Service 50 Projects Supporting Mangaung Metro IDP – Water & Sanitation No. Project Name Project Description Estimate (R Mil) Beneficiaries Status 1. Pipeline from Rustfontein WTW to Lesaka Reservoir 15 km 700 mm diameter ductile iron R 90 Mil • Botshabelo • Thaba Nchu • Construction underway 2. Pipeline from Lesaka Reservoir to OK/Motlatla Reseviors 10 km pipeline R 10 Mil – Planning phase R 60 Mil (Not Secured) • Botshabelo • Thaba Nchu • Pre-feasibility study complete • Feasibility underway 3. Gariep to Knellpoort pipeline 180 km 600 mm diameter pipeline R 10 Mil – Planning phase R 1.8 Billion (Not Secured) •Botshabelo • Thaba Nchu • Bloemfontein • Pre-feasibility study complete • Feasibility underway 51 Projects Supporting Mangaung Metro IDP – Water & Sanitation (Cont.) No. 4. Project Name/ Project Scheme Description Estimate (R Mil) Beneficiaries Status Novo Transfer New pump to increase output to Rustfontein Dam R 30 Mil • Bloemfontein • Thaba Nchu • Botshabelo • Installation complete. • Commissioning underway. Pipe line between Knellpoort Dam and Welbedacht WTW R 5 Mil (Secured) • Bloemfontein • Thaba Nchu • Botshabelo • Wepener •Dewetsdorp •Reddersburg • Edenburg • PSP appointed • Pipe route and prelim designs concluded • Detailed design underway (GBRS Intervention no. 1) 5. Welbedacht WTW to Knellpoort dam (GBRS Intervention no. 3) R 250 Mil (Not Secured) 52 Projects Supporting Mangaung Metro IDP – Water & Sanitation (Cont.) No. Project Name/ Project Scheme Description Estimate (R Mil) Beneficiaries Status 6. Additional Boreholes in Thana Nchu 24 solar boreholes R 10 Mil •North and South of Thaba Nchu villages • Drilling/Exploration complete • Installation of boreholes underway 7. Extend Treatment capacity at Rustfontein Increase WTW capacity from 100 Ml/day to 150 Ml/day R 10 Mil (Secured) • Bloemfontein • Thaba Nchu • Botshabelo • Detail design underway 35 km GRP 1000 mm diameter pipeline from Brandkop to Leeukop junction R 60 Mil (Secured) • Bloemfontein • Thaba Nchu • Botshabelo • Construction tender adjudication underway 8. Parallel Pipeline to PCP (Welbedacht to Bloemfontein pipeline) R 160 Mil (Not secured) R 330 Mil (Partially Secured) 53 Projects Supporting Mangaung Metro IDP – Water & Sanitation Cont… No. Project Name/ Project Scheme Description Estimate (R Mil) Beneficiaries Status 9. Booster pump station on the Excelsior pipeline Houtneck booster pumpstation R 6 Mil (Secured) R 15 Mil (partially secured) • Excelsior • Rural Villages • Detail design underway 10. Morago pipeline 10 km 250 mm diameter pipeline at Thaba Nchu R 8 Mil • Excelsior • Construction is at • Rural Villages 100 % complete. north Thaba Nchu 11. Steel tank at Motlatla Reservoirs Construction of Additional 4 Ml/d reservoir R 6 Mil •Excelsior • Rural Villages • Construction is at 100 % complete. 54 PRESENTATION TITLE Presented by: Name Surname Directorate Amatola Water Date 56 AW Bulk Service Delivery 57 Projected Total Supply to Amatole Projected Municipality. Total Supply to Amathole District Municipality in m /annum 3 WTW Dam 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 Laing Laing 1 589 203 1 605 095 1 621 146 1 637 358 1 653 731 Binfield Binfield 2 192 766 2 973 893 3 098 532 3 224 417 3 351 562 Debe Debe 588 182 1 099 182 1 163 057 1 226 932 1 290 807 Glenmore Glen Melville 358 940 362 529 366 155 369 816 373 514 Peddie Regional Sandile 1 509 452 1 524 547 1 539 792 1 555 190 1 664 690 Sandile Sandile 2 897 330 5 525 330 5 853 830 6 182 330 6 510 830 Upper Mnyameni Mnyameni 85 472 86 326 87 190 88 062 88 942 365 432 657 432 693 932 730 432 766 932 9 586 776 9 586 776 13 834 334 Masincedane Mnyameni Totals 58 14 423 633 15 014 536 Projected Total Supply to Buffalo City Metropolitan Municipality Projected Total Supply to BCMM in m3/annum WTW Dam Nahoon Nahoon Laing Laing Sandile Sandile Peddie regional Sandile 2015/16 Totals 2016/17 2017/18 2018/19 2019/20 11 437 339 11 551 713 11 667 230 13 857 230 16 777 230 7 435 309 7 903 863 8 032 176 8 161 773 8 292 666 2 905 000 2 934 050 2 963 391 2 993 025 3 022 955 364 655 368 301 371 984 375 704 379 461 22 145 950 22 761 610 23 038 501 25 391 489 28 476 106 Projected Total Supply to Ndlambe Municipality in m3/annum Kenton-on-Sea + Bushman's Sea wells & Diaz River Mouth Cross Boreholes Supply- RO Plant Totals 59 908 992 918 082 927 263 936 536 945 901 908 992 918 082 927 263 936 536 945 901 PRESENTATION TITLE Presented by: Name Surname Directorate Overberg Water Date 60 Service Area 61 CAPEX – Potable Water Projects Project description Status Estimate Constr. d Project Commen Value cement date Rûensveld-East WTW Upgrade Detail Design, R7.5mil Procurement & Constr. Stage Emerging Concept Design R4.0mil Farmers Bulk Supply Pipeline Project Timeframe s/completi on Percentag e Completio n Estimated Volumes to be sold 2014/15 2015/16 25% 4.6Ml/day 2015/16 2015/16 15% 0.5Ml/day 62 PRESENTATION TITLE Presented by: Name Surname Directorate Sedibeng Water Date 63 Area of Supply and Operation 64 CAPEX SPEND 2014/2015 (Cont.) PROJECTS FUNDED FROM EXTERNAL FUNDS VAAL GAMAGARA NAMAKWA 47 129 0 TOTAL 47 129 GRAND TOTAL 118 392 26 020 The Vaal Gamagara pipeline, is a nine (9) year project, in the area of Sedibeng Water. The total cost of the pipe line is R10b. Sedibeng budgeted from internal funds a percentage of the costs towards 55% the replacement. Namakwa pipeline refurbishment is funded by the Department of Water and 188 910 100% Sanitation. 214 930 456% 259 978 220 % GRAND TOTAL Five Year Capex Projection (Internal Funds) REGION CAPEX – FREE STATE REGION 14/15 15/16 16/17 17/18 18/19 19/20 Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 92 250 Total 55 989 73 731 92 700 97 600 76 650 488 920 12 422 73 900 120 790 118 200 113 000 122 300 560 612 21 400 3 500 3 500 3 600 3 600 3 600 39 200 68 656 147 788 147 334 136 089 3 367 3 670 506 904 158 468 298 919 364 324 355 489 212 217 206 220 1 595 637 CAPEX – NORTHERN CAPE (VAAL GAMAGARA) CAPEX – NORTH WEST REGION – NORTHERN CAPE (NAMAKWA) TOTAL 67 PRESENTATION TITLE Presented by: Name Surname Directorate Thank You Date 68