ConcessionaireDetails/MPR Aug

advertisement
M/s.
HYDERABAD
SAI
MAATARINI
TOLLWAYS
LIMITED,
Name of Project: Four Laning of Panikoili - Rimuli Section of NH215 from Km 0+000 – 163+000 (Design Length 166+173 Kms) in
the State of Orissa under NHDP Phase-III as BOT (Toll) Basis on
DBFOT pattern.
MONTHLY PROGRESS REPORT
for
AUGUST-2014
CLIENT
NATIONAL HIGHWAYS AUTHORITY OF INDIA
(MINISTRY OF SHIPPING, ROAD TRANSPORT & HIGHWAYS)
(Government of India)
Independent Engineer
Project Management Consultant
SAI CONSULTING ENGINEERS PVT. LTD,
SHELADIA ASSOCIATES INC., USA,
Ahmedabad
Hyderabad
EPC Contractor
M/s. GAYATRI PROJECTS, LTD., Hyderabad
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from
Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
Table of Contents
1.
PROJECT LOCATION MAP ................................................................................................................................ 3
2.
SCOPE OF THE PROJECT ................................................................................................................................... 4
3.
PROCUREMENT OF THE SITE IN TERMS OF LENGTH OF PROJECT HIGHWAY (KM).................. 6
4.
PRECONSTRUCTION ACTIVITIES ..................................................................................................................... 19
5.
STATUS OF DESIGNS & DRAWINGS ................................................................................................................ 21
6.
PROGRESS ..................................................................................................................................................... 22
6.1.
6.2.
7.
PHYSICAL PROGRESS ..........................................................................................................................................22
FINANCIAL PROGRESS ........................................................................................................................................22
STRIP CHART OF WORK PROGRESS ................................................................................................................ 24
7.1.
7.2.
7.3.
7.4.
7.5.
7.6.
7.7.
PROGRESS OF MAJOR BRIDGES ............................................................................................................................48
PROGRESS OF MINOR BRIDGES ............................................................................................................................48
PROGRESS OF ROBS ..........................................................................................................................................50
PROGRESS OF FLYOVER.......................................................................................................................................50
PROGRESS OF VEHICULAR UNDER PASSES (VUPS): ..................................................................................................51
PROGRESS OF PEDESTRIAN UNDER PASSES (PUPS):.................................................................................................51
PROGRESS OF CULVERTS (PIPE/BOX/SLAB): ...........................................................................................................52
8.
CONSTRUCTION CONSTRAINTS: .................................................................................................................... 56
9.
CHANGE OF SCOPE OF WORK ........................................................................................................................ 58
10.
CLAIMS: ..................................................................................................................................................... 58
11.
DISPUTES................................................................................................................................................... 59
12.
NON CONFORMING PRODUCT NOTIFICATIONS (NCPNS). .......................................................................... 60
13.
CORRESPONDENCE .................................................................................................................................... 62
14.
ENVIRONMENTAL REGULATIONS & CLEARANCES: .................................................................................... 65
15.
STATEMENT SHOWING ROAD ACCIDENT CASES FOR THE MONTH: ........................................................... 67
16.
EVICTION OF ENCROACHMENTS:............................................................................................................... 68
17.
APPENDIX - CONCESSIONAIRE STAFF ......................................................................................................... 69
18.
APPENDIX 2 - SUMMARY OF TEST RESULTS ............................................................................................... 74
19.
APPENDIX 3 - LIST OF PLANT AND EQUIPMENTS ....................................................................................... 86
20.
APPENDIX 4 - LIST OF LAB EQUIPMENT & CALIBRATION STATUS............................................................... 89
21.
APPENDIX 5 - CALIBRATION STATUS OF PLANTS ....................................................................................... 95
22.
APPENDIX 6 - WEATHER REPORT ............................................................................................................... 96
23.
APPENDIX 7 – PHOTOGRAPHS ................................................................................................................... 97
24.
ANNEXURE A – DISBURSEMENT OF COMPENSATION .............................................................................. 103
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
2
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from
Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
1. Project Location Map
The Project Site of the Four-Lane divided Project Highway comprises the section of National
Highway No 215 commencing from Km 0.000 to Km 163.000 i.e. Panikoili – Rimuli section in the
State of Odisha. The present carriageway of the Project Highway is an intermediate lane/twolane/single carriageway.
PROJECT ROUTE
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
3
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
2. Scope of the Project
S.NO.
1
2
3
4
DESCRIPTION
5
6
7
8
i)
ii)
iii)
iv)
iv)
9
a)
b)
c)
d)
e)
f)
g)
Project Design Stretch
Project Cost (INR)
Construction Period
Concession Period
:
:
:
:
Appointed Date
Financial Close
Scheduled Date of Completion
Details of Project Highway
Carriageway Length
Bypasses Length
Realignment Length
Sub Total
Service/Slip Roads
Built-up Area
Details of Project Structures
Flyovers / Elevated Structures
ROBs
Major Bridges
RUBs
Minor Bridges
PUPs/Cattle Crossings
VUPs
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
M/s. SAI MAATARINI TOLLWAYS LIMITED
REMARKS
Km 0+000 to Km 166+200 (Design Length: 166.173 KM)
1,410 Cr.
VGF Rs.548.49 Cr.
910 Days
24 Years including Construction Period
02/05/2013
04/09/2013
29/10/2015
Existing
163.000 Km
163.000 Km
Existing
2 Nos
5 Nos
1 No
32 Nos
-
Proposed
127.807 Km
32.800 Km
5.566 Km
166.173 Km
42.336 Km
5.400 Km
Proposed
1 No
2 Nos
6 Nos
30 Nos
21 Nos
15 Nos
Page
4
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
h)
i)
j)
k)
l)
m)
10
i)
ii)
iii)
iv)
v)
vi)
Animal Underpasses
Elephant Underpasses
Reptile Underpasses
Slab Culverts
Box Culverts
Pipe Culverts
Sub Total
Project Facilities / Miscellaneous
Grade Intersections
Grade Separated Intersections
Bus Bays
Truck Lay Bays
Toll Plazas
Wayside Amenities
Sub Total
M/s. SAI MAATARINI TOLLWAYS LIMITED
:
:
:
:
:
:
:
:
:
:
:
:
:
:
202 Nos
4 Nos
48 Nos
294 Nos
6 Nos
2 Nos
50 Nos min.
04 Nos
256 Nos
38 Nos
431 Nos
12 Nos
1 No
43 Nos
4 Nos
3 Nos
2 Nos
65 Nos
Page
5
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
3. Procurement of the Site in terms of Length of Project Highway (Km).
3.1 Fragile Working Fronts of Land Available impeding mobilization of Manpower & Machinery:
Continuous
Stretch
Land Available
Length
<0.500
>0.5 to <1
>1 to <2
>2 to <3
>3 to < 4
>4 to <5
>5 to <6
>6 to <7
>7 to <8
>8 to <9
>9 to <10
>10
Total
M/s. SAI MAATARINI TOLLWAYS LIMITED
17.742
14.253
27.757
12.965
20.38
0.000
0.000
0.000
0.000
0.000
0.000
0.000
93.097
Minor Hindrance
Length
6.944
4.720
1.141
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
12.805
Full
Hindrance
Length
3.21
6.085
10.930
8.95
3.18
0.000
0.000
0.000
0.000
0.000
0.000
0.000
32.355
Reserve
Forest
Length
5.091
3.610
19.225
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
27.926
Total
32.987
28.668
59.053
21.915
23.560
0.000
0.000
0.000
0.000
0.000
0.000
0.000
166.183
Page
6
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
3.2 Fragile Working Fronts of Land Available impeding mobilization of Manpower & Machinery:
Bar Chart
Land Available Length
Minor Hindrance Length
Full Hindrance Length
Reserve Forest Length
30.000
25.000
20.000
15.000
10.000
5.000
0.000
Stretch (kKM)
<0.500
>0.5 to <1
>1 to <2
>2 to <3
>3 to < 4
>4 to <5
>5 to <6
>6 to <7
>7 to <8
>8 to <9
>9 to <10
>10
1. Continuous stretch of land to be available in possession with Concessionaire for efficient mobilization is at least 10 Kms.
2. Continuous stretch of land to be available in possession with Concessionaire for general mobilization is at least 5 Kms.
3. Any length of land in bits less than the above parameters if available in possession with Concessionaire creates problem for mobilization &
efficient execution. The execution in these types of bits shall cause a serious impediment / hindrance to Concessionaire
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
7
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
3.3. Chainage wise Land Stretches Available:
Chainage
From
To
code
Length
Land Status
1
2
Alatiri
00+000
00+120
00+120
00+140
GA
YA
A
A
0.12
0.02
G
Y
Available
Structure under Arbitration case
3
Alatiri, Patharapada, M.D
Jamalpur, Ouapada,
Dhanpur, Aliya,
00+140
03+350
GE
E
3.21
G
Available
03+350
03+360
04+200
04+230
05+470
05+500
05+670
05+920
06+340
06+440
06+700
06+820
03+360
04+200
04+230
05+470
05+500
05+670
05+920
06+340
06+440
06+700
06+820
06+880
YA
GB
YA
GC
YA
GA
YA
GA
YA
GA
GA
YA
A
B
A
C
A
A
A
A
A
A
A
A
0.01
0.84
0.03
1.24
0.03
0.17
0.25
0.42
0.10
0.26
0.12
0.06
Y
G
Y
G
Y
G
Y
G
Y
G
G
Y
Temple
Available
Diary Form
Available
Compound wall
Available
Land under 3A notification & Temple
Available
Structure under Arbitration case
Available
Available
Maruti Show room
06+880
09+490
GD
D
2.61
G
Available
09+490
09+820
09+820
10+300
YA
GA
A
A
0.33
0.48
Y
G
10+300
10+440
YA
A
0.14
Y
Land under 3A notification & Temple
Available
Land acquisition Problem due to non
acceptance of compensation by land
owner (Internal Problem)
Available
Land acquisition Problem due to non
acceptance of compensation by land
owner (Internal Problem)
Available
Land acquisition Problem due to non
acceptance of compensation by land
owner (Internal Problem)
Available
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
JAJPUR BY-PASS
Village Name
19
Aliya
Aliya, Ghikoili, Benapur
Benapur
Benapur, Talugaon
Benapur, Talugaon
Benapur, Talugaon
Benapur, Talugaon
Benapur, Talugaon
Benapur, Talugaon
Sanapatuli, Badapatuli,
Tentulikhunta
Tentulikhunta, Dandakiri
Dandakiri
20
Dandakiri, Baladia
10+440
10+580
GA
A
0.14
G
21
Baladia, Chandama,
Santarapur
10+580
10+673
YA
A
0.09
Y
10+673
10+790
GA
A
0.12
G
10+790
11+100
YA
A
0.31
Y
11+100
11+400
GA
A
0.30
G
22
23
24
Chandama, Santarapur
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
FOREST
TOTAL
Length 06.45 KM.
Sl No.
Page
8
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
Sl No.
Village Name
Chainage
From
To
code
Length
Land Status
25
11+400
11+695
YA
A
0.30
Y
26
27
28
11+695
12+370
12+950
12+370
12+950
13+150
GB
YB
GA
B
B
A
0.68
0.58
0.20
G
Y
G
Land acquisition Problem due to non
acceptance of compensation by land
owner (Internal Problem), Burial ground &
Pvt Pond
Available
Alignment Problem
Available
13+150
14+380
GC
C
1.23
G
Available
14+380
14+490
14+490
15+620
YA
GC
A
C
0.11
1.13
Y
G
15+620
15+640
YA
A
0.02
Y
Land under 3A notification
Available
Land acquisition Problem due to non
acceptance of compensation by land
owner (Internal Problem)
15+640
15+930
GA
A
0.29
G
Available
15+930
16+080
GA
A
0.15
G
School building
16+080
19+200
GE
E
3.12
G
Available
19+200
20+800
FC
C
1.60
F
Ragadi Reserve Forest
20+800
22+800
GC
C
2.00
G
Available
22+800
23+000
23+150
23+250
23+350
23+400
24+010
24+680
24+730
23+000
23+150
23+250
23+350
23+400
24+010
24+680
24+730
24+770
YA
GA
YA
GA
YA
GB
YB
GA
YA
A
A
A
A
A
B
B
A
A
0.20
0.15
0.10
0.10
0.05
0.61
0.67
0.05
0.04
Y
G
Y
G
Y
G
Y
G
Y
Govt building (Forest dept), School
Available
Pvt building
Available
Temple
Available
Shops, School, P.S, Bank, Market Area
Available
Structure under Arbitration case
30
31
Kuanarda, Nayagarh,
Naguan
Nayagarh, Naguan
Naguan, Itapur, Talagarh
32
Talagarh
29
33
34
35
11
12
13
14
15
16
17
18
19
20
21
Talagarh, Uparagarh,
Mangarajpur
Talagarh, Uparagarh,
Mangarajpur
Talagarh, Uparagarh,
Mangarajpur, Manjuri,
Ragadi
Ragadi
Ragadi, Korabandi, Kadama,
Andhari
Andhari
Andhari, Jarda
Jarda
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
FOREST
TOTAL
4.80
Page
9
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
Sl No.
22
23
24
25
26
Village Name
Ramachandrapur
Chainage
code
Length
Land Status
From
To
24+770
24+930
25+250
26+100
26+200
24+930
25+250
26+100
26+200
26+620
GA
YA
GB
YA
GA
A
A
B
A
A
0.16
0.32
0.85
0.10
0.42
G
Y
G
Y
G
Available
Market, BSNL building, Hospital
Available
Encroachments, Shops, Houses
Available
27
Ramachandrapur,
Badapadana, Padanpur,
Suanpada
26+620
27+150
YB
B
0.53
Y
Encroachments, Houses
28
29
30
Suanpada
27+150
27+300
27+380
27+300
27+380
27+600
GA
YA
GA
A
A
A
0.15
0.08
0.22
G
Y
G
Available
Big Pond
Available
31
Suanpada, Nuagaon
27+600
27+960
YA
A
0.36
Y
Land acquisition Problem due to non
acceptance of compensation by land
owner (Internal Problem)
32
27+960
28+240
GA
A
0.28
G
33
28+240
28+350
YA
A
0.11
Y
28+350
28+480
GA
A
0.13
G
28+480
28+580
YA
A
0.10
Y
28+580
28+830
29+000
28+830
29+000
29+250
GA
YA
GA
A
A
A
0.25
0.17
0.25
G
Y
G
29+250
29+290
YA
A
0.04
Y
29+290
29+500
30+200
30+800
29+500
30+200
30+800
30+940
GA
YB
GB
YA
A
B
B
A
0.21
0.70
0.60
0.14
G
Y
G
Y
34
Nuagaon
35
36
37
38
39
40
41
42
43
Nuagaon, Gointhagodi
Gointhagodi
Gointhagodi, Khalana
Khalana
Khalana, agarda, Sainkula
Khalana, agarda, Sainkula
Sainkula
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
FOREST
TOTAL
Available
Land acquisition Problem due to non
acceptance of compensation by land
owner (Internal Problem), GP building
Available
Land acquisition Problem due to non
acceptance of compensation by land
owner (Internal Problem)
Available
Houses
Available
Land acquisition Problem due to non
acceptance of compensation by land
owner (Internal Problem)
Available
Sainkula market, PS
Available
Land under 3A notification
Page
10
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
ANANDAPUR BYPASS
RAG
44
45
Chainage
code
Length
Land Status
From
To
30+940
31+280
31+280
31+400
GA
YA
A
A
0.34
0.12
G
Y
Available
Temple, Market, Houses
46
Sainkula,
Machala,Rudranarayanapur,
Bamphidi
31+400
33+100
GC
C
1.70
G
Available
47
Rudranarayanapur
33+100
33+160
YA
A
0.06
Y
Land acquisition Problem due to non
acceptance of compensation by land
owner (Internal Problem)
48
Rudranarayanapur,
Bamphidi, Hasanpur
33+160
33+430
GA
A
0.27
G
Available
49
Hasanpur
33+430
33+670
YA
A
0.24
Y
50
Hasanpur
33+670
34+050
GA
A
0.38
G
Land acquisition Problem due to non
acceptance of compensation by land
owner (Internal Problem)
Available
51
Hasanpur, Salapada,
Belabahali, Barigaon
34+050
37+000
GD
D
2.95
G
Realignment & Major Bridge
Salapada
Salapada, Sudusudia, Janra
Janra
Khaparakhai
Ghasipura
37+000
37+120
38+120
38+400
38+600
38+800
39+800
39+900
40+330
40+650
37+120
38+120
38+400
38+600
38+800
39+800
39+900
40+330
40+650
41+900
GA
GB
GA
YA
GA
FB
GA
GA
GA
GC
A
B
A
A
A
B
A
A
A
C
0.12
1.00
0.28
0.20
0.20
1.00
0.10
0.43
0.32
1.25
G
G
G
Y
G
F
G
G
G
G
Available
Available
Available
Govt Structure
Available
Salapada Reserve Forest
Available
Available
Available
Available
62
Kainpura
41+900
42+800
GB
B
0.90
G
Available
63
Sailong
42+800
43+400
GB
B
0.60
G
Available
64
Sailong
65
Morabali
43+400
44+000
44+100
44+000
44+100
44+480
GB
YA
GA
B
A
A
0.60
0.10
0.38
G
Y
G
Available
Shops, Market Complex & Junctions
Available
52
53
54
55
56
57
58
59
60
61
Barigaon
Salapada
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
3.788
7.444
FOREST
TOTAL
Length
02.95 KM.
Village Name
11.232
3.000
Length 03.50 KM.
Sl No.
Page
11
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
66
67
68
69
70
71
72
73
74
75
Indupura
Gohira
Talagaon
Biragobindapur
Bhalukuma
Dhakota
Amaranga
Bandha
Nahaguna
Kanto
76
Kolimati
77
Kamonda
78
GHATGAON BYPASS
Village Name
Darkhola
79
80
Melana
81
Balijodi
82
Balijodi
83
Uperdiha
84
85
86
Kusunpur
Kusunpur
Golabandha
87
Bataharichandanpur
88
Sanamasinabila
Chainage
From
To
44+480
45+100
46+400
47+580
50+700
52+800
53+400
55+000
55+650
55+700
57+700
58+500
59+000
60+250
62+060
64+900
66+800
69+150
45+100
46+400
47+580
50+700
52+800
53+400
55+000
55+650
55+700
57+700
58+500
59+000
60+250
62+060
64+900
66+800
69+150
69+300
69+300
70+500
code
Length
GB
GC
GC
GE
GD
GB
GC
RB
GA
RC
RB
RA
RC
FC
GD
FC
RD
GA
B
C
C
E
D
B
C
B
A
C
B
A
C
C
D
C
D
A
0.62
1.30
1.18
3.12
2.10
0.60
1.60
0.65
0.05
2.00
0.80
0.50
1.25
1.81
2.84
1.90
2.35
0.15
70+500
FC
C
74+400
GE
E
74+400
74+900
FA
74+900
76+520
76+520
Land Status
G
G
G
G
G
G
G
R
G
R
R
R
R
F
G
F
R
G
Available
Available
Available
Available
Available
Available
Available
Compensation is in process
Available
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Atai Reserve Forest
Available
Atai Reserve Forest
Compensation is in process
Available
1.20
F
Atai Reserve Forest
3.90
G
Available
A
0.50
F
Atai Reserve Forest
FC
C
1.62
F
Atai Reserve Forest
78+400
RC
C
1.88
R
Compensation is in process
78+400
79+000
79+400
81+000
82+980
83+600
79+000
79+400
81+000
82+980
83+600
84+700
RB
RA
RC
RC
RB
RC
B
A
C
C
B
C
0.60
0.40
1.60
1.98
0.62
1.10
R
R
R
R
R
R
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
84+700
86+400
FC
C
1.70
F
Masinabila Reserve Forest
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
FOREST
TOTAL
1.947
1.129
-
3.076
9.814
5.354
3.448
1.574
-
13.262
6.928
5.430
19.603
5.700
-
2.323
21.926
1.800
5.610
12.040
8.681
-
20.721
3.634
4.180
-
7.815
7.883
13.254
2.202
2.214
-
10.085
15.467
Length 04.60 KM.
Sl No.
5.100
Page
12
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
89
90
91
92
93
94
95
96
Sanabarabeda
Tikira
Nangalkanti
Dhenkikote
Khantaghar
KhajuriJuani
Katrabeda
Chikinia
97
Pipilia
98
Bankapatuli
99
Gopalapur
100
Gopalapur, Badaposi
101
Keonjhar By-pass
Village Name
102
103
104
105
106
107
108
109
110
111
Badaposi
Badaposi
Jamunalia
Tolankbahal
Tulashichaura, Sirispal
Chainage
From
To
86+400
88+380
89+500
89+900
90+500
92+600
93+800
96+100
98+300
101+480
101+980
102+700
88+380
89+500
89+900
90+500
92+600
93+800
96+100
98+300
101+480
101+980
102+700
103+200
103+200
103+800
107+580
108+180
code
Length
GC
RC
GA
RB
RD
GC
RD
RD
RE
RA
RB
GA
C
C
A
B
D
C
D
D
E
A
B
A
1.98
1.12
0.40
0.60
2.10
1.20
2.30
2.20
3.18
0.50
0.72
0.50
103+800
FB
B
107+580
108+180
109+200
GE
GB
GC
E
B
C
109+200
110+050
FB
B
110+050
111+430
GC
111+430
112+900
FC
112+900
113+950
113+950
114+080
114+194
114+440
114+615
116+615
116+640
116+680
116+850
117+100
114+080
114+194
114+440
114+615
116+615
116+640
116+680
116+850
117+100
117+400
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land Status
G
R
G
R
R
G
R
R
R
R
R
G
Available
Compensation is in process
Available
Compensation is in process
Compensation is in process
Available
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Compensation is in process
Available
0.60
F
Pipila Reserve Forest
3.78
0.60
1.02
G
G
G
Available
Available
Available
0.85
F
Naranapur Reserve Forest
C
1.38
G
Available
C
1.47
F
Naranapur Reserve Forest
FC
C
1.05
F
Naranapur Reserve Forest
GA
FA
GA
FA
FC
GA
RA
GA
RA
GA
A
A
A
A
C
A
A
A
A
A
0.130
0.114
0.246
0.175
2.000
0.025
0.040
0.170
0.250
0.300
G
F
G
F
F
G
R
G
R
G
Available
Sabik Jungle
Available
Sabik Jungle
Village Forest
Available
Compensation is in process
Available
Compensation is in process
Available
Land (Hect)
GOVT
PVT
6.682
6.058
2.493
1.566
6.246
11.934
5.994
10.858
11.344
16.317
4.464
2.177
1.704
3.298
2.695
4.945
18.102
3.577
FOREST
-
-
TOTAL
9.174
7.624
10.710
14.112
7.697
14.156
14.039
21.263
21.679
0.900
2.550
7.560
Length 15.65 KM
Sl No.
Page
13
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
Village Name
Sirispal
Sidhmath
Nizgarh
Nizgarh
Maligaon
Gopinathpur Nuagaon
Nuagaon
Dhurpada
Dhurpada
Raisuan
Raisuan & Gopinathpur
Chainage
From
To
117+400
117+710
120+960
121+150
121+380
121+400
121+750
121+821
123+500
124+100
124+300
125+075
125+100
127+080
127+100
127+300
128+840
128+860
129+000
129+020
129+420
129+460
129+650
129+670
129+900
130+340
130+640
131+400
131+420
132+000
132+200
117+710
120+960
121+150
121+380
121+400
121+750
121+821
123+500
124+100
124+300
125+075
125+100
127+080
127+100
127+300
128+840
128+860
129+000
129+020
129+420
129+460
129+650
129+670
129+900
130+340
130+640
131+400
131+420
132+000
132+200
132+260
M/s. SAI MAATARINI TOLLWAYS LIMITED
code
FA
GE
FA
GA
FA
GA
FA
GC
FB
YA
GB
YA
GC
YA
GA
GC
FA
GA
FA
GA
RA
GA
YA
RA
GA
GA
YB
YA
GB
FA
YA
Length
A
E
A
A
A
A
A
C
B
A
B
A
C
A
A
C
A
A
A
A
A
A
A
A
A
A
B
A
B
A
A
0.310
3.250
0.190
0.230
0.020
0.350
0.071
1.679
0.600
0.200
0.775
0.025
1.980
0.020
0.200
1.540
0.020
0.140
0.020
0.400
0.040
0.190
0.020
0.230
0.440
0.300
0.760
0.020
0.580
0.200
0.060
Land Status
F
G
F
G
F
G
F
G
F
Y
G
Y
G
Y
G
G
F
G
F
G
R
G
Y
R
G
G
Y
Y
G
F
Y
Land (Hect)
GOVT
PVT
FOREST
TOTAL
Village Forest
Available
Village Forest
Available
Village Forest
Available
Sabik Jungle
Available
Village Forest
King Fort wall
Available
Muslim Samadhi
Available
Land Acquation (3A & 3D Missing)
Available
Available
Sabik Jungle
Available
Sabik Jungle
Available
Compensation is in process
Available
Structure
Compensation is in process
Available
Available
Electrical & RWSS Pipe Line
Land Acquation (3A & 3D Missing)
Available
Sabik Jungle
Land Acquation (3A & 3D Missing)
1.350KM
RAG
Sl No.
Page
14
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
Village Name
Silisuan
Banajodi
Banajodi
Banajodi, Padmapur
Padmapur, Putulia
Putulia
Keshpank
Chainage
From
To
132+260
132+277
132+300
132+337
132+369
132+515
132+565
132+600
133+420
133+450
133+505
133+580
134+010
134+180
134+475
134+575
134+675
134+890
134+910
134+970
134+980
135+249
135+450
136+010
136+600
136+900
136+929
137+300
137+343
137+400
137+600
137+920
132+277
132+300
132+337
132+369
132+515
132+565
132+600
133+420
133+450
133+505
133+580
134+010
134+180
134+475
134+575
134+675
134+890
134+910
134+970
134+980
135+249
135+450
136+010
136+600
136+900
136+929
137+300
137+343
137+400
137+600
137+920
138+420
M/s. SAI MAATARINI TOLLWAYS LIMITED
code
FA
YA
FA
YA
FA
GA
FA
GB
YA
GA
FA
GA
FA
GA
FA
GA
FA
GA
FA
GA
FA
GA
FB
YB
GA
FA
GA
FA
GA
GA
GA
GA
Length
A
A
A
A
A
A
A
B
A
A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
A
A
A
A
A
A
A
A
0.017
0.023
0.037
0.032
0.146
0.050
0.035
0.820
0.030
0.055
0.075
0.430
0.170
0.295
0.100
0.100
0.215
0.020
0.060
0.010
0.269
0.201
0.560
0.590
0.300
0.029
0.371
0.043
0.057
0.200
0.320
0.500
Land Status
F
Y
F
Y
F
G
F
G
Y
G
F
G
F
G
F
G
F
G
F
G
F
G
F
Y
G
F
G
F
G
G
G
G
Sabik Jungle
Land Acquation (3A & 3D Missing)
Sabik Jungle
Land Acquation (3A & 3D Missing)
Sabik Jungle
Available
Sabik Jungle
Available
Electrical
Available
Village Forest
Available
Village Forest
Structure
Village Forest
Available
Village Forest
Available
Village Forest
Available
Village Forest
Available
Village Forest
RWSS Pipe Line
Structure
Sabik Jungle
Available
Sabik Jungle
Structure
Available
Available
Available
Land (Hect)
GOVT
PVT
FOREST
TOTAL
0.85 KM
RAG
Sl No.
1.560
0.110
1.670
Page
15
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
Village Name
175
176
177
Jhumpura By-Pass
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
Jadichatra
Bankamarani
Bankamarani, Hundla
Jamudiha, Palasponga
Palasponga
Palasponga, Murusuan
Tangarani
196
197
198
199
200
201
202
203
204
205
Jamuposhi ,Spongepatna
Jhumpura
Jhumpura, Bhaluka & Arsala
Arsala
Chainage
code
Length
Land Status
From
To
138+420
138+480
138+500
138+480
138+500
138+523
GA
GA
FA
A
A
A
0.060
0.020
0.023
G
G
F
Structure
Available
Sabik Jungle
138+523
138+943
FA
A
0.420
F
Village Forest
138+943
138+963
139+000
139+037
139+469
139+632
140+200
141+310
142+120
138+963
139+000
139+037
139+469
139+632
140+200
141+310
142+120
142+195
FA
GA
FA
GA
FA
GB
FC
GB
GA
A
A
A
A
A
B
C
B
A
0.020
0.037
0.037
0.432
0.163
0.568
1.110
0.810
0.075
F
G
F
G
F
G
F
G
G
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
Available
Tangarani Reserve Forest
Structure
Available
142+195
142+205
FA
A
0.010
F
Village Forest
142+205
142+540
143+400
143+465
144+615
145+200
145+210
142+540
143+400
143+465
144+615
145+200
145+210
145+270
GA
RB
GA
FC
RB
FA
RA
A
B
A
C
B
A
A
0.335
0.860
0.065
1.150
0.585
0.010
0.060
G
R
G
F
R
F
R
Available
Compensation is in process
Available
Tangarani Reserve Forest
Compensation is in process
Village Forest
Compensation is in process
145+270
145+295
FA
A
0.025
F
Village Forest
145+295
147+760
148+650
149+300
149+620
149+649
149+660
149+680
149+770
147+760
148+650
149+300
149+620
149+649
149+660
149+680
149+770
149+779
GD
GB
RB
YA
FA
GA
FA
GA
FA
D
B
B
A
A
A
A
A
A
2.465
0.890
0.650
0.320
0.029
0.011
0.020
0.090
0.009
G
G
R
Y
F
G
F
G
F
Available
Available
Compensation is in process
Structure & RWSS Pipe Line
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
M/s. SAI MAATARINI TOLLWAYS LIMITED
Land (Hect)
GOVT
PVT
1.170
0.390
2.030
1.150
FOREST
TOTAL
1.560
3.180
1.665
1.360
0.250
1.610
5.510
2.470
7.980
2.830
Length 3.80 KM
Sl No.
2.830
Page
16
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
Sl No.
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
Village Name
Sundhimursuan,
Balabhadrapur
Balabhadrapur
Balabhadrapur,
Patabila
Balaibandh
Balaibandh,Mursuan
Chainage
From
To
149+779
149+800
149+823
150+000
150+042
150+115
150+286
150+430
150+460
150+600
150+800
152+260
152+350
152+380
152+430
152+510
152+780
153+040
153+140
153+200
153+530
153+600
154+900
155+000
155+180
155+400
155+700
156+200
157+090
158+405
158+415
149+800
149+823
150+000
150+042
150+115
150+286
150+430
150+460
150+600
150+800
152+260
152+350
152+380
152+430
152+510
152+780
153+040
153+140
153+200
153+530
153+600
154+900
155+000
155+180
155+400
155+700
156+200
157+090
158+405
158+415
159+000
M/s. SAI MAATARINI TOLLWAYS LIMITED
code
GA
FA
GA
FA
GA
FA
GA
FA
GA
FA
GC
GA
GA
GA
RA
YA
GA
RA
YA
RA
GA
FC
YA
RA
YA
GA
RA
YB
FC
FA
GB
Length
A
A
A
A
A
A
A
A
A
A
C
A
A
A
A
A
A
A
A
A
A
C
A
A
A
A
A
B
C
A
B
0.021
0.023
0.177
0.042
0.073
0.171
0.144
0.030
0.140
0.200
1.460
0.090
0.030
0.050
0.080
0.270
0.260
0.100
0.060
0.330
0.070
1.300
0.100
0.180
0.220
0.300
0.500
0.890
1.315
0.010
0.585
Land Status
G
F
G
F
G
F
G
F
G
F
G
G
G
G
R
Y
G
R
Y
R
G
F
Y
R
Y
G
R
Y
F
F
G
Available
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
Available
Sabik Jungle
Available
Available
Available
Available
Compensation is in process
Structure
Available
Compensation is in process
Structure
Compensation is in process
Available
Balibandha Reserve Forest
Structure
Compensation is in process
Structure
Available
Compensation is in process
RWSS Pipe Line
Balibandha Reserve Forest
Village Forest
Available
Land (Hect)
GOVT
PVT
FOREST
TOTAL
1.630
1.630
0.650
0.650
3.250
3.250
3.900
Page
17
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
RAG
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
Village Name
Mursuan
Mursuan,Parsala, Sijukala
Parsala, Sijukala
Rimuli
Chainage
code
From
To
159+000
159+400
159+415
159+590
159+618
159+690
159+890
160+110
160+380
160+445
160+573
160+675
160+728
161+085
161+099
162+240
162+270
163+000
159+400
159+415
159+590
159+618
159+690
159+890
160+110
160+380
160+445
160+573
160+675
160+728
161+085
161+099
162+240
162+270
163+000
164+715
164+715
165+010
Length
Land (Hect)
Land Status
YA
FA
GA
FA
YA
FA
YA
FA
YA
FA
YA
FA
YA
FA
YC
FA
GB
GC
A
A
A
A
A
A
A
A
A
A
A
A
A
A
C
A
B
C
0.400
0.015
0.175
0.028
0.072
0.200
0.220
0.270
0.065
0.128
0.102
0.053
0.357
0.014
1.141
0.030
0.730
1.715
Y
F
G
F
Y
F
Y
F
Y
F
Y
F
Y
F
Y
F
G
G
Trees, Utility
Sabik Jungle
Available
Sabik Jungle
Trees, Utility
Sabik Jungle
Trees, Utility
Sabik Jungle
Trees, Utility
Sabik Jungle
Trees, Utility
Sabik Jungle
Trees, Utility
Sabik Jungle
Trees, Utility
Village Forest
Available
Available
165+010
FA
A
166+183
GC
C
0.295
F
Village Forest
1.173
G
Available
GOVT
PVT
FOREST
TOTAL
9.740
1.80 KM
Sl No.
ABSTRACT
Description
Land Available Length (KM)
Minor Hindrance Length (KM)
Compensation Not Paid
Full Hindrance Length (KM)
Reserve Forest (151.94 Hec.)
Total Length (KM)>>>
M/s. SAI MAATARINI TOLLWAYS LIMITED
Type
G
y
R
F
Total Length
(%)
93.097
12.805
32.355
27.926
56.02%
7.71%
166.183
100%
36.27%
Page
18
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
4. Preconstruction Activities
A. Shifting of Electrical Poles
SL.NO
Erection:
1
2
3
4
5
6
7
Description
Concreting of Poles
9m PSC Poles 300 KG
Transformers
A) 250 KVA 11/0.4 KV
B) 150 KVA 11/0.4 KV
C) 100 KVA 11/0.4 KV
D) 63 KVA 11/0.4 KV
E) 25 KVA 11/0.4 KV
F) 16 KVA 11/0.4 KV
G) 16 KVA 11/0.23 KV
H) 10 KVA 11/0.25 KV
RS Joist
A) 150/150 18M
B) 150/150 15M
C) 150/150 13M
D) 150/150 11M
3PH 4W LT Line
33 KV HT Line
11KV 3Ph. 3W HT Lines
mm2
8
55
AAA Conductor
9
100 mm2 AAA Conductor
Dismantling:
1
55 mm2 AAA Conductor
2
34 mm2 AAA Conductor
3
80 mm2 AAA Conductor
4
11 KV Line
5
33 KV Line
6
LT Line
7
8 m Joist Poles
8
8m PSC Poles 200 Kgs.
9
9m PSC Poles Kgs.
10
11m Joist Poles
Unit
Nos
Nos
Km.0+000 to Km.24+000
Total
Done
Balance
Nos
Nos
Nos
Nos
Km
Km
Km
40
222
4
0
12
20
155
4
12
138
16
0
0
0
0
0
0
0
0
0
0
12
0
20
67
0
0
0
Km
Km
12
21
12
0.5
0
20.5
Km
Km
Km
Km
Km
Km
Nos
Nos
Nos
Nos
20
8
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
352
91
1
1
5
3
1
2
214
75
1
1
5
3
1
2
12
2
85
148
23
3
M/s. SAI MAATARINI TOLLWAYS LIMITED
2
20
8
0
0
0
0
85
148
23
3
Km.24+000 to Km.113+000
Total
Done
Balance
296
280
95
7.5
2
0
13
10
15
2
11
8
46
150
1.3
1
41
24
1
2
1
18
0.06
1.5
0.16
22
2
1
6
13
9
10.00
2.00
Km.113+000 to Km.163+000
Total
Done
Balance
320
298
0
2
0
13
9
13
2
11
7
0
0
46
132
0
1.3
0.94
-1.5
0
26
540
0
13.7
16.8
22
95
7.5
73
23.5
0
0
0
22
2
1
6
1
-10
-2
693
350
171
1
1
6
4
10
1
6
2
18
6
12
44
4
4.105
1
2
Km.0+000 to Km.163+000
Total
Done
Balance
693
179
0
1
1
6
4
10
1
6
2
0
0
26
496
0
9.7
16.8
22
1341
721
0
3
1
20
15
30
6
18
12
0
12
72
730
222
19
17.8
34
255
270
0
0
0
1
2
7
3
1
3
0
0
0
82
155
8
0.06
13.5
1086
451
0
3
1
19
13
23
3
17
9
0
12
72
648
67
11
17.74
20.5
68.895
23.5
180
52
16.105
0.5
163.895
51.5
0
0
0
17
6
9
0
0
0
0
20
8
0
39
8
15
91
161
23
3
0
0
0
1
0
4
0
9
10
2
20
8
0
38
8
10
91
152
13
1
Remarks
Page
19
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
B. Tree Felling
Sl.
No.
Chainage (Km)
From
To
Length
A
1
2
3
D.F.O.
Estimate
Lr. No.
E
1171
1171
No of Trees as per Estimate
at Site
Felled
Balance
DL.
Revised Estimate sanction (Rs.)
No.
DFO
PIU / RO
Authority
B
C
D
F
G
H=F-G
I
J
K
L
0+000
24+000
24
1054
1054
1185875
2091000 Approved
24+000
58+000
34
1197
906
291
2535000
58+000 107+000
49
4848
2474
2374
36
22330839 22330839
104+600 113+100
8.50
1520
1027
164
863
Yet to be
4
39
9284356
9284356
approved
113+300 143+000
29.90
1520
4458
1237
3221
5
143+000 163+000
20
2501
814
1687
35
8088566 8088566
Total
15085
6649
8436
43424636 43424636
NB: Estimates for 1 & 2 amounting to Rs 2,01,000/ approved by Authority while estimates for item 3 to 5 amounting to Rs
3,97,03,761/ - are yet to be approved. P ayment for part bill for DL No. 36 was limited to Rs 5,277,667/ - against Rs
1,16,56,994/ - work done. Thus there was a back log in payment of Rs. 63,79,327/ - and therefore DM, OFDC is pressing to pay
advance amount to carryout tree felling. Therefore sanction for estimates amounting to nearly Rs.4 Cr. is to be pursued by
PIU.
C. RWS&S & PH Estimates:
Status of revised estimates “RWS&S and PH pipe lines & Tube Wells shifting”
Description
Revised Estimate
Amount
a
Km 0+000 to Km 24+000
b
Km 24+000 to Km 163+000
Sl. No.
Sub Total : (+/-)
Rs. 9,80,483
Sanction from
Authority
Yet to be received
Work in Progress
Rs. 2,10,19,000
Yet to be received
Work in Progress
Remarks
Rs. 2,19,99,483
These estimates which were prepared based on SSR 2007-08 were revised with current SSR (2013-14) by Line department; are to be got sanctioned by PIU
from authority.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
20
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III
as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
5. Status of Designs & Drawings
A. Plan & Profile : From Km 0+000 to Km 166+173: finalized in conformance of the provisions of
C.A. & IRC Codes.
B. Structures: The Structural drawings are being confirmed as is consistent with the phased
requirement for execution of work.
i.
Major Bridges
: 06 Nos.
ii.
Minor Bridges
: 30 Nos.
iii.
Flyover
: 01 No.
iv.
ROBs
: 02 Nos.
v.
VUPs
: 15 Nos.
vi.
PUPs
: 21 Nos.
vii.
AUPs
: 06 Nos.
viii.
EUPs
: 02 Nos.
ix.
Box/Slab/Pipe Culverts : 295 Nos.
x.
RUPs
: 50 Nos. min.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 21
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III
as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
6. Progress
6.1.
Physical Progress
Highways
Sr.
No.
Item
1
2
3
4
5
6
C&G (Kms)
Exca. & Emb. -Top (Kms)
Subgrade-Top (Kms)
GSB (Kms)
WMM-1st (Kms)
WMM-Top (Kms)
Sr.
No.
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
Description
Scope
(2Lane)
327.595
322.844
322.844
322.844
322.844
322.844
Scope
(2Lane)
6
30
2
1
15
21
6
2
50
260
Length (Km)
LHS
Total
Length (Km)
(%)
140.54
55.97
32.73
28.01
16.98
5.38
Average(A) :
42.90%
17.34%
10.14%
8.68%
5.26%
1.67%
14.33%
RHS
77.2
36.19
21.7
18.41
12.77
6.91
63.34
19.78
11.03
9.6
4.21
0
Construction
Remarks
Avg.
Remarks
Progress Completed
5
27
2
1
9
13
0
0
0
151
Not started
Major Bridges (Nos.)
1
Minor Bridges (Nos.)
3
ROB (Nos.)
0
Flyover (No.)
0
VUP (Nos.)
6
PUP (Nos.)
8
AUP (Nos.)
6
EUP (Nos.)
2
RUP (Nos.)
50
Culverts (Nos.)
109
Average (B) :
((20.55% X 4.751)+(12.67 X 327.595)) ÷ (322.346 + 4.751) =
length involved in Structures is about 2.3755 Km x 2 = 4.751 Km
length involved in Highway is about 161.173 Km x 2 = 322.346 Km
Percentage progress on Highway (A) = 14.33%
Percentage progress on Structures (B) =
20.55%
Weighted Average (%) of Physical Progress = 14.75%
(%)
11.46%
21.50%
12.50%
25.00%
32.08%
49.40%
0.00%
0.00%
0.00%
53.60%
20.55%
14.75%
6.2. Financial Progress
Description
Target*
Achieved
Percentage (%)
Cum. Upto (Jul’14)
1132.32
633.31
31.35%
Month (Aug’14)
43.53
33.50
1.66%
Cumulative (Aug’14)
1175.85
666.80
33.01%
* Target as per original program
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 22
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
PROJECT COMPLETION SHEDULE (PCS) AS PER SCHEDULE-G OF C.A.
Appoint Date :
Description
02-05-13
May'13
Jun'13
As per C.A.
Achieved in Cr.
Cum. in Cr.
Percentage (%)
Description
As per C.A.
Achieved in Cr.
Cum. in Cr.
Percentage (%)
Sep'14
Oct'14
Project Cost (Rs. In Cr.):
Milestone-1 (A.D.: 29-10-13 ; G.P.: 26-01-14)
Jul'13
Aug'13 Sep'13 Oct'13 Nov'13
202
404.00
404.00
20.00%
Milestone-3 (A.D.: 10-02-15; G.P.: 11--05-15)
Nov'14 Dec'14 Jan'15 Feb'15 Mar'15
1414
A.D.: Well within time as set forth in Schedule-G
Dec'13
Jan'14
Feb'14
18.13
422.13
20.90%
31.08
453.21
22.44%
34.52
487.73
24.15%
Apr'15
May'15
Jun'15
2,020
Milestone-2 (A.D.: 05-06-14; G.P.: 03-09-14)
Mar'14 Apr'14
May'14 Jun'14 Jul'14
606
29.48
33.37
31.10
30.23
21.40
517.21 550.58 581.68 611.91 633.31
25.60% 27.26% 28.80% 30.29% 31.35%
COD (A.D.: 28-10-15)
Jul'15
Aug'15 Sep'15
2020
Oct'15
Aug'14
33.49
666.80
33.01%
Total
808
666.80
2.6379
G.P.: Within grace period of 90 days pursuant to Cl. 12.4.2 of C.A.
Beyond the grace period
Milestone – I: Occurred within the grace period pursuant to Cl. 12.4.2 of C.A.; as acquiesced by I.E. vide Lr. No. SAI-3521-2014 dated 03-09-2014
Milestone-II : Occurred within the grace period pursuant to Cl. 12.4.2 of C.A.; which is to be acquiesced by I.E. after furnishing the Company’s Statutory Auditor’s
Certificate by Concessionaire.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 23
RHS
Chainage
Exc. Upto Emb. Top
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
0.000
0.050
0.100
0.150
0.200
0.250
0.300
0.350
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
0.850
0.900
0.950
1.000
1.050
1.100
1.150
1.200
1.250
1.300
1.350
1.400
1.450
1.500
1.550
1.600
1.650
1.700
1.750
1.800
1.850
1.900
1.950
2.000
2.050
2.100
2.150
2.200
2.250
2.300
2.350
2.400
2.450
2.500
2.550
2.600
2.650
2.700
2.750
2.800
2.850
2.900
2.950
3.000
3.050
3.100
3.150
3.200
3.250
3.300
3.350
3.400
3.450
3.500
3.550
3.600
3.650
3.700
3.750
3.800
3.850
3.900
3.950
4.000
4.050
4.100
4.150
4.200
4.250
4.300
4.350
4.400
4.450
4.500
4.550
4.600
4.650
4.700
4.750
4.800
4.850
4.900
4.950
5.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
7. Strip chart of work progress
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 24
RHS
Chainage
5.000
5.050
5.100
5.150
5.200
5.250
5.300
5.350
5.400
5.450
5.500
5.550
5.600
5.650
5.700
5.750
5.800
5.850
5.900
5.950
6.000
6.050
6.100
6.150
6.200
6.250
6.300
6.350
6.400
6.450
6.500
6.550
6.600
6.650
6.700
6.750
6.800
6.850
6.900
6.950
7.000
7.050
7.100
7.150
7.200
7.250
7.300
7.350
7.400
7.450
7.500
7.550
7.600
7.650
7.700
7.750
7.800
7.850
7.900
7.950
8.000
8.050
8.100
8.150
8.200
8.250
8.300
8.350
8.400
8.450
8.500
8.550
8.600
8.650
8.700
8.750
8.800
8.850
8.900
8.950
9.000
9.050
9.100
9.150
9.200
9.250
9.300
9.350
9.400
9.450
9.500
9.550
9.600
9.650
9.700
9.750
9.800
9.850
9.900
9.950
10.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 25
RHS
Chainage
10.000
10.050
10.100
10.150
10.200
10.250
10.300
10.350
10.400
10.450
10.500
10.550
10.600
10.650
10.700
10.750
10.800
10.850
10.900
10.950
11.000
11.050
11.100
11.150
11.200
11.250
11.300
11.350
11.400
11.450
11.500
11.550
11.600
11.650
11.700
11.750
11.800
11.850
11.900
11.950
12.000
12.050
12.100
12.150
12.200
12.250
12.300
12.350
12.400
12.450
12.500
12.550
12.600
12.650
12.700
12.750
12.800
12.850
12.900
12.950
13.000
13.050
13.100
13.150
13.200
13.250
13.300
13.350
13.400
13.450
13.500
13.550
13.600
13.650
13.700
13.750
13.800
13.850
13.900
13.950
14.000
14.050
14.100
14.150
14.200
14.250
14.300
14.350
14.400
14.450
14.500
14.550
14.600
14.650
14.700
14.750
14.800
14.850
14.900
14.950
15.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 26
RHS
Chainage
15.000
15.050
15.100
15.150
15.200
15.250
15.300
15.350
15.400
15.450
15.500
15.550
15.600
15.650
15.700
15.750
15.800
15.850
15.900
15.950
16.000
16.050
16.100
16.150
16.200
16.250
16.300
16.350
16.400
16.450
16.500
16.550
16.600
16.650
16.700
16.750
16.800
16.850
16.900
16.950
17.000
17.050
17.100
17.150
17.200
17.250
17.300
17.350
17.400
17.450
17.500
17.550
17.600
17.650
17.700
17.750
17.800
17.850
17.900
17.950
18.000
18.050
18.100
18.150
18.200
18.250
18.300
18.350
18.400
18.450
18.500
18.550
18.600
18.650
18.700
18.750
18.800
18.850
18.900
18.950
19.000
19.050
19.100
19.150
19.200
19.250
19.300
19.350
19.400
19.450
19.500
19.550
19.600
19.650
19.700
19.750
19.800
19.850
19.900
19.950
20.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 27
RHS
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
EXC upto Emb Top
Chainage
20.000
20.050
20.100
20.150
20.200
20.250
20.300
20.350
20.400
20.450
20.500
20.550
20.600
20.650
20.700
20.750
20.800
20.850
20.900
20.950
21.000
21.050
21.100
21.150
21.200
21.250
21.300
21.350
21.400
21.450
21.500
21.550
21.600
21.650
21.700
21.750
21.800
21.850
21.900
21.950
22.000
22.050
22.100
22.150
22.200
22.250
22.300
22.350
22.400
22.450
22.500
22.550
22.600
22.650
22.700
22.750
22.800
22.850
22.900
22.950
23.000
23.050
23.100
23.150
23.200
23.250
23.300
23.350
23.400
23.450
23.500
23.550
23.600
23.650
23.700
23.750
23.800
23.850
23.900
23.950
24.000
24.050
24.100
24.150
24.200
24.250
24.300
24.350
24.400
24.450
24.500
24.550
24.600
24.650
24.700
24.750
24.800
24.850
24.900
24.950
25.000
LHS
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-14th
EMB-13th
EMB-12th
EMB-11th
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
Exc. Upto Emb. Top
EMB. Top NGL
Exc. Upto Emb. Top
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
Page 28
RHS
Chainage
25.000
25.050
25.100
25.150
25.200
25.250
25.300
25.350
25.400
25.450
25.500
25.550
25.600
25.650
25.700
25.750
25.800
25.850
25.900
25.950
26.000
26.050
26.100
26.150
26.200
26.250
26.300
26.350
26.400
26.450
26.500
26.550
26.600
26.650
26.700
26.750
26.800
26.850
26.900
26.950
27.000
27.050
27.100
27.150
27.200
27.250
27.300
27.350
27.400
27.450
27.500
27.550
27.600
27.650
27.700
27.750
27.800
27.850
27.900
27.950
28.000
28.050
28.100
28.150
28.200
28.250
28.300
28.350
28.400
28.450
28.500
28.550
28.600
28.650
28.700
28.750
28.800
28.850
28.900
28.950
29.000
29.050
29.100
29.150
29.200
29.250
29.300
29.350
29.400
29.450
29.500
29.550
29.600
29.650
29.700
29.750
29.800
29.850
29.900
29.950
30.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 29
RHS
Chainage
30.000
30.050
30.100
30.150
30.200
30.250
30.300
30.350
30.400
30.450
30.500
30.550
30.600
30.650
30.700
30.750
30.800
30.850
30.900
30.950
31.000
31.050
31.100
31.150
31.200
31.250
31.300
31.350
31.400
31.450
31.500
31.550
31.600
31.650
31.700
31.750
31.800
31.850
31.900
31.950
32.000
32.050
32.100
32.150
32.200
32.250
32.300
32.350
32.400
32.450
32.500
32.550
32.600
32.650
32.700
32.750
32.800
32.850
32.900
32.950
33.000
33.050
33.100
33.150
33.200
33.250
33.300
33.350
33.400
33.450
33.500
33.550
33.600
33.650
33.700
33.750
33.800
33.850
33.900
33.950
34.000
34.050
34.100
34.150
34.200
34.250
34.300
34.350
34.400
34.450
34.500
34.550
34.600
34.650
34.700
34.750
34.800
34.850
34.900
34.950
35.000
LHS
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-15th
EMB-14th
EMB-13th
EMB-12th
EMB-11th
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
Exc upto Emb. Top
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 30
RHS
Chainage
40.000
40.050
40.100
40.150
40.200
40.250
40.300
40.350
40.400
40.450
40.500
40.550
40.600
40.650
40.700
40.750
40.800
40.850
40.900
40.950
41.000
41.050
41.100
41.150
41.200
41.250
41.300
41.350
41.400
41.450
41.500
41.550
41.600
41.650
41.700
41.750
41.800
41.850
41.900
41.950
42.000
42.050
42.100
42.150
42.200
42.250
42.300
42.350
42.400
42.450
42.500
42.550
42.600
42.650
42.700
42.750
42.800
42.850
42.900
42.950
43.000
43.050
43.100
43.150
43.200
43.250
43.300
43.350
43.400
43.450
43.500
43.550
43.600
43.650
43.700
43.750
43.800
43.850
43.900
43.950
44.000
44.050
44.100
44.150
44.200
44.250
44.300
44.350
44.400
44.450
44.500
44.550
44.600
44.650
44.700
44.750
44.800
44.850
44.900
44.950
45.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-14th
EMB-13th
EMB-12th
EMB-11th
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 31
RHS
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-Top
M/s. SAI MAATARINI TOLLWAYS LIMITED
Exc upto Emb Top
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-20th
EMB-19th
EMB-18th
EMB-17th
EMB-16th
EMB-15th
EMB-14th
EMB-13th
EMB-12th
EMB-11th
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
Exc upto Emb Top
EXC upto Emb Top
EXC upto Emb Top
Chainage
45.000
45.050
45.100
45.150
45.200
45.250
45.300
45.350
45.400
45.450
45.500
45.550
45.600
45.650
45.700
45.750
45.800
45.850
45.900
45.950
46.000
46.050
46.100
46.150
46.200
46.250
46.300
46.350
46.400
46.450
46.500
46.550
46.600
46.650
46.700
46.750
46.800
46.850
46.900
46.950
47.000
47.050
47.100
47.150
47.200
47.250
47.300
47.350
47.400
47.450
47.500
47.550
47.600
47.650
47.700
47.750
47.800
47.850
47.900
47.950
48.000
48.050
48.100
48.150
48.200
48.250
48.300
48.350
48.400
48.450
48.500
48.550
48.600
48.650
48.700
48.750
48.800
48.850
48.900
48.950
49.000
49.050
49.100
49.150
49.200
49.250
49.300
49.350
49.400
49.450
49.500
49.550
49.600
49.650
49.700
49.750
49.800
49.850
49.900
49.950
50.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 32
RHS
Chainage
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Exc upto Emb. Top
Exc upto Emb. Top
13
Exc upto Emb. Top
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
50.000
50.050
50.100
50.150
50.200
50.250
50.300
50.350
50.400
50.450
50.500
50.550
50.600
50.650
50.700
50.750
50.800
50.850
50.900
50.950
51.000
51.050
51.100
51.150
51.200
51.250
51.300
51.350
51.400
51.450
51.500
51.550
51.600
51.650
51.700
51.750
51.800
51.850
51.900
51.950
52.000
52.050
52.100
52.150
52.200
52.250
52.300
52.350
52.400
52.450
52.500
52.550
52.600
52.650
52.700
52.750
52.800
52.850
52.900
52.950
53.000
53.050
53.100
53.150
53.200
53.250
53.300
53.350
53.400
53.450
53.500
53.550
53.600
53.650
53.700
53.750
53.800
53.850
53.900
53.950
54.000
54.050
54.100
54.150
54.200
54.250
54.300
54.350
54.400
54.450
54.500
54.550
54.600
54.650
54.700
54.750
54.800
54.850
54.900
54.950
55.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
18th Layer
Page 33
RHS
Chainage
55.000
55.050
55.100
55.150
55.200
55.250
55.300
55.350
55.400
55.450
55.500
55.550
55.600
55.650
55.700
55.750
55.800
55.850
55.900
55.950
56.000
56.050
56.100
56.150
56.200
56.250
56.300
56.350
56.400
56.450
56.500
56.550
56.600
56.650
56.700
56.750
56.800
56.850
56.900
56.950
57.000
57.050
57.100
57.150
57.200
57.250
57.300
57.350
57.400
57.450
57.500
57.550
57.600
57.650
57.700
57.750
57.800
57.850
57.900
57.950
58.000
58.050
58.100
58.150
58.200
58.250
58.300
58.350
58.400
58.450
58.500
58.550
58.600
58.650
58.700
58.750
58.800
58.850
58.900
58.950
59.000
59.050
59.100
59.150
59.200
59.250
59.300
59.350
59.400
59.450
59.500
59.550
59.600
59.650
59.700
59.750
59.800
59.850
59.900
59.950
60.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 34
RHS
Chainage
M/s. SAI MAATARINI TOLLWAYS LIMITED
Exc upto Emb. Top
Exc upto Emb. Top
Exc upto Emb. Top
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
85.000
85.050
85.100
85.150
85.200
85.250
85.300
85.350
85.400
85.450
85.500
85.550
85.600
85.650
85.700
85.750
85.800
85.850
85.900
85.950
86.000
86.050
86.100
86.150
86.200
86.250
86.300
86.350
86.400
86.450
86.500
86.550
86.600
86.650
86.700
86.750
86.800
86.850
86.900
86.950
87.000
87.050
87.100
87.150
87.200
87.250
87.300
87.350
87.400
87.450
87.500
87.550
87.600
87.650
87.700
87.750
87.800
87.850
87.900
87.950
88.000
88.050
88.100
88.150
88.200
88.250
88.300
88.350
88.400
88.450
88.500
88.550
88.600
88.650
88.700
88.750
88.800
88.850
88.900
88.950
89.000
89.050
89.100
89.150
89.200
89.250
89.300
89.350
89.400
89.450
89.500
89.550
89.600
89.650
89.700
89.750
89.800
89.850
89.900
89.950
90.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 35
RHS
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
12th Layer
9th
Layer
11th Layer
8th Layer
10th Layer
7th Layer
7th Layer
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
9thLayer
Chainage
90.000
90.050
90.100
90.150
90.200
90.250
90.300
90.350
90.400
90.450
90.500
90.550
90.600
90.650
90.700
90.750
90.800
90.850
90.900
90.950
91.000
91.050
91.100
91.150
91.200
91.250
91.300
91.350
91.400
91.450
91.500
91.550
91.600
91.650
91.700
91.750
91.800
91.850
91.900
91.950
92.000
92.050
92.100
92.150
92.200
92.250
92.300
92.350
92.400
92.450
92.500
92.550
92.600
92.650
92.700
92.750
92.800
92.850
92.900
92.950
93.000
93.050
93.100
93.150
93.200
93.250
93.300
93.350
93.400
93.450
93.500
93.550
93.600
93.650
93.700
93.750
93.800
93.850
93.900
93.950
94.000
94.050
94.100
94.150
94.200
94.250
94.300
94.350
94.400
94.450
94.500
94.550
94.600
94.650
94.700
94.750
94.800
94.850
94.900
94.950
95.000
LHS
8th
Layer
Exc. Upto Emb. Top
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
Hardrock
Rock
Page 36
RHS
OGL Samp.
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Exc. upto E. Top
Chainage
Exc. Upto Emb. Top
Exc. Upto Emb. Top
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp.
95.000
95.050
95.100
95.150
95.200
95.250
95.300
95.350
95.400
95.450
95.500
95.550
95.600
95.650
95.700
95.750
95.800
95.850
95.900
95.950
96.000
96.050
96.100
96.150
96.200
96.250
96.300
96.350
96.400
96.450
96.500
96.550
96.600
96.650
96.700
96.750
96.800
96.850
96.900
96.950
97.000
97.050
97.100
97.150
97.200
97.250
97.300
97.350
97.400
97.450
97.500
97.550
97.600
97.650
97.700
97.750
97.800
97.850
97.900
97.950
98.000
98.050
98.100
98.150
98.200
98.250
98.300
98.350
98.400
98.450
98.500
98.550
98.600
98.650
98.700
98.750
98.800
98.850
98.900
98.950
99.000
99.050
99.100
99.150
99.200
99.250
99.300
99.350
99.400
99.450
99.500
99.550
99.600
99.650
99.700
99.750
99.800
99.850
99.900
99.950
100.000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
Page 37
RHS
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
Chainage
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
Exc. Upto Emb. Top (Hard Rock)
EMB-9th
Exc. Upto Emb. Top (Hard Rock)
EMB-10th
113+000
113+050
113+100
113+150
113+200
113+250
113+300
113+350
113+400
113+450
113+500
113+550
113+600
113+650
113+700
113+750
113+800
113+850
113+900
113+950
114+000
114+050
114+100
114+150
114+200
114+250
114+300
114+350
114+400
114+450
114+500
114+550
114+600
114+650
114+700
114+750
114+800
114+850
114+900
114+950
115+000
115+050
115+100
115+150
115+200
115+250
115+300
115+350
115+400
115+450
115+500
115+550
115+600
115+650
115+700
115+750
115+800
115+850
115+900
115+950
116+000
116+050
116+100
116+150
116+200
116+250
116+300
116+350
116+400
116+450
116+500
116+550
116+600
116+650
116+700
116+750
116+800
116+850
116+900
116+950
117+000
117+050
117+100
117+150
117+200
117+250
117+300
117+350
117+400
117+450
117+500
117+550
117+600
117+650
117+700
117+750
117+800
117+850
117+900
117+950
118+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-11th
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-12th
EMB-13th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 38
RHS
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-12th
EMB-13th
M/s. SAI MAATARINI TOLLWAYS LIMITED
Excavation upto Emb Top Layer
EMB-11th
Excavation upto Emb Top layer
EMB-12th
Excavation upto Emb Top Layer
Excavation up to Subgrade Top Layer
EMB-13th
Excavation upto Subgrade Top layer
Chainage
118+000
118+050
118+100
118+150
118+200
118+250
118+300
118+350
118+400
118+450
118+500
118+550
118+600
118+650
118+700
118+750
118+800
118+850
118+900
118+950
119+000
119+050
119+100
119+150
119+200
119+250
119+300
119+350
119+400
119+450
119+500
119+550
119+600
119+650
119+700
119+750
119+800
119+850
119+900
119+950
120+000
120+050
120+100
120+150
120+200
120+250
120+300
120+350
120+400
120+450
120+500
120+550
120+600
120+650
120+700
120+750
120+800
120+850
120+900
120+950
121+000
121+050
121+100
121+150
121+200
121+250
121+300
121+350
121+400
121+450
121+500
121+550
121+600
121+650
121+700
121+750
121+800
121+850
121+900
121+950
122+000
122+050
122+100
122+150
122+200
122+250
122+300
122+350
122+400
122+450
122+500
122+550
122+600
122+650
122+700
122+750
122+800
122+850
122+900
122+950
123+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 39
RHS
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
Chainage
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-12th
EMB-13th
EMB-14th
.
M/s. SAI MAATARINI TOLLWAYS LIMITED
.
.
.
Excavation Upto Emb Top Layer
Slush Removal
.
.
.
.
.
.
.
Excavation upto Emb Top Layer
EMB-9th
Excavation Upto Emb Top Layer
EMB-10th
Excavation Upto Emb Top Layer
EMB-11th
Excavation Upto Emb Top Layer
EMB-12th
Excavation up to Emb Top layer RFI was raised
but filling up to 01 layer may be required
EMB-13th
Excavation Upto Emb Top Layer
EMB-14th
123+000
123+050
123+100
123+150
123+200
123+250
123+300
123+350
123+400
123+450
123+500
123+550
123+600
123+650
123+700
123+750
123+800
123+850
123+900
123+950
124+000
124+050
124+100
124+150
124+200
124+250
124+300
124+350
124+400
124+450
124+500
124+550
124+600
124+650
124+700
124+750
124+800
124+850
124+900
124+950
125+000
125+050
125+100
125+150
125+200
125+250
125+300
125+350
125+400
125+450
125+500
125+550
125+600
125+650
125+700
125+750
125+800
125+850
125+900
125+950
126+000
126+050
126+100
126+150
126+200
126+250
126+300
126+350
126+400
126+450
126+500
126+550
126+600
126+650
126+700
126+750
126+800
126+850
126+900
126+950
127+000
127+050
127+100
127+150
127+200
127+250
127+300
127+350
127+400
127+450
127+500
127+550
127+600
127+650
127+700
127+750
127+800
127+850
127+900
127+950
128+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
.
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-15th
EMB-16th
EMB-17th
EMB-18th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 40
RHS
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
Chainage
OGL FDD
EMB-Top
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-12th
M/s. SAI MAATARINI TOLLWAYS LIMITED
Excavation Upto Emb Top Layer
Excavation Upto Emb Top Layer
EMB-10th
Excavation upto Emb Top Layer
OGL FDD
128+000
128+050
128+100
128+150
128+200
128+250
128+300
128+350
128+400
128+450
128+500
128+550
128+600
128+650
128+700
128+750
128+800
128+850
128+900
128+950
129+000
129+050
129+100
129+150
129+200
129+250
129+300
129+350
129+400
129+450
129+500
129+550
129+600
129+650
129+700
129+750
129+800
129+850
129+900
129+950
130+000
130+050
130+100
130+150
130+200
130+250
130+300
130+350
130+400
130+450
130+500
130+550
130+600
130+650
130+700
130+750
130+800
130+850
130+900
130+950
131+000
131+050
131+100
131+150
131+200
131+250
131+300
131+350
131+400
131+450
131+500
131+550
131+600
131+650
131+700
131+750
131+800
131+850
131+900
131+950
132+000
132+050
132+100
132+150
132+200
132+250
132+300
132+350
132+400
132+450
132+500
132+550
132+600
132+650
132+700
132+750
132+800
132+850
132+900
132+950
133+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
OGL Record
C&G
EXCAVATION
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL Record
EXCAVATION
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-13th
EMB-14th
EMB-15th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 41
RHS
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
Chainage
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-12th
EMB-13th
EMB-14th
EMB-15th
Excavation was done but RFI was not raised
EMB-10th
M/s. SAI MAATARINI TOLLWAYS LIMITED
Excavation upto Emb Top Layer
Excavation upto Emb Top Layer
Excavation upto Emb Top Layer
EMB-11th
133+000
133+050
133+100
133+150
133+200
133+250
133+300
133+350
133+400
133+450
133+500
133+550
133+600
133+650
133+700
133+750
133+800
133+850
133+900
133+950
134+000
134+050
134+100
134+150
134+200
134+250
134+300
134+350
134+400
134+450
134+500
134+550
134+600
134+650
134+700
134+750
134+800
134+850
134+900
134+950
135+000
135+050
135+100
135+150
135+200
135+250
135+300
135+350
135+400
135+450
135+500
135+550
135+600
135+650
135+700
135+750
135+800
135+850
135+900
135+950
136+000
136+050
136+100
136+150
136+200
136+250
136+300
136+350
136+400
136+450
136+500
136+550
136+600
136+650
136+700
136+750
136+800
136+850
136+900
136+950
137+000
137+050
137+100
137+150
137+200
137+250
137+300
137+350
137+400
137+450
137+500
137+550
137+600
137+650
137+700
137+750
137+800
137+850
137+900
137+950
138+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-12th
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-16th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
Page 42
RHS
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
Chainage
Excavation upto Emb. Top
EMB-9th
138+000
138+050
138+100
138+150
138+200
138+250
138+300
138+350
138+400
138+450
138+500
138+550
138+600
138+650
138+700
138+750
138+800
138+850
138+900
138+950
139+000
139+050
139+100
139+150
139+200
139+250
139+300
139+350
139+400
139+450
139+500
139+550
139+600
139+650
139+700
139+750
139+800
139+850
139+900
139+950
140+000
140+050
140+100
140+150
140+200
140+250
140+300
140+350
140+400
140+450
140+500
140+550
140+600
140+650
140+700
140+750
140+800
140+850
140+900
140+950
141+000
141+050
141+100
141+150
141+200
141+250
141+300
141+350
141+400
141+450
141+500
141+550
141+600
141+650
141+700
141+750
141+800
141+850
141+900
141+950
142+000
142+050
142+100
142+150
142+200
142+250
142+300
142+350
142+400
142+450
142+500
142+550
142+600
142+650
142+700
142+750
142+800
142+850
142+900
142+950
143+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-12th
EMB-11th
EMB-10th
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
EMB-12th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 43
RHS
Chainage
143+000
143+050
143+100
143+150
143+200
143+250
143+300
143+350
143+400
143+450
143+500
143+550
143+600
143+650
143+700
143+750
143+800
143+850
143+900
143+950
144+000
144+050
144+100
144+150
144+200
144+250
144+300
144+350
144+400
144+450
144+500
144+550
144+600
144+650
144+700
144+750
144+800
144+850
144+900
144+950
145+000
145+050
145+100
145+150
145+200
145+250
145+300
145+350
145+400
145+450
145+500
145+550
145+600
145+650
145+700
145+750
145+800
145+850
145+900
145+950
146+000
146+050
146+100
146+150
146+200
146+250
146+300
146+350
146+400
146+450
146+500
146+550
146+600
146+650
146+700
146+750
146+800
146+850
146+900
146+950
147+000
147+050
147+100
147+150
147+200
147+250
147+300
147+350
147+400
147+450
147+500
147+550
147+600
147+650
147+700
147+750
147+800
147+850
147+900
147+950
148+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 44
RHS
Chainage
153+000
153+050
153+100
153+150
153+200
153+250
153+300
153+350
153+400
153+450
153+500
153+550
153+600
153+650
153+700
153+750
153+800
153+850
153+900
153+950
154+000
154+050
154+100
154+150
154+200
154+250
154+300
154+350
154+400
154+450
154+500
154+550
154+600
154+650
154+700
154+750
154+800
154+850
154+900
154+950
155+000
155+050
155+100
155+150
155+200
155+250
155+300
155+350
155+400
155+450
155+500
155+550
155+600
155+650
155+700
155+750
155+800
155+850
155+900
155+950
156+000
156+050
156+100
156+150
156+200
156+250
156+300
156+350
156+400
156+450
156+500
156+550
156+600
156+650
156+700
156+750
156+800
156+850
156+900
156+950
157+000
157+050
157+100
157+150
157+200
157+250
157+300
157+350
157+400
157+450
157+500
157+550
157+600
157+650
157+700
157+750
157+800
157+850
157+900
157+950
158+000
LHS
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
OGL Samp. Testing
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-1st
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
EMB-7th
EMB-8th
EMB-9th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 45
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 46
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
BC
DBM
WMM-Top
WMM-1st
GSB
SG-Top
SG-IInd
SG-Ist
EMB-Top
EMB-17th
EMB-16th
EMB-15th
EMB-14th
LHS
EMB-13th
EMB-12th
EMB-11th
EMB-10th
EMB-9th
EMB-8th
EMB-7th
EMB-6th
EMB-5th
EMB-4th
EMB-3rd
EMB-2nd
EMB-1st
OGL Record
OGL FDD
C&G
163+000
163+050
163+100
163+150
163+200
163+250
163+300
163+350
163+400
163+450
163+500
163+550
163+600
163+650
163+700
163+750
163+800
163+850
163+900
163+950
164+000
164+050
164+100
164+150
164+200
164+250
164+300
164+350
164+400
164+450
164+500
164+550
164+600
164+650
164+700
164+750
164+800
164+850
164+900
164+950
165+000
165+050
165+100
165+150
165+200
165+250
165+300
165+350
165+400
165+450
165+500
165+550
165+600
165+650
165+700
165+750
165+800
165+850
165+900
165+950
166+000
166+050
166+100
166+150
166+200
OGL Samp. Testing
Chainage
OGL Samp. Testing
C&G
OGL FDD
OGL Record
EMB-2nd
EMB-3rd
EMB-4th
EMB-5th
EMB-6th
RHS
EMB-7th
EMB-8th
EMB-9th
EMB-10th
EMB-11th
Excavation Upto Emb Top Layer
EMB-1st
EMB-12th
EMB-Top
SG-Ist
SG-IInd
SG-Top
GSB
WMM-1st
WMM-Top
DBM
BC
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 47
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
7.1.
Progress of Major Bridges
Sl.
No
.
Chainage
1
35+342
Kusai River
2
56+800
3
83+568
4
108+085
5
6
Identification
Foundation
Sub Structure
Super
Structure
LHS
RHS
Scope
Completed
(%)
2
0.000
0.00%
2
0.250
12.50%
2
0.250
12.50%
2
0.250
12.50%
139+495
Mushal River
Kurkurkuta
River
Khalijore
River
Ardei River
2
0.500
25.00%
151+200
Ardei River
2
0.125
6.25%
Average
11.46%
Scope
Completed
(%)
(KM)
LHS
RHS
LHS
RHS
Not started due to resistance / deadlock created by
adjacent Belbahali Villagers.
COMPLETED
7.2.
IN PROGRESS
Progress of Minor Bridges
Sl.
No
Chainage
1
17+100
Bandi River
2
1.00
50.00%
2
22+017
Andhari River
2
1.00
50.00%
3
24+818
Ghagia Nalla
2
0.50
25.00%
4
25+543
Kallapal Jore
2
1.00
50.00%
5
31+982
Sasan River
2
0.10
5.00%
2
0.50
25.00%
2
1.00
50.00%
2
0.05
2.50%
2
1.00
50.00%
2
1.00
50.00%
2
0.50
25.00%
2
0.50
25.00%
2
0.25
12.50%
(KM)
6
33+672
7
36+512
8
40+071
9
44+400
10
49+422
11
57+322
12
67+297
Identification
Foundation
LHS
RHS
Sub Structure
LHS
Dhanaghara
Nallah
Kannadiapata
River
Jhadeswar
River
Muhan
RHS
Super Structure
LHS
RHS
13
82+625
14
95+410
Sagadia
Nallah
Sita River
2
0.13
6.25%
15
97+913
Aniadhar
2
0.13
6.25%
16
106+926
River
2
0.50
25.00%
17
111+551
2
0.13
6.25%
18
116+160
2
0.13
6.25%
19
117+074
2
0.25
12.50%
20
143+235
Khalighat
New
construction
New
construction
New
construction
2
0.13
6.25%
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
48
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No
Chainage
21
146+697
22
148+547
23
149+027
24
151+990
25
153+843
26
155+467
27
156+771
28
158+252
29
163+037
30
166+003
(KM)
Identification
New
construction
New
construction
New
construction
New
construction
New
construction
New
construction
New
construction
New
construction
New
construction
New
construction
Foundation
LHS
RHS
Sub Structure
LHS
RHS
Super Structure
LHS
RHS
These structures are not started due to impasse
created by villagers of Jhumpura since long time.
COMPLETED
M/s. SAI MAATARINI TOLLWAYS LIMITED
IN PROGRESS
Scope
Completed
(%)
2
0.13
6.25%
2
0.00
0.00%
2
0.00
0.00%
2
0.13
6.25%
2
0.13
6.25%
2
0.13
6.25%
2
1.00
50.00%
2
0.13
6.25%
2
0.50
25.00%
2
1.00
50.00%
Average
21.50%
Page 49
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
7.3. Progress of ROBs
Sl. No.
Chainage
1
9+233
2
115+639
Foundation
Side
A1
P1
Sub-str
P2
A2
A1
P1
Super-str
P2
A2
LHS
1
1
0.5
0.5
RHS
1
1
0.5
0.5
LHS
0.25
RHS
`0.25
COMPLETED
A1-P1
P1-P2
P2-A2
Scope
Complete
(%)
2
0.375
18.75%
2
0.125
6.25%
12.50%
IN PROGRESS
7.4. Progress of Flyover
Foundation
Sl. No.
Chainage
A1
1
125+284.500
Sub Structure
Super-Str (Girders)
Super-Str (Deck slab)
Side
LHS
1
RHS
1
Weg.
Actual
Avg.
P1
P2
P3
A2
A1
P1
0
1
1
0.25
0.25
0
1
1
0.25
0.25
25.00%
20.00%
P2
P3
A2
0.25
0.25
0.25
0.25
25.00%
5.00%
A1-P1
P1-P2
P2-P3
30.00%
0.00%
P3-A2
A1-P1
P1-P2
P2-P3
P3-A2
20.00%
0.00%
25.00%
COMPLETED
M/s. SAI MAATARINI TOLLWAYS LIMITED
IN PROGRESS
Page
50
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
7.5.
Progress of Vehicular Under Passes (VUPs):
Sl.
No.
Design
Chainage
Size
1
10+673
2
Foundation
Sub Structure
Super
Structure
Scope
Completed
1 x 12.00 x 5.50
2
1.750
87.50%
20+038
1 x 12.00 x 5.50
2
1.500
75.00%
3
23+544
1 x 12.00 x 5.50
2
2.000
100%
4
29+857
1 x 12.00 x 5.50
2
0.750
37.50%
5
38+783
1 x 12.00 x 5.50
2
0.000
0.00%
6
42+133
1 x 12.00 x 5.50
2
1.500
75.00%
7
45+448
1 x 12.00 x 5.50
2
0.000
0.00%
8
53+382
1 x 12.00 x 5.50
2
0.000
0.00%
9
77+950
1 x 12.00 x 5.50
2
0.000
0.00%
10
90+500
1 x 12.00 x 5.50
2
0.000
0.00%
11
115+121
1 x 12 x 5.50
2
0.000
0.00%
12
117+685
1 x 12 x 5.50
2
0.500
25.00%
13
122+926
1 x 12 x 5.50
2
0.500
25.00%
14
128+846
1 x 12 x 5.50
2
0.375
18.75%
15
131+412
1 x12 x 5.5
2
0.750
37.50%
LHS
RHS
LHS
RHS
LHS
(%)
RHS
32.08%
IN PROGRESS
COMPLETED
7.6.
Progress of Pedestrian Under Passes (PUPs):
Sl.
No.
Design
Chainage
1
05+665
2
Size
Foundation
Sub Structure
Super
Structure
Scope
Completed
1x5x3
2
0.000
0.00%
09+630
1 x 5.00 x 3.00
2
2.000
100.00%
3
15+838
1 x 5.00 x 3.00
2
1.000
50.00%
4
22+705
1 x 5.00 x 3.00
2
1.000
50.00%
5
24+505
1 x 5.00 x 3.00
2
0.000
0.00%
6
37+187
1x5x3
2
0.000
0.00%
7
40+838
1x5x3
2
1.500
75.00%
8
51+512
1x5x3
2
2.000
100.00%
9
76+800
1 x 5.0 x 3.0
2
0.000
0.00%
10
94+254
1 x 5.0 x 3.0
2
1.000
50.00%
11
109+840
1 x 5.0 x 3.0
2
0.000
0.00%
12
114+576
1x5x3
2
2.000
100.00%
13
118+272
1x5x3
2
2.000
100.00%
14
120+680
1x5x3
2
0.000
0.00%
15
126+981
1x5x3
2
2.000
100.00%
LHS
RHS
LHS
M/s. SAI MAATARINI TOLLWAYS LIMITED
RHS
LHS
(%)
RHS
Page
51
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
Design
Chainage
16
127+632
17
Foundation
Size
Sub Structure
Super
Structure
Scope
Completed
(%)
1x5x3
2
2.000
100.00%
136+518
1x5x3
2
1.250
62.50%
18
142+651
1x5x3
2
0.000
0.00%
19
149+792
1x5x3
2
0.000
0.00%
20
156+099
1x5x3
2
1.000
50.00%
21
164+366
1x5x3
2
2.000
100.00%
LHS
RHS
LHS
RHS
LHS
COMPLETED
7.7.
RHS
IN PROGRESS
49.40%
Progress of Culverts (Pipe/Box/Slab):
Foundation
Sub Structure
Super Structure
LHS
LHS
Sl.
No.
Chainag
e
Structure
Type
1
01+177
Box Culvert
2
0.75
37.50%
2
02+115
HP Culvert
2
2
100.00%
3
03+051
HP Culvert
2
1
50.00%
4
03+452
HP Culvert
2
1
50.00%
5
03+871
HP Culvert
2
1
50.00%
6
04+363
HP Culvert
2
1
50.00%
7
05+069
HP Culvert
2
1
50.00%
8
05+956
HP Culvert
2
0.25
12.50%
9
08+556
HP Culvert
2
0.375
18.75%
10
09+170
Box Culvert
2
0.25
12.50%
11
11+370
HP Culvert
2
1
50.00%
12
11+600
HP Culvert
2
0.25
12.50%
13
12+376
HP Culvert
2
2
100.00%
14
13+060
Box Culvert
2
2
100.00%
15
13+223
HP Culvert
2
1
50.00%
16
13+952
HP Culvert
2
1
50.00%
17
14+240
HP Culvert
2
1
50.00%
18
14+700
Box Culvert
2
1
50.00%
19
15+680
HP Culvert
2
0.125
6.25%
20
16+382
HP Culvert
2
1
50.00%
21
17+375
HP Culvert
2
1
50.00%
22
17+563
HP Culvert
2
1
50.00%
23
18+300
HP Culvert
2
1
50.00%
24
19+901
HP Culvert
2
1
50.00%
25
20+627
HP Culvert
2
1
50.00%
26
20+783
Box Culvert
2
1
50.00%
27
21+070
HP Culvert
2
1
50.00%
LHS
RHS
M/s. SAI MAATARINI TOLLWAYS LIMITED
RHS
RHS
Scope Completed
(%)
Page 52
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Foundation
Sub Structure
Super Structure
LHS
LHS
Sl.
No.
Chainag
e
Structure
Type
28
21+224
HP Culvert
2
1
50.00%
29
21+692
HP Culvert
2
1
50.00%
30
21+852
Box Culvert
2
0.75
37.50%
31
23+015
Slab Culvert
2
1
50.00%
32
23+430
Box Culvert
2
0.125
6.25%
33
23+925
Box Culvert
2
1
50.00%
34
25+956
Box Culvert
2
1
50.00%
35
26+360
Box Culvert
2
1
50.00%
36
27+075
Box Culvert
2
0.75
37.50%
37
27+494
Slab Culvert
2
1
50.00%
38
27+753
Box Culvert
2
1
50.00%
39
28+147
Box Culvert
2
1
50.00%
40
30+307
Box Culvert
2
1
50.00%
41
30+646
Box Culvert
2
1
50.00%
42
32+319
Box Culvert
2
1
50.00%
43
32+460
Box Culvert
2
1
50.00%
44
32+646
Box Culvert
2
1
50.00%
45
33+125
Box Culvert
2
0.125
6.25%
46
34+252
Box Culvert
2
0.125
6.25%
47
39+101
Box Culvert
2
0.125
6.25%
48
39+920
Box Culvert
2
0.25
12.50%
49
40+195
Box Culvert
2
0.25
12.50%
50
41+245
Box Culvert
2
0.25
12.50%
51
43+577
Box Culvert
2
1
50.00%
52
47+024
Box Culvert
2
0.125
6.25%
53
47+235
Box Culvert
2
1
50.00%
54
47+359
Box Culvert
2
1
50.00%
55
47+705
Box Culvert
2
1
50.00%
56
47+870
Box Culvert
2
0.35
17.50%
57
48+080
Box Culvert
2
0.25
12.50%
58
49+066
Box Culvert
2
0.35
17.50%
59
58+877
Box Culvert
2
2
100.00%
60
60+529
Box Culvert
2
0.625
31.25%
61
62+305
Box Culvert
2
2
100.00%
62
62+734
Box Culvert
2
2
100.00%
63
86+550
Box Culvert
2
1
50.00%
64
91+817
Box Culvert
2
1
50.00%
65
92+402
Box Culvert
2
0.75
37.50%
66
93+362
Box Culvert
2
0.125
6.25%
67
94+166
Box Culvert
2
0.35
17.50%
LHS
RHS
M/s. SAI MAATARINI TOLLWAYS LIMITED
RHS
RHS
Scope Completed
(%)
Page 53
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Foundation
Sub Structure
Super Structure
LHS
LHS
Sl.
No.
Chainag
e
Structure
Type
68
96+604
Box Culvert
2
0.125
6.25%
69
96+697
Box Culvert
2
1
50.00%
70
96+810
Box Culvert
2
0.35
17.50%
71
99+676
Box Culvert
2
0.35
17.50%
72
100+042
Box Culvert
2
0.125
6.25%
73
105+655
Box Culvert
2
0.35
17.50%
74
105+765
Slab Culvert
2
0.125
6.25%
75
105+872
Box Culvert
2
0.35
17.50%
76
106+062
Box Culvert
2
0.125
6.25%
77
106+335
Box Culvert
2
0.125
6.25%
78
113+540
Box Culvert
2
0.125
6.25%
79
113+880
Box Culvert
2
2
100.00%
80
114+140
Box Culvert
2
2
100.00%
81
114+930
Box Culvert
2
2
100.00%
82
115+190
Box Culvert
2
0
0.00%
83
115+325
Box Culvert
2
2
100.00%
84
115+605
Box Culvert
2
0
0.00%
85
115+850
Box Culvert
2
1.5
75.00%
86
116+420
Box Culvert
2
2
100.00%
87
116+690
Box Culvert
2
2
100.00%
88
117+225
Box Culvert
2
2
100.00%
89
117+400
Box Culvert
2
2
100.00%
90
117+817
Box Culvert
2
2
100.00%
91
118+106
Box Culvert
2
2
100.00%
92
118+440
Box Culvert
2
2
100.00%
93
118+680
Box Culvert
2
2
100.00%
94
118+982
Box Culvert
2
0.65
32.50%
95
119+200
Box Culvert
2
2
100.00%
96
119+460
Box Culvert
2
2
100.00%
97
119+700
Box Culvert
2
2
100.00%
98
119+800
Box Culvert
2
2
100.00%
99
120+090
Box Culvert
2
2
100.00%
100
120+677
Box Culvert
2
2
100.00%
101
120+770
Box Culvert
2
2
100.00%
102
120+910
Box Culvert
2
2
100.00%
103
121+120
Box Culvert
2
2
100.00%
104
121+300
Box Culvert
2
2
100.00%
105
121+470
Box Culvert
2
2
100.00%
106
121+940
Box Culvert
2
2
100.00%
107
122+109
Box Culvert
2
0.25
12.50%
LHS
RHS
RHS
Shifted to Ch.120+770
Shifted to Ch.115+850
M/s. SAI MAATARINI TOLLWAYS LIMITED
RHS
Scope Completed
(%)
Page 54
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Foundation
Sub Structure
Super Structure
LHS
LHS
Sl.
No.
Chainag
e
Structure
Type
108
122+237
Box Culvert
2
2
100.00%
109
122+597
Box Culvert
2
2
100.00%
110
123+117
Box Culvert
2
0.35
17.50%
111
123+677
Box Culvert
2
0.25
12.50%
112
126+265
Box Culvert
2
2
100.00%
113
126+420
Box Culvert
2
2
100.00%
114
127+330
Box Culvert
2
2
100.00%
115
127+470
Box Culvert
2
2
100.00%
116
128+570
Box Culvert
2
2
100.00%
117
128+710
Box Culvert
2
2
100.00%
118
129+540
HP Culvert
2
1
50.00%
119
130+094
Box Culvert
2
1
50.00%
120
130+460
Box Culvert
2
0
0.00%
121
130+896
Box Culvert
2
1
50.00%
122
130+993
Box Culvert
2
1
50.00%
123
131+500
Box Culvert
2
1
50.00%
124
133+830
Box Culvert
2
1
50.00%
125
134+475
Box Culvert
2
1
50.00%
126
135+554
Box Culvert
2
1
50.00%
127
139+853
Box Culvert
2
1
50.00%
128
140+596
Box Culvert
2
1
50.00%
129
140+887
Box Culvert
2
1
50.00%
130
141+365
Box Culvert
2
1
50.00%
131
141+656
Box Culvert
2
1
50.00%
132
141+767
Box Culvert
2
1
50.00%
133
142+240
Box Culvert
2
0.125
6.25%
134
151+677
Box Culvert
2
0.125
6.25%
135
152+445
Box Culvert
2
0.35
17.50%
136
152+835
Box Culvert
2
0.35
17.50%
137
155+000
Box Culvert
2
2
100.00%
138
156+300
Box Culvert
2
0
0.00%
139
158+592
Box Culvert
2
0.35
17.50%
140
158+971
HP Culvert
2
1
50.00%
141
159+323
Box Culvert
2
1
50.00%
142
160+421
Box Culvert
2
1
50.00%
143
161+259
Box Culvert
2
2
100.00%
144
161+920
Box Culvert
2
1.25
62.50%
145
163+331
Box Culvert
2
2
100.00%
146
163+801
Box Culvert
2
0.75
37.50%
147
164+036
Box Culvert
2
0.75
37.50%
LHS
RHS
RHS
Shifted to Ch.116+420
M/s. SAI MAATARINI TOLLWAYS LIMITED
RHS
Scope Completed
(%)
Page 55
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Foundation
Sub Structure
Super Structure
LHS
LHS
Sl.
No.
Chainag
e
Structure
Type
148
164+191
Box Culvert
2
2
100.00%
149
164+520
Box Culvert
2
2
100.00%
150
164+631
Box Culvert
2
2
100.00%
151
165+104
Slab Culvert
2
1
50.00%
LHS
RHS
RHS
COMPLETED
RHS
IN PROGRESS
Scope Completed
(%)
53.60%
Construction Constraints:
8.
A. Land Acquisition:
(i)
Jajpur District: Km 0+000 to Km 24+000:
3D Notification has been issued for about 517 missing bits in 28 villages of Jajpur District which
was published in local news paper on 01-06-2014. CALA has raised a demand note for Rs.
9,12,40,109/- on 15-07-2014 vide their Lr. No. 111 to PIU, NHAI, Keonjhar for depositing of funds
under section 3G of NH Act-1956. RO, NHAI, Odisha has accorded sanction and placement of
funds towards the payment of compensation under section 3G vide their Lr. No. 11012/1/01/3GKeonjhar/2845/2014, dated 20-08-2014. PIU, NHAI, vide Lr. No. 6320 dated 23-08-2014
addressed CALA to process preparation for payment of compensation as NHAI, Head quarters has
been requested to deposit funds. It means funds are yet to be placed with CBS account and
remitted to CALA joint account for the compensation process.
The delay in compensation adversely affects execution of Four-Laning in entire stretch of 24 Kms
as these bits are spread over in 28 villages.
(ii)
Keonjhar District: 24+000 to Km 163+000:
The following table depicts the status of compensation for private L.A. for the project.
Compensation Amount
Tahasil
No of
Area for compensation (Acr.)
(Rs . In Cr.)
Villages Under 3D Awarded Disbursed
(%)
Awarded Disbursed
(%)
Ghasipura
27
140.492 135.327
112.96 83.47%
38.11
24.56 64.44%
Anandapur
11
47.516
46.986
37.55 79.92%
7.26
5.67 78.09%
Ghatgaon
17
138.86
133.2
41.61 31.24%
5.71
2.83 49.59%
Sadar
34
256.422 237.367
206.997 87.21%
50.90
40.20 78.98%
Jhumpura
10
86.285
90.621
62.24 68.68%
16.80
11.28 67.15%
Champua
3
38.155
31.35
28.11 89.67%
11.23
6.17 54.92%
Total
102
707.73
674.851
489.467 72.53%
130.01
90.71 69.77%
It is conspicuous that even on date nearly 30% of compensation is yet to be disbursed in the
entire District. While the compensation paid for Anandapur and Sadar Tahasils is nearing 78% &
79%; for Ghasipura & Jhumpura stand at 64% & 67%; for Ghatgaon & Champua stand at a
precarious level of nearly 50% & 55% even after 16months from Appointed Date.
From the above table, it is glaringly visible that compensation in Ghatgaon Tahasil is grievously
affected; the percentage of compensation being made is still at less than 50%. It is known that
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 56
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
the compensation for the villagers of (1)Kusunpur, (2)Tlkina, (3)Upardiha, (4)Khantaghar,
(5)Golbandaha, (6)Melan, (7)Chikinia and (8)Bataharichandanpur (8 villages out of 17 villages) is
abnormally delayed due to delay in placement of funds with CALA to a tune of about Rs. 6 Cr. as
per Lr. No. 6274, dated 21-07-2014 of PD addressed to RO, NHAI, Bhubaneswar.
B. Forest Land Diversion Proposal:
(i) Stage-I Clearance – Obtained from MoEF vide Order No. F.No. 8-01/2014-FC, GOI, MoEF,
FC – Division, New Delhi, dated 06-05-2014.
As regard the Stage-II Forest Clearance, the user agency is permitted vide MoEF order No.
F.NO. 11-306/2014-FC, GOI, FC Division, New Delhi to fell the forest trees and use the land for
the purpose of executing the project irrespective of issuance of Stage-II clearance provided
the user agency paid the requisite costs as mentioned in the conditions laid down in stage-I
forest clearance which was issued to this project.
C. Missing bits from 3D Notifications requiring direct purchase by P.D: There are at least 2
missing bits between Km 0+000 to Km 24+000, about 98 missing bits between Km 24+000 to
Km 58+000 and 11 missing bits between Km 113+000 to Km 166+173 requiring direct
purchase by PIU. Further missing bits, if any, in between Km 58+000 to Km 113+000 are still
to be identified as the compensation payment is still in process and incomplete to identify
the same.
D. Total Govt. Buildings and Religious Structures:
About 164 Nos. of Govt. Buildings and Religious Structures are to be constructed by
Concessionaire as directed by PIU, NHAI, Keonjhar, outside the PROW as a part of relocating
them which now exist within the PROW as severe impediment for execution of Four-Laning
which is spread in the entire stretch. Construction of 1 School building at Km 16 was
commenced and PD was requested to provide guidelines / modalities for supervision &
certification of payment for these structures being executed by Concessionaire.
E. Eviction of Encroachments –:
Eviction of encroachments has been mostly completed in the entire project stretch except in
Arsala Village (Km149+300 to 151+150) & Gopinathpur to an extent of 250meters.
F. Govt. Land Alienation:
Jajpur District: 59 cases were filed with Vyasanagar Tahasil
Keonjhar District: 305 cases (Ghasipura-78, Anandpur-30, Ghatgaon-60, Sadar-97, Bansapal
(new)-3, Champua-10, Jhumpura (New) 27) were filed.
The alienation may take some time for official transfer of land to Authority by way of
mutation. Project Director has to take expeditious steps on the matter.
G. Court cases, Arbitration cases:
There are about 217 Arbitration cases in Keonjhar District and a dozen cases in Jajpur District.
Public Resentment at Belabahali villagers protesting the construction of work of Major Bridge
proper at Km 35+803 across Kusei River along the approved alignment as a result of which
work in about 5Kms Length (Realignment length is 1.56Kms) has remained deadlock even
Collector, Keonjhar convened a meeting at Collectorate on 22-08-2014 with all concerned
and then proposed to refer the matter to E-in-C-cum Secretary (Works), Odisha for
resolution. Further Bhaluka villagers in the Jumpura bypass have stalled the work of Minor
Bridges at Km 148+457 & Km 149+027 including part of Four-Laning (about 750m).
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 57
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
9. Change of Scope of Work
1. 31 Nos. New Culverts pertaining to Khaneipur Irrigation Department:
Project Director has communicated in principle approval of these additional culverts vide Lr. No.
6067, dated 24-04-2014 for which Change of Scope Notice has to be issued for all 31 culverts as I.E.
vide Lr. No. 123 dated 30-05-2014 has communicated to PD, a comprehensive proposal on the
matter.
Project Director has been requested vide Concessionaire’s letter SMTL/P-R/NH-215/TSNCGM/NHAI/2013-14/384, dated 28-07-2014 to address irrigation wings between Km 0+000 to Km
113+000 requesting the latter to support GPL for joint survey of 21 Irrigation Culverts falling within
the area to exactly locate the crossing points on NH-215, decide upon invert levels, exact size of
vents etc., in order to communicate to Sheladia for preparation of design & drawings with estimate
at an early date, as GPL found that the Jr. level officers are not cooperating for joint survey passing
out the time. The stalemate still continues.
Concessionaire has furnished GADs for 11 Nos. of Kanupur Irrigation Project for irrigation canals
crossing NH-215 highway vide Lr. No. 336, dated 25-05-2014 to Project Director for review and
acceptance and so far no communication has been received. Certain observations raised by
irrigation department are being attended to.
2. Slip/Service Roads for Flyover @ Km 125+284:
It was agreed to provide Change of Scope Notice and therefore Concessionaire was asked to provide
cost implication with detailed drawings for slip roads & island/round about arrangement.
3. VUP at KM 115+189 (MDR-Tulasichunura):
As required by NHAI the cost implication for double vent VUP in lieu of single vent VUP have been
furnished to I.E. to cause issuance of Change of Scope Notice. Concessionaire vide Lr. No. SMTL/P-R/NH215/TSN-CGM/I.E./2013-14/357,dated 23-08-2014 addressed to I.E. furnishing the rate analysis for the
estimate furnished on 01-07-2014.
10. Claims:
a. Extension of Time (EOT) for achieving Mile stones & Scheduled 4-Laning Date:
1) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/023, dated 21-09-2013 addressed to I.E.
for E.O.T. – Delay in acceptance of Designs & Drawings by 1 year 3 months & accessibility of
land of 72 Kms (43.37%) for Project Work.
2) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/025, dated 22-09-2013 addressed to I.E.
for E.O.T. of 5 months – Delay in permissions / approvals for electrical utility shifting.
3) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/055, dated 11-11-2013 addressed to I.E.
indicating the facts of delay on the obligation of NHAI before commencement of execution of
4-laning pursuant to Cl. 12.4.1 of C.A.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 58
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
4) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/071, dated 23-11-2013 addressed to I.E.
for E.O.T. of 7 Month – Delay in Tree felling.
5) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/075, dated 26-11-2013 addressed to I.E.
for E.O.T. of 7 Months.– Delay for shifting of RWSS & PH Pipe lines
6) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/076, dated 26-11-2013 addressed to I.E.
for E.O.T. of 7 Months. – Delay in Tree felling.
7) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/182, dated 10-03-2014 addressed to I.E.
for E.O.T. – Review of Design & Drawings by Independent Engineer pursuant to Cl. 12.3 of C.A.
– Abnormal delay in review of about 10 months from Appointed Date after submission of
Design & Drawings – Determination of Extension of Time for Project Milestones & Scheduled
Four Laning Date pursuant to Cl. 12.4.2 of C.A. and Cl. 3.1 (vii) & Cl. 8.2 Schedule-Q of C.A. –
Requested.
8) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/183, dated 10-03-2014 addressed to I.E.
for E.O.T. – Determination of extension of Time for all Milestones or the Scheduled Four Laning
Date and amendment for them as stipulated in Cl. 6 of Schedule-G and Cl. 12.4.2 of Concession
Agreement for the reasons of delay in obligations attributable to Authority / Independent
Engineer – Requested.
9) Lr. No. SAI/IC/03/241/2014, dated 27-03-2014 – I.E. has stated that the extension of time is not
justified and untenable without calling for verifying relevant documents, records of evidence
from either NHAI / Concessionaire. Thus the action of IE is arbitrary & indiscreet.
10) Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/309, dated 21-06-2014 addressed to
I.E. substantiating its claim for occurrence of Milestone-I with a detailed substance.
11. Disputes
a) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/182, dated 10-03-2014 addressed to I.E. for
E.O.T. – Review of Design & Drawings by Independent Engineer pursuant to Cl. 12.3 of C.A. –
Abnormal delay in review of about 10 months from Appointed Date after submission of Design &
Drawings – Determination of Extension of Time for Project Milestones & Scheduled Four Laning
Date pursuant to Cl. 12.4.2 of C.A. and Cl. 3.1 (vii) & Cl. 8.2 Schedule-Q of C.A. – Requested.
b) Letter No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/183, dated 10-03-2014 addressed to I.E. for
E.O.T. – Determination of extension of Time for all Milestones or the Scheduled Four Laning Date
and amendment for them as stipulated in Cl. 6 of Schedule-G and Cl. 12.4.2 of Concession
Agreement for the reasons of delay in obligations attributable to Authority / Independent
Engineer – Requested.
c) Lr. No. SAI/IC/03/241/2014, dated 27-03-2014 – I.E. has stated that the extension of time is not
justified and untenable as demanded by Concessionaire vide their Lr. No. 182 dated 10-03-2014.
d) In Lr. No. SAI/IC/03/247/2014, dated 01-04-2014 I.E. has rejected the plea of Concessionaire for
EOT for 10 months which was demanded vide Lr. No. 183 dated 10-03-2014.
e)
In Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/211, dated 01-04-2014 Concessionaire has
informed I.E. that it would go for “Dispute Resolution” vide Cl. 44 of C.A. for the rejection made
vide Lr. No. 247 dated 01-04-2014.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 59
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
f)
Concessionaire vide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/NHAI/2014-15/309, dated 18-042014 addressed to P.D. requesting him to restrain from imposing damages for Non-occurrence of
Milestone-1 as recommended by IE. vide their letter No. 1399 dated 04-04-2014, the contents of
which are not agreed to by Concessionaire who requested to maintain status quo until EOT case
under dispute is settled.
g) Concessionaire vides its Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/238, dated 21-04-2014
notified I.E. with a request to mediate and assist the parties to dispute for arriving at an amicable
settlement pursuant to Cl. 44.2 (conciliation) of C.A.
h) I.E. vide their Lr. No. SAI/IC/02/110/2014, dated 29-04-2014 informed P.D. on the intention of
Concessionaire for dispute resolution and narrated the provisions in Cl. 44.2 of C.A. with a copy
to Concessionaire.
i) Concessionaire vide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2014-15/254, dated 06-05-2014
requested IE to take up dispute resolution in consonance with Cl. 44.2 of C.A. through
conciliation.
j)
Concessionaire vide its Lr. No. REF: SMTL/P-R/NH-215/TSN-CGM/NHAI/2013-14/325, dated 0905-2014 addressed to PD for EOT for 10 months
k) Concessionaire vode its Lr. No. SMTL/P-R/NH-215/TSN-CGM/NHAI/2013-14/326, dated 11-052014 addressed to PD for EOT for 10 months.
l)
Concessionaire vide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/I.E./2013-14/274, dated 17-05-2014
addressed to I.E. requested for EOT of 365 days for project milestones under various reasons.
m) IE vide their Lr. No. SAI/IC/02/120/2014, dated 26-05-2014 addressed to P.D. asked to provide
details and documents related to action taken by PIU under Cl. 10.3 of C.A.
n) As a reply to PDs Lr. No. NHAI/11011/1/PKR(SMTPL)/2012/PIU/KJR/6162, dated 29-05-2014,
Concessionaire vide its Lr. No. SMTL/P-R/NH-215/TSN-CGM/NHAI/2013-14/342, dated 31-052014 has replied with its legitimate demand of EOT for 365 days as on 31-05-2014.
The dispute in regard to Extension of Time for Project completion is under stalemate because of PIU not
providing relevant data to I.E. as asked by it vide point no (m) above.
12. Non Conforming Product Notifications (NCPNs).
Sl.
No.
NCPN
No
I.E.'s Lr. No.
1
2
SAI/IC/03/178/
2013 Dt.08-022014
2
3
SAI/IC/03/179/
2014 Dt.10-022014
Description
PMC Lr. No. &
Date
SMTL Lr. No. &
Date
Compliance
Major Bridge at Km 56+800 (A2). Since the Design related
issues (Founding Level) has not resolved/settled for Major
Bridge at Km 56+800, the Concessionaire has constructed
the Raft (A2) without submission of compliance report, as
IE designer's commented on submitted design and
drawings of aforementioned structure.
Fly Over at Km 125+284.5 (A2&P3). Since the Design
related issues (Overlapped pressure bulbs of Abutment &
adjacent pier is not considered in the design) has not
resolved/settled for Fly Over at Km 125+284.5, the
Concessionaire has constructed the Raft (A2&P3) without
submission of compliance report, as IE designer
commented on submitted design and drawings of
aforementioned structure.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 60
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
3
4
5
NCPN
No
I.E.'s Lr. No.
Description
PMC Lr. No. &
Date
4
SAI/IC/03/188/
2014 Dt.14-022014
Km 146 (Batching Plant).
Without Calibration of
Admixture at Km 146 Batching Plant, Production of
Concrete started.
Sheladia/PMC/
NH-215/201314/97
Dt.
18-02-2014
SMTL/P-R/NH215/TSNCGM/I.E./201314/152
dt.19-02-2014
SAI/IC/03/196/
2014 Dt.17-022014
Major Bridge at Ch. 56+800. 1st lift of Abutment/Return
Wall: A2 1. Haunch not provided as shown in the Drgs 2.
Dowels for lap is very less (500mm to 1500mm instead of
two layers as shown in the drawings). 3. Vertical bars in
Abutment wall are fixed in one layer instead of two layer as
shown in the drawings. 4. RFIs are not submitted but the
Concessionaire for casting footing and 1st lift of wall. 5. 1st
lift of wall (Abutment & Return) is casted after all NCR has
been issued to Concessionaire.
Sheladia/PMC/
NH-215/201314/122
Dt.
19-03-2014
SMTL/P-R/NH215/TSNCGM/I.E./201314/197
Dt.19-03-2014
SAI/IC/03/223/
2014 Dt.0803-2014
AT Km 56+800 Major Bridge: As per IE designer comments,
concessionaire has to furnish the data of RQD, UCS and
core recovery for all abutments and piers for conformity of
hard rock, but without submission of aforesaid data PCC for
P4 has been done and further reinforcement has been
placed for concrete (Raft) works. Hence it is considered as
non-conformity of work till submission of required of
necessary data.
At Km 22+380 to Km 22+540 (LHS): Embankment 2nd layer
work is in progress over bulged / uncompacted 1st layer at
above mentioned chainage. The same has been
communicated vide our WIR No.07 for your necessary
action. Despite repeated instructions further layers (3rd
Layer) is in progress without attending any rectification
measures and approval of beneath layers. Since the
embankment layers are not being constructed as per the
MORTH Specifications the aforesaid works are treated as
not approved.
Sheladia/PMC/
NH-215/201314/194
Dt.
09-06-2014
SMTL/P-R/NH215/TSNCGM/I.E./201314/298
Dt.10-06-2014
Sheladia/PMC/
NH-215/201314/194
Dt.
09-06-2014
SMTL/P-R/NH215/TSNCGM/I.E./201314/298
Dt.10-06-2014
5
11
6
13
SAI/IC/03/271/
2014 dt.2104-2014.
7
14
SAI/IC/03/283/
2014 dt.0105-2014.
Safety during Construction:
15
SAI/IC/03/299/
2014 dt.1305-2014.
At Km 10+000 to 10+320 (RHS): The embankment 4th layer
is under progress on loose, un-compacted and without
approval of beneath layer because of it was containing
Marshy type material which is not suitable for embankment
works in accordance to MORTH specification. In this respect
WIR no. 8 & 9 had been issued for removal of the
unsuitable material (Copy enclosed for ready reference).
But without attending rectification works the next layer is
in process this is also contaminated with Marshy type
material.
16
SAI/IC/03/374/
2014
At Km 56+800 MAJOR BRIDGE: Foundation & walls of Pier
P2, Pier P3 and Pier P4 are completed without submitting
the confirmatory Boring details and laboratory test results
for IE’s review & comments.
SAI/IC/03/376/
2014
At Km 94+000 and Km 107+000 Base Camp Location: No
proper storage platform above the ground has been
provided for the steel placement at Base Camp at Ch.
94+000 and Ch.107+000 camp location and all other
construction places wherever the work is progress. Rusting
has taken place at all the structure locations became of
prolonged exposure to water, in spite of repeated
reminders, no precautionary measures have been taken.
Reinforcement has been found immersed / dipped into the
water for no longer periods, no remedial measures are
being taken.
8
9
10
17
M/s. SAI MAATARINI TOLLWAYS LIMITED
SMTL Lr. No. &
Date
Compliance
Page 61
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
NCPN
No
11
18
I.E.'s Lr. No.
Description
SAI/IC/03/377/
2014
Wherever the GSB laying is in progress thickness provided
is not uniform under the main carriageway, shoulders &
median. GSB thickness under median and shoulders is less
than that of the main carriageway. Locations: LHS –
113+600 – 113+880, 114+020 – 114+550, 114+590 –
114+770, 119+000 – 119+400, 119+580 - 120+080,
121+200 – 121+930, 122+000 – 122+090, 122+120 –
122+470, 123+380 – 123+600, 128+250 – 128+550,
130+600 – 130+900, 131+800 – 132+300, 132+960 –
133+300, 134+340 – 134+900, 135+060 – 135+560,
135+800 – 136+020, 137+320 – 137+560, 137+980 –
138+930,140+880 – 141+140, 160+740 – 160+800.
RHS – 113+600 – 113+880, 114+020 – 114+550, 114+590 –
114+770, 118+690 – 118+930, 119+000 – 120+380,
121+200 – 121+930, 122+000 – 122+090, 122+120 –
122+240, 122+280 – 122+470, 123+380 – 123+600,
126+450 – 126+640, 128+250 – 128+550, 129+440 –
129+800, 129+960 – 130+300, 132+960 – 133+300,
138+460 – 139+120, 158+400 – 158+570, 158+620 –
158+960, 159+000 – 159+300, 159+700 – 159+840,
160+610 – 160+700, 162+220 – 162+360.
PMC Lr. No. &
Date
SMTL Lr. No. &
Date
Compliance
13. Correspondence
INCOMING CORRESPONDENCE
Sl.
No.
Ref No.
Date
1
SAI/IC/03/364/2014
04-Aug-14
2
SAI/IC/03/365/2014
04-Aug-14
3
SAI/IC/03/366/2014
04-Aug-14
4
SAI/IC/03/367/2014
04-Aug-14
5
SAI/IC/03/368/2014
04-Aug-14
6
SAI/IC/03/369/2014
05-Aug-14
7
SAI/IC/03/373/2014
07-Aug-14
8
SAI/IC/03/374/2014
08-Aug-14
9
SAI/IC/03/376/2014
08-Aug-14
10
SAI/IC/03/377/2014
08-Aug-14
11
SAI/IC/03/379/2014
08-Aug-14
12
SAI/IC/03/380/2014
09-Aug-14
13
SAI/IC/03/381/2014
09-Aug-14
14
SAI/IC/03/382/2014
09-Aug-14
15
SAI/IC/03/384/2014
09-Aug-14
Subject
Observations on GAD, Substructure and
Foundation for Minor Bridges at 97+913
Observations on Substructure and Foundation
for Minor Bridges at 143+238 (Dec. ch.)
Observations on GAD, Substructure and
Foundation for Minor Bridges at 112+574
Observations on GAD, Substructure and
Foundation for Minor Bridges at 116+163
Observations on Substructure and Foundation
for Minor Bridges at 117+077 (Dec. ch.)
Observations on revised hydrology and
hydraulic report for Major Bridge at 35+803
Structures where T-beam RCC Girder super
structure concurred by IE
NCPN-16 Chainage at 56+800 Major Bridge
NCPN -17
NCPN -18
Revised Work Programme
Review of Borrow Area No.16, 17, 28 Ext, 70,
71,b71A, 85, 110, 121, 123, 124
Review of WMM JMF
Review of Concrete MIX Design M15, M30 &
M35
Occurrence of Milestone - I & II
M/s. SAI MAATARINI TOLLWAYS LIMITED
Encl:
Address To
Yes
CGM, SMTL
Yes
CGM, SMTL
Yes
CGM, SMTL
Yes
CGM, SMTL
Yes
CGM, SMTL
Yes
CGM, SMTL
Yes
CGM, SMTL
Yes
CGM, SMTL
Yes
CGM, SMTL
Yes
CGM, SMTL
Nil
CGM, SMTL
Nil
CGM, SMTL
Nil
CGM, SMTL
Nil
CGM, SMTL
Nil
CGM, SMTL
CC:
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
PD,
NHAI,Keonjhar,
Page 62
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
Ref No.
16
SAI/IC/03/385/2014
12-Aug-14
17
SAI/IC/03/387/2014
13-Aug-14
18
SAI/IC/03/390/2014
21-Aug-14
19
SAI/IC/03/391/2014
21-Aug-14
Date
Subject
Encl:
Address To
CC:
Nil
CGM, SMTL
PD,
NHAI,Keonjhar,
Nil
CGM, SMTL
PD,
NHAI,Keonjhar,
Observations on Hydrology and Hydraulic
Report for Major Bridges @ 35+803
Yes
CGM, SMTL
PD,
NHAI,Keonjhar,
Observations on revised Hydrology and
Hydraulic Report for Major Bridges @ 35+803
Yes
CGM, SMTL
PD,
NHAI,Keonjhar,
Subject
Encl:
Address To
CC:
Nil
Team Leader,
Keonjhar
The CGM
(Tech.),OR,NHAI,
New Delhi, NHAI
Yes
Team Leader,
Keonjhar
PD, NHAI,
Keonjhar
Nil
Team Leader,
Keonjhar
PD, NHAI,
Keonjhar
Yes
PD, NHAI,
Keonjhar
Yes
Team Leader,
Keonjhar
Nil
PD, NHAI,
Keonjhar
Team Leader,
Keonjhar
Nil
PD, NHAI,
Keonjhar
Team Leader,
Keonjhar
Nil
Team Leader,
Keonjhar
Review of Concrete MIX Design M15, M30 &
M35
Deployment of Plant & Machinery
OUTGOING CORRESPONDENCE
Sl. No.
Ref No.
Date
1
SMTL/P-R/NH215/TSNCGM/IE/201415/345
01-Aug-14
2
SMTL/P-R/NH215/TSNCGM/IE/201415/346
01-Aug-14
3
SMTL/P-R/NH215/TSNCGM/I.E./201415/347
4
SMTL/P-R/NH215/TSNCGM/NHAI/201314/387
02-Aug-14
5
SMTL/P-R/NH215/TSNCGM/I.E./201415/348
06-Aug-14
6
SMTL/P-R/NH215/TSNCGM/Cont./201314/126
09-Aug-14
7
SMTL/P-R/NH215/TSNCGM/NHAI/201314/389
09-Aug-14
8
SMTL/P-R/NH215/TSNCGM/IE/201314/350
11-Aug-14
02-Aug-14
Extension of time for all Milestone or
Scheduled Four Laning Date - Dispute
resolution - pursuant to cl.44.2 of C.A. Immediate amicable settlement for EOT
without further delay - Requested - Reg.
Submission of (1) Hydraulic report for Major
Bridge at Km 35+803 along with compliance
report and (2) Design & Drawings along
additional calculations for pier Cap for
Substructure of Minor Bridge at km 95+407 Review of Independent Engineer - Requested Reg.
Submission of Design & Drawings along with
compliances for (1) Minor Bridge at km
143+238 and (2) Minor Bridge at Km 117+077 Review of Independent Engineer-RequestedReg.
Missing of Govt. & Religious structures not
covered in the earlier approved estimate of
different Departments for reconstruction - cost
estimate for reconstruction for Govt. &
Religious Structures from Km 0+000 to Km
113+000 by concerned NH Division - Furnished
Occurrence of Milestone I & II - Notified by
Concessionaire - Formal concurrence Requested - Reg.
Commencement of all bridges including Minor
Bridges - Immediate action before 15-08-2014 Strict implementation - instruction issued - Reg.
Supervision of ROBs located at Km 9+180 Jajpur
Bypass and Km 115+639 Keonjhar Bypass Prevailing upon Officers of East Coast Railway Requested - Reg.
Monthly Progress Report for the month of July2014 pursuant to Cl.13.1 of C.A. - Furnished Reg.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Team Leader,
Keonjhar
PD, NHAI,
Keonjhar
PD, NHAI,
Keonjhar
Page 63
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl. No.
Ref No.
Date
9
SMTL/P-R/NH215/TSNCGM/IE/201314/351
12-Aug-14
10
SMTL/P-R/NH215/TSNCGM/NHAI/201314/391
13-Aug-14
11
SMTL/P-R/NH215/TSNCGM/NHAI/201314/392
13-Aug-14
12
SMTL/P-R/NH215/TSNCGM/Cont./201314/128
13
14
15
16
SMTL/P-R/NH215/TSNCGM/NHAI/201314/393
SMTL/P-R/NH215/TSNCGM/Cont./201314/129
SMTL/P-R/NH215/TSNCGM/Cont./201314/130
SMTL/P-R/NH215/TSNCGM/NHAI/201314/394
14-Aug-14
14-Aug-14
16-Aug-14
18-Aug-14
18-Aug-14
17
SMTL/P-R/NH215/TSNCGM/IE/201314/355
19-Aug-14
18
SMTL/P-R/NH215/TSNCGM/NHAI/201314/395
19-Aug-14
19
SMTL/P-R/NH215/TSNCGM/NHAI/201314/396
21-Aug-14
20
SMTL/P-R/NH215/TSNCGM/NHAI/201314/398
24-Aug-14
Subject
Estimate of Shifting of Electrical Utilities from
Km 24+000 to Km 163+000 - Observations of
HO, NHAI - Communication of reply Requested - Reg.
Reconstruction of Govt. Buildings falling within
the PROW of NH-215 Joint Inspection of
Keonjhar, Jhumpura & Champua Tahasils of
Keonjhar Dsitrict on 25-07-2014, 30-07-2014 to
31-07-2014 for identifying Govt. sites for
relocation of the buildings - certain
recommendation of this committee constituted
by collector, Keonjhar on 16-07-2014 involving
cost increase - Course of action top be followed
- Requested - Reg.
Information on Environment Management Plan
(EMP) of Nh-215 Project in Odisha - Furnished Reg.
Delay in processing MPR for want of latest
information viz., Accident Data / Evictions of
Encroachment, Utility Shifting etc., - Immediate
action by General Managers, GPL to furnish the
information by 16-08-2014 - Instructions issues
- Reg.
Status of Construction of slurry pipe line by
ESSAR wi9thin the Project6 Corridor - Details
furnished - Reg.
Drawing of approved / revised Pier & Pier cap
(CE's DRG No-1715/13 - Sheet No-4) for ROB at
Km 9+233 - Furnished - Reg.
Clearing of Pending NCPNs - Action plan Sought after - Reg.
Acquisition of Additional Land required for Toll
Plazas etc.; - Statement of Additional Land to
be acquired pursuant to Cl. 10.3.6 of C.A. expeditious action - Requested Reg.
Submission of Re-confirmatory Bore Logs for
Major Bridge at Km 56+800 for A1, P1, P2 & P3
on 10-06-2014 - Non receipt of observations
within 15 days pursuant to Cl.12.3 © of C.A. Dropping of NCPNs (02.,11 & 16) related to the
Major Bridge - Requested - Reg.
Reimbursement of balance cost towards Tree
Felling from (i) Km 0+000 to Km 24+000 (jajpur
range)m (ii) Km 24+000 to Km 58+000
(Anandpur Range) & (iii) Km 58+000 to Km
107+000 (Ghatgaon Range) besides cost of
DGPS Survey carried out by ORSAC - Reg.
Construction of 20 Additional Culverts of
Irrigation department across Project Highway
(Km 0+000 to Km 113+000) - extension of
support from respective line departments to
survey the salient features of locations in order
to finalize relevant Design & Drawings - Reg.
Meeting held in Collectroate, Keonjhar on 2208-14 to resolve the impasse created by
villagers of Belbhalai preventing constriction of
Major Bridge at Km 35+305 on the project
stretch - Stalemate continued unresolved - Reg.
M/s. SAI MAATARINI TOLLWAYS LIMITED
Encl:
Address To
Yes
Team Leader,
Keonjhar
Yes
PD, NHAI,
Keonjhar
Team Leader,
Keonjhar
Yes
PD, NHAI,
Keonjhar
Team Leader,
Keonjhar
Nil
The G. M.,
Sec I & II,
Gayatri
Projects Ltd.,
Jajpur &
Keonjhar.
Yes
PD, NHAI,
Keonjhar
Yes
Yes
The G. M.,
Sec I, Gayatri
Projects Ltd.,
Jajpur.
The G. M.,
Sec I & II,
GPL., Jajpur
& Keonjhar.
CC:
PD, NHAI,
Keonjhar
TL, PMC, Jajpur
Team Leader,
Keonjhar
TL, PMC, Jajpur
TL, PMC, Jajpur
Nil
PD, NHAI,
Keonjhar
Team Leader,
Keonjhar
Yes
Team Leader,
Keonjhar
Nil
PD, NHAI,
Keonjhar
Team Leader,
Keonjhar
Nil
PD, NHAI,
Keonjhar
Team Leader,
Keonjhar
Nil
PD, NHAI,
Keonjhar
Team Leader,
Keonjhar
PD, NHAI,
Keonjhar
Page 64
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl. No.
21
Ref No.
Date
SMTL/P-R/NH215/TSNCGM/Cont./201314/132
Subject
31-Aug-14
Encl:
Supply of Information related to latest Ambient
Air / Noise / Water Quality Monitoring Report Urgent Action to furnish by 05-09-2014 Instructions Issued - Reg.
Nil
Address To
CC:
The G. M.,
Sec I & II,
Gayatri
Projects Ltd.,
Jajpur &
Keonjhar.
TL, PMC, Jajpur
14. Environmental Regulations & Clearances:
APPLICABLE PERMITS (Cl. 4.1.3 (d) and Schedule-E of C.A.
SEC-II (Km.0 – Km.113)
Manjuri
Km. 18+500
Sl
No.
a
b
c
d
Description of
Permission /
License
Permission of
the
state
Government
for extraction
of
boulders
from quarry
Permission of
Village
Panchayata
and Pollution
Control Board
for installation
of crushers
License for use
of explosives
Permission of
the
state
Government
for
drawing
water
from
river
/
reservoir
WMM Plant
NA
NA
NA
Manjuri
(Km.
19+000)
Hasanpur
Km.
33+000
Batching
Plant
NA
NA
NA
Ostapura
(Km.
42+000)
Bandha / Arjun
Bania (Km.
58+000)
Langalakanthi
(92+000)
Khajirijiani
(Km.
94+000)
Stone
Quarry
Crusher
WMM Plant
HM Plant
Batching
Plant
HSD Pump
Hot Mix
Plant
HSD
Pump
Stone
Quarry
Crusher
Stone Quarry
Crusher
Batching Plant
HM Plant
WMM Plant
HSD Pump
Stone Quarry
Crusher
NA
Approved
(Part
payment
deposited
for
renewal)
FDP under
Process
To be applied
for
Permission
Approved
(25% Part
payment
deposited
for renewal)
NA
Approved
(Valid up
to 31-12015)
Approved (Valid
up to 31-12-015)
To be applied
for
Permission
Approved
(Valid up to
31-12-015)
NA
Approved
(Renewed
up to 3112-014)
Approved
(Renewed up to
31-12-014)
Approved
Approved
(Renewed
up to 31-032015)
Approved for total stretch (Km. 00+000 to 163+000)
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 65
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Manjuri
Km. 18+500
Description of
Permission /
License
Sl
No.
License from
Inspector of
factories
or
other
competent
Authority for
setting
up
Batching Plant
Clearance of
Pollution
Control Board
for setting of
Batching Plant
Clearance of
Village
Panchayats
and Pollution
Control Board
for
Asphalt
Plant
e
f
g
WMM Plant
NA
Manjuri
(Km.
19+000)
Hasanpur
Km.
33+000
Batching
Plant
Hot Mix
Plant
HSD
Pump
In Process
Ostapura
(Km.
42+000)
Bandha / Arjun
Bania (Km.
58+000)
Langalakanthi
(92+000)
Stone
Quarry
Crusher
Stone Quarry
Crusher
Batching Plant
HM Plant
WMM Plant
HSD Pump
Stone Quarry
Crusher
NA
Under Process
(Plan Approved
but not applied
for licence)
NA
Not Applied
NA
Approved
(Renewed
up to 31-032015)
NA
NA
In Process
Approved
NA
NA
Approved
(Renewed up to
31-03-2015)
In Process
NA
Approved
NA
Approved
Khajirijiani
(Km.
94+000)
Stone
Quarry
Crusher
WMM Plant
HM Plant
Batching
Plant
HSD Pump
h
Permission of Village Panchayat and State Government for borrow earth
In Process
i
Permission of State Government for cutting of trees
In Process
j
Any other permits or clearance required under Applicable Laws
Labour License - Done
SEC-II (Km.113 – Km.163)
SL.NO:
DESCRIPTION
A
Permission of the State
Government for extraction
of boulders from quarry
B
Permission
of
Village
Panchayat
State Pollution Control
Board for installation of
Crushers
State Pollution Control
Board for Crushing of
Granite Stone Chips
GPL
@ 115 (Ramachandrapur)
1.Permission for quarry obtained
through
auction
at
Km.
115
Tulasichoura
Stone
Quarry
-3,
Tulasichoura Village of 12 Aces for long
term Memo NO. 8028 dated 21.12.2013
for 3 years. Environmental Clearance is
pending with /SEIAA.office
Completed Order No GP/2012-13/1209
& 07-83-2013
Completed Order No
NOC/242 & 15-05-2012
943/IND-I-
Completed order no 220/APC & 05-042014
M/s. SAI MAATARINI TOLLWAYS LIMITED
@ 135 (Raisuan)
1.Permission for quarry obtained through
auction at Km. 135 Tikarpada Stone Quarry
No-1,Tikarpada Village of 12 Aces on dated
01.04.2014. To be renew by 31-03-2015
Environmental Clearance is pending with
/SEIAA.office
-NA-NA-
-NA-
Page 66
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
SL.NO:
DESCRIPTION
License for use of
explosives
Permission of the State
Government for drawing
water from river/reservoir
License from Inspector of
factories
or
other
competent authority for
setting up Batching Plant
Clearance of Pollution
Control Board for setting
up Batching Plant
Clearance
of
Village
Panchayats and Pollution
Control Board for Asphalt
Plant
Permission
of
Village
Panchayat
and
State
Government for borrow
earth
C
D
E
F
G
H
GPL
@ 115 (Ramachandrapur)
Completed (Tulasichoura) Order No
5/2013 & 01-01-2014
@ 135 (Raisuan)
Completed (Tikarpada) Order No 14/2012 &
01-01-2014
-NA-
-NA-
Completed
(Order
595/210061200110 & 06-03-2012)
No
-NA-
Completed ( Order No 347/IND-INOC/240 & 19-03-2012)
-NA-
Completed, Village Panchayat Order No
87 & 19-12-2012, Pollution Control
Board Order No 347-IND-NOC/240 &
19-03-2012
-NA-
Completed
-NA-
I
Permission
of
State
Government for cutting of
trees.
Completed Order No 3196/Lease on
dated, Keonjhar the 24-04.2013 for DL39, & Order No 8478/Lease on dated,
Keonjhar the 20-11.2013 for DL-35 (Only
for Non forest & Govt land)
J
Any other permits or
clearances required under
Applicable Laws.
WMM Plant Completed
15. Statement showing Road Accident cases for the month:
JUN '14
Stretch / NH
Sl.
No.
State
PIU/CMU
NH No.
From
(Km)
To (Km)
1
Odisha
Keonjhar
215
Panikoili
Remuli
Detail of Accident
Length
163
TOTAL
No. of
Animals
Killed (If
Any)
Fatal
Grievous
Minor
Total
7
6
12
24
Nil
7
6
12
24
Nil
Remarks
JUL '14
Stretch / NH
Sl.
No.
State
1
Odisha
PIU/CMU
Keonjhar
NH No.
215
Detail of Accident
Length
From
(Km)
To (Km)
Panikoili
Remuli
163
TOTAL
M/s. SAI MAATARINI TOLLWAYS LIMITED
No. of
Animals
Killed (If
Any)
Fatal
Grievous
Minor
Total
17
12
18
28
Nil
17
12
18
28
NA
Remarks
Page 67
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
16. Eviction of Encroachments:
Private Building
Sl
No
Name of
the Village
Total no of encroachments
Govt. Structure
Total
Nos
Compensation
Dismantle
Paid Balance Complete
Balance
Total
Nos
Dismantle
No of Balance
Notices to Issue
Issued Notices Completed Balance
Total
Dismantle
Balance
Sadar Tahasil
1
Jamunalia
2
1
1
1
0
5
5
0
2
Tolankbahal
1
1
0
1
0
0
0
0
3
Sirispal
2
2
0
2
0
0
0
0
4
Nizgarh
13
13
0
10
3
11
11
0
5
1
1
0
1
0
3
3
0
4
4
0
4
0
0
0
0
7
Maligaon
Gopinathpur
Nuagaon
Dhrupada
2
2
0
2
0
0
0
0
8
Raisuan
26
22
4
20
2
16
16
0
14
2
9
Gopinathpur
22
22
0
20
2
21
21
0
18
3
10
Khuntapada
0
0
0
0
0
11
Silisuan
3
2
1
2
0
9
9
0
9
12
Banajodi
8
5
3
5
0
18
18
0
14
13
Padmapur
20
19
1
19
0
17
17
0
14
Putulia
32
30
2
20
10
2
2
0
15
Keshpank
3
2
1
2
0
16
Jadichatara
0
0
0
0
0
1
1
0
17
Bankamaruni
2
1
1
0
1
9
5
4
18
Hundula
0
0
0
0
0
5
4
1
19
Jamudiha
18
10
8
10
0
6
3
3
4
20
Palaspanga
20
18
2
18
0
27
17
10
12
21
Mursuan
2
1
1
0
1
1
1
22
Spongepatna
0
0
0
0
0
34
23
Tangarani
Sub Total Sadar
Tahasil
4
4
0
2
2
185
160
25
139
21
3
0
3
0
0
0
27
0
0
0
0
0
0
0
0
0
0
2
2
7
6
1
0
6
2
2
6
11
0
1
1
8
8
0
1
1
4
1
1
17
0
7
2
0
0
1
0
2
0
4
3
4
14
22
0
0
9
7
2
0
0
34
0
185
133
52
1
86
9
37
Jhumpura Tahasil
1
2
3
4
Bhaluka
Arsala
Sundhimurs
uan
Balabhadrapur
5
1
5
Katalposi
16
11
5
8
3
11
11
6
Balibandh
27
16
11
12
4
7
7
14
5
2
3
0
2
3
3
2
85
35
23
20
15
25
0
25
0
0
7
Mursuan
Sub Total
Jhumpura Tahasil
Champua Tahsil
1
Sijukala
3
2
1
2
0
9
9
0
9
0
2
Parsala
12
2
10
2
0
13
13
0
13
0
Rimuli
Sub Total
Champua Tahasil
4
1
3
1
0
19
5
14
5
0
22
22
0
22
0
9
7
2
Grand Total
289
200
62
164
36
232
155
77
108
9
68
11
16
3
0
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 68
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
STAFF OF SPV & Its TEAM
17. Appendix - Concessionaire Staff
S. No.
1
2
3
Name
Mr. T. Suryanarayana
Mr. U. Anil Kumar
Mr. Gopal Mandal
Designation
Chief General Manager (Tech.)
Sr. Planning Engineer / Quantity Surveyor
Office Asst.
Project Management Consultants Team Staff
S. No.
Name
Designation
1
2
3
Mr. P. N. Rao
M D Rami Reddy
Mr. S K S Marar
Team Leader Cum Senior Highway Engineer
Senior Material Engineer
Senior Planner
4
T S Sundaram
Resident Highway Engineer-I
5
Ranjit Kumar
Resident Highway Engineer - III
6
Sanjay Kumar Acharya
Bridge Engineer - I
7
S. K. Singh
Bridge Engineer - III
8
Mangulu Charan Panda
Field Engineer (Highways) - I
9
Umesh Kumar Nayak
Field Engineer (Highways) - II
10
Laxman Rao V
Field Engineer (Bridges) - I
11
Mahaboob Subhani
Field Engineer (Bridges) - II
12
Balachandrudu
Field Engineer (Bridges) - III
13
Satya Ranjan Mohapatra
Quality Control Engineer - I
14
Shaik. Rahamatulla
Quality Control Engineer - II
15
Suvendu Das
Lab Technician - I
16
Mrutyunjaya Mohanty
Lab Technician - II
17
Ranjan Kumar Sahoo
Lab Technician - III
18
Arjun Kumar Jha
Lab Technician - III
19
Chitaranjan Pattanaik
Surveyor - I
20
Shashikanta Sahoo
QS – I
21
R. K. Nayak
Office Manager Cum Computer Operator
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 69
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state
of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
11.0 Appendixes
Appendix – 1 Concessionaire’s EPC Contractor’s Staff
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
70
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road
SectioH-215 from Km 0+000 – 163+000 in the state of Odisha under NHDP PhaseIII as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
SEC – I KEY PERSONEL STAFF LIST
SL.NO.
NAME OF EMPLOYEE
1
BVU BHASKAR
2
S. Venkata Reddy
3
D.S.R. Ratnakar
4
B Satyanarayna
ADMIN & LIAISIONING
1
B. Pattanaik
2
Monoranjan Patra
3
Siba Prasad Mohapatra
4
P P K Kar
5
N Apanna Babu
ACCOUNTS
1
P Nagendra
2
Tapas Sen
3
Naidu
4
Madhu
PLANNING & BILLING
1
V. Sunil Kumar
2
N Satish
3
S. Mahapatra
4
G C Senapati
5
Ram Chandra Sahoo
HIGHWAYS
1
D V V Satyanarayana
2
G Padmanabham
3
Vijay Bhatia
4
A Bheemudu
5
G V S N Murthy
6
D Venkateswara Rao
STRUCTURES
1
Mohd. Akhtar
2
Sai Prasad
3
Pradhan
4
Venkatesh
QA & AC
1
Tirupathy Reddy
2
Purnachandra Rao
DESIGNATION
General Manager
Project Manager
Project Manager
Project Manager
REMARKS
CM (HR & Admin)
PRO
Dy. Manager, HR/Admin
HR & IT Executive
Health Visitor
AGM (F & A)
Manager Accounts
Accountant
Cashier
Sr.PE (Planning)
Sr. Project Engineer
Project Engineer
Planning & Billing Asst.
Asst. QS
Project Manager - Roads
DPM
DPM
DPM Roads
Project Engineer
Paving In-charge
DGM Structures
P.E
Site Engineer
Site Engineer
Material Engineer
Lab Technician
SURVEY
1
2
3
Rakesh Kumar Sahoo
Tapas Kumar Behra
Sesha Sai
Sr. Surveyor
Jr. Surveryor
Jr. Surveryor
1
2
P.RAMU
Ravi kiran
Manager
Asst. Manager
STORES
MECHANICAL DIVISION
1
2
3
Y. Venkataramaih
K. Vijay Kumar
K. Basava Raj
M/s. SAI MAATARINI TOLLWAYS LIMITED
DGM (P&M)
Manager, Plants
Crusher In-charge
Page
71
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state
of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
72
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll)
Basis.
Monthly Progress Report : August -2014
SEC – II KEY PERSONEL STAFF LIST
Sl. No
1
Name of Employee
Designation
KV.Saikrishna Rao
General Manager
B.S.N.Murthy
2
PLANNING & Q.S
Remarks
Additional General Manager
1
Ishwari Prasad Nath
Planning Engineer
2
Surajit Mohanta
Planning Assistant
3
P.Siva Sankar
Quantity Assistant
4
Mukut Chandra Choudhury
Quantity Assistant
ADMIN & STORE
1
S.Maruthakasi
Senior Manager (Stores)
2
Asish Kumar Swain
Manager (Liasioning)
3
M.Arunakar Reddy
Manager (Liasioning)
4
Sankarsan Mohanty
Admin Asst.
FINANCE /ACCOUNT
N.Tirupathi Rao
Asst. Manager (F & A)
Shibu.P
Accounts Officer
1
Dinesh Chandra Seth
Deputy General Manager
2
Bijay Kumar Behera
Material Engineer
2
K S Akhil
Asst Material Engineer
Gupteswar Routray
Asst. Engineer ( Materials)
B.Krishana Rao
Senior Surveyor
Krishna Lal
Surveyor
1
K.Ravi Kumar
Construction Manager
2
Koteswar Rao
DPM (Highways)
Kanak Raju
Sr Engineer
1
B. P. Jain
Deputy General Manager
2
A. Klayana Raju
Sr. DPM (Structure)
3
Kanchu Simhadri
Construction Manager
4
Ganesh Singha
Manager (Structure)
1
2
QA & QC
3
SURVEY
1
2
HIGHWAY
3
STRUCTURE
Mitresh Kumar Gautam
5
MECHANICAL & PLANTS
Bridge Engineer
1
N.Srinivasa Rao
Dy. General Manager (Mechanical)
2
D.N.Raju
Dy. General Manager (Plants)
3
L.Srinivasa Rao
Foreman
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
73
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August -2014
18. Appendix 2 - Summary of test Results
QC Test Summary – Section-I (Km 0 to Km 113)
Sl.
No.
A
i
ii
iii
iv
v
vi
vii
B
i
ii
iii
iv
v
vi
vii
viii
ix
C
i
ii
iii
iv
v
vi
vii
viii
D
i
ii
Name of Test
Testing Method
Frequency of Test
OGL (Ref. MORTH Section 305 & 900) (1 sample to be collected for every 250 m on either side)
Gradation/Sieve Analysis
IS:2720 (Part 4)
1 test/Sample
Liquid Limit & PI
IS:2720 (Part 5)
1 test/Sample
Max. Dry Density & OMC
IS:2720 (Part 8)
1 test/Sample
Moisture Content
IS :2720 (Part 2)
1 test/Sample
CBR
IS:2720 (Part 16)
If sample in SG level
Free Swell Index
IS:2720 (Part 40)
1 test/Sample
Field Density Compaction for OGL
IS:2720 (Part 28)
1 Set Test Per 1000 m2
EARTHWORK (Ref. MORTH Section 305 & 900)
Gradation/Sieve Analysis
IS:2720 (Part 4)
2 test/3000 m3
Liquid Limit & PI
IS:2720 (Part 5)
2 test/3000 m3
Max. Dry Density & OMC
IS:2720 (Part 8)
2 test/3000 m3
Moisture Content
IS :2720 (Part 2)
1 test/250 m2
CBR
IS:2720 (Part 16)
1 test/3000 m3
Free Swell Index
IS:2720 (Part 40)
2 test/3000 m3
BS:1377(tests
Sulphate Content
As & when Required
9/10)
Field Density Compaction for Embankment
IS:2720 (Part 28)
1 Set Test Per 1000 m2
Field Density Compaction for Subgrade
IS:2720 (Part 28)
1 Set Test Per 500 m2
GSB (Ref. MORTH Section 401 & 900)
Gradation/Sieve Analysis
IS: 2386-Part 1
1 test/200 m3
Liquid Limit & PI
IS:2720 (Part 5)
1 test/200 m3
Moisture Content
IS :2720 (Part 2)
1 test/250 m3
Field Density Compaction
IS:2720 (Part 28)
1 test/500 m2
1 test/ source and as when
CBR
IS:2720 (Part 16)
required
Initially one, as and when required
Max. Dry Density & OMC
IS:2720 (Part 8)
by the Engineer
1 test/ source and as when
Water Absorption
IS:2386 (Part 3)
required
Initially one, as and when required
10% Fines Value
BS:812(Part111)
by the Engineer
WMM (Ref. MORTH Section 406 & 900)
Aggregate Impact Value
IS:2386 (Part 4)
1 test/200 m3
Gradation/Sieve Analysis
IS:2720 (Part 4) &
IS: 2786-Part 1
M/s. SAI MAATARINI TOLLWAYS LIMITED
1 test/100 m3 of aggregate
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
2157000
34,763.6
18853.7
45000
0
3451.4
2202000
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
796
791
796
2401
97
837
2401
0
0
0
28
6
8
28
796
791
796
2429
103
845
2429
78
78
78
0
0
78
0
0
0
0
0
0
0
0
78
78
78
0
0
78
0
874
869
874
2401
97
915
2401
0
0
0
28
6
8
28
874
869
874
2429
103
923
2429
1438
1438
1438
17402
261
1438
0
0
0
352
27
0
1438
1438
1438
17754
288
1438
30
30
30
0
14
30
0
0
0
0
0
0
30
30
30
0
14
30
1468
1468
1468
17402
275
1468
0
0
0
352
27
0
1468
1468
1468
17754
302
1468
0
0
0
0
0
0
0
0
0
13479
3923
226
126
13705
4049
0
0
0
0
0
0
13479
3923
226
126
13705
4049
212
203
701
701
1
0
18
18
213
203
719
719
0
0
0
0
0
0
0
0
0
0
0
0
212
203
701
701
1
0
18
18
213
203
719
719
5
0
5
0
0
0
5
0
5
4
0
4
0
0
0
4
0
4
3
0
3
0
0
0
3
0
3
4
0
4
0
0
0
4
0
4
121
0
121
23
0
23
144
0
144
257
0
257
36
0
36
293
0
293
34,763.6
22305.1
Page
74
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
Name of Test
Testing Method
Frequency of Test
1 test/200 m3
1 test/100 m3
1 test/500 m2
Initially one, as and when required
by the Engineer
Initially one, as and when required
by the Engineer
Initially one, as and when required
by the Engineer
iii
iv
v
Combined Flakiness Index & Elongation Index
Atterberg Limits (Passing 0.425 mm)
Field Density Compaction
IS:2386 (Part 1)
IS:2720 (Part 5)
IS:2720 (Part 28)
vi
Max. Dry Density & OMC
IS:2720 (Part 8)
vii
Abrasion value
IS:2386 (Part 4)
viii
Water Absorption
IS:2386 (Part 3)
BITUMINOUS COURSES
DBM / BC (Ref. MORTH Section 507, 509 & 900)
Quality of binder
Aggregate Impact Value / Los Angles Abrasion
Value
Flakiness Index & Elongation Index
IS: 73
IS:2386 Part 4 &
IS: 2386-Part 3
IS:2386 Part 1
E
1
i
ii
iii
iv
Specific Gravity & Water absorption of
aggregate
IS:2386 Part 3
v
Soundness (Magnesium and sodium sulphate)
IS:2386 Part 5
vi
Sand equivalent test for fine aggregate
IS:2720 Part 37
vii
Stone Polish Test
(BS 812 Part –
114)
viii
Mix grading
IS:2720 (Part 4)
ix
Stability of mix
Asphalt Institute
Manual MS-2
M/s. SAI MAATARINI TOLLWAYS LIMITED
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
121
204
724
0
0
0
121
204
724
23
36
102
0
0
9
23
36
111
144
240
826
0
0
9
144
240
835
4
0
4
0
0
0
4
0
4
1
0
1
0
0
0
1
0
1
1
0
1
0
0
0
1
0
1
1 test/lot
1
0
1
0
0
0
1
0
1
One test per 50 cum. of aggregate
3
0
3
2
0
2
5
0
5
One test per 50 cum. of aggregate
Initially one test of 3 representative
specimens for each source of
supply.
Subsequently
when
warranted by changes in the
quality of aggregates.
Initially, one determination by each
method for each source of supply,
then as warranted by change in the
quality of the aggregates.
Initially one, as and when required
by the Engineer
Initially one, as required, for
Bituminous Concrete.
One set of tests on individual
constituents and mixed aggregate
from the drier for each 400 tones
of mix subject to a minimum of
two tests per plant per day.
For each 400 tones of mix
produced, a set of 3 Marshall
specimens to be prepared and
tested for stability, flow value,
density and void content subject to
a minimum of two sets being
tested per plant per day.
3
0
3
2
0
2
5
0
5
2
0
2
2
0
2
4
0
4
4
0
4
0
0
0
4
0
4
4
0
4
0
0
0
4
0
4
0
0
0
0
0
0
0
0
0
19
0
19
54
0
54
73
0
73
0
0
0
0
0
0
0
0
0
Page 75
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
Name of Test
x
Water sensitivity of mix (Retained tensile
strength)
xi
Control of temperature of binder in boiler,
aggregate in the dryer and mix at the time of
laying and rolling.
xii
Control of binder content and grading of the
mix.
xiii
Rate of spread of mixed material
xiv
F
1
Density of compacted layer
Coating and stripping of bitumen aggregate
mixtures
MATERIAL FOR STRUCTURES
COARSE AGGREGATE (MORTH 1007)
i
Moisture Content
xv
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
AASHTO T 283
0
0
0
0
0
0
0
0
0
At regular close interval
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
1
0
0
0
1
0
1
Daily/at every day of concreting
218
0
218
43
0
43
261
0
261
One per source & there after every
month.
17
0
17
0
0
0
17
0
17
one test per day
490
0
490
43
0
43
533
0
533
222
0
222
11
0
11
233
0
233
203
0
203
11
0
11
214
0
214
17
0
17
0
0
0
17
0
17
Asphalt Institute
Manual MS-2
IS:6241
Specific Gravity
iii
Gradation/Sieve Analysis
iv
Aggregate Impact Value/Los Angles Abrasion
Value
v
Flakiness Index
IS:383,IS:2386 P-1
vi
Water absorption of Aggregate
IS383,IS:2386 P-III
IS:383,IS:2386 -V
IS:383,IS:2386 PVII
IS:383, ASTM 295,
IS:2386 Part VIII
IS:383,IS:SP-23
IS:383, IS:2386 PII
Soundness (Magnesium and sodium sulphate)
Alkali-Aggregate reactivity
ix
Petrographic Analysis
x
Chloride & Sulphate
xi
Deleterious Material
2
FINE AGGREGATE (MORTH 1008)
Total to Date
Initially one test of 3 representative
specimens for each source of
supply.
Subsequently
when
warranted by changes in the
quality of aggregates (if required)
ii
vii
Number of Tests Conducted
In This Month
Previous Month
Frequency of Test
IS:383,IS:2386 PIII
IS:383, IS:2386 Part III
IS:383,IS:2386 –
Part 1
IS:383, IS:2386
Part IV
viii
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
Testing Method
M/s. SAI MAATARINI TOLLWAYS LIMITED
One test for each 400 tones of mix
subject to a minimum of two tests
per day per plant.
Regular control through checks on
the weight of mixed material and
layer thickness
1 test / 250 sq.m area
Initially one, as and when required
by the Engineer
One per source & there after once
in a week.
One per source & there after once
in a week .
One per source & there after every
month.
One per source
17774.3
2037.5
19811.8
4
0
4
0
0
0
4
0
4
One per source
4
0
4
0
0
0
4
0
4
One per source
4
0
4
0
0
0
4
0
4
One per source
4
0
4
0
0
0
4
0
4
One per source
4
0
4
0
0
0
4
0
4
Page 76
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
i
ii
iii
iv
v
vi
vii
viii
ix
3
i
ii
iii
iv
v
vi
vii
viii
ix
x
xi
xii
xiii
xiv
4
i
ii
Name of Test
Testing Method
Frequency of Test
IS:383,IS2386 Part
Silt Content
Daily
II
Moisture Content
(IS:383,IS:2386)
Daily/at every day of concreting
(IS:383, IS:2386
Clay Lumps
At every day of concreting
Part II)
(IS:383,IS:2386POne per source & there after every
Specific Gravity
III)
month.
(IS:383,IS:2386 –
Gradation/Sieve Analysis, Fineness Modulus
Daily
Part III)
IS:383,IS:2386 POne per source & there after every
Water absorption of Aggregate
III
month.
Chloride & Sulphate
(IS:383,IS:SP -23)
One per source
(IS383,IS:2386
Deleterious Material
One per source
Part II)
Soundness (Magnesium and Sodium Sulphate)
IS:383,IS:2386 P-V One per source
43 GRADE ORDINARY PORTLAND CEMENT (Ref. IS: 8112 & MoRTH 1006)
Initial Setting Time
Final Setting Time
(IS:4031)
Soundness by Le-Chatlier’s method (%)
One test per week no. and
Fineness by dry sieve method 90micron
once per source 3rd party testing
Compressive strength
IS 516
iv
Chemical Tests
Loss on Ignition
Insoluble residue
Alumina Iron Oxide ratio
MTC for each supply and
Lime Saturation factor
(IS:4032)
one per source 3rd party testing
Magnesia
Sulphuric anhydride
Alkalies
Chlorides
53 GRADE ORDINARY PORTLAND CEMENT (Ref. IS: 12269, MoRTH 1006)
Initial Setting Time
Final Setting Time
(IS:4031)
Soundness (by Le-Chatlier’s method) by
Autoclave (%)
One
test
per
week
and
Fineness by dry sieve method 90micron
once per source 3rd party testing
v
Compressive strength
iii
IS 516
M/s. SAI MAATARINI TOLLWAYS LIMITED
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
17774.3
2037.5
19811.8
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
417
0
417
43
0
43
460
0
460
218
0
218
43
0
43
261
0
261
0
0
0
0
0
0
0
0
0
41
0
41
0
0
0
41
0
41
266
0
266
43
0
43
309
0
309
41
0
41
0
0
0
41
0
41
1
0
1
0
0
0
1
0
1
1
0
1
0
0
0
1
0
1
1
0
1
0
0
0
1
0
1
1
1
1
1
3
3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
1
1
1
3
3
0
0
0
0
0
0
0
0
0
0
1
1
1
1
3
3
3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
1
1
1
3
3
3
0
0
0
0
0
0
0
0
0
2
2
2
2
6
6
3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
2
2
2
6
6
3
0
0
0
0
0
0
0
0
0
15
15
0
0
15
15
4
4
0
0
4
4
19
19
0
0
19
19
5
0
5
4
0
4
9
0
9
15
30
30
30
0
0
0
0
15
30
30
30
4
12
9
0
0
0
0
0
4
12
9
0
19
42
39
30
0
0
0
0
19
42
39
30
Page 77
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
vi
vii
viii
ix
x
xi
xii
xiii
xiv
5
i
ii
iii
iv
v
vi
vii
viii
ix
6
i
Name of Test
Chemical Tests
Loss on Ignition
Insoluble residue
Alumina Iron Oxide ratio
Lime Saturation factor
Magnesia
Sulphuric anhydride
Alkalies
Chlorides
WATER (MORTH 1010)
Volume of 0.02N NaOH required to neutralize
100 ml sample of water using phenolphthalein
as an indicator
Volume of 0.02N H2SO4 required to
neutralize 100 ml sample of water using
methyl orange as an indicator
Solids
Organic
Inorganic
Sulphates (SO4)
Chlorides (CI)
Suspended matter
pH
ADMIXTURE (MORTH 1012)
Chloride Content
Testing Method
(IS:8112)
(IS:3025)
(IS:456,IS:3025)
(IS:9103, IS:6925)
Dry Material content
(IS:9103)
iii
Ash content
(IS:9103)
iv
Relative density
(IS:9103)
7
CONCRETE (MORTH 1716.2.5)
Sample of cube (A sample means a set of 3
cubes)
ii
Workability (Slump)
iii
Cube Strength of Concrete
a
COMPRESSIVE STRENGTH (MIX DESIGN
CUBES) No. Of Cubes
MTC for each supply and
one per source 3rd party testing
(IS:3025)
ii
i
Frequency of Test
(IS:10262,IS:456,
IRC:21)
IS : 516
IS 516
IS 516
IS 516
M/s. SAI MAATARINI TOLLWAYS LIMITED
(As
per
IRC
SP
84,8.6ii)
Water from each source shall be
tested before start of work and
there after every 3 months and
after every monsoon till the
completion of work.
Once per
required
Once per
required
Once per
required
Once per
required
source and as when
source and as when
source and as when
source and as when
Every concrete spread over entire
period of concreting
Every batch of concrete at dispatch
as well as delivery point
As per requirement
M15 7days
M15 28 days
M20 7days
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
2
2
2
2
2
2
2
2
2
0
0
0
0
0
0
0
0
0
2
2
2
2
2
2
2
2
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
2
2
2
2
2
2
2
2
0
0
0
0
0
0
0
0
0
2
2
2
2
2
2
2
2
2
5
0
5
0
0
0
5
0
5
5
0
5
0
0
0
5
0
5
5
5
5
5
5
5
5
0
0
0
0
0
0
0
5
5
5
5
5
5
5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5
5
5
5
5
5
5
0
0
0
0
0
0
0
5
5
5
5
5
5
5
3
0
3
0
0
0
3
0
3
3
0
3
0
0
0
3
0
3
3
0
3
0
0
0
3
0
3
3
0
3
0
0
0
3
0
3
2392
0
2392
0
0
0
2392
0
2392
7110
0
7110
816
0
816
7926
0
7926
36
60
30
0
0
0
36
60
30
3
6
0
0
0
0
3
6
0
39
66
30
0
0
0
39
66
30
Page 78
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
Name of Test
Frequency of Test : 1/Design Mix (or)
1/Change of Source
COMPRESSIVE STRENGTH (SITE CUBES)
No. Of Cubes
b
Frequency of Test : MORTH Sec.1700
Table:1700-8
Testing Method
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
IS 516
8
i
ii
NP4 HUME PIPES
Cube Strength of Concrete
Dimensions, Workmanship & Finish
iii
Hydrostatic test pressure
iv
Three edge Bearing test
9
i
STEEL
MTC
ii
SAMPLING
IS 1786
iii
iv
v
CHEMICAL
UTS
YIELD STRESS
IS 1786
IS 1786
IS 1786
IS :516
IS : 458 -2003
IS : 458 -2003,
IS:3597
IS : 458 -2003,
IS:3597
M/s. SAI MAATARINI TOLLWAYS LIMITED
Frequency of Test
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
60
18
36
39
81
18
36
18
30
6
9
654
1245
210
219
39
42
1233
3165
69
234
6
0
51
9
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
60
18
36
39
81
18
36
18
30
6
9
654
1245
210
219
39
42
1233
3165
69
234
6
0
51
9
0
0
0
3
6
3
6
0
0
3
6
15
60
0
0
0
0
132
567
6
45
0
6
27
144
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
6
3
6
0
0
3
6
15
60
0
0
0
0
132
567
6
45
0
6
27
144
60
18
36
42
87
21
42
18
30
9
15
669
1305
210
219
39
42
1365
3732
75
279
6
6
78
153
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
60
18
36
42
87
21
42
18
30
9
15
669
1305
210
219
39
42
1365
3732
75
279
6
6
78
153
As per requirement
As per requirement
2
2
0
0
2
2
0
0
0
0
0
0
2
2
0
0
2
2
2% of the pipes
2
0
2
0
0
0
2
0
2
As per requirement
2
0
2
0
0
0
2
0
2
Each Delivery
FOR BELOW 100 TONS UNDER 10MM - 1/25TON; 10-MM TO 16 MM
- 1/35TON;
OVER 16-MM 1/45TON
72
0
72
0
0
0
72
0
72
4
0
4
0
0
0
4
0
4
4
4
4
0
0
0
4
4
4
0
0
0
0
0
0
0
0
0
4
4
4
0
0
0
4
4
4
M20 28 days
M25 7days
M25 28 days
M30 7days
M30 28 days
M35 7days
M35 28 days
M40 7days
M40 28 days
M20Kerb 7days
M20Kerb 28 days
M15 7days
M15 28 days
M20 7days
M20 28 days
M25 7days
M25 28 days
M30 7days
M30 28 days
M35 7days
M35 28 days
M40 7days
M40 28 days
M20Kerb 7days
M20Kerb 28 days
Page 79
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
vi
vii
viii
ix
x
Name of Test
ELONGATION
BEND TEST
REBEND TEST
UNIT WEIGHT
DIAMETER
Testing Method
IS 1786
IS 1786
IS 1786
IS 1786
IS 1786
Frequency of Test
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
Each Consignment
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed
Failed
Total
4
4
4
4
4
0
0
0
0
0
4
4
4
4
4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
4
4
4
4
0
0
0
0
0
4
4
4
4
4
QC Test Summary – Section-III (Km 113.000 to Km 166.173)
Sl.
No.
A
i
ii
iii
iv
v
vi
vii
B
i
ii
iii
iv
v
vi
vii
viii
ix
C
i
ii
iii
iv
v
vi
Name of Test
Testing Method
Frequency of Test
OGL (Ref. MORTH Section 305 & 900) (1 sample to be collected for every 250 m on either side)
Gradation/Sieve Analysis
IS:2720 (Part 4)
1 test/Sample
Liquid Limit & PI
IS:2720 (Part 5)
1 test/Sample
Max. Dry Density & OMC
IS:2720 (Part 8)
1 test/Sample
Moisture Content
IS :2720 (Part 2)
1 test/Sample
CBR
IS:2720 (Part 16)
If sample in SG level
Free Swell Index
IS:2720 (Part 40)
1 test/Sample
Field Density Compaction for OGL
IS:2720 (Part 28)
1 Set Test Per 1000 m2
EARTHWORK (Ref. MORTH Section 305 & 900)
Gradation/Sieve Analysis
IS:2720 (Part 4)
2 test/3000 m3
Liquid Limit & PI
IS:2720 (Part 5)
2 test/3000 m3
Max. Dry Density & OMC
IS:2720 (Part 8)
2 test/3000 m3
Moisture Content
IS :2720 (Part 2)
1 test/250 m2
CBR
IS:2720 (Part 16)
1 test/3000 m3
Free Swell Index
IS:2720 (Part 40)
2 test/3000 m3
BS:1377(tests
Sulphate Content
As & when Required
9/10)
Field Density Compaction for Embankment
IS:2720 (Part 28)
1 Set Test Per 1000 m2
Field Density Compaction for Subgrade
IS:2720 (Part 28)
1 Set Test Per 500 m2
GSB (Ref. MORTH Section 401 & 900)
Gradation/Sieve Analysis
IS: 2386-Part 1
1 test/200 m3
Liquid Limit & PI
IS:2720 (Part 5)
1 test/200 m3
Moisture Content
IS :2720 (Part 2)
1 test/250 m3
Field Density Compaction
IS:2720 (Part 28)
1 test/500 m2
1 test/ source and as when
CBR
IS:2720 (Part 16)
required
Initially one, as and when required
Max. Dry Density & OMC
IS:2720 (Part 8)
by the Engineer
M/s. SAI MAATARINI TOLLWAYS LIMITED
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
1125000
1368000
1368000
1368000
12500
438000
1368000
Number of Tests Conducted
In This Month
Previous Month
Passed
Failed
Total
Passed
Failed
Total
196
196
196
0
0
0
0
0
0
122
196
196
196
0
2
196
1125
0
0
0
0
0
0
0
0
0
0
0
0
0
0
24
20
20
0
10
24
916
912
912
50
146
902
0
0
3
3
3
0
0
0
1,125,000
2
196
1003
0
0
0
0
0
0
1368000
1368000
1368000
12500
438000
1368000
892
892
892
50
136
878
Total to Date
Passed Failed
Total
0
0
0
0
0
0
0
196
196
196
0
2
196
1003
0
0
0
0
0
0
122
196
196
196
0
2
196
1125
0
0
0
0
0
0
0
0
3
3
3
0
892
892
895
53
139
878
24
20
20
6
10
24
916
912
915
50
149
902
0
0
0
0
0
0
10433000
987,000
1000
500
10434000
987500
9907
1843
526
131
10433
1974
6
6
0
0
6
6
9913
1849
526
131
10439
1980
31,400
30,600
13,500
145,000
0
0
0
19,500
31,400
30,600
13,500
164,500
153
153
54
290
4
0
0
39
157
153
54
329
0
0
0
0
0
0
0
0
0
0
0
0
153
153
54
290
4
0
0
39
157
153
54
329
4
0
4
39
0
39
43
0
43
4
0
4
0
0
0
4
0
4
Page 80
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
Name of Test
Testing Method
vii
Water Absorption
IS:2386 (Part 3)
viii
10% Fines Value
BS:812(Part111)
D
I
WMM (Ref. MORTH Section 406 & 900)
Aggregate Impact Value
ii
Gradation/Sieve Analysis
iii
iv
v
Combined Flakiness Index & Elongation Index
Atterberg Limits (Passing 0.425 mm)
Field Density Compaction
vi
Max. Dry Density & OMC
IS:2720 (Part 8)
vii
Abrasion value
IS:2386 (Part 4)
viii
Water Absorption
IS:2386 (Part 3)
IS:2386 (Part 4)
IS:2720 (Part 4) &
IS: 2786-Part 1
IS:2386 (Part 1)
IS:2720 (Part 5)
IS:2720 (Part 28)
E
1
MATERIAL FOR STRUCTURES
COARSE AGGREGATE (MoRTH 1007)
i
Moisture Content
ii
Specific Gravity
iii
Gradation/Sieve Analysis
iv
Aggregate Impact Value/Los Angles Abrasion
Value
IS:383,IS:2386 PIII
IS:383, IS:2386 Part III
IS:383,IS:2386 –
Part 1
IS:383, IS:2386
Part IV
v
Flakiness Index
IS:383,IS:2386 P-1
vi
Water absorption of Aggregate
IS383,IS:2386 P-III
vii
Soundness (Magnesium and sodium sulphate)
viii
Alkali-Aggregate reactivity
ix
Petrographic Analysis
x
xi
2
Chloride & Sulphate
Deleterious Material
FINE AGGREGATE (MORTH 1008)
IS:383,IS:2386 -V
IS:383,IS:2386 PVII
IS:383, ASTM 295,
IS:2386 Part VIII
IS:383,IS:SP-23
IS:383, IS:2386 P-II
i
Silt Content
IS:383,IS2386 Part
II
M/s. SAI MAATARINI TOLLWAYS LIMITED
Frequency of Test
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
1 test/ source and as when
required
Initially one, as and when required
by the Engineer
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
Passed Failed
Total
5
0
5
0
0
0
5
0
5
7
0
7
0
0
0
7
0
7
1 test/200 m3
11400
2200
13600
57
0
57
11
0
11
68
0
68
1 test/100 m3 of aggregate
9800
2000
11800
98
0
98
20
0
20
118
0
118
1 test/200 m3
1 test/100 m3
1 test/500 m2
Initially one, as and when required
by the Engineer
Initially one, as and when required
by the Engineer
Initially one, as and when required
by the Engineer
11400
9800
61500
2200
2000
19500
13600
11800
81000
57
95
123
0
0
15
57
95
138
11
20
39
0
0
0
11
20
39
68
115
162
0
0
15
68
115
177
0
2
2
2
0
2
0
0
0
2
0
2
0
1
1
1
0
1
0
0
0
1
0
1
0
1
1
1
0
1
0
0
0
1
0
1
230
0
230
50
0
50
280
0
280
6
0
6
1
0
1
7
0
7
275
0
275
50
0
50
325
0
325
48
4
0
4
52
0
52
Daily/at every day of concreting
One per source & there after
every month.
one test per day
One per source & there after once
in a week.
One per source & there after once
in a week .
One per source & there after
every month.
One per source
48
48
0
48
4
0
4
52
0
52
3
0
3
1
0
1
4
0
4
3
0
3
0
0
0
3
0
3
One per source
3
0
3
0
0
0
3
0
3
One per source
3
0
3
0
0
0
3
0
3
One per source
One per source
1
3
0
0
1
3
0
0
0
0
0
0
1
3
0
0
1
3
Daily
10
0
10
4
0
4
14
0
14
Page 81
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
ii
iii
iv
v
vi
vii
viii
ix
3
i
ii
iii
iv
v
vi
vii
viii
ix
x
xi
xii
xiii
xiv
4
i
ii
iii
Name of Test
Testing Method
Frequency of Test
Moisture Content
(IS:383,IS:2386)
Daily/at every day of concreting
(IS:383, IS:2386
Clay Lumps
At every day of concreting
Part II)
(IS:383,IS:2386POne per source & there after
Specific Gravity
III)
every month.
(IS:383,IS:2386 –
Gradation/Sieve Analysis, Fineness Modulus
Daily
Part III)
IS:383,IS:2386 POne per source & there after
Water absorption of Aggregate
III
every month.
Chloride & Sulphate
(IS:383,IS:SP -23)
One per source
(IS383,IS:2386
Deleterious Material
One per source
Part II)
Soundness (Magnesium and Sodium Sulphate)
IS:383,IS:2386 P-V One per source
43 GRADE ORDINARY PORTLAND CEMENT (Ref. IS: 8112 & MoRTH 1006)
Initial Setting Time
Final Setting Time
One test per week and
(IS:4031)
once per source 3rd party testing
Soundness by Le-Chatlier’s method (%)
Fineness by dry sieve method 90micron
Compressive strength
IS 516
Chemical Tests
Loss on Ignition
Insoluble residue
Alumina Iron Oxide ratio
MTC for each supply and
Lime Saturation factor
(IS:4032)
one per source 3rd party testing
Magnesia
Sulphuric anhydride
Alkalies
Chlorides
53 GRADE ORDINARY PORTLAND CEMENT (Ref. IS: 12269, MoRTH 1006)
Initial Setting Time
Final Setting Time
One test per week and
Soundness (by Le-Chatlier’s method) by
(IS:4031)
once per source 3rd party testing
Autoclave (%)
iv
Fineness (by Blaine’s air permeability method)
v
vi
vii
viii
ix
x
Compressive strength
Chemical Tests
Loss on Ignition
Insoluble residue
Alumina Iron Oxide ratio
Lime Saturation factor
IS 516
(IS:8112)
M/s. SAI MAATARINI TOLLWAYS LIMITED
MTC for each supply and
one per source 3rd party testing
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
225
0
225
50
0
50
Passed Failed
275
0
Total
275
0
0
0
0
0
0
0
0
0
6
0
6
1
0
1
7
0
7
225
0
225
50
0
50
275
0
275
6
0
6
1
0
1
7
0
7
0
0
0
0
0
0
0
0
0
3
0
3
0
0
0
3
0
3
0
0
0
0
0
0
0
0
0
19
19
2
19
70
5
3
3
3
3
3
3
3
3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
19
19
2
19
70
5
3
3
3
3
3
3
3
3
4
4
0
4
9
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
4
0
4
9
0
0
0
0
0
0
0
0
0
23
23
2
23
79
5
3
3
3
3
3
3
3
3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
23
23
2
23
79
5
3
3
3
3
3
3
3
3
1
1
0
0
1
1
0
0
0
0
0
0
1
1
0
0
1
1
1
0
1
0
0
0
1
0
1
1
0
1
0
0
0
1
0
1
9
2
2
2
2
2
0
0
0
0
0
0
9
2
2
2
2
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9
2
2
2
2
2
0
0
0
0
0
0
9
2
2
2
2
2
Page 82
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
xi
xii
xiii
xiv
5
i
ii
iii
iv
v
vi
vii
viii
ix
6
i
Name of Test
Magnesia
Sulphuric anhydride
Alkalies
Chlorides
WATER (MORTH 1010)
Volume of 0.02N NaOH required to neutralize
100 ml sample of water using phenolphthalein
as an indicator
Volume of 0.02N H2SO4 required to
neutralize 100 ml sample of water using
methyl orange as an indicator
Solids
Organic
Inorganic
Sulphates (SO4)
Chlorides (CI)
Suspended matter
pH
ADMIXTURE (MORTH 1012)
Chloride Content
Testing Method
(IS:3025)
(IS:456,IS:3025)
(IS:9103, IS:6925)
Dry Material content
(IS:9103)
iii
Ash content
(IS:9103)
iv
Relative density
(IS:9103)
7
CONCRETE (MORTH 1716.2.5)
Sample of cube (A sample means a set of 3
cubes)
ii
Workability (Slump)
iii
Cube Strength of Concrete
(IS:10262,IS:456,
IRC:21)
IS : 516
IS 516
(As per IRC SP 84,8.6ii)
Water from each source shall be
tested before start of work and
there after every 3 months and
after every monsoon till the
completion of work.
Once per
required
Once per
required
Once per
required
Once per
required
COMPRESSIVE STRENGTH (MIX DESIGN
CUBES) No. Of Cubes
IS 516
M/s. SAI MAATARINI TOLLWAYS LIMITED
source and as when
source and as when
source and as when
M15 7days
M15 28 days
M20 7days
IS 516
IS 516
source and as when
Every concrete spread over entire
period of concreting
Every batch of concrete at
dispatch as well as delivery point
As per requirement
IS 516
1
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
(IS:3025)
ii
i
Frequency of Test
M20 28 days
M25 7days
Number of Tests Conducted
In This Month
Previous Month
Total to Date
Passed
Failed
Total
Passed
Failed
Total
2
2
2
2
0
0
0
0
2
2
2
2
0
0
0
0
0
0
0
0
0
0
0
0
Passed Failed
2
2
2
2
0
0
0
0
Total
2
2
2
2
2
0
2
0
0
0
2
0
2
2
0
2
0
0
0
2
0
2
2
2
2
2
2
2
2
0
0
0
0
0
0
0
2
2
2
2
2
2
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
2
2
2
2
2
2
0
0
0
0
0
0
0
2
2
2
2
2
2
2
2
0
2
0
0
0
2
0
2
2
0
2
0
0
0
2
0
2
2
0
2
0
0
0
2
0
2
2
0
2
0
0
0
2
0
2
16100
2110
18210
800
0
800
100
0
100
900
0
900
16100
2110
18210
3000
0
3000
500
0
500
3500
0
3500
17
0
17
0
0
0
17
0
17
21
0
21
0
0
0
21
0
21
12
0
12
2
0
2
14
0
14
12
0
12
0
0
0
12
0
12
0
0
0
0
0
0
0
0
0
Page 83
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
Name of Test
Testing Method
Frequency of Test
IS 516
IS 516
M25 28 days
M30 7days
IS 516
Frequency of Test : 1/Design Mix (or)
1/Change of Source
IS 516
M30 28 days
M35 7days
IS 516
IS 516
M35 28 days
M40 7days
IS 516
IS 516
M40 28 days
M15 7days
IS 516
COMPRESSIVE STRENGTH (SITE CUBES)
No. Of Cubes
IS 516
M15 28 days
2
Frequency of Test : MORTH Sec.1700
Table:1700-8
M25 28 days
M30 7days
M30 28 days
M35 7days
IS 516
IS 516
M35 28 days
M40 7days
IS 516
IS 516
IS 516
8
i
STEEL
MTC
ii
SAMPLING
IS 1786
iii
iv
v
vi
CHEMICAL
UTS
YIELD STRESS
ELONGATION
IS 1786
IS 1786
IS 1786
IS 1786
M/s. SAI MAATARINI TOLLWAYS LIMITED
1939
M20 28 days
IS 516
IS 516
116
M25 7days
IS 516
IS 516
1823
M20 7days
IS 516
IS 516
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
M40 28 days
M20Kerb 7days
M20Kerb 28 days
Each Delivery
FOR BELOW 100 TONS UNDER 10MM - 1/25TON; 10-MM TO 16
MM - 1/35TON; OVER 16-MM 1/45TON
14229
48
1880.5
113.5
16109.5
161.5
Number of Tests Conducted
In This Month
Previous Month
Passed
Failed
Total
Passed
Failed
Total
Total to Date
Passed Failed
Total
0
0
0
0
0
0
0
0
0
14
0
14
0
0
0
14
0
14
21
0
21
0
0
0
21
0
21
7
0
7
1
0
1
8
0
8
13
0
13
0
0
0
13
0
13
7
0
7
0
0
0
7
0
7
13
0
13
0
0
0
13
0
13
242
0
242
8
0
8
250
0
250
445
0
445
41
0
41
486
0
486
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
848
0
848
106
0
106
954
0
954
1997
0
1997
304
0
304
2301
0
2301
3
0
3
4
0
4
7
0
7
12
0
12
5
0
5
17
0
17
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
165
0
165
0
0
0
165
0
330
165
0
165
0
0
0
165
0
330
33
33
33
33
0
0
0
0
33
33
33
33
0
0
0
0
0
0
0
0
0
0
0
0
33
33
33
33
0
0
0
0
33
33
33
33
Page 84
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
vii
viii
ix
x
Name of Test
BEND TEST
REBEND TEST
UNIT WEIGHT
DIAMETER
Testing Method
IS 1786
IS 1786
IS 1786
IS 1786
M/s. SAI MAATARINI TOLLWAYS LIMITED
Frequency of Test
Each Consignment
Executed Quantity
Upto
Present
Previous
Cumulative
Month
Month
Number of Tests Conducted
In This Month
Previous Month
Passed
Failed
Total
Passed
Failed
Total
33
33
165
165
0
0
0
0
33
33
165
165
0
0
0
0
0
0
0
0
0
0
0
0
Total to Date
Passed Failed
33
33
165
165
0
0
0
0
Total
33
33
165
165
Page 85
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll)
Basis.
Monthly Progress Report : August -2014
19. Appendix 3 - List of Plant and Equipments
Section (0-113)
Sl.
Description of P&M
No.
PLANTS
1
Crusher
2
Crusher
3
Crusher
4
Batching Plant
5
Batching Plant
6
Batching Plant
7
Wet Mix Plant
8
Wet Mix Plant
9
Wet Mix Plant
10
Hot Mix Plant
11
Hot Mix Plant
MACHINERY
1
JCB
2
Hire JCB
3
Excavator
4
Hire excavator
5
Loader-3036
6
Hire loader
7
Soil compactors
8
Grader cat120k
9
Sensor- Paver
10
Crane hydro
11
Hire hydra crane
12
Dumper
13
BT Sprayer
14
Hire tipper & dumpers
15
Boom Placer
16
Bolero
17
Camper Genio
18
Camper
19
Diesel tanker
Dozer tractor
20
ap26j4393(vtr/9)
21
Innova or04h 2222 (lmv/193)
22
Scorpio
23
Sumo ap05aa 1266 (lmv/172)
24
Tata magic
25
Camper Genio
26
Camper
27
Concrete Pump (mcp/12)
28
Dewatering Pump
29
DG 5 Kva
30
DG 15 Kva
31
DG 125 Kva
32
DG 440 Volts
33
DG 1400 Volts
34
DG 160 Kva
35
DG 20 Kva
36
DG 250 Kva
37
DG 25 Kva
Make/Brand
Capacity
Available
at Site
Remarks
Metso
Metso
Puzzolana
Schwing Stetter
Schwing Stetter
Schwing Stetter
Apollo
Apollo
MAXMECH
Speco
Apollo
240 TPH
240 TPH
200 TPH
30 CPH
60 CPH
30 CPH
160 TPH
250 TPH
200 TPH
160 TPH
160 TPH
1
1
1
1
1
1
1
1
1
1
1
KM-42
KM-58
KM-94
KM-19
KM-58
KM-94
KM-18
KM-94
KM-58
KM-58
KM-32
0.3 m3
12 KL
5
3
6
11
2
3
5
3
1
1
2
17
1
9
1
11
3
6
2
5 Kva
15 Kva
125 Kva
440 volts
1400 volts
160 Kva
20 Kva
250 Kva
25 Kva
1
1
6
1
2
1
3
2
4
1
1
2
1
1
1
3
1
2
1 m3
Vogele
1.7 m3
1.7 m3
8-10 Ton
200 Cum/hr
Cum/Hr/40/30
20 MT
2.4 – 6 Mtr
Tyota
Mahindra
TATA
TATA
TATA
TATA
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
86
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
Description of P&M
Make/Brand
DG 30 Kva
DG 40 Kva
DG 45 Kva
DG 500 Kva
DG 62.5 Kva
DG 82.5 Kva
Kerb Cutter
Trolley Air Compressor
Water Tanker
Water Tanker
Transit Mixer
Transit Mixer
Trailers
Trailers
Tractors
Capacity
30 Kva
40 Kva
45 Kva
500 Kva
62.5 Kva
82.5 Kva
80 Rmt/hr
100 PSI
12 KL
12 KL
6 m3
6 m3
Available
at Site
1
3
1
3
1
2
1
5
5
3
10
3
2
1
8
Remarks
Section (113-166)
Sl. No.
Description of P&M
Make/Brand
Capacity
Available
at Site
200 TPH
240 TPH
150 TPH
1
1
1
@ Ch 115+000
@ Ch 116+000
@ Ch 135+800
30 cum/Hr
160 TPH
3
1
1-@ Ch 115+400, 2- @ Ch 148+800 &
3- @ Ch 151+200
@ Ch 115+000
A
1
2
3
Plant
Crusher
Crusher
Crusher
4
5
B
1
2
3
4
5
6
7
8
9
Batching Plant
WMM PLANT
Machinery
Excavator
Excavator
Dumper
Tipper
WMM Paver
Dozer (D80)
Grader
Soil Compactor
Soil Compactor
Schwing Stetter
Appolo
TATA-210
L&T
Ashok Leyland
TATA
Vogele
Hindustan
CAT
Escort
JCB
1m3
1 m3
14 m3
6 m3
Cum/hr 40/30
Cum/hr 300/150
200 cum/hr
8-10 Ton
Cum/hr 100/60
8
5
42
3
2
3
3
5
1
10
Water Tanker
Ashok Leyland
12 KL
8
m3
5
11
12
13
JCB
Transit Mixer
Transit Mixer
Puzzolana
Puzzolana
Taurian
CAT
Asia Motors
Ashok Leyland
13
Transit Mixer
Ashok Leyland
14
Loader
Hindustan
15
BT Sprayer
Ashok Leyland
16
Tractor
Ford
17
Broomer
18
0.3
6
m3
2
6
m3
5
4
m3
8
1.7 m3
4
2.4 – 6 mtr
1
50km /hr
1
Appolo
1250 Sqm/hr
1
Kerb Cutting Machine
80 Rmt/hr
1
19
Plate Earth Compacter –
1
Testwell
3000 VPM
(approx.)
1
20
Concrete Pump
Greaves Cotton Ltd.
30 cum/Hr
2
M/s. SAI MAATARINI TOLLWAYS LIMITED
Remarks
Page 87
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl. No.
Description of P&M
Make/Brand
21
Electrical Vibrator 3
Phase - 1
Killic Eng
22
Petrol Vibrator – 1
Killic
23
DG Set
24
Capacity
Available
at Site
300 kgf / 5.96
kgcm (Max.)
4
12000 VPM
1
Caterpillar
500 KVA
3
DG Set
Caterpillar
250 KVA
1
25
DG Set Silent
Kirloskar
125 KVA
1
26
DG Set Silent
Kirloskar
100 KVA
1
27
DG Gen Set
Kirloskar
63 KVA
1
28
DG Gen Set
Kirloskar
20 KVA
1
29
Trolley Based Search
Light
Sigma
5 KVA
2
30
Air Compressor with
Patch Heater
N/A
3 PHASE
1
31
Welding Transformer
450 Amp – 1
Shaketech
3 PHASE
1
32
Welding Machine – 2
Rama
3 PHASE
1
33
Weigh Bridge 80/100
Vishwakarma
80MT
3
34
Tata 407 HSD Distributer
TATA
3 KL
1
M/s. SAI MAATARINI TOLLWAYS LIMITED
Remarks
Page 88
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
20. Appendix 4 - List of Lab Equipment & Calibration Status
Lab at Km 19
Sl.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Description
Quantity
Last Date of
Calibration
Due Date of
Calibration
Thermostatic Controlled Oven ( 0 to 300o Capacity) Big
Thermostatic Controlled Oven ( 0 to 300o Capacity) Medium
Digital Water Bath, Capacity-50 Liter
Digital Water Bath, Accuracy- 1 deg C
Electronic balance (30 kg ) 1 gm accuracy
Balance-01
Electronic balance (30 kg ) 1 gm accuracy
Balance-02
Electronic balance (30 kg ) 1 gm accuracy
Balance-03
Electronic balance (30 kg ) 5 gm accuracy
Electronic balance (1000 gm ) 0.1 gm accuracy
Electronic balance (15 kg) 1.0 gm accuracy
Electronic balance (15 kg) 0.5 gm accuracy
Balance-01
Electronic balance (15 kg) 0.5 gm accuracy
Balance-02
Electronic balance (600 gm ) 0.01 gm accuracy
Digital Thermometer, Accuracy-1°C
Digital Thermometer, Accuracy-1°C
Enamel trays
450 mm x600 mm x 50
mm
Enamel trays
300 mm x450 mm x 50
mm
Enamel trays
300 mm x450 mm x 50
mm
Enamel trays
300 mm x 250 mm x 50
mm
Enamel trays
300 mm x 250 mm x 50
mm
GI trays
600 mm x450 mm
GI trays
450 mm x300 mm
Vernier Calipers
Riffler 50 mm
Standard Spatulas (Small)
Standard Spatulas (Small)
Standard Spatulas (Big)
Standard Spatulas (Big)
Rapid Moisture Meters No-2
100,75,63,53,50,45,40,37.5,31.5,26.5,25,22.4,20,19,16,14,1
3.2,12.5,11.2,10,9.5,6.3,5.6,4.75 mm (450 mm dia IS Sieves)
4.75,2.36,2.8,2,1.4,1.18,1,0.710,0.600,0.500,0.425,0.355,0.
300,0.180,0.150,0.090,0.075 mm & Pan (200 mm dia Brass
Is Sieves)
Casagrande Liquid limit testing device
Casagrande Liquid limit testing device
CBR Testing Machine
Cone penetro meter
Proctor mould 2250 cc with 4.9kg rammer
1
1
1
1
12.11.13
14.11.13
18.01.14
22.07.14
11.11.14
13.11.14
17.01.15
21.07.15
1
12.11.13
11.11.14
1
12.11.13
11.11.14
1
12.11.13
11.11.14
1
1
1
12.11.13
12.11.13
12.11.13
11.11.14
11.11.14
11.11.14
1
12.11.13
11.11.14
1
12.11.13
11.11.14
1
1
1
12.11.13
21.10.13
22.07.14
11.11.14
20.10.14
21.07.15
5
14.11.13
13.11.14
5
14.11.13
13.11.14
5
18.01.14
17.01.15
10
14.11.13
13.11.14
5
18.01.14
17.01.15
3
3
1
1
5
5
5
5
1
14.11.13
14.11.13
14.11.13
22.07.14
14.11.13
22.07.14
14.11.13
22.07.14
25.08.14
13.11.14
13.11.14
13.11.14
21.07.15
13.11.14
21.07.15
13.11.14
21.07.15
24.02.14
48
11.11.13
10.11.14
36
11.11.13
10.11.14
1
1
1
1
1
22.07.14
14.11.13
11.11.13
14.11.13
24.06.14
21.07.15
13.11.14
10.11.14
13.11.14
23.06.15
M/s. SAI MAATARINI TOLLWAYS LIMITED
Remarks
Page 89
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
37
38
39
40
41
42
43
44
45
46
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
Description
Proctor mould 2250 cc with 4.9kg rammer
Proctor mould 2250 cc with 4.9kg rammer
Proctor mould 2250 cc with 4.9kg rammer
Proctor mould 1000 cc with2.6kg rammer
Proctor mould 1000 cc with2.6kg rammer
Sand Pouring Cylinders with complete set (100mm dia)
No-2
Sand Pouring Cylinders with complete set (100mm dia)
No-3
Sand Pouring Cylinders with complete set (150mm dia)
No-2
Sand Pouring Cylinders with complete set (200mm dia)
No-1
100 lm glass measuring jars (FSI)
CBR moulds
Surcharge weight (2.5 Kg)
Spacer discs
Perforated plates
Aluminum containers
Proving Ring (50 KN)
No-980
Proving Ring (50 KN)
No-239
Vicat Needle Apparatus ( with dash pot)
Cement Mortar Cube Moulds (7.06x7.06x7.06 cm)
Aggregate Impact Value Test Apparatus
Flakiness Gauge
Flakiness Gauge
Elongation Gauge
Elongation Gauge
Concrete Cube moulds ( 150x150x150 mm)
Slump cone with rod
Slump cone with rod
Slump cone with rod
Slump cone with rod
Density Buckets (3L,15L & 30 litre)
Compressive Testing Machine (2000 kn) (CTM)
Wire Basket (Specific Gravity Apparatus)
Cement mortar cube vibrating machine
Aggregate Crushing Value
Soundness apparatus
Ductility Test apparatus (Complete Set)
Ring & ball apparatus electrically operated
Bitumen Penetro meter
Saybolt Visco meter
Tar Visco meter
Cannonmanning U tube visco meter (6mm u Tube)
Cannonmanning U tube visco meter (13mm u Tube)
Modified Marshall Rammers
Modified Marshall Moulds
Standard Marshall Rammers
Standard Marshall Moulds
Pipette - 25 ml
Depth Gauges
Core cutting machine with entire assembly
Core Barrel - 150 mm dia
Core Bit - 150 mm dia
M/s. SAI MAATARINI TOLLWAYS LIMITED
Quantity
Last Date of
Calibration
Due Date of
Calibration
1
1
1
1
1
24.06.14
24.06.14
24.06.14
24.06.14
24.06.14
23.06.15
23.06.15
23.06.15
23.06.15
23.06.15
1
12.08.14
12.11.14
1
23.08.14
22.11.14
1
12.08.14
12.11.14
1
12.08.14
12.11.14
12
56
105
2
56
151
1
1
1
15
1
1
1
1
1
93
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
4
27
4
30
1
2
1
2
3
14.11.13
18.01.14
18.01.14
11.11.13
18.01.14
24.06.14
15.10.13
15.10.13
14.11.13
14.11.13
11.11.13
14.11.13
14.11.13
14.11.13
14.11.13
14.11.13
22.07.14
22.07.14
22.07.14
22.07.14
14.11.13
30.06.14
14.11.13
14.11.13
22.07.14
14.11.13
22.07.14
22.07.14
22.07.14
22.07.14
22.07.14
19.07.14
19.07.14
22.07.14
22.07.14
22.07.14
22.07.14
22.07.14
22.07.14
22.07.14
22.07.14
22.07.14
13.11.14
17.01.15
17.01.15
10.11.14
17.01.15
23.06.15
14.10.14
14.10.14
13.11.14
13.11.14
10.11.14
13.11.14
13.11.14
13.11.14
13.11.14
13.11.14
21.07.15
21.07.15
21.07.15
21.07.15
13.11.14
30.06.15
13.11.14
13.11.14
21.07.14
13.11.14
21.07.15
21.07.15
21.07.15
21.07.15
21.07.15
21.07.15
21.07.15
21.07.15
21.07.15
21.07.15
21.07.15
21.07.15
21.07.15
21.07.15
Remarks
Page 90
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
90
91
Description
Core Barrel - 100 mm dia
Core Bit - 100 mm dia
Quantity
Last Date of
Calibration
Due Date of
Calibration
3
3
22.07.14
22.07.14
21.07.15
21.07.15
Last Date of
Calibration
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
09.07.14
24.08.14
Due Date of
Calibration
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
09.01.15
24.02.15
04.06.14
03.06.15
Remarks
Lab at Km 55+000
Sl.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Description
Quantity
300o
Thermostatic Controlled Oven ( 0 to
Capacity) Big
Thermostatic Controlled Oven ( 0 to 300o Capacity) Medium
Thermostatic Controlled Oven ( 0 to 300o Capacity) Medium
Electronic balance (30 kg ) 5 gm accuracy
Electronic balance (30 kg ) 5gm accuracy
Electronic balance (30 kg ) 5gm accuracy
Electronic balance (30 kg ) 5 gm accuracy
Electronic balance (10kg) 1.0g accuracy
Electronic balance (10 kg) 1.0g accuracy
Electronic balance (600 gm ) 0.01 gm accuracy
Electronic balance (600 gm ) 0.01 gm accuracy
Rapid Moisture Meters
Rapid Moisture Meters
100 mm
90 mm
80mm
75 mm
63 mm
63 mm
53 mm
50 mm
45 mm
40 mm
40 mm
37.5 mm
31.5 mm
31.5 mm
26.5 mm
26.5 mm
25 mm
25 mm
20mm
20 mm
19 mm
19 mm
16 mm
16mm
14 mm
13.2 mm
13.2 mm
13.2 mm
12.5 mm
12.5 mm
11.2 mm
11.2 mm
10.0 mm
10.0 mm
9.5mm
M/s. SAI MAATARINI TOLLWAYS LIMITED
1
1
1
1
2
1
2
1
1
1
1
1
1
1
Remarks
2
1
1
1
2
1
2
2
2
2
2
2
2
1
1
2
2
4
Page 91
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
Description
9.5 mm
9.5 mm
9.5 mm
6.7 mm
6.3 mm
5.6 mm
4.75 mm
4.75mm
4.75mm
4.75mm
4.75mm
2.80 mm
2.80 mm
2.36mm
2.36mm
2.0 mm
2.0 mm
1.40 mm
1.40 mm
1.18 mm
1.18 mm
1.18 mm
1.18 mm
1.00 mm
1.00 mm
1.00 mm
1.00 mm
1.00 mm
600 mic
600 mic
600 mic
600mic
500 mic
500 mic
425 mic
425 mic
425 mic
300 mic
300 mic
300 mic
180 mic
180 mic
150 mic
150 mic
150 mic
150 mic
90 mic
90 mic
90 mic
90 mic
75 mic
75 mic
75 mic
75 mic
75 mic
Lid and pan
M/s. SAI MAATARINI TOLLWAYS LIMITED
Quantity
Last Date of
Calibration
Due Date of
Calibration
04.06.14
03.06.15
Remarks
1
1
1
1
4
2
2
2
2
4
5
4
2
3
3
2
4
4
5
2
Page 92
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
Description
Lid and pan
Proctor mould 2250 cc with 4.9kg rammer
Proctor mould 2250 cc with 4.9kg rammer
Proctor mould 2250 cc with 4.9kg rammer
Proctor mould 2250 cc with 4.9kg rammer
Proctor mould 2250 cc with 4.9kg rammer
Proctor mould 1000 cc with2.6kg rammer
Proctor mould 1000 cc with2.6kg rammer
Proctor mould 1000 cc with2.6kg rammer
Proctor mould 1000 cc with2.6kg rammer
Proctor mould 1000 cc with2.6kg rammer
Sand Pouring Cylinders with complete set 100 mm dia
Sand Pouring Cylinders with complete set 100 mm dia
Sand Pouring Cylinders with complete set 150 mm dia
Sand Pouring Cylinders with complete set 150 mm dia
Sand Pouring Cylinders with complete set 200 mm dia
Sand Pouring Cylinders with complete set 200 mm dia
100 lm glass measuring jars (FSI)
CBR moulds
Surcharge weight (2.5 Kg)
Spacer disc with handle
Aluminum containers
Perforated plates
Proving Ring (50 KN)-1009
Proving Ring (25 KN)-0716
Vicat Needle Apparatus ( with dash pot)
Cement Mortar Cube Moulds (7.06x7.06x7.06 cm)
Aggregate Impact Value Test Apparatus
Flakiness Gauge
Flakiness Gauge
Flakiness Gauge
Flakiness Gauge
Flakiness Gauge
Elongation Gauge
Elongation Gauge
Elongation Gauge
Elongation Gauge
Elongation Gauge
Concrete Cube moulds ( 150x150x150 mm)
Slump cone
Slump cone
Slump cone
Slump cone
Slump cone
Slump cone
Slump cone
Slump cone
Slump cone
Slump cone
Slump rod
Slump rod
Slump rod
Slump rod
Slump rod
Slump rod
Slump rod
M/s. SAI MAATARINI TOLLWAYS LIMITED
Quantity
5
5
5
5
3
30
15
30
3
200
15
2
1
12
2
5
5
140
10
10
Last Date of
Calibration
Due Date of
Calibration
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
13.08.14
05.07.2014
13.08.14
05.07.2014
25.06.14
05.07.2014
04.06.2014
04.06.2014
04.06.2014
04.06.2014
04.06.2014
04.06.2014
01.07.2014
01.07.2014
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
04.06.14
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
03.06.15
12.11.14
05.10.2014
12.11.14
05.10.2014
24.09.14
05.10.2014
13.11.14
13.11.14
13.11.14
13.11.14
13.11.14
13.11.14
01.07.2015
01.07.2015
06.06.15
03.06.15
03.06.15
06.06.15
03.06.15
03.06.15
06.06.15
03.06.15
03.06.15
06.06.15
03.06.15
03.06.15
06.06.15
03.06.15
03.06.15
06.06.15
03.06.15
03.06.15
06.06.15
03.06.15
03.06.15
06.06.15
03.06.15
03.06.15
06.06.15
03.06.15
03.06.15
06.06.15
03.06.15
03.06.15
06.06.15
Remarks
Page 93
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
161
162
163
164
165
Description
Quantity
Slump rod
Slump rod
Slump rod
Compressive Testing Machine (2000 kn) (CTM)
Cement mortar cube vibrating machine
1
1
Last Date of
Calibration
04.06.14
04.06.14
04.06.14
30.06.14
04.06.14
Due Date of
Calibration
03.06.15
03.06.15
06.06.15
30.06.2015
03.06.15
Remarks
Lab at Km 94+300
Sl.
No.
Description
Nos.
Last Date of
Calibration
1
126
3
6
129
54
1
1
24
1
1
08/02/2014
25/01/2014
06/06/2014
06/06/2014
06/06/2014
06/06/2014
18/06/2014
18/06/2014
28/08/2014
16/01/2014
26/02/2014
Due Date for
next
calibration
07/02/2015
24/01/2015
05/12/2014
05/12/2014
05/12/2014
05/12/2014
17/12/2014
17/12/2014
27/02/2015
16/07/2015
26/08/2015
1
2
3
4
5
6
7
8
9
10
11
Compressive Testing Machine (2000KN)
Moisture Containers
Flakiness & Elongation gauges
Proctor Moulds
Surcharge Weights
CBR Moulds
CBR Test Machine
AIV Test Apparatus
IS Sieves
Proving Ring 50 KN
Proving Ring 30 KN
12
Thermostatically Controlled Oven-01 (0-300OC)
1
08/02/2014
07/02/2015
13
Thermostatically Controlled Oven-02
(0-150OC)
1
24/01/2014
23/01/2015
14
15
16
Digital Weighing Scale-01 (cap.30kg)
Digital Weighing Scale-02 (cap.30kg)
Digital Weighing Scale-03 (cap.60kg)
1
1
1
24/02/2014
24/02/2014
24/02/2014
23/02/2015
23/02/2015
23/02/2015
17
Digital Weighing Scale-04 (cap.600 gm)
1
24/02/2014
23/02/2015
18
Rapid Moisture Meter (No-01)
1
22/07/2014
21/10/2014
19
Sand Pouring Cylinder (200 mm Dia)
1
26/08/2014
25/11/2014
20
WMM Plant
1
07/07/2014
06/01/2015
Qty
Last Date of
Calibration
Next due
Calibration
date
Remarks
Lab at Km 115+500
Sl.
No.
Description of Equipment / Instrument
1
62
1
1
17
4
Calibration till
pending
9-Jul-14
12-Aug-14
4-Oct-13
24-Dec-13
20-Jun-14
20-Jun-14
9-Jul-15
11-Feb-15
4-Oct-14
23-Dec-14
20-Dec-14
20-Dec-14
1
25-Aug-14
22-Feb-15
1
10-Dec-13
10-Dec-14
1
1
1
Yet to be done
Yet to be done
Yet to be done
1
Flexural Testing Machine
1
2
3
4
5
6
7
Compressive Testing Machine
Cube mould
Aggregate Impact Value
C.B.R. Apparatus
CBR Mould
Proctor Mould
Hot Air Oven (Thermostatically controlled , temp range's
from 0 to 300)
Hot Air Oven (Thermostatically controlled , temp range's
from 0 to 300)
Marshall Stability Apparatus
Standard Bitumen Penetrometer
Ductility Testing Machine
8
9
10
11
12
M/s. SAI MAATARINI TOLLWAYS LIMITED
Remarks
Page 94
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
Sl.
No.
13
14
15
16
17
18
19
Description of Equipment / Instrument
Electronic Balance (0 - 600 gm)
Electronic Balance (0 - 30Kg)
Electronic Balance (0 - 90 Kg)
Electronic Balance (0 - 20 Kg)
Electronic Balance (0 - 5 Kg)
Sand Pouring Cylinder (100mm)
Sand Pouring Cylinder-2 (200mm)
Qty
Last Date of
Calibration
1
1
1
1
1
1
1
19-Nov-13
19-Nov-13
19-Nov-13
19-Nov-13
19-Nov-13
13-May-13
10-May-14
Next due
Calibration
date
19-Nov-14
19-Nov-14
19-Nov-14
19-Nov-14
19-Nov-14
10-Oct-13
10-Nov-14
Remarks
21. Appendix 5 - Calibration Status of Plants
Sl.
No.
Description of Equipment / Instrument
1
WMM Plant @ 17+860 LHS
2
Concrete Batch mix Plant @ 18+500 LHS
3
Hot Mix Plant @ Km 32+300 LHS
4
Hot Mix Plant @ Km 55+400
5
Concrete Batch mix Plant @ 55+400 LHS
6
WMM Plant @ 55+400 LHS
7
Concrete Batch mix Plant @ 93+600 LHS
8
MAKE /
BRAND
Last Date of
Calibration
Calibration
Frequency
Due Date of
Calibration
Appolo 200TPH
04.06.14
6 Months
03.12.14
Schwing Stetter, CP30
07.06.14
3 Months
06.09.14
Apollo ANP 2000
02.07.14
6 Months
01.01.15
Sepco 160TPH
Erection is in progress
Schwing Stetter, CP60
03.07.14
3 Months
02.10.15
Maxmech 200TPH
08.07.14
6 Months
07.01.15
Schwing Stetter, CP30
11.06.14
3 Months
10.09.14
WMM Plant @ Km 93+600
Apollo 250TPH
07.07.14
6 Months
06.01.15
9
WMM Plant @ Km 115+200
Apollo 200TPH
05.03.14
6 Months
05.09.14
10
Concrete Batch mix Plant @Km 115+000
Schwing Stetter (Delta)
28.08.14
3 Months
27.11.14
11
Concrete Batch mix Plant @ Km 150+700
Schwing Stetter (Delta)
11.07.14
3 Months
11.10.14
M/s. SAI MAATARINI TOLLWAYS LIMITED
REMARKS
Page 95
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
22. Appendix 6 - Weather Report
Section-I (Ch. 0+000 to Ch. 55+000)
DD-MM-YY
Min Temp
(˚C)
Max
Temp (˚C)
1-Aug-14
28.20
32.30
2-Aug-14
27.00
3-Aug-14
Average
Rainfall
Section-I (Ch. 55+000 to Ch.
113+000)
Min Temp
(˚C)
Max
Temp (˚C)
-
29.50
34.80
31.60
10.00
28.90
25.40
27.60
108.80
4-Aug-14
25.20
27.60
5-Aug-14
25.20
6-Aug-14
Average
Rainfall
Section- II (Ch. 113+000 to Ch.
166+173)
Average
Rainfall
Min Temp
(˚C)
Max
Temp (˚C)
2.00
26.60
32.60
-
32.30
15.00
26.30
30.90
-
27.50
31.00
138.00
25.20
29.50
-
-
26.60
28.80
-
23.80
27.20
-
29.50
-
28.20
32.00
-
23.80
27.50
-
25.20
31.80
-
29.50
35.20
-
25.40
29.90
-
7-Aug-14
25.50
31.40
-
29.10
33.10
-
25.60
29.80
-
8-Aug-14
27.00
30.90
3.60
28.10
33.40
-
25.20
30.20
13.00
9-Aug-14
25.60
28.50
-
27.80
29.50
17.00
24.30
25.50
25.00
10-Aug-14
26.70
31.70
-
27.80
28.00
-
24.80
26.80
-
11-Aug-14
26.40
31.80
-
29.40
34.30
-
25.20
28.40
-
12-Aug-14
26.60
29.50
-
29.70
34.10
-
25.90
30.70
-
13-Aug-14
27.70
31.80
-
29.90
30.10
-
24.10
31.90
-
14-Aug-14
27.90
30.80
-
28.30
36.00
-
24.90
32.10
-
15-Aug-14
26.60
31.80
2.80
28.80
35.80
13.00
25.40
32.30
-
16-Aug-14
26.50
31.80
-
27.60
33.70
135.00
25.40
30.50
-
17-Aug-14
26.50
30.30
-
27.90
34.20
-
25.00
30.20
-
18-Aug-14
26.80
31.90
-
27.20
34.40
5.00
24.50
33.60
6.00
19-Aug-14
26.60
32.60
-
28.90
34.20
13.00
26.10
34.10
-
20-Aug-14
26.50
32.90
-
28.60
32.50
-
25.40
30.10
4.00
21-Aug-14
26.20
32.90
22.40
28.30
35.50
2.00
24.50
32.00
75.00
22-Aug-14
26.00
32.70
-
27.40
34.10
-
24.30
29.80
-
23-Aug-14
28.00
31.50
-
27.80
34.70
-
25.00
32.60
-
24-Aug-14
28.00
32.60
36.20
28.70
34.20
-
25.00
33.00
-
25-Aug-14
28.10
32.00
-
29.20
36.70
-
25.60
33.30
-
26-Aug-14
28.00
32.40
9.80
28.80
39.00
8.00
25.80
33.30
4.00
27-Aug-14
28.30
32.20
8.40
29.40
36.50
-
25.60
33.60
20.00
28-Aug-14
27.30
30.90
8.10
27.50
31.90
4.00
25.30
32.40
-
29-Aug-14
27.10
30.60
20.00
28.10
32.70
3.00
25.00
31.30
15.00
30-Aug-14
26.70
30.90
33.00
27.50
31.60
2.00
25.00
31.30
3.00
31-Aug-14
25.90
30.70
42.00
26.70
26.90
-
24.70
29.80
5.00
(in mm)
M/s. SAI MAATARINI TOLLWAYS LIMITED
(in mm)
(in mm)
Page 96
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
23. Appendix 7 – Photographs
WMM Top KM 31+420 to 31+900 (LHS) and WMM Top KM 32+370 to 32+600 (LHS)
Hard Rock Excavation at Ch.127+100 and GSB Compaction in progress at Ch.138+660
PUP 15+838 (LHS) and VUP 23+544 RHS Slab Completed & LHS Slab Shuttering in Progress
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 97
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
MNB 25+543 LHS Slab Shuttering in Progress and
Progress of MJB 56+800 RHS and MNB 106+926 RHS A1 & A2
VUP at Ch.117+685 and Box Culvert at Ch.117+817
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 98
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
FLYOVER at Ch.125+282
PUP at Ch.136+518 and Major Bridge at Ch.139+485
Major Bridge at Ch.139+485 and Major Bridge at Ch.151+101 (Pile Concrete)
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 99
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
Major Bridge at Ch.151+101 (Pile) and (Load Test)
Major Bridge at Ch.151+101 (Load Test) and PUP at Ch.156+099 (Retaining Wall)
Pipe Culvert at Ch.158+971 and PUP at Ch.164+267 (Retaining Wall)
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 100
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
PUP at Ch.164+267 and Minor Bridge at Ch.166+003
WMM Plant at Km 18+500
HM Plant at Km 33+000 and HM Plant at Km 55+400
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 101
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT
(Toll) Basis.
Monthly Progress Report : August - 2014
[
Crusher Plant at Km 55+400 and Batching Plant at Km 55+400
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page 102
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the state of
Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August -2014
24. Annexure A – DISBURSEMENT OF COMPENSATION
Khata
Sl.
No.
Tahasil
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
2
Ghasipura 1
28
29
30
31
32
33
34
Anandapur 1
Village
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
2
3
4
5
6
7
3
Jarda
Ramchandrapur
Badapadana
Suanpada
Nuagaon
Gointhagodi
Khalana
Agarda
Sainkul
Bamphidi
Machhal
Rudranarayanpur
Hasanpur
Padanpur
Barigaon
Salapada
Sudusudia
Janra
Khaparakhai
Ghasipura
Kainipura
Sailong
Morabali
Indupura
Gohira
Talagaon
Biragobindpur
Total:
Siapada
Belabahali
Bhalukuma
Amarang
Dhakotha
Bandha
Nahaguna
Area
Total
Paid
Balance
Total
U/s 3D
5
58
108
12
26
87
24
60
1
66
12
30
21
80
2
99
13
60
61
26
103
102
101
4
3
45
37
101
1342
19
8
64
96
48
17
0
6
46
77
11
16
56
22
47
7
12
31
1
10
31
2
13
1
18
1
0
3
9
1
15
6
54
17
15
12
16
21
1
2
12
9
32
345
3
3
5
20
11
3
-2
8
5.330
7.603
0.500
1.910
7.120
2.190
3.890
0.100
5.220
1.740
2.040
1.350
11.100
0.070
10.860
1.710
2.655
2.920
1.450
17.440
13.370
18.394
0.320
0.350
6.550
4.210
10.100
140.492
3.316
0.920
8.850
10.400
2.850
2.880
0.080
48
11
30
18
71
1
84
7
6
44
11
91
86
80
3
1
33
28
69
997
16
5
59
76
37
14
2
M/s. SAI MAATARINI TOLLWAYS LIMITED
Awarded
area
(in Acre)
9
5.300
6.968
0.490
1.610
6.500
2.140
3.730
0.100
4.770
1.740
2.040
1.350
10.590
0.070
10.820
1.530
2.655
2.800
1.410
17.340
13.290
17.044
0.200
0.350
6.300
4.210
9.980
135.327
3.126
0.680
8.850
10.400
2.810
2.880
0.070
Award passed
(in Amount.)
10
6699101.00
59595805.00
575560.00
3400317.00
11717717.00
3042675.00
18869980.00
29660.00
26236511.00
884360.00
4229733.00
3841684.00
7316263.00
76845.00
16562603.00
7239310.00
62618824.00
25556523.00
12509103.00
43916732.00
8660812.00
39420219.00
434900.00
105838.00
5631485.00
3228613.00
8677166.00
381078339.000
1532588.00
336608.00
17817435.00
19431972.00
13382424.00
3943383.00
729546.00
Amount
Possessio
n handed
over
11
5.300
6.968
0.490
1.610
6.500
2.140
3.730
0.100
4.770
1.740
2.040
1.350
10.590
0.070
10.820
1.530
2.655
2.800
1.410
17.340
13.290
17.044
0.200
0.350
6.300
4.210
9.980
135.327
3.126
0.680
8.850
10.400
2.810
2.880
0.070
Total Received
13
562000.00
Paid
As on 15.02.2014
14
6206762.00
36760829.00
555560.00
1448550.00
7742881.00
2178125.00
16087035.00
29660.00
884358.00
44178232.00
45654250
434568.00
24041844.00
850254.00
4229733.00
3619018.00
5535731.00
30527.00
13155579.00
4652615.00
1210695.00
22300719.00
6115177.00
39446332.00
7571929.00
28527565.00
361665.00
43060.00
4830946.00
2175627.00
5885240.00
245563998.00
1252197.00
271190.00
16666197.00
15166664.00
9034285
3012309.00
409644.00
Balance
15
-6206762.00
-36760829.00
6440.00
-1448550.00
-7742881.00
-2178125.00
-16087035.00
29660.00
-24041844.00
34104.00
-4229733.00
-3619018.00
-5535731.00
-30527.00
-13155579.00
-4652615.00
-1210695.00
-22300719.00
-6115177.00
4731900.00
-7571929.00
-28527565.00
-361665.00
-43060.00
-4830946.00
-2175627.00
-5885240.00
-199909748.00
-1252197.00
163378.00
-16666197.00
-15166664.00
-320861.00
-3012309.00
-409644.00
% of area
handed
over
Actually
area paid
(in Acre)
16
17
4.100
5.860
0.490
1.410
5.280
2.120
3.360
4.620
1.640
2.040
1.280
9.860
0.020
9.560
0.980
0.430
2.350
1.150
14.850
10.360
15.010
0.160
0.280
5.420
4.010
6.320
112.960
3.120
0.530
6.750
8.160
2.450
1.880
0.600
Page
103
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Khata
Sl.
No.
Tahasil
35
36
37
38
39
40
41
42
43
Ghatgaon
Village
Paid
Balance
58
32
3
11
40
31
2
5
18
1
1
6
8.520
6.140
0.610
2.950
287
69
47.516
46.986
35
5
57
47
39
5.740
7.610
21.450
10.330
5.440
5.720
7.000
20.400
8.110
5.440
45
5.470
5.160
11.020
6.160
0.120
3.870
11.260
5.380
4.210
10.420
6.660
12.220
11.500
11.020
6.120
0.120
3.870
10.200
5.380
4.210
10.400
6.660
11.890
11.500
Kanto
Kolimati
Kamonda
Darkhola
Total:
356
1
2
3
4
5
Melan
Balijodi
Uperdiha
Kusunpur
Golabandh
Bataharichandanpu
r
Sanamasinabilla
Sanabarbeda
Nangalkanti
Tikira
Dhenkikote
Khantaghar
Khajurijiani
Katarabeda
Chikinia
Pipilia
Bankapatuli
35
29
57
47
39
39
10
1
85
85
26
12
49
32
55
36
31
7
1
28
25
8
3
0
85
85
26
4
25
32
27
11
Total:
682
148
534
138.860
14
17
18
28
21
22
4
18
19
2
14
15
2
48
34
11
17
15
26
20
20
4
14
15
2
14
13
2
47
32
3
0
3
2
1
2
0
4
4
0
0
2
0
1
2
2.010
5.090
9.160
13.280
8.750
14.530
2.010
4.020
12.400
0.640
7.980
10.130
3.080
19.657
15.780
6
45
46
47
48
49
50
51
52
53
54
55
7
8
9
10
11
12
13
14
15
16
17
Sadar
Total
Awarded
area
(in Acre)
8.470
6.140
0.610
2.950
8
9
10
11
44
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
Area
Total
U/s 3D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Gopalpur
Badaposi
Jamunalia
Tolankbahal
Tulasichaura
Sirispal
Motitangar
Atibudhipada
Dimiribahal
Balabhadrapur
Ranki
Suleikhamar
Sidhamath
Nizigarh
Maligaon
24
45
8
24
M/s. SAI MAATARINI TOLLWAYS LIMITED
Amount
10818496.00
3788190
277980.00
570922.00
Possessio
n handed
over
8.470
6.140
0.610
2.950
72629544.00
46.986
712547.00
5.72
7.000
20.400
8.110
5.440
8,792,887.00
1,398,135.00
138,436,583.00
31,316,669.00
7,402,501.00
5.160
11,812,590.00
3,485,442.00
16411599.00
17314853.00
11.020
6.120
0.120
3.870
10.200
5.380
4.210
10.420
6.660
11.890
11.500
133.200
57073931.00
133.220
2.010
4.830
9.160
12.970
7.920
13.980
2.010
4.010
12.400
0.640
7.980
10.130
3.080
18.237
15.780
7620020.00
4885650.00
10113315.00
8835488.00
9664118.00
18626518.00
833750.00
803364.00
5037728.00
280000.00
12577718.00
5707975.00
1426000.00
64520264.00
19885208.00
2.010
4.830
9.160
12.970
7.920
13.980
2.010
4.010
12.400
0.640
7.980
10.130
3.080
18.237
15.780
Award passed
(in Amount.)
1364347.00
3471401.00
5449704.00
172362.00
1786570.00
11103095.00
Total Received
Paid
As on 15.02.2014
Balance
% of area
handed
over
Actually
area paid
(in Acre)
6989476.00
3371759.00
218671.00
320861.00
-6989476.00
-3371759.00
59308.00
6.150
6.020
0.530
1.360
56713253.00
-46966421.00
37.550
8792887.00
207741.00
138436583.00
31316669.00
7402501.00
6.710
-
11812590.00
8.480
5.180
0.120
8,555,073.00
9,438,772.00
1159394.00
-1312645.00
-2602.00
20391101.00
137975366.00
3547601.00
-500653.00
-4805747.00
13656622.00
-8555073.00
-9438772.00
378385257.00
28301694.00
350083563.00
10,751,627.00
6,909,824.00
11,631,776.00
8,968,284.00
10,637,076.00
19,290,919.00
838,775.00
803,367.00
4,688,780.00
281,600.00
12,659,701.00
5,744,029.00
1,395,240.00
69,930,828.00
20,561,137.00
6,753,375.00
4,741,186.00
7,660,380.00
8,779,008.00
9,503,450.00
16,520,838.00
833,750.00
534,767.00
4,215,288.00
280,000.00
12,577,718.00
5,405,475.00
1,426,000.00
61,757,584.00
19,177,208.00
3998252.00
2168638.00
3971396.00
189276.00
1133626.00
2770081.00
5025.00
268600.00
473492.00
1600.00
81983.00
338554.00
-30760.00
8173244.00
1383929.00
277979.00
169,760.00
20,391,101.00
137,975,366.00
3,547,601.00
1,190,394.00
2,326,048.00
1,312,645.00
172,362.00
500,653.00
4,805,747.00
13,656,622.00
3.080
5.650
4.570
7.820
100.02
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
41.610
1.860
4.830
8.800
12.890
7.720
13.580
2.010
3.650
10.860
0.640
7.980
9.840
3.080
18.037
15.330
Page 104
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH-215 from Km 0+000 – 163+000 in the
state of Odisha under NHDP Phase-III as BOT (Toll) Basis.
Monthly Progress Report : August - 2014
[
Khata
Sl.
No.
Tahasil
Village
71
16
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Jhumpura
1
2
3
4
5
6
7
8
9
10
Champua 1
2
3
Actually
area paid
(in Acre)
23
20
3
9.890
9.650
13109814.00
9.650
13,399,734.00
11,769,294.00
1630440.00
100.00
8.870
16
107
50
15
14
39
34
68
26
18
10
23
29
40
2
1
43
26
16
90
46
8
7
32
29
64
24
7.140
15.930
7.010
8.290
3.840
4.960
2.645
6.650
6.320
4.010
2.940
4.720
4.020
4.700
0.810
6.100
16.140
11.790
7.140
15.280
4.380
2.680
0.750
4.860
2.590
5.990
5.950
4.010
2.940
4.720
4.020
4.700
0.810
6.100
15.000
10.660
17176821.00
44260634.00
20979594.00
2447135.00
3041360.00
12662387.00
57856536.00
36608761.00
12184452.00
4055143.00
4834590.00
3349581.00
17286602.00
34169991.00
1292512.00
7.140
15.280
4.380
2.680
0.750
4.860
2.590
5.990
5.950
4.010
2.940
4.720
4.020
4.700
0.810
6.100
15.000
10.660
18,295,045.00
40,876,693.00
23,157,570.00
6,409,912.00
5,097,522.00
11,682,040.00
50,255,364.00
34,243,520.00
11,931,759.00
3,605,931.00
4,522,697.00
2,750,516.00
16,370,687.00
32,704,471.00
249,480.00
17,330,293.00
26,917,188.00
15,241,071.00
2,005,907.00
1,496,172.00
7,961,525.00
28,687,613.00
35,258,548.00
9,476,432.00
2,340,468.00
3,739,587.00
1,340,208.00
8,824,026.00
20,694,265.00
1,142,608.00
51,993,275.00
1,815,660.00
46,044,553.00
1,519,891.00
964752.00
13959505.00
7916499.00
4404005.00
3601350.00
3720515.00
21567751.00
-1015028.00
2455327.00
1265463.00
783110.00
1410308.00
7546661.00
12010206.00
-893128.00
0.00
5948722.00
295769.00
100.00
100.00
36
18
0
17
4
7
7
7
5
4
2
18
1
14
12
6
0
1
7
8
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
7.140
12.630
3.520
1.570
0.410
3.980
1.890
5.960
5.280
2.010
2.670
1.320
2.860
4.290
0.810
13.360
7.320
860
713
147
256.42
2
237.367
237.367
514454839.00
401955676.00
112499163.00
100.00
100.00
60
25
108
15
30
3
45
1
79
32
23
26
68
36
7
85
10
18
3
28
1
55
19
18
15
43
24
18
23
5
12
0
17
0
24
13
5
11
25
17.610
6.210
9.630
7.570
14.330
0.230
5.740
0.260
13.605
11.100
6.805
5.430
25.920
16.721
6.210
9.630
7.130
14.330
0.230
5.740
0.260
13.380
10.370
6.620
5.430
25.920
16.721
6.130
9.630
7.130
14.330
0.230
5.740
0.260
13.380
10.370
6.620
5.430
25.920
15,103,383.00
20,335,176.00
8,351,019.00
4,429,952.00
48,689,541.00
1,396,067.00
6,145,432.00
117,325.00
9,202,935.00
122,154.00
30,926,425.00
3,455,544.00
9,296,859.00
11,380,312.00
41,017,583.00
6752364.00
15905224.00
-48689541.00
1005620.00
2582759.00
-788.00
2556766.00
-1404.00
15099483.00
3370483.00
2275680.00
11424622.00
34821481.00
100.00
98.71
4.46
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
10.890
3.680
8.540
5.750
10.230
0.230
4.120
0.260
11.620
6.920
5.350
3.750
19.010
Total:
515
338
177
G. Total:
3755
248
3
1272
9
9
17
34
2
M/s. SAI MAATARINI TOLLWAYS LIMITED
124.44
0
707.73
0
50632833.00
2195326.00
508961188.00
14607843.00
19842512.00
62942470.00
2314087.00
8849956.00
117325.00
11999161.00
122154.00
46681854.00
553618.00
11805472.00
23259261.00
77257476.00
Total Received
2,401,687.00
8,728,191.00
116,537.00
11,759,701.00
120,750.00
46,025,908.00
6,826,027.00
11,572,539.00
22,804,934.00
75,839,064.00
Paid
As on 15.02.2014
% of area
handed
over
Balance
Jhumpura
Bhaluka
Arshala
Sundhimursuan
Balabhadrapur
Patabilla
Katalposi
Manibandha
Balibandha
Murusuan
Sijukala
Parsala
Remuli
(Ch. 24.000 to Ch. 163.000)
Amount
Paid
Gopinathpur
Nuagaon
Dhrupada
Raisuan
Gopinathpur
Khuntapada
Silisuan
Banajodi
Padampur
Putulia
Keshpank
Jadichatar
Bankamaruni
Hundula
Jamudiha
Palaspanga
Murusuan
Spongepatna
Tangarani
Nuagaon
Award passed
(in Amount.)
Possessio
n handed
over
Total
Total:
90
91
92
93
94
95
96
97
98
99
100
101
102
Area
Awarded
area
(in Acre)
Total
U/s 3D
Balance
121.971
280353189.00
121.891
221633897.00
174531148.00
47102749.00
99.93
90.350
674.851
1300096191.00
674.791
1160840790.00
907065769.00
253775021.00
99.99
489.47
Page 105
SAI MAATARINI TOLLWAYS LIMITED Four Laning of Panikoili – Rimuli Road SectioH215 from Km 0+000 – 163+000 in the state of Odisha under NHDP Phase-III as BOT (Toll)
Basis.
Monthly Progress Report : August -2014
M/s. SAI MAATARINI TOLLWAYS LIMITED
Page
106