Schedule A - Culvert Project Description (Please complete one Schedule for each crossing) Location Site Name/No/Civic Address: ___________________________________________________________ Please mark location on a copy of a topographic map (preferably at 1:50,000 scale) or Google Earth Image and include as a separate attachment with the application. If including a 1:50,000 Topographic Map, Please Provide: Map No: ________________ Or, UTM Coordinates: N ____________________ E ____________________ NAD __________ ZONE __________ Design Drainage Area Profile: Drainage Area: Drainage Area Classification: ___________________ km2 Forest: ______________________% Main Channel Length: ___________________ km Barren: ______________________% Slope of Drainage Area: ___________________ % Wetland: ______________________% Urban: ______________________% □ RFFA □ Hydrologic Details: Return Period: 1: ____________ years Estimation Method: □ Rational Maximum Flow: □ TR55 3 ____________ m /s Design Flow: Other _________ ____________ m3/s Description of Estimation: Please show calculation(s) below or attach separate sheets, if required. _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ Page 1 of 2 Design (cont’d) Culvert Shape: □ Round □ Pipe-arch □ Other _______________ Culvert Material: □ Steel □ Concrete □ Aluminum □ Other ______________ Headwall Type: □ Concrete □ Wood □ Rip-rap □ Other ______________ Number of Pipes: ____________ Length: ____________ metres Width: ____________ mm Height: ____________ mm (for arch-pipe) Diameter: ____________ mm (for round pipe) Max Velocity: ____________ m/s Min Velocity: ____________ m/s If the undertaking involves replacing an existing culvert, please provide dimensions of existing culvert and reasoning behind the replacement (undersized, collapse, etc.): _____________________ _____________________________________________________________________________________ _____________________________________________________________________________________ Complete the diagram below and check inlet/outlet type: Construction Equipment to be used: ___________________________________________________________ Proposed dewatering method: _____________________________________________________ Briefly describe how erosion control and stabilization will be carried out: ______________________________________________________________________________ _____________________________________________________________________________________ ______________________________________________________________________________ Briefly describe how site restoration will be carried out: _____________________________________________________________________________________ _____________________________________________________________________________________ ______________________________________________________________________________ Technical guidelines, departmental policies and application forms are available at: http://www.env.gov.nl.ca/env/waterres/regulations/appforms/index.html Page 2 of 2