Society of American Military Engineers October 14, 2009 San Diego County’s Water Sources (2008) LAKE SHASTA LAKE OROVILLE State Water Project (Bay-Delta) 28% Local Water Supply Projects 18% San Diego County imports more than 80% of its water supply Colorado River 54% 2 Water Reliability in 2009 Regulatory restrictions have severely cut water supplies from Northern California 3 Pumping Restrictions Increased Regulatory Pumping Restrictions JAN Salmon Delta Smelt Longfin Smelt 4 FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Impacts on Southern California’s Supplies Reductions in water supplies from the State Water Project due to Delta smelt restrictions 1,851,000 AF 1,709,000 AF 43% lost 44% lost 980,000 AF 40% lost 24% lost 415,000 AF 315,000 AF 585,000 AF Drier Years 960,000 AF 1,060,000 AF Wetter Years AF = Acre-feet. One acre-foot = 325,900 gallons. 5 Bay-Delta Conservation Plan Summary − Plan Elements under Development Fremont Weir Gate Ops Tidal Habitat Restoration Target Outflow Targets Bypass Flow Criteria Intake Screen & Locations Cross Channel Ops Conveyance Alignment Tidal Gates Thru-Delta Component South Delta Exports 6 6 Last Vote on a Delta Solution 7 The Impact on Rates $ $$ $$$ $$$$ Colorado River Water State Water Project Spot Water Transfers Loss of Sales (Shortage) <2003 2003-2007 2008> 2009-10? Supply challenges make securing water more expensive Shift to more-expensive supplies is driving up the cost of water from MWD, the Water Authority’s largest supplier Water Authority passes increased costs to member agencies Member (retail) agencies pass costs to ratepayers 8 Monthly Household Wholesale Water Bill Estimated Monthly Bill $45.00 $43.27 $40.00 $35.00 $33.82 $30.00 $25.00 $27.73 $30.20 $20.00 $15.00 $10.00 $5.00 $- 2007 2008 2009 2010* 9 City of San Diego Org Chart 10 Public Utilities Department Jim Barrett Director Tom Crane Strategic Programs Ann Sasaki Assistant Director Wastewater Ops Steve Meyer Environmental Monitoring & Tech Services Stan Griffith Wastewater Collection Alex Ruiz Assistant Director Business Support Mike Vogl Customer Support Vacant Engineering Program Mgmt Darlene Morrow-Truver Employee Services & Internal Control Jim Fisher Assistant Director Water Ops Jesus Meda Water Treatment & Engineering Marsi Steirer Long Range Planning & Water Resources Stan Medina Water Construction & Maintenance Chris McKinney Wastewater Treatment & Disposal Wastewater Branch Rod Greek Finance & IT Business Support Branch Water Branch CityTV Public Service Announcement : CityTV Channel May - On Going City Water Conservation June July August September 13.6% 13.9% 11.3% 10.2% Water had planned a 15% budget reduction CWA Allocation was 8% reduction 13 San Diego Regional Wastewater System City of San Diego plus 15 other municipalities and special districts Serving more than 2.2 million Californians in over a 450 square mile area 14 Modified Permit Summary Point Loma Influent 300 250 Standard 301h modified permit PPM 200 150 100 Point Loma modified permit Point Loma Effluent 50 Secondary Requirement 0 TSS BOD 15 System Performance 1995 Renewal 2002 Renewal 2009 Renewal Mass Emissions TSS Removal BOD Removal 11,100 mt/yr 84% 60% 10,100 mt/yr 85% 65% 7,200 mt/yr 89% 66% Flow to Ocean Reclaimed Use Sewer Spills 188 MGD 0 365/yr 168 MGD 3,400 af/yr 215/yr 145 MGD 13,200 af/yr 62/yr 100% 100% Permit compliance 100% Current permit requires 80% TSS and 58% BOD removal 16 17 FY2010 Water & Wastewater CIP Wastewater - $134MM $74MM Pipeline repair, replacement, rehab $39MM Trunk sewer replacement $9MM Pump station repair/upgrade Water - $150MM $43MM Waterline replacement $38MM Alvarado WTP upgrade/expansion $16MM Miramar WTP upgrade/expansion $11MM IPR $6MM Otay WTP upgrade/expansion $5MM Lower Otay emergency outlet 18 New Adds to the FY2010 Program Project Description Status Scripps Miramar PS Replace existing PS with new and expanded PS, with full redundancy Finalizing 10% Design $ 20,700,000 Harbor Dr/Lindbergh Field Pipelines Replace ~10 miles of 16inch cast iron mains 10% Design Complete; waiting for ECP to assign a design team $ 18,400,000 Catalina Standpipe Replace and expand existing standpipe 10% Design in progress $ 3,000,000 Replace and expand 10% Design in progress existing clearwells Either 1) replace the existing PS or 2) abandon 10% Design in progress as part of a pump station consolidation strategy Upgrade existing pump 10% Design in progress station $ 6,500,000 $ 6,500,000 Upgrade existing pump station $ 6,500,000 Miramar Clearwells Climax PS Via Dominique PS College Ranch Hydro PS 10% Design in progress Tot Proj $ Est 19 Questions? Jim Barrett, PE, F-SAME Director of Public Utilities City of San Diego 858.292.6401 20