UEPL
ULUNDURPET EXPRESSWAYS PRIVATE
LIMITED
MONTHLY O&M REPORT
OCTOBER 2014
Submitted to:
NATIONAL HIGHWAYS AUTHORITY OF INDIA
&
CDM SMITH INDIA PRIVATE LIMITED
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Contents
1.
Location Map
Page No
2
2.
Project Details
4
3.
Daily inspection reports
8
4.
Weekly summary of defect list
11
5.
Monthly inspection reports
14
6.
Monthly compliance report
19
7.
Preventive/Periodic maintenance report
22
8.
Material modification report
24
9.
Accidents/ Incidents summary
26
10.
Emergency Response Protocol - reports
28
11.
Quality control tests reports
30
12.
Monthly complaints summary
33
13.
Incidents of Emergency de-commissioning
35
14.
Lane Closure
37
15.
Summary of force majeure events
39
16.
Disputes impact report
41
17.
Action report for disputes resolution
43
18.
Monthly fee statement
45
19.
Monthly Escrow Account Report
47
20.
O&M Constraints/Critical Issues
49
21.
Important Visits during the month
51
22.
Important Correspondence
53
23.
Weather Report
59
24.
Photographs
61
25.
Other activities
69
26.
List of Encroachments Removed
83
27.
List of Breakdown/Parked vehicles removed
87
28.
List of vehicles travelled in Opposite Direction
91
Page 1
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
1. LOCATION MAP
Page 2
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
1. LOCATION MAP

Tindivanam to Ulundurpet Expressway
Page 3
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
2. PROJECT DESCRIPTION
Page 4
Ulundurpet Expressways Pvt. Ltd.
2.
PROJECT DESCRIPTION
2.1
Introduction
Monthly O&M Report
Ministry of Road Transport and Highway (MoRT&H) has embarked on a staged up gradation
program of various National Highway corridors. The widening is necessary to develop
National Highway corridors where traffic intensity has increased significantly and there is
requirement of augmentation of capacity for safe and efficient movement of traffic.
MoRT&H has authorized National Highway Authority of India to implement the
development projects for these corridors either through self-budgetary sources, loans from
international banking institutions or on BOT. To have maximum development private sector
participation is being encouraged.
In order to provide a better level of service to the vehicular traffic, it has been decided to
augment the capacity of the Tindivanam - Trichy section of NH-45 from existing Km.
121.000 to existing Km. 325.000, total proposed length is approx 205.00 in the State of
Tamilnadu. The National Highway no. 45 is an important road connecting the state capital
and port of Chennai and serving the various parts of the state. The present two lane
undivided carriageway is unable to cater to the requirement of traffic. The portion Chennai
to Tindivanam (Km. 0.000 to Km. 121.000) has already been widened to a 4-lane divided
carriageway.
Thus the Construction package - VI-A for the project includes developing the existing two
lane Carriageway to four lane divided carriageway standards including with strengthening of
existing two lane between Tindivanam – Ulundurpet Section from Km. 121.000 to Km.
192.250 of NH 45. Therefore the entire package involve (i) Design, Engineering,
construction, Development, Finance, Operation and Maintenance of 4 laning the existing 2
lane section from Km. 121.000 (Near Tindivanam) to Km. 192.25 (Near Ulundurpet) on NH45.
This package was awarded through Global Tendering Process to the Concessionaire M/s
GMR Ulundurpet Expressways Private Limited, Bangalore on Build Operate and Transfer
basis.
The Project Road (Tindivanam-Ulundurpet Section) traverses through Villupuram district in
the state of Tamilnadu. The project road passes through urban areas like Tindivanam,
Kotteripattu, Sendur, Vikravandi, Mundiampakkam, etc. The road is already 4 laned up to
Tindivanam, under a separate agreement. The stretches after Ulundurpet are also upgraded
to 4 lanes.
Page 5
Ulundurpet Expressways Pvt. Ltd.
2.2
Monthly O&M Report
Salient information for the project
1) Name of Project
: (i)
Design,
Engineering,
Construction,
Development,
Finance,
Operation
and
Maintenance of 4 laning the existing 2 lane section
from Km. 121.000 (Near Tindivanam) to to Km.
192.250 (Near Ulundurpet) on NH 45, in the state
of Tamilnadu.
2) Client / Employer
: National Highways Authority of India (NHAI)
G-5 & 6, Sector 10, Dwaraka,
New Delhi – 110075.
3) Concessionaire
: M/s. Ulundurpet Expressways Pvt. Ltd.,
Skip
House, No. 25/1, Museum Road, Bangalore –
500025.
4) Independent Consultant
: M/s. CDM Smith India Private Limited,
Plot No. 307, Thamirabarani Square, Periyar Nagar,
Villupuram. 626501.
5) O&M Contractor
: M/s Highway Concessions One Private Limted.
Unit No. 720, 7th Floor, Swastik Chamber,
Sion Trombay Road, Chembur,
Mumbai – 400071
6)
: M/s. FEEDBACK VENTURES PVT. LTD.
2.3
Sr.
Design Consultant
Salient dates of Concession are:
Description
Date
1
Date of signing of Concession Agreement
19th April 2006
2
Commencement date of Concession
16th October 2006
3
Scheduled Project Completion Date
23rd July 2009 (After 98 days of
extension)
4
Scheduled End of Concession
21st January 2027
5
Provisional completion certificate Date
23rd July 2009
6
Toll notification date
26th March 2009
7
Dedication to Nation
23rd July 2009
8
Toll Collection started
24th July 2009 00:00hrs
Page 6
Ulundurpet Expressways Pvt. Ltd.
2.4
Monthly O&M Report
Project details:
The Project details are as follows:
Sl.
Description
Details
1
Scope of
Construction
Strengthening of existing 2 – lane road and widening to 4 – lane
Dual Carriageway from Km 121+000 – Km 192+250 of NH-45
(Tindivanam - Ulundurpet Section).
2
Project Length
72.900 km.(including by-pass)
3
Pavement
 4 lane divided carriageway with raised median
 Service road of variable width.
4
Intersections/
Junctions
Minor: 99 Nos.
Major : 5 Nos.
5
Bridges
Minor: 15 Nos.
Major : 6 Nos.
6
ROB
3 Nos.
7
Grade
Separator
1 Nos.
8
Vehicular
Underpass
2 Nos.
9
Culverts
Pipe Culvert : 54 Nos
Slab Culvert & Box Culvert : 66 Nos
10
Toll Plaza
1 No.
11
Pedestrian
Underpasses
6 Nos.
12
Passenger
Shelters
34 Nos.
13
Other facilities
3 Nos. Truck Bus Lay bay at three locations
Page 7
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
3. DAILY INSPECTION REPORTS
Page 8
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
3. DAILY INSPECTION REPORTS
DAILY INSPECTION REPORT SUMMARY (CIVIL)
Chainage: 121+000 to 193+900
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
October-14
15 16 17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
G
G
N
N
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
VISUAL INSPECTION
Riding Surface
- Pavement
- Expansion Joint
- Pothole
- Bleeding
Median
- Kerb
Side slope
- Shape
DURING RAINY SEASON (JULY - DEC)
Drainage
- Side/ Toe Drain
- Gullies and Catch pit
NL
NL
Poor
Fair
Good
No
Normal
Not Applicable
NL NL
NL NL
P
F
G
N
- NL
- NA
**Some of the defects identified in the project highway have been shown in the weekly summary of defect list and the same has been rectified
immediately.
Page 9
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
DAILY INSPECTION REPORT SUMMARY (Traffic)
Chainage: 121+000 to 193+900
1
2
3
4
5
6
7
8
9
10
11
12
13
14
October -14
15 16 17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Safety Barrier
- Damaged Barrier
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Traffic Operation
Facility
- Signs
- Marking
- Delineator
- Lighting
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
Traffic Condition
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
NL
P
F
G
N
NL
NA
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
NL
Description
VISUAL INSPECTION
Encroachment
NL NL
Poor Fair Good No Normal Not Applicable -
**In some locations metal beam crash barriers, solar blinkers, and other sign boards are damaged and the same have been shown in the weekly
defect list. These items are replaced immediately
Page 10
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
4. WEEKLY SUMMARY DEFECT LIST
Page 11
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
4. Weekly summary defect list.
Month: October 14
Date
Defect
No
01.10.14
10-14/01
04.10.14
06.10.14
10-14/02
10-14/03
10-14/04
06.10.14
07.10.14
135+000RHS , 130+750 RHS
10-14/06
07.10.14
10-14/07
08.10.14
08.10.14
09.10.14
09.10.14
10.10.14
181+450 RHS, 181+200RHS,
184+300LHS
Km 121+000-Km 126+000
132+200 RHS
10-14/05
07.10.14
08.10.14
Location
10-14/08
10-14/09
10-14/10
10-14/11
10-14/12
10-14/13
10.10.14
10-14/14
11.10.14
13.10.14
13.10.14
10-14/15
10-14/16
10-14/17
13.10.14
14.10.14
10-14/18
10-14/19
14.10.14
10-14/20
15.10.14
16.10.14
16.10.14
17.10.14
17.10.14
18.10.14
10-14/21
10-14/22
10-14/23
10-14/24
10-14/25
10-14/26
20.10.14
10-14/27
Km 121+000- Km 123+000
Km 121+000- Km 123+000
121+730, 122+570,
Km 158+000-Km 167+000,
Km 126+000- Km 129+000
143+900 RHS, 125+200 RHS,
124+600 RHS, 123+400 RHS
KM 123+000 – KM 126+000
158+750, 158+960, 159+610,
161+682
185+800LHS, 187+300LHS, 185+800
RHS
Km 167+000- Km176+000
138+100 RHS, 121+250LHS, 128+600
LHS
139+950 LHS
121+700-122+500 LHS
Description
Remark/
compliance
Pot holes to be rectified
Complied
Median chutes need cleaning
Damaged Delineator to be replaced
Damaged Hazard marker to be
replaced
Longitudinal Median chutes to be
cleaned
Embankment chutes need cleaning
Culvert Apron vegetation to be
cleaned
Complied
Complied
Complied
Damaged Delineator to be replaced
Pot holes to be rectified
Median chutes need cleaning
Km 192+000 – Km 193+900
132+500 LHS
150+400 – Toll plaza
133+650
Sub-node 2 Km 172+750
179+275 Sub node 3
Damaged Hazard marker to be
replaced
Metal beam found damaged
Faded kerb paint to be painted
Longitudinal Median chutes to be
cleaned
Embankment chutes need cleaning
Culvert Apron vegetation to be
cleaned
Missed median plants to be
replaced
Damaged sign board to be rectified
C1,C2,C3 Fused light to be replaced
CCTV cable cut to be joined
Voltage Fluctuation to be rectified
MDS not working, To be rectified
KM 124+785 RHS
Hazard marker to be replaced
Km 157+100-157+800, 186+050187+200
Pot holes to be repaired
Km 149+000 – Km 150+000
Km 159+000 – Km 169+000
166+680, 168+228, 168+528,
168+783
Complied
Complied
Complied
Median chutes need cleaning
Embankment chutes need cleaning
Culvert Apron vegetation to be
cleaned
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Page 12
Ulundurpet Expressways Pvt. Ltd.
21.10.14
21.10.14
22.10.14
10-14/28
10-14/29
10-14/30
179+275 Sub node 3
165+400 RHS
23.10.14
24.10.14
25.10.14
25.10.14
10-14/31
10-14/32
10-14/33
10-14/34
27.10.14
28.10.14
10-14/35
10-14/36
160+800 RHS
157+970-158+150 median
126+250
Km 151+200-Km 151+600, Km
185+350-Km 186+100
126+990 VMS
29.10.14
31.10.14
10-14/37
10-14/38
136+450, 171+050
133+780
146+740 RHS
Km 148+400-Km 148+450, ROB3
Monthly O&M Report
ATCC controller power tripped
OFC cable cut, Splicing to be done
Fused Contractor coil to be
replaced
OFC cable cut in the ECB chamber
Median drain to be cleaned
Timer to be changed
Pot holes to be repaired
63Ams Fuse carrier to be replaced
encoder switched off due to power
fluctuation
Timer cable cut , to be repaired
Pot holes to be repaired
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Page 13
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
5. MONTHLY INSPECTION REPORTS
Page 14
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
5. MONTHLY INSPECTION REPORTS
MONTHLY INSPECTION REPORT (CIVIL)
M1
MONTH : October 14
CHAINAGE : KM 121/000 to KM 193/900
Description
Comment
Poor
Condition
Fair
Remark
Good
VISUAL INSPECTION
Side Slope
- Turfing
Turfing is maintained regularly
- Pitching / Masonry
Side slope is normal.
√
√
CLOSE INSPECTION
Pavement
- Rut
NIL
- Cracks
NIL
- Shoving
NIL
- Bleeding/Raveling
NIL
- Edge Deformation
NIL
- Depression
NIL
-Depression
NIL
- Roughness
NIL
√
√
√
√
√
√
√
√
NIL
√
NIL
√
Median
- Damaged/Crack
Side Slope
- Retaining wall
Page 15
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
MONTHLY INSPECTION REPORT (CIVIL)
M1
MONTH : October 14
CHAINAGE : KM 121/000 to 193/900
Description
Comment
Poor
Condition
Fair
Good
Remark
CLOSE INSPECTION
Other Facilities
- Unwanted vegetation
Unwanted vegetations are cleaned regularly
- Landscape
Landscaping is maintained regularly
- Truck Lay bay facilities
All the facilities are maintained for the Road users
- Amenities facilities
All the facilities are maintained for the Road users
√
√
√
√
THOROUGH INSPECTION
Traffic Operation Facilities
- Damaged/Missing Signs
Damaged/Missing signs are replaced regularly
- Faded Sign Painting
NIL
- Dirty Sign Face
Sign Boards are cleaned regularly
- Damaged Gantry Sign
NIL
- Damaged/Missing Temporary sign
NIL
√
√
√
√
√
Page 16
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
MONTHLY INSPECTION REPORT (STRUCTURE)
M2
MONTH : October 14
CHAINAGE : KM 121/000 to 193/900
Description
Comment
Poor
Condition
Fair
Good
Remark
CLOSE INSPECTION
Drainage
- Side / Toe drain
Drains are cleaned regularly
- Gullies and catch pit
Cleaned regularly
√
√
Damaged Hand rails in the bridges replaced immediately.
√
Bridge
- Damaged/Faded Handrail
Page 17
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
M3
MONTHLY INSPECTION REPORT (TRAFFIC)
MONTH : October 14
CHAINAGE : KM 121/000 to 193/900
Description
Comment
Poor
Condition
Fair
Good
Remark
CLOSE INSPECTION
Traffic Operating Facilities
- Faded marking
NIL
- Damaged/Missing Delineator
Damaged/Missing Delineators are replaced immediately
√
√
THOROUGH INSPECTION
Traffic Condition
Normal
Vehicles are parked nearby motels at night. Parked vehicles are
removed immediately during patrolling.
Safety Measures has been implemented throughout the road to
avoid accidents
√
- Illegal settlement
No Encroachments found in the highway
- Damaged/Missing Highway property
NIL
- Illegal Construction
NIL
- Public Complaint
NIL
- Environmental watch
- Service road
Normal
Animals are tied and crops are being dried at service roads even
after repeated instructions for removal. Service roads are
cleaned regularly.
√
√
√
√
√
- Encroachment road
NIL
- Bus bay
Bus bays are cleaned regularly
- Traffic flow
- Stalled vehicle
- Accident Prone Area
√
√
Encroachment
√
√
√
Page 18
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
6. MONTHLY COMPLIANCE REPORT
Page 19
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
6. MONTHLY COMPLIANCE REPORT
October 14
Date
Defect
No
01.10.14
10-14/01
04.10.14
10-14/02
10-14/03
06.10.14
06.10.14
07.10.14
10-14/04
10-14/05
07.10.14
10-14/06
07.10.14
10-14/07
08.10.14
10-14/08
10-14/09
08.10.14
08.10.14
09.10.14
09.10.14
10.10.14
10-14/10
10-14/11
10-14/12
10-14/13
10.10.14
10-14/14
11.10.14
13.10.14
13.10.14
10-14/15
10-14/16
10-14/17
13.10.14
10-14/18
14.10.14
10-14/19
14.10.14
10-14/20
Location
181+450 RHS, 181+200RHS,
Pot holes to be rectified
184+300LHS
Km 121+000-Km 126+000
Median chutes need cleaning
Damaged Delineator to be
132+200 RHS
replaced
135+000RHS , 130+750
Damaged Hazard marker to be
RHS
replaced
Longitudinal Median chutes to be
Km 121+000- Km 123+000
cleaned
Embankment chutes need
Km 121+000- Km 123+000
cleaning
Culvert Apron vegetation to be
121+730, 122+570,
cleaned
Km 158+000-Km 167+000,
Median chutes need cleaning
Km 126+000- Km 129+000
143+900 RHS, 125+200
Damaged Delineator to be
RHS, 124+600 RHS,
replaced
123+400 RHS
Embankment chutes need
KM 123+000 – KM 126+000
cleaning
158+750, 158+960,
Culvert Apron vegetation to be
159+610, 161+682
cleaned
185+800LHS, 187+300LHS,
Pot holes to be rectified
185+800 RHS
Km 167+000- Km176+000
Median chutes need cleaning
138+100 RHS, 121+250LHS,
128+600 LHS
139+950 LHS
121+700-122+500 LHS
Km 149+000 – Km 150+000
Km 159+000 – Km 169+000
166+680, 168+228,
168+528, 168+783
Km 192+000 – Km 193+900
15.10.14
10-14/21
16.10.14
10-14/22
Description
132+500 LHS
150+400 – Toll plaza
Damaged Hazard marker to be
replaced
Metal beam found damaged
Faded kerb paint to be painted
Longitudinal Median chutes to be
cleaned
Embankment chutes need
cleaning
Culvert Apron vegetation to be
cleaned
Missed median plants to be
replaced
Damaged sign board to be
rectified
C1,C2,C3 Fused light to be
replaced
Remark/
compliance
Action
Yes
Complied
Yes
Complied
Complied
Yes
Yes
Complied
Yes
Complied
Yes
Complied
Yes
Complied
Yes
Complied
Yes
Complied
Yes
Complied
Yes
Complied
Yes
Complied
Yes
Complied
Yes
Complied
Yes
Complied
Complied
Complied
Yes
Yes
Yes
Yes
Yes
Complied
Yes
Complied
Yes
Complied
Yes
Page 20
No
Ulundurpet Expressways Pvt. Ltd.
16.10.14
17.10.14
17.10.14
18.10.14
20.10.14
10-14/23
10-14/24
10-14/25
10-14/26
10-14/27
21.10.14
21.10.14
22.10.14
10-14/28
10-14/29
10-14/30
23.10.14
24.10.14
25.10.14
25.10.14
10-14/31
10-14/32
10-14/33
10-14/34
27.10.14
28.10.14
10-14/35
10-14/36
29.10.14
31.10.14
10-14/37
10-14/38
133+650
Sub-node 2 Km 172+750
179+275 Sub node 3
KM 124+785 RHS
Km 157+100-157+800,
186+050-187+200
179+275 Sub node 3
165+400 RHS
136+450, 171+050
160+800 RHS
157+970-158+150 median
126+250
Km 151+200-Km 151+600,
Km 185+350-Km 186+100
126+990 VMS
133+780
146+740 RHS
Km 148+400-Km 148+450,
ROB3
Monthly O&M Report
CCTV cable cut to be joined
Voltage Fluctuation to be rectified
MDS not working, To be rectified
Hazard marker to be replaced
Pot holes to be repaired
ATCC controller power tripped
OFC cable cut, Splicing to be done
Fused Contractor coil to be
replaced
OFC cable cut in the ECB chamber
Median drain to be cleaned
Timer to be changed
Pot holes to be repaired
63Ams Fuse carrier to be replaced
encoder switched off due to
power fluctuation
Timer cable cut , to be repaired
Pot holes to be repaired
Complied
Complied
Complied
Complied
Complied
Yes
Yes
Yes
Yes
Yes
Complied
Complied
Complied
Yes
Yes
Yes
Complied
Complied
Complied
Complied
Yes
Yes
Yes
Yes
Complied
Complied
Yes
Yes
Complied
Complied
Yes
Yes
Page 21
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
7. PREVENTIVE/ PERIODIC
MAINTENANCE REPORT
Page 22
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
7. PREVENTIVE/ PERIODIC MAINTENANCE REPORT
Sl.
no.
Description
location
Nature of
maintenance
Action date
Remarks
From
To
NIL
Page 23
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
8. MATERIAL MODIFICATION REPORT
Page 24
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
8. MATERIAL MODIFICATION REPORT
Sl.
Description
Type of
Reason for
no.
of activity
modification
modification
Observed performance
Up to
Below
Remarks
satisfaction expectation
NIL
Page 25
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
9. ACCIDENTS/ INCIDENTS SUMMARY
Page 26
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
ACCIDENT/ INCIDENT SUMMARY ATTACHED SEPARATELY
Page 27
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
10. EMERGENCY RESPONSE
PROTOCOL - REPORTS
Page 28
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
ERP reports submitted separately
Page 29
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
11. QUALITY CONTROL TEST REPORTS
Page 30
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
11. QUALITY CONTROL TEST REPORTS
Laboratory Reports – Road
Sl.
no.
1
2
3
4
5
6
Description
of items and
type of test
Earth filling Field density
Earthwork - Lab
tests
GSB - lab tests
WMM
DBM
BC
Frequenc
y as per
MoRT&H
Material
quantity
Tested
From
01.10.14
To
31.10.14
Actual no of test
conducted from
01.10.14 To 31.10.14
Passed
Failed
Total
Test
required
as per
MoRT&
H
Specifica
tions
Total
cumulative
quantity
tested up to
31.10.14
Actual
test done
up to
31.10.14
Test
required
as per
MoRT&H
up to
31.10.14
Total
cumulative
test done
up to
31.10.14
Total
Cumu.
Test
Required
as per
MoRT&H
Up to
31.10.14
6 tests per
1000 m3
0
0
0
0
136
140
140
140
140
136
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
24
25
10
10
32
24
25
10
10
2989
24
25
10
10
44
24
25
10
10
42
24
25
10
10
44
24
25
10
10
42
In addition to BC tests, Bitumen, Tack coat and all other related to BC have been tested as per frequency.
Page 31
%age
Failure
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Laboratory Reports – Structures
Sl.
no.
Description of
items and type
of test
Frequency as
per MoRT&H
Section 900
Total
quantity
executed
till
Total
cumulative
test
conducted
up to
Date
Date
Total no.
of test
required
as per
MoRT&H
No. of test conducted
till date
Total
cumulative
test
conducted
up to
Passed
Failed
Total
Date
1
M15 concrete
6 cubes per 5 cum
26
31.10.14
15
15
0
15
15
2
M25 concrete
6 cubes per 5 cum
92.5
31.10.14
36
42
0
42
42
3
M30 concrete
6 cubes per 5 cum
415.5
31.10.14
90
108
0
108
108
Tested At
MTC
Page 32
Ind
Lab
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
12. MONTHLY COMPLAINTS
SUMMARY
Page 33
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
12. MONTHLY COMPLAINTS SUMMARY
Sl.
no.
Type of complain
Total
Outstanding
numbers Complains
Complained about
1
Traffic & Safety
0
0
2
Toll rate
3
0
Toll location and Exemption for
Non Defence person
3
Maintenance
6
0
Maintenance
4
Emergency Services
0
0
5
Visibility
0
0
6
Others
0
0
Complains
that cannot
be resolved
Page 34
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
13. INCIDENTS OF EMERGENCY
DE-COMMISSIONING
Page 35
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
13. INCIDENTS OF EMERGENCY DE-COMMISSIONING
Sl.
Cause of emergency
Affected
Affected
no.
decommissioning
stretch
Tenure
Remarks
NIL
Page 36
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
14. LANE CLOSURE
Page 37
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
14. LANE CLOSURE – OCTOBER-14.
ULUNDURPET EXPRESSWAYS PVT. LTD.
ABSTRACT
LANE CLOSURE DURING THE MONTH OF OCTOBER-14
Sl.
No.
DATE
TIMING LOCATION
Lane-Km
LANES
No. of
&
closing
LENGTH
hours/Days
--
--
closed x no. of
days which
Remarks
closed
01.10.14
1
to
--
--
--
--
31.10.14
Total
0.000
October 14
0.000
Total
0.000
Lane Availability = 72.90 x 4 x 1865 – 0.000 = 100 %
72.90 x 4 x 1865
This does not include any emergency closures.
Lane km closed x no. of days for month up to October -14
Years
From
To
Lane closed
Number of days
2009
2010
2011
2012
2013
2014
2014
2014
2014
2014
23.07.2009
January
January
January
January
January
July
August
September
October
December
December
December
December
December
June
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
162
from
COD.
365
365
366
365
181
31
31
30
31
Total
1927
Page 38
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
15. SUMMARY OF FORCE MAJEURE
EVENTS
Page 39
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
15. SUMMARY OF FORCE MAJEURE
Details of
Sl.
no.
Type of force
majeure
Duration of Force
Total
majeure
duration
event
Additional cost
Whether
action of
Incurred due to above
reimbursable
concessionaire
incident
from insurance
to minimize the
damage
From
Remarks
( details of
evidence – if
any )
To
NIL
Page 40
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
16. DISPUTES IMPACT REPORT
Page 41
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
16. DISPUTE IMPACT REPORT
Sl.
no.
Duration of
Disputable Activity
disputable
activity
Concessionaire
Approximate
action to
Contractual
Cost Impact
minimize the
Back ground
1
of
the
unregistered
buses
of TNSTC crossing
Toll plaza are not
paying Toll fee.
Proper
communication
24.07.2009
to till date
15.0 crores
and
regular
follow up done
with
Depots.
all
the
TNSTC
of
the vehicles
vehicles
of crossing
the
and Toll plaza has
SETC crossing been
our Toll plaza submitted to
have to pay TNSTC
the Toll fee.
Remarks
(if any)
List
Some
by IC/ NHAI
details
impact
All
Action require
Evidence
through
CD
and hard copy
Intimation
to
the SETC and
TNSTC for the
full
Toll
fee
payment
and
clear
the
outstanding
amount
accumulated
from July 2009.
Page 42
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
17. ACTION REPORT FOR DISPUTES
RESOLUTION
Page 43
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
17. ACTION REPORT FOR DISPUTE RESOLUTION
Sl.
no.
Details of
Details of Disputes
initiation
Some of the unregistered
1
concessionaire’s
buses of TNSTC crossing
Toll plaza are not paying
Toll fee.
Proper
communication
and regular follow
up done with all
the departments.
Details of evidence
Remarks
submitted
(if any)
List of vehicles
crossing the Toll
plaza has been
submitted to TNSTC
through CD and
hard copy
Some of the
TNSTC has been
agreed to settle
after reconciliation
from both ends
Page 44
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
18. MONTHLY FEE STATEMENT
Page 45
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
[1) Name of work: Design, Construction, Development, Finance, Operation and
Maintenance of
“existing 2 lane section from Km 121 (Tindivanam) to Km 192.25 (Ulundurpet)” NH-45 in the state
of Tamilnadu on Build, Operate, and Transfer (BOT) basis.
2) Date of commencement of fee collection: 24/07/2009
3) Report for the month ending: October 2014
4) Fee rates (in Rs):
Present
Rates during
Rates during
Rates during
Year before
previous Year
last Year
last year w.e.f
applied w.e.f
applied w.e.f
01/09/2011
01/09/2012
01/09/2013
(date)
(date)
(date)
50
62
67
70
75
88
109
117
125
130
Truck / Bus
176
217
234
245
260
Multi Axle Vehicle (>2 axle)
283
350
376
400
420
Vehicle Type
Car, passenger van or jeep
Light commercial vehicle
(LCV) including minibus
Fee rate on
commencement
Rates
applied
w.e.f
01/09/2014
(date)
5) Collection during Month under report – Rs. 9, 08, 73,170/- (In Words – Nine Crores Eight
Lakhs Seventy Three Thousand One Hundred and Seventy Only)
Corresponding month during
Vehicle Type
Previous month
previous year (01st Oct’2013 –
Current month
31st Oct’2013)
Nos.
Amount
Nos.
Amount
Nos.
Amount
Car, passenger van or jeep
325490
18443855
300791
15474450
348790
20148145
Light commercial vehicle
53290
6179345
54260
5945139
49061
5727045
Truck / Bus
205949
39287982
163263
25032118
191665
33462565
Multi Axle Vehicle (>2 axle)
96831
35064765
77170
28180415
84839
31535415
Gross Total
681560
98975947
595484
74632122
674355
90873170
Page 46
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
19. MONTHLY ESCROW ACCOUNT
REPORT
Page 47
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Escrow Account details Submitted Separately.
Page 48
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
20. O&M CONSTRAINTS/ CRITICAL
ISSUES
Page 49
Ulundurpet Expressways Pvt. Ltd.
20.
Monthly O&M Report
O&M CONSTRAINTS/ CRITICAL ISSUE
1)
2)
Over speeding of vehicles plying on the highways leading to lot of accidents.
Over loading of trucks – Due to overloading excessive materials like sand,
coal etc. are spilling over the main carriageway daily. Since the sand quarry is
located in our project highway regularly sand is depositing in the
carriageway.
3)
Service roads, Bus shelters and bus bays are not utilized by the Local buses
instead they stop in the main carriageway only. This forces the
public to wait along the main carriageway only. (Locations 131/950, 133/530,
136/500, 137/950, 152/850,154/700, 154/350, 170/150, 170/400)
4)
Animals are being tied and crops are being dried in Service road and Main
Carriageway by the villagers even after repeated instructions. (Locations
Service road at chintamani, Perangiyur, Madappattu, Pidagam, Sengurichy,
Gadilam and Mettathur.
5)
Requisition for Toll exemption by the political people. Also making nuisance
and nonpayment of Toll fee by the vehicles during frequent political rallies.
6)
Requisition for the Toll exemption by the local multi axle vehicles.
7)
Parking of the vehicles in the hard shoulder nearby motels and sand quarries.
8)
Traveling in wrong direction by some vehicles nearby motels and petrol bunks.
9)
Some of the TNSTC Buses unwilling to pay Toll fee /User fee for crossing the plaza. Also
they are not settling the Huge outstanding amount to the total of 13 crores.
10)
Sign boards, Bus shelter litters and Truck lay bay amenities are frequently
stolen along the project highway.
11)
Formation of temporary shops near the bus stops. After removal of the
encroachments reoccupation by the Local shop owners.
12)
Advertisements of the political parties are painted and pasted in the
structures of our Project Highway. They are unwilling to stop even after
repeated instructions. Complaints lodged in respective police stations.
13)
In habitual areas like Kootteripattu, Madappattu, Gadilam the wastages from
the shops are dumped in the drains and service roads.
14)
Banners for the advertisements are fixed along the project highway.
15)
Access is being made by the local people by damaging the toe drains and RCC
drains.
16)
ROW fencing is stolen by the local people regularly.
Page 50
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
21. IMPORTANT VISITS
Page 51
Ulundurpet Expressways Pvt. Ltd.
21.
Monthly O&M Report
IMPORTANT VISITS:
Sr. no.
Date
Visit Details
Specific comments (if any)
1
12.10.2014
NHAI-CGM has inspected the site
--
Page 52
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
22. IMPORTANT CORRESPONDENCE
Page 53
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
22. IMPORTANT CORRESPONDENCE:
INCOMING:
Sr.
No
1
From whom
received
Date of
Receipt
CDM
Smith
India Pvt. Ltd.,
4-Oct-14
CDM
Smith
India Pvt. Ltd.,
6-Oct-14
2
3
4
5
CDM
Smith
India Pvt. Ltd.,
6-Oct-14
CDM
Smith
India Pvt. Ltd.,
8-Oct-14
CDM
Smith
India Pvt. Ltd.,
10-Oct-14
6
Project Director,
NHAI, VPM
7
8
Letter no.
CEIPj/NHAI/2A/2013/1213020
/GMR(UE)/0648
CEIPj/NHAI/2A/2013/1213020
/GMR(UE)/0655
CEIPj/NHAI/2A/2013/1213020
/GMR(UE)/0656
CEIPj/NHAI/2A/2013/1213020
/GMR/V/0662
CEIPj/NHAI/2A/2013/1213020
/GMR/V/0665
10-Oct-14
NHAI/PD/VPM/VI-A &
PTTL/2014/1016
CDM
Smith
India Pvt. Ltd.,
10-Oct-14
CDM
Smith
India Pvt. Ltd.,
10-Oct-14
Project Director,
NHAI, VPM
16-Oct-14
CEIPj/NHAI/2A/2013/1213020
/GMR (UE)/0673
CEIPj/NHAI/2A/2013/1213020
/GMR (UE)/0674
NHAI/PD/VPM/PPPAC/201
4/1043
CDM
Smith
India Pvt. Ltd.,
17-Oct-14
CDM
Smith
India Pvt. Ltd.,
17-Oct-14
9
10
11
CEIPj/NHAI/2A/2013/1213020
/GMR (UE)/0676
CEIPj/NHAI/2A/2013/1213020
/GMR (UE)/0681
Subject
Creating awareness among drivers about antidrinking driving on National and State
Highways on 04.10.2014 from 6.00 pm to 8.00
pm - Forwarding NHAI letter
Onset of monsonn maintenance activities to
be taken up - Avert stagnation of storm water
within ROW, longitudinal drains / CD works /
water courses chute drains, median drains, etc
- Requested to submit advance program for
the month of October 2014
Approval of movement of Modular hydraulic
trailer combination type HT-3 with GVW of
124 MT from Trichy (TN) to Gadawara (AP) Forwarded NHAI letter
Forwarding NHAI request - Display of fee
structure on the Toll Plazas and courtesy
behavior by the Toll Booths staffs Compliance forwarded to NHAI
Policy Matters: Technical (166/2014) Plantation - Circulations issued by Delhi-HQ Forwarded Format for reporting status of
plantations in PPP projects
CBCID Cases - Details of movement of vehicles
in TN Toll Plaza between 01.09.2014 and
05.09.2014 - Information sought for
CBCID Cases - Details of movement of vehicles
in TN Toll Plaza between 01.09.2014 and
05.09.2014 - Information sought for
Request for removal of 130m barricading for
the use of Bus Stand/ shelter to the general
public - Forwarding President's letter
Workshop cum data entry to the PMIS System
at Regional Office, Chennai from 16.10.2014 to
18.10.2014 regarding operationalization of
PPP Monitoring System and creation of Project
specific websites
Avenue Plantation - Effective Implementation
in the stretches - Instructions issued
Construction of Public Facilities i.e. Traffic Aid
Post, Medical Aid Post and Washroom at Toll
Plaza along NHs - Requested to send report on
18.10.2014
Page 54
Ulundurpet Expressways Pvt. Ltd.
12
CDM
Smith
India Pvt. Ltd.,
17-Oct-14
Project Director,
NHAI, VPM
17-Oct-14
CDM
Smith
India Pvt. Ltd.,
23-Oct-14
CDM
Smith
India Pvt. Ltd.,
23-Oct-14
Project Director,
NHAI, VPM
24-Oct-14
Project Director,
NHAI, VPM
24-Oct-14
Project Director,
NHAI, VPM
25-Oct-14
Project Director,
NHAI, VPM
25-Oct-14
13
14
15
16
17
Monthly O&M Report
CEIPj/NHAI/2A/2013/1213020
/GMR (UE)/0685
ETC Video conferencing on 27.10.2014 Requested to submit the Change of Scope if
any on or before 20.10.2014 for onward
transmission to Regional Office on 24.10.2014
NHAI/PD/VPM/VI-A
& Implementation of Electronic Toll Collection
PTTL/2014/1045
(ETC) on Pan India basis - Installation of
Weigh-in-Motion (WIM), Static Weigh Bridge
(SWB), AVCC and CCTV at all Toll Plazas (NHAI
& Concessionaires) - Submission of timelines
for implementation of ETC in the States of
Tamil Nadu and Kerala
CEISignage’s including photos of Former Ministers
Pj/NHAI/2A/2013/1213020 etc. on National Highways - The
/GMR (UE)/0692
concessionaire instructed to remove forthwith
the photos of former ministers in the Project
Highway
CEICBCID Cases - Details of movement of vehicles
Pj/NHAI/2A/2013/1213020 in TN Toll Plaza between 01.09.2014 and
/V/0689
05.09.2014 - Concessionaire comments
forwarded to NHAI
NHAI/PIU-VPM/INV/201415/1062
NHAI/PD/VPM/VI-A &
PTTL/2014/1064
NHAI/PD/VPM/NH-45/VIA/2014/1072
18
NHAI/PD/VPM/PTTL/2014/
1074
19
CDM
Smith
India Pvt. Ltd.,
20
27-Oct-14
CEIPj/NHAI/2A/2013/1213020
/GMR (UE)/0698
Submission of Invoice No.11/2014-15 to
release of 50% of Independence Consultancy
charges Rs.1,17,072/- (O&M) for the month of
September 2014
Provisions of Project Facilities at Toll Plazas i.e.
i.e. Traffic Aid Post, Medical Aid Post and
Washroom - Compliance to the decision of
Executive Committee held on 30.07.2014
Painting in speed breakers in Service Road, (ii)
Rectification of damaged Street Lights and (iii)
Painting in speed breakers in service road to
avoid to avoid accidents - Necessary action
requested - comments sought for
Implementation of ETC on Pan India basis Timelines for ETC Implementation Requested to follow the instruction given by
the NHAI-HQ for implementation of ETC on
Pan India basis and report may be furnished
Implementation of Electronic Toll Collection
(ETC) on Pan India basis - Installation of
Weigh-in-Motion (WIM), Static Weigh Bridge
(SWB), AVCC and CCTV at all Toll Plazas (NHAI
& Concessionaire) - Submission of timelines
for Implementation of ETC in the States of
Tamil Nadu & Kerala
Page 55
Ulundurpet Expressways Pvt. Ltd.
CDM
Smith
India Pvt. Ltd.,
28-Oct-14
21
CDM
Smith
India Pvt. Ltd.,
28-Oct-14
22
CDM
Smith
India Pvt. Ltd.,
31-Oct-14
23
CDM
Smith
India Pvt. Ltd.,
31-Oct-14
24
CDM
Smith
India Pvt. Ltd.,
25
26
CDM
Smith
India Pvt. Ltd.,
CDM
Smith
India Pvt. Ltd.,
27
31-Oct-14
31-Oct-14
31-Oct-14
Monthly O&M Report
CEIPj/NHAI/2A/2013/1213020
/V/0699
CEIPj/NHAI/2A/2013/1213020
/GMR(TT)/0702
CEIPj/NHAI/2A/2013/1213020
/GMR(UE)/0706
CEIPj/NHAI/2A/2013/1213020
/GMR(UE)/0709
CEIPj/NHAI/2A/2013/1213020
/GMR(UE)/0713
CEIPj/NHAI/2A/2013/1213020
/GMR(UE)/0717
CEIPj/NHAI/2A/2013/1213020
/GMR(UE)/0724
CDM
Smith
India Pvt. Ltd.,
28
31-Oct-14
CEIPj/NHAI/2A/2013/1213020
/GMR(UE)/0725
Implementation of Electronic Toll Collection
(ETC) on Pan India basis - Installation of
Weigh-in-Motion (WIM), Static Weigh Bridge
(SWB), AVCC and CCTV at all Toll Plazas (NHAI
& Concessionaire) - Requested NHAI to issue
change of scope Notices
Implementation of Electronic Toll Collection
(ETC) on Pan India basis - Installation of
Weigh-in-Motion (WIM), Static Weigh Bridge
(SWB), AVCC and CCTV at all Toll Plazas (NHAI
& Concessionaire) - Requested NHAI to issue
change of scope Notices
Provisions of Project Facilities at Toll Plazas i.e.
i.e. Traffic Aid Post, Medical Aid Post and
Washroom - Compliance to the decision of
Executive Committee held on 30.07.2014 - The
Concessionaire requested to submit the
Estimate
Painting in speed breakers in Service Road, (ii)
Rectification of damaged Street Lights and (iii)
Painting in speed breakers in service road to
avoid to avoid accidents - Necessary action
requested - The concessionaire instructed to
submit the proposal
CBCID Cases - Details of movement of vehicles
in TN Toll Plaza between 01.09.2014 and
05.09.2014 - The concessionaire is requested
verify the vehicles as informed by CBCID
passed the toll plaza
Avenue Plantation - Effective implementation
in the stretches - The concessionaire is
instructed to submit the 2nd fortnight report
on 31.10.2014
Implementation of Dedicated ETC lane at Toll
Plaza - Change of Scope - The concessionaire is
instructed to commence the dedicated ETC
lane works as per assurance in the meeting
held on 10.10.2014 at RO-Chennai
Implementation of Electronic Toll Collection
(ETC) on Pan India basis - Installation of
Weigh-in-Motion (WIM), Static Weigh Bridge
(SWB), AVCC and CCTV at all Toll Plazas (NHAI
& Concessionaire) - The Concessionaire is
requested to commence the dedicated ETC
lane works as per assurance given in the
meeting held on 10.10.2014
Page 56
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
OUTGOING:
Sr. No.
To Whom Sent
Date
Letter no.
1
CDM Smith India
Pvt. Ltd., Villupuram
6-Oct-14
UEPL/IC/10-14/06/02
2
CDM Smith India
Pvt. Ltd., Villupuram
6-Oct-14
UEPL/IC/10-14/06/01
3
CDM Smith India
Pvt. Ltd., Villupuram
7-Oct-14
UEPL/IC/10-14/07/01
4
CDM Smith India
Pvt. Ltd., Villupuram
7-Oct-14
UEPL/IC/10-14/07/01
5
CDM Smith India
Pvt. Ltd., Villupuram
4-Oct-14
UEPL/IC/10-14/04/01
6
CDM Smith India
Pvt. Ltd., Villupuram
9-Oct-14
UEPL/IC/10-14/09/02
7
CDM Smith India
Pvt. Ltd., Villupuram
9-Oct-14
UEPL/IC/10-14/09/02
8
CDM Smith India
Pvt. Ltd., Villupuram
9-Oct-14
UEPL/IC/10-14/09/03
9
CDM Smith India
Pvt. Ltd., Villupuram
11-Oct-14
UEPL/IC/10-14/11/01
10
CDM Smith India
Pvt. Ltd., Villupuram
13-Oct-14
UEPL/IC/10-14/13/01
11
CDM Smith India
Pvt. Ltd., Villupuram
15-Oct-14
UEPL/IC/10-14/15/02
Subject
Creating awareness among drivers
about anti-drinking driving on National
and State Highways on 04.10.2014 from
6.00 pm to 8.00 pm - Forwarding NHAI
letter
Vikravandi Toll Plaza - Complaint Concessionaire is requested to submit
the report - Compliance
Forwarding NHAI request - Display of fee
structure on the Toll Plazas and courtesy
behavior by the Toll Booths staffs Compliance
Implementation of Electronic Toll
Collection (ETC) on PAN India basis:
Installation
of
weigh-in-motion
(WIM)/Static Weigh Bridge (SWB), AVCC
and CCTV at all Toll Plazas (NHAI&
Concessionaires) - Delegation of Powers
to ROs - Compliance
Submission of Monthly Progress Report
for the month of September 2014
CBCID Cases - Requesting details of
movement of vehicles in TN Toll Plaza
between 01.09.2014 and 05.09.2014 Compliance
CBCID Cases - Requesting details of
movement of vehicles in TN Toll Plaza
between 01.09.2014 and 05.09.2014 Compliance
Submission of Monthly report on CSR
activities and the Road Safety
Awareness Programs for the month of
September 2014
Methodology
for
the
periodic
maintenance, overlay with recycling of
the bituminous pavement
Policy Matters: Technical (166/2014) Plantations - Compliance
Onset of monsonn maintenance
activities to be taken up - Avert
stagnation of storm water within ROW,
longitudinal drains / CD works / water
courses chute drains, median drains, etc
- Requested to submit advance program
Page 57
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
12
CDM Smith India
Pvt. Ltd., Villupuram
15-Oct-14
UEPL/IC/10-14/15/01
13
CDM Smith India
Pvt. Ltd., Villupuram
17-Oct-14
UEPL/IC/10-14/17/01
14
CDM Smith India
Pvt. Ltd., Villupuram
17-Oct-14
UEPL/IC/10-14/17/02
15
CDM Smith India
Pvt. Ltd., Villupuram
25-Oct-14
UEPL/IC/10-14/25/01
16
CDM Smith India
Pvt. Ltd., Villupuram
24-Oct-14
UEPL/IC/10-14/24/01
17
Project Director,
NHAI
31-Oct-14
HW/UEPL/NHAI/1014/31/01 dated
31.10.2014
18
CDM Smith India
Pvt. Ltd., Villupuram
UEPL/IC/10-14/31/01
dated 31.10.2014
for the month of October 2014 Compliance
Removal of dismantling of Metal Beam
crash barrier and Toe wall near
Vikravandi LHS Bus Shelter to facilitate
the Bus to enter the service road and
stop near bus shelter
Construction of Public Facilities i.e.
Traffic Aid Post, Medical Aid Post and
Washroom at Toll Plaza along NHs Compliance
ETC Video conferencing on 27.10.2014 Requested to submit the Change of
Scope if any on or before 20.10.2014 for
onward transmission to Regional Office
on 24.10.2014 - Compliance
Signage’s including photos of Former
Ministers etc. on National Highways The concessionaire instructed to remove
forthwith the photos of former ministers
in the Project Highway - Compliance
Implementation of Electronic Toll
Collection (ETC) on Pan India basis Installation of Weigh-in-Motion (WIM),
Static Weigh Bridge (SWB), AVCC and
CCTV at all Toll Plazas (NHAI &
Concessionaire) - Requested NHAI to
issue change of scope Notices
Release payment of Rs.1,17,072/against the Invoice No.11/2014-15
towards 50% fee of Independence
Consultancy charges (O&M) for the
month of September 2014
Avenue
Plantation
Effective
implementation in the stretches - The
concessionaire is instructed to submit
the 2nd fortnight report on 31.10.2014
Page 58
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
23. WEATHER REPORT
Page 59
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
23. WEATHER REPORT
Temperature as per site
office ( c )
Minimum
Maximum
Temperature as per news
paper ( c )
Minimum
Maximum
Sl.
no.
Date
Average
rainfall
(mm)
1
01.10.14
0
24
34
26
33
2
02.10.14
0
25
33
24
33
3
03.10.14
0
26
33
25
33
4
04.10.14
0
25
35
24
35
5
05.10.14
0
26
35
25
36
6
06.10.14
0
25
35
26
36
7
07.10.14
15
25
35
25
34
8
08.10.14
0
25
34
24
34
9
09.10.14
4
25
35
25
33
10
10.10.14
0
26
35
25
33
11
11.10.14
0
25
35
26
33
12
12.10.14
0
25
35
27
37
13
13.10.14
0
25
34
26
38
14
14.10.14
0
25
35
26
35
15
15.10.14
0
25
31
27
35
16
16.10.14
3
27
33
26
33
17
17.10.14
93
24
32
24
31
18
18.10.14
72
25
31
23
28
19
19.10.14
37
27
33
23
26
20
20.10.14
42
24
32
23
25
21
21.10.14
5
27
33
23
31
22
22.10.14
3
24
32
24
32
23
23.10.14
37
25
30
25
30
24
24.10.14
50
25
30
23
29
25
25.10.14
1
27
33
24
32
26
26.10.14
1
25
30
24
29
27
27.10.14
5
25
32
24
31
28
28.10.14
0
25
32
24
32
29
29.10.14
0
25
32
25
32
30
30.10.14
0
25
32
24
32
31
31.10.14
5
23
31
24
30
Page 60
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
24. PHOTOGRAPHS
Page 61
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
24. PHOTOGRAPHS
Cleaning of Vegetation in Apron and culvert Vent way
Median plants Pruning
Page 62
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Project Facilities Cleaning (ECB cleaning)
Cleaning of Bus shelter
Page 63
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Grass removal in median
Repairing of Pot holes
Page 64
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Cleaning of sign boards
Safety measures done for Break down vehicle
Page 65
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Replacing of new hazard marker
Removal of vegetation in ROB RE wall
Page 66
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Removal of ROW vegetation
Repairing of Earthen shoulder
Page 67
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Replacing of Missed median plants
NHAI stickering done in Toll plaza Canopy
Page 68
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
25. OTHER ACTIVITIES
Page 69
Ulundurpet Expressways Pvt. Ltd.
25.
Monthly O&M Report
OTHER ACTIVITIES
Sl.
No.
Date
1
Entire
Month
Location
Various Locations
Description
Road safety programs conducted and the
detailed report enclosed for reference.
Page 70
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Date & Time
Location
01.10.2014 / 7.30 P.M to 9.00 P.M
Participants
Events
More than 150 Passengers and drivers.
 The night intervention Road Safety Awareness Program
conducted at A.S Hotel reaching out of more than 150 people.
 This Hotel is located on Km 150+600 chainage.
 The live video of accidents displayed and explained the reason
for the same and having an interaction with the people.
A.S.Hotel, Papanapattu
Photographs
Introductory talk on Road Safety
Dissemination of ppt information on RSP
Interaction with audience
Interaction with audience
Page 71
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Date & Time
Location
04.10.2014 / 06.00 P.M to 8.00 P.M
Participants
Events
Approximately 100 Drivers and cleaners.
 The UEPL conducted anti – drinking drive for drivers at
Vikravandi Toll Plaza approximately 100 drivers and cleaners
benefited.
 This was located in 150/400 chainage.
 The Vikravandi Traffic Police with the guidance of
Mr.Shanmugam checked the alcohol content in breathing air
with the support of Breath Analyzer instrument.
 A pamphlet containing the importance of non-alcohol while on
driving has been distributed.
 The program has been published in local dailies and attached.
VIKRAVANDI TOLL GATE, VILUPPURAM.
Photographs
Alcohol Breathing Analyser testing
Dissemination of information on RSP by Traffic
SI
Phamplet distibution by Traffic Inspector
View of audience
Page 72
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
PAPER CLIPPINGS
DINAKARAN 06-10-2014
Page 73
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
DINAMALAR 05-10-2014
Page 74
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Date & Time
Location
14.10.2014 / 10.00 A.M to 1.00 P.M
Participants
Events
Labours of Plaza
Toll Plaza ROWs, Vikravandi.
 Final 600 palm seeds were put on ROWs near Plaza.
 How the palm seeds are grown itself in bags and is the witness
of the sproutedness of remaining 35000 palm seed already put
on our ROWs.
 It would be visible by another 3 to 4 years as a small palm tree.
 It would protect not only our boundary but our environment
also.
Photographs
Seperation of Palm seeds
Scene of palm seed sproutedness in bags
Palm seed planted at ROWs
Sprouted Palm seeds ready for transportation
Page 75
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Date & Time
Location
24.10.2014 / 11.30 A.M to 1.00 P.M
Participants
Events
More than 100 General public.
 The Road Safety Awareness Program conducted at Aristo
Hotel reaching out of more than 100 people.
 This Hotel is located on Km 143+400 chainage RHS.
 The live video of accidents displayed and explained the reason
for the same and having an interaction with the people.
 The audience appreciated the initiative of UEPL and appealed
to extend all the risky places.
Hotel Aristo, V.Salai
Photographs
Introductory talk by UEPL Staff
Dissemination of ppt information on RSP
Live Accident Vedio presentation
Page 76
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Date & Time
Location
25.10.2014 / 11.30 A.M to 1.30 P.M
Participants
Events
100 Students from various departments
 RSP conducted at SIGA College reaching out of more than
100 students from different departments.
 The college is located in 2 kilometers away from 155/400
chainage.
 The live accident video shown to students and made realize
them while on riding.
 The consequences of accident in detail to safeguard everyone.
 The students would spread this message atleast to their
friends.
SIGA Arts College, Kappiyampuliyur.
Photographs
Introductory talk by UEPL Staff
Dissemination of ppt information on RSP
Interaction with Live Accident Vedio
Feedback session at the end
Page 77
Ulundurpet Expressways Pvt. Ltd.
Date & Time
Location
Participants
Events
Monthly O&M Report
29.10.2014 / 7.30 P.M to .00 P.M
Pidagam Petrol Bunk
More than 150 lorry drivers exclusively
 Road Safety Awareness Program conducted near Pidagam
Petrol Bunk reaching out of more than 150 exclusively sand
lading Lorrie’s drivers and cleaners.
 This Petrol Bunk is located on Km 169+900chainageRHS.
 The live video of accidents displayed and explained the reason
for the same and having an interaction with the people.
 The drivers are inculcated to maintain the speed level as well
as to inform the control room while encountering break downs.
Photographs
Introductory talk by ezeeway Staff
Dissemination of ppt information on RSP
Live Accident Vedio presentation
Feedback by the audience
Page 78
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Date & Time
Location
30.10.2014 / 2.30 P.M to 4.15 P.M
Participants
Events
200 Girls from various classes.
 This Government High School is located on 154/300 chainage.
 The reason behind this program was majority of the students
of this school have to cross the road while coming and return
to home and is one of the most accident prone spot.
 More than 200 girls students had been reached out through
this program.
 The risk of the road is shown through live accident videos and
appealed to the students to share the message with the family.
Govt. High School, Mundiampakkam
Photographs
Introductory talk by AHM
Dissemination of ppt information on RSP
A scene of participants
Prize distribution by ezeeway Manager
Page 79
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Date & Time
Location
31.10.2014 / 11.00 A.M to 1.00 P.M
Participants
Events
150 Boys from various classes.
 This Government Higher Secondary School is located on
148/300 chainage.
 The reason behind this program was some of the students of
this school using two wheelers outside the school campus for
their personal work without knowing the risk behind it.
 More than 150 boys students from various classes had been
reached out through this program.
 The risk of the road is shown through live accident videos and
appealed to the students to share the message with the family.
 Finally prizes and road safety slogan printed pen were
distributed.
Govt. Higher Secondary School, Vikravandi
Photographs
RSP Talk by UEPL Staff
Interaction with the student on RSP
Prize distribution to student
RSP slogan printed pen distribution
Page 80
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
Date & Time
Location
31.10.2014 / 11.30 A.M to 1.00 P.M
Participants
Events
More than 100 General Public
 Road Safety Awareness Program conducted at Hotel J Classic
reaching out of more than 100people.
 This Hotel is located on Km 145+100chainageRHS.
 The live video of accidents displayed and explained the reason
for the same and having an interaction with the people.
Hotel J Classic, V.Salai
Photographs
Introductory talk by UEPL Staff
Dissemination of ppt information on RSP
Live Accident Vedio presentation
Page 81
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
EDUCATIONAL SUPPORT
UEPL supports for the development of poor and less privileged students education in and around
Toll Plaza who are studying in Government Schools continuously. The support is in the form of
providing qualified additional teachers to the schools where student and teachers ratio is
disproposnate. The details of the support are mention as under.
Class in
No. of
which
S.No. Volunteers Name Qualification School Name
students beneficiaries
benefited
studying
1
S.SATHYA
B.A., D.T.ED.,
Panchayat Union
Middle School,
Papanapattu.
32
II & III
50
II & IV
2
S.SUDHA
B.A., D.T.ED.,
Panchayat Union
Primary School,
Melakonthai.
3
M.RAJAVENI
M.A., B.Ed.,
Government High
School, V.Sathanur
47
VI & VII
4
R.JAYAKALVIKARASI
M.A., B.Ed.,
Adhithiravidar
Welfare School,
V.Sathanur
26
III & IV
5
R.DEVI
M.Sc., B.Ed.,
Government High
School,
Mundiyampakkam.
130
VI, VII, VIII
6
S.VIJAYARAJAN
B.Com (C.A)
Government Girls
High School,
Vikravandi.
40
X
82
VI, XI and
XII
85
VII, XI and
XII
7
S.DEVARAJ
B.Sc., D.E.E.E.,
8
P.AYYANARAPPAN
M.A., D.E.E.E.,
Government
Higher Secondary
School,
Vikravandi.
Government
Higher Secondary
School,
Vikravandi.
Page 82
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
26. List of Encroachments Removed During the Month October.14
Location
Chainage
SIDE
Type of Encroachment & Action
Taken
S.No
Date
1
1-Oct-14
160+600
RHS
Hotel board removed.
2
1-Oct-14
154+800
LHS
Wall poster removed.
3
1-Oct-14
154+500
LHS
Wall poster removed.
4
1-Oct-14
154+200
RHS
Wall poster removed.
5
1-Oct-14
154+200
RHS
Wall poster removed.
6
1-Oct-14
154+100
RHS
Wall poster removed.
7
1-Oct-14
155+400
LHS
Wall poster removed.
8
2-Oct-14
181+750
LHS
Wall poster removed.
9
2-Oct-14
181+750
LHS
Bus stop Wall poster removed.
10
2-Oct-14
181+750
LHS
PUP Wall poster removed.
11
2-Oct-14
148+300
RHS
Wall poster removed.
12
3-Oct-14
176+900
RHS
Add banner removed.
13
3-Oct-14
167+000
RHS
Wall poster removed.
14
3-Oct-14
179+200
RHS
Wall poster removed.
15
3-Oct-14
180+000
LHS
Wall poster removed.
16
3-Oct-14
179+850
RHS
Wall poster removed.
17
3-Oct-14
177+000
LHS/RHS
Wall poster removed.
18
4-Oct-14
158+200
LHS
Party adds white wash at the wall.
19
4-Oct-14
133+700
RHS
Wall poster removed.
20
5-Oct-14
153+000
PUP
Wall poster removed.
21
5-Oct-14
181+700
LHS
Wall poster removed.
22
6-Oct-14
152+900
LHS
Wall poster removed.
23
6-Oct-14
154+300
LHS
Wall poster removed.
24
6-Oct-14
154+400
LHS
Wall poster removed.
25
6-Oct-14
154+780
LHS
Wall poster removed.
26
6-Oct-14
152+600
RHS
All board removed
27
6-Oct-14
166+950
LHS
Wall poster removed.
28
6-Oct-14
170+000
PUP
Wall poster removed.
29
7-Oct-14
154+300
RHS
Wall poster removed.
30
7-Oct-14
154+700
RHS
Wall poster removed.
31
9-Oct-14
170+000
PUP
Wall poster removed
32
9-Oct-14
181+400
VUP
Wall poster removed
33
9-Oct-14
176+400
LHS
Add board removed
Page 83
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
34
10-Oct-14
154+600
LHS
Wall poster removed
35
10-Oct-14
141+600
LHS
Wall poster removed
36
10-Oct-14
176+400
LHS
Wall poster removed
37
10-Oct-14
181+400
VUP
Wall poster removed
38
10-Oct-14
170+200
RHS
Wall poster removed & White wash.
39
11-Oct-14
132+000
LHS
Wall poster removed
40
11-Oct-14
133+800
LHS
Wall poster removed
41
11-Oct-14
193+400
RHS
Add banner removed
42
11-Oct-14
184+600
RHS
Add banner removed
43
11-Oct-14
185+050
LHS
Wall poster removed
44
11-Oct-14
170+200
RHS
Wall poster removed
45
11-Oct-14
170+200
RHS
Wall poster removed
46
12-Oct-14
181+400
VUP
Wall poster removed
47
12-Oct-14
193+400
RHS
Wall poster removed
48
12-Oct-14
185+600
PUP
Wall poster removed
49
12-Oct-14
144+400
LHS
Add banner removed
50
12-Oct-14
144+500
LHS
Coffee board removed
51
12-Oct-14
152+000
RHS
Wall poster removed
52
12-Oct-14
124+000
LHS
Wall poster removed
53
13-Oct-14
152+900
LHS
Wall poster removed
54
13-Oct-14
153+000
LHS
Wall poster removed
55
13-Oct-14
153+100
LHS
Wall poster removed
56
13-Oct-14
145+600
LHS
Sticker removed
57
13-Oct-14
170+000
VUP
Wall poster removed
58
13-Oct-14
186+800
PUP
Wall poster removed
59
14-Oct-14
132+000
LHS/RHS
Wall poster removed
60
14-Oct-14
153+000
LHS
Wall poster removed
61
14-Oct-14
152+000
RHS
Wall poster removed
62
14-Oct-14
167+000
LHS
Wall poster removed
63
14-Oct-14
167+000
LHS
Bus stop Wall poster removed
64
14-Oct-14
168+350
LHS
Bus stop Wall poster removed
65
14-Oct-14
170+000
LHS
Bus stop Wall poster removed
66
14-Oct-14
170+200
RHS
Bus stop Wall poster removed
67
15-Oct-14
164+200
LHS
Add Board Removed
68
15-Oct-14
181+600
LHS
Wall poster removed
69
15-Oct-14
185+800
LHS
Wall poster removed
Page 84
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
70
15-Oct-14
185+500
RHS
Wall poster removed
71
15-Oct-14
167+200
LHS
Chicken shop removed
72
15-Oct-14
167+050
LHS
Chicken shop removed
73
15-Oct-14
126+400
LHS
Wall poster removed
74
16-Oct-14
150+500
LHS
Wall poster removed
75
16-Oct-14
185+100
LHS
Wall poster removed
76
16-Oct-14
193+400
RHS
Wall poster removed
77
16-Oct-14
179+850
RHS
Wall poster removed
78
16-Oct-14
180+100
LHS
Wall poster removed
79
16-Oct-14
185+800
LHS
Wall poster removed
80
16-Oct-14
167+700
RHS/LHS
Wall poster removed
81
16-Oct-14
191+850
LHS
Wall poster removed
82
16-Oct-14
176+150
RHS
Wall poster removed
83
17-Oct-14
151+200
VUP
Wall poster removed
84
17-Oct-14
153+000
PUP
Wall poster removed
85
17-Oct-14
155+200
PUP
Wall poster removed
86
17-Oct-14
124+000
VUP
Wall poster removed
87
17-Oct-14
180+000
LHS
Wall poster removed
88
17-Oct-14
184+000
LHS
Wall poster removed
89
17-Oct-14
193+400
RHS
Wall poster removed
90
17-Oct-14
170+200
RHS
Wall poster removed
91
17-Oct-14
181+600
RHS
Wall poster removed
92
18-Oct-14
156+000
RHS
Add banner removed
93
18-Oct-14
153+000
RHS
Wall poster removed
94
18-Oct-14
181+600
LHS
Wall poster removed
95
18-Oct-14
185+800
LHS
Wall poster removed
96
18-Oct-14
186+000
RHS
Wall poster removed
97
18-Oct-14
166+950
RHS
Wall poster removed
98
19-Oct-14
151+100
LHS
Wall poster removed
99
19-Oct-14
153+000
RHS
Wall poster removed
100
21-Oct-14
154+700
LHS
Wall poster removed
101
21-Oct-14
154+200
LHS
Wall poster removed
102
21-Oct-14
152+000
RHS
Wall poster removed
103
22-Oct-14
144+800
LHS
Wall poster removed
104
22-Oct-14
151+120
LHS
Wall poster removed
105
22-Oct-14
152+800
LHS
Wall poster removed
Page 85
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
106
22-Oct-14
154+600
LHS
Wall poster removed
107
23-Oct-14
153+300
LHS
Wall poster removed
108
23-Oct-14
186+600
LHS/RHS
Wall poster removed
109
25-Oct-14
130+820
LHS
Add banner removed
110
25-Oct-14
130+900
LHS
Add banner removed
111
25-Oct-14
132+200
LHS
Add banner removed
112
25-Oct-14
132+120
LHS
Add banner removed
113
25-Oct-14
134+820
LHS
Add banner removed
114
25-Oct-14
137+160
LHS
Add banner removed
115
25-Oct-14
144+300
LHS
Add banner removed
116
25-Oct-14
158+660
LHS
Add banner removed
117
25-Oct-14
153+700
RHS
Add banner removed
118
25-Oct-14
153+000
LHS/RHS
Add banner removed
119
25-Oct-14
185+700
PUP
Wall poster removed
120
25-Oct-14
191+900
LHS
Wall poster removed
121
27-Oct-14
181+500
PUP
Wall poster removed
122
28-Oct-14
154+800
LHS
Wall poster removed
123
28-Oct-14
153+000
LHS
Wall poster removed
124
28-Oct-14
139+400
RHS
Wall poster removed
125
28-Oct-14
136+200
LHS
Wall poster removed
126
28-Oct-14
141+600
LHS
Wall poster removed
127
28-Oct-14
153+000
VUP
Wall poster removed
128
28-Oct-14
175+500
RHS
Wall poster removed
129
28-Oct-14
176+400
LHS
Wall poster removed
130
29-Oct-14
144+800
LHS
Wall poster removed
131
30-Oct-14
170+000
PUP
wall poster removed
132
30-Oct-14
167+200
LHS
Chicken shop removed
133
30-Oct-14
151+125
LHS
wall poster removed
134
30-Oct-14
152+800
PUP
wall poster removed
135
30-Oct-14
153+000
PUP
wall poster removed
136
30-Oct-14
153+800
LHS
wall poster removed
137
30-Oct-14
154+450
LHS
wall poster removed
138
30-Oct-14
154+700
LHS
wall poster removed
Page 86
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
27. List of Breakdown/Parked vehicles removed
S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Date
Time
1-Oct-14
1-Oct-14
1-Oct-14
1-Oct-14
2-Oct-14
2-Oct-14
2-Oct-14
2-Oct-14
2-Oct-14
2-Oct-14
3-Oct-14
4-Oct-14
4-Oct-14
4-Oct-14
4-Oct-14
5-Oct-14
5-Oct-14
5-Oct-14
5-Oct-14
6-Oct-14
6-Oct-14
6-Oct-14
6-Oct-14
6-Oct-14
7-Oct-14
7-Oct-14
7-Oct-14
8-Oct-14
9-Oct-14
9-Oct-14
9-Oct-14
9-Oct-14
9-Oct-14
9-Oct-14
10-Oct-14
10-Oct-14
10-Oct-14
10-Oct-14
10-Oct-14
10-Oct-14
11-Oct-14
11-Oct-14
0:40
1:40
5:25
12:10
0:11
0:45
3:30
12:20
15:00
18:40
14:45
0:00
10:30
13:30
19:45
5:00
6:00
17:30
20:10
6:30
6:45
11:15
11:40
16:00
0:00
6:30
7:15
19:00
0:10
1:10
7:45
13:00
19:40
19:45
0:10
0:20
1:15
2:45
14:00
21:45
1:10
5:00
Location
Chainage
SIDE
137+500
LHS
143+200
LHS
129+600
LHS
134+800
RHS
153+200
RHS
129+900
RHS
136+800
RHS
143+350
LHS
157+500
LHS
155+300
RHS
155+900
RHS
129+700
RHS
143+600
RHS
149+200
RHS
139+900
RHS
137+900
LHS
153+000
RHS
127+400
RHS
141+800
LHS
141+000
RHS
141+100
RHS
150+300
RHS
149+500
RHS
147+500
LHS
157+300
RHS
121+850
LHS
139+800
LHS
125+500
LHS
158+400
RHS
153+600
RHS
140+000
LHS
148+000
RHS
132+900
LHS
133+400
LHS
140+000
LHS
145+000
LHS
139+800
LHS
121+100
LHS
154+900
LHS
143+600
RHS
128+200
LHS
150+200
LHS
Type of Vehicle
Car TN37T0384
Tractor TN32J8321
Lorry TN20BD7474
Lorry TN32D7223
Car TN09BY3333
Tipper TN32A6107
Lorry TN32H1164
Tempo traveler
Tempo
traveler
TN20AB5697
VanTNBJ1656
TN02AY1612
Lorry TN09AK8184
Lorry HR55M0964
Lorry TN21AX9877
Lorry TN21AY2199
Lorry TN20AE4235
Tata Ace TN39BA9586
Tata Ace TN65B5265
Car TN45U6362
Lorry GJ05Z3672
Car TN01V7799
Van TN20Z7777
Lorry TN72AK7813
Car TN22AT5107
Lorry TN32M6454
Van TN60 C9707
Van TN31 H3205
Van TN31 AJ1712
Car TN23AF5982
Lorry TN77B1877
Lorry TN22Y4545
Car TN06L5011
Car TN38AU7459
Van TN32AD1388
Tata Ace TN32J5465
Eicher van TN04H7830
Tata ace PY01BX5419
Van TN32AD1388
Lorry TN28AC1185
Tata ace TN32Q9245
Tipper Lorry
Eicher van
TN32D5571
Tipper Lorry
TN28AX1628
TN20AU4272
Page 87
Ulundurpet Expressways Pvt. Ltd.
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
11-Oct-14
11-Oct-14
11-Oct-14
11-Oct-14
12-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
14-Oct-14
14-Oct-14
14-Oct-14
15-Oct-14
15-Oct-14
15-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
17-Oct-14
17-Oct-14
17-Oct-14
18-Oct-14
18-Oct-14
18-Oct-14
18-Oct-14
18-Oct-14
18-Oct-14
19-Oct-14
19-Oct-14
20-Oct-14
20-Oct-14
21-Oct-14
22-Oct-14
24-Oct-14
24-Oct-14
27-Oct-14
27-Oct-14
27-Oct-14
27-Oct-14
27-Oct-14
27-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
29-Oct-14
5:30
7:00
18:30
22:45
3:50
0:10
12:30
14:12
18:20
1:13
3:20
14:00
0:55
8:10
18:30
3:05
4:45
15:55
12:00
20:00
17:05
0:20
4:45
7:45
18:00
17:00
3:05
1:00
15:00
12:33
15:00
17:30
17:30
2:20
23:30
4:15
4:35
15:04
17:30
21:00
21:35
6:55
9:45
14:25
17:55
18:40
12:45
Monthly O&M Report
153+600
125+600
141+500
146+600
131+200
152+100
144+200
143+600
128+200
125+000
136+400
134+350
155+400
148+700
130+800
147+600
139+000
123+750
155+000
153+600
150+400
149+750
147+200
138+450
155+000
129+800
150+500
136+300
150+400
138+050
155+400
123+000
125+400
139+850
128+000
151+000
153+800
157+340
154+000
155+800
159+300
137+400
131+700
155+100
158+600
155+800
153+230
RHS
RHS
RHS
LHS
LHS
RHS
RHS
LHS
RHS
LHS
RHS
RHS
RHS
RHS
LHS
RHS
RHS
LHS
RHS
LHS
RHS
LHS
LHS
RHS
RHS
RHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
LHS
RHS
LHS
LHS
LHS
RHS
RHS
LHS
RHS
LHS
Eicher van TN57R3739
Tipper Lorry
Lorry
TN54Z6431
TN32J5799
Tata ace TN29AM0322
Lorry TN45U2514
Car TN09BU1899
Lorry TN31AR1017
Tractor TN25V8372
Lorry TN37Y9257
Tata Ace TN37BY4897
Lorry TN21Q0775
Lorry TN21E6777
Lorry TN19F 1548
Eicher TN03 3936
Car TN19TU 2071
Lorry TN45U 6536
Lorry HR55S 9251
Lorry TN20BF 6339
Eicher Van
Lorry
TN46F2525
TN18D1861
Lorry TN23AZ4887
Lorry TN21P7768
CarTN45L6413
LorryTN27V9471
LorryTN28AW3879
CarTN49P1414
LorryTN22CT7511
Car TN18X6053
Lorry TN46F0411
Bus TN32N3881
Bus PY01BZ0027
Lorry HR55D9129
Car TN11Z0802
Bus TN21N1678
Eicher van
van
TN30AR6707
TN20AQ9868
Van TN01R2745
Bus TN32N2395
Bus TN32N3937
Lorry TN28AC8710
Car TN45AR9772
Tata ace TN22CH5890
Lorry TN22BT0830
Eicher van TN47P8480
Tanker TN03K7479
Tata ace TN20CB1118
Car TN20BU0751
Page 88
Ulundurpet Expressways Pvt. Ltd.
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
29-Oct-14
29-Oct-14
29-Oct-14
29-Oct-14
29-Oct-14
29-Oct-14
29-Oct-14
30-Oct-14
1-Oct-14
1-Oct-14
2-Oct-14
2-Oct-14
2-Oct-14
3-Oct-14
4-Oct-14
4-Oct-14
4-Oct-14
4-Oct-14
5-Oct-14
5-Oct-14
5-Oct-14
5-Oct-14
6-Oct-14
6-Oct-14
6-Oct-14
6-Oct-14
6-Oct-14
7-Oct-14
7-Oct-14
8-Oct-14
8-Oct-14
9-Oct-14
9-Oct-14
10-Oct-14
10-Oct-14
10-Oct-14
10-Oct-14
10-Oct-14
12-Oct-14
12-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
14-Oct-14
14-Oct-14
14-Oct-14
15-Oct-14
3:05
17:10
18:20
19:55
18:15
20:45
22:30
7:00
3:40
4:16
2:05
3:15
5:13
8:05
7:35
11:30
17:40
14:08
5:45
7:50
18:30
19:00
0:40
4:21
1:12
12:10
12:45
4:09
4:50
9:48
22:20
13:25
22:10
1:30
2:20
3:40
13:50
15:15
15:05
14:40
13:29
16:15
18:30
0:30
1:30
6:35
6:00
Monthly O&M Report
135+040
152+000
155+660
150+900
150+400
150+400
150+400
133+500
173+000
192+900
182+800
181+800
167+700
162+700
169+700
185+800
181+400
163+100
184+600
172+100
188+400
192+800
185+450
168+450
176+400
175+200
186+200
167+850
161+200
161+700
162+850
182+900
170+700
166+200
170+600
170+000
160+250
167+800
178+800
187+600
169+800
167+800
160+300
184+700
164+500
170+400
170+400
RHS
RHS
RHS
RHS
LHS
RHS
LHS
RHS
RHS
RHS
LHS
RHS
RHS
LHS
LHS
LHS
LHS
RHS
LHS
LHS
RHS
RHS
RHS
RHS
LHS
RHS
RHS
RHS
LHS
LHS
LHS
RHS
RHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
LHS
RHS
LHS
RHS
Lorry TN28M5743
Lorry TN28F9667
Lorry TN77C8188
TNSTC Bus
Lorry
TN01N0097
TN68N0412
Lorry TN21T7613
Lorry TN20AF8268
Lorry TN50E1308
Lorry TN32W3598
Tata Ace TN38BJ1181
Car U3575
Car TN30K2568
Lorry TN04AB6773
Car TN03J5017
Bus KA41A9901
Van AP27Y9829
Tata Ace TN65Q4350
Lorry TN10M9337
Tata magic
Lorry
TN21R3997
TN02AP4869
Car PY01AC1374
Car TN01AF9931
Tata Ace TN31AD9891
Car TN49S5478
Bus AR01F8293
Lorry TN28AJ2220
Car TN05AC4584
Lorry TN21 K3339
Car PY01BN1692
Gas Tanker KA21 5416
Lorry TN32AT5587
Tata Ace TN32AY0135
Lorry TN30Y7342
Car TN76T3169
Car TN02AK5908
Car TN32S4866
Lorry TN04U2493
Lorry TN04T0247
Car TN49AW3456
Car TN22BK8984
Tata Sumo
Lorry
TN47R1036
TN31AW3553
207 Van TN20BQ5346
Lorry TN32Z9699
Lorry TN13P3283
Lorry TN21AJ9136
Tata sumo TN32P3245
Page 89
Ulundurpet Expressways Pvt. Ltd.
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
15-Oct-14
15-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
17-Oct-14
19-Oct-14
20-Oct-14
20-Oct-14
20-Oct-14
21-Oct-14
21-Oct-14
21-Oct-14
21-Oct-14
22-Oct-14
22-Oct-14
22-Oct-14
22-Oct-14
25-Oct-14
25-Oct-14
25-Oct-14
26-Oct-14
26-Oct-14
26-Oct-14
26-Oct-14
26-Oct-14
27-Oct-14
27-Oct-14
27-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
29-Oct-14
29-Oct-14
8:08
22:15
1:34
1:45
4:25
15:30
6:15
6:55
12:45
13:00
20:00
0:40
5:10
5:50
6:50
1:10
3:45
11:35
19:57
1:50
15:00
17:40
1:45
5:00
16:07
17:40
19:30
4:00
11:45
18:18
1:50
5:05
19:20
5:15
21:40
Monthly O&M Report
174+400
167+000
159+700
163+200
163+100
175+800
177+900
193+200
174+900
176+400
169+950
185+400
160+500
159+100
173+050
186+600
169+000
179+700
188+600
174+100
188+450
170+850
171+100
166+300
175+800
168+400
165+400
177+900
183+700
163+450
186+750
188+450
158+600
184+600
186+900
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
LHS
LHS
RHS
LHS
RHS
RHS
LHS
LHS
LHS
LHS
LHS
RHS
LHS
RHS
RHS
LHS
LHS
LHS
RHS
LHS
LHS
LHS
Van TN30P 6301
Van TN16 8508
Eicher van TN69AS
Lorry TN42Z
2818 7686
Amb TN10S 9218
Lorry TN32Q 0412
Lorry TN28KL1625
Lorry TN64H2908
407VAN TN46J4284
Bus TN63N1293
Tata ace TN31Q4972
Car TN74P7795
Tata AceTN47Z6843
Bus TN69L9777
Car TN32F7799
Eicher van TN18H2486
BusTN12A0092
CarTN48R3433
CarTN09AW5823
SETC bus TN01AN0057
Van TN28Q6393
Car TN22AA2391
lorry TN43 4057
Car TN18Q 0016
Lorry TN672520
Tata Ace TN31AE2032
Car TN05AL1830
Eicher van
Car
TN07X 4370
TN45AL8339
Eicher van
Car
AP02TA8922
TN20AQ9861
Tata van TN20CV3667
Lorry TN04AK4307
Lorry TN32F3224
Bus TN01N5799
Page 90
Ulundurpet Expressways Pvt. Ltd.
Monthly O&M Report
28. List of Vehicles Travelled in Opposite Direction
S.No
Date
Time
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
1-Oct-14
1-Oct-14
1-Oct-14
1-Oct-14
2-Oct-14
2-Oct-14
2-Oct-14
3-Oct-14
4-Oct-14
4-Oct-14
4-Oct-14
4-Oct-14
4-Oct-14
5-Oct-14
6-Oct-14
6-Oct-14
6-Oct-14
6-Oct-14
6-Oct-14
6-Oct-14
7-Oct-14
7-Oct-14
9-Oct-14
11-Oct-14
11-Oct-14
11-Oct-14
11-Oct-14
11-Oct-14
11-Oct-14
11-Oct-14
12-Oct-14
12-Oct-14
12-Oct-14
12-Oct-14
12-Oct-14
12-Oct-14
12-Oct-14
12-Oct-14
12-Oct-14
4:13
5:05
5:38
8:03
3:22
7:25
7:25
16:00
12:30
15:00
15:05
15:15
15:15
11:10
11:35
11:35
12:40
15:50
17:20
17:20
13:20
10:15
14:10
6:55
7:20
13:50
0:10
0:15
0:20
0:15
6:32
9:25
11:10
11:45
3:45
5:50
5:50
6:40
6:45
Location
Chainage LHS/RHS
193+400
LHS
177+500
RHS
164+700
RHS
175+750
RHS
175+500
LHS
193+400
RHS
193+300
RHS
193+400
RHS
192+800
RHS
138+200
RHS
136+600
RHS
134+600
RHS
134+600
RHS
186+400
LHS
146+400
RHS
146+400
RHS
126+000
RHS
152+200
RHS
134+200
LHS
192+200
RHS
182+200
RHS
173+400
RHS
193+300
RHS
130+000
RHS
131+800
LHS
152+100
RHS
193+400
RHS
192+800
RHS
187+400
LHS
184+450
RHS
152+100
RHS
151+700
RHS
151+600
RHS
134+200
RHS
193+400
RHS
169+600
RHS
169+600
RHS
191+800
LHS
193+200
RHS
Vehicle
number
TN31M3442
PY01BN4048
TN22E4556
TN32AZ7295
TN05AE5862
AP28TD1328
TN07BT0723
TN07BC0327
TN32AY3165
TN16 9099
TN32AD8501
TN88 8048
TN31AV2090
TN30AL1044
TN32AX0726
TN32Q3240
TN30K9510
TN51W5679
TN11C4442
TN47T8731
TN32R9981
TN20AK0621
TN45AP7738
TN61A1919
TN32AC9968
TN32A0942
TN38AC6573
TN39AA5508
TN77B3144
TN15A1899
TN31K7098
TN47C6226
TN51W5679
TN32AX2896
TN07K9421
AP27JV1080
TN34J3434
TN24C5526
TN28AK2939
Type of Vehicle
LORRY
CAR
LORRY
LORRY
AUTO
207 VAN
CAR
CAR
CAR
CAR
CAR
LORRY
LORRY
CAR
Tata Ace
Tractor
LORRY
LORRY
CAR
LORRY
LORRY
VAN
CAR
LORRY
LORRY
Tractor
LORRY
LORRY
CAR
Tata Ace
LORRY
LORRY
LORRY
CAR
EICHER VAN
Tata Ace
CAR
LORRY
LORRY
Page 91
Ulundurpet Expressways Pvt. Ltd.
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
12-Oct-14
12-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
14-Oct-14
14-Oct-14
14-Oct-14
14-Oct-14
14-Oct-14
14-Oct-14
14-Oct-14
15-Oct-14
15-Oct-14
15-Oct-14
15-Oct-14
15-Oct-14
15-Oct-14
15-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
6:45
6:45
6:00
6:10
6:10
6:10
6:38
6:38
6:40
0:25
14:30
15:20
15:22
15:22
15:55
15:55
16:15
16:15
16:15
16:15
16:50
17:00
17:13
10:30
10:50
13:05
6:30
6:35
13:45
14:20
7:30
7:40
7:45
7:45
10:05
10:05
12:45
10:05
10:31
16:15
17:10
17:15
17:15
17:20
193+200
193+200
193+400
192+800
192+800
192+800
186+400
186+400
184+600
154+200
142+000
145+000
145+000
145+000
146+300
146+300
146+600
146+600
146+600
146+600
158+300
152+200
147+300
168+400
170+300
165+400
132+600
135+200
134+100
141+700
155+400
154+000
152+100
152+100
180+200
180+200
172+500
146+000
146+600
135+200
146+600
146+600
146+600
146+800
Monthly O&M Report
RHS
RHS
RHS
RHS
RHS
RHS
LHS
LHS
LHS
LHS
RHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
LHS
RHS
LHS
LHS
LHS
LHS
LHS
RHS
LHS
RHS
LHS
RHS
RHS
LHS
LHS
RHS
LHS
LHS
RHS
LHS
LHS
LHS
LHS
TN32L2151
TN32J9558
TN33BC4495
TN10AA7482
TN11J9697
TN28PL5500
TN31B4281
TN46E2462
TN31AW8434
TN66L9261
TN32B4439
TN20CY2354
TN30X2473
TDS1293
TN32J6313
TN10D1611
TN32D4006
TN32T7916
TN69M8292
TN19S3496
TN03H3975
HR55L2992
TN32H6570
TN05AQ9295
TN32AC6331
PY01AH0667
TN32AX2896
TN21AY2668
TN32Q3136
TN21BA0140
TN28AA 9177
TN32E 6819
TN32E 1477
TDS 1986
TN30M 6106
TN32AC 9790
TN31AA 4111
TN24G 0429
NO NUMBER
TN32T 3044
TN28AH 8688
TN32T 7277
TN01AC 6049
TN33P 8440
Tractor
Tractor
VAN
CAR
CAR
CAR
CAR
Tata Ace
CAR
LORRY
CAR
Tata Ace
CAR
LORRY
Tata Ace
LORRY
BUS
BUS
BUS
BUS
Tata Ace
LORRY
LORRY
Tata Ace
Tata Ace
CAR
Tata Ace
LORRY
AUTO
Tata Ace
LORRY
VAN
TANKER LORRY
TANKER LORRY
LORRY
LORRY
Tata Ace
AMBULANCE
Tractor
Tractor
LORRY
LORRY
LORRY
LORRY
Page 92
Ulundurpet Expressways Pvt. Ltd.
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
16-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
16-Oct-14
17-Oct-14
17-Oct-14
18-Oct-14
18-Oct-14
18-Oct-14
18-Oct-14
18-Oct-14
18-Oct-14
18-Oct-14
18-Oct-14
19-Oct-14
19-Oct-14
19-Oct-14
19-Oct-14
19-Oct-14
20-Oct-14
20-Oct-14
21-Oct-14
21-Oct-14
21-Oct-14
21-Oct-14
21-Oct-14
23-Oct-14
23-Oct-14
23-Oct-14
24-Oct-14
25-Oct-14
25-Oct-14
25-Oct-14
25-Oct-14
25-Oct-14
26-Oct-14
26-Oct-14
26-Oct-14
26-Oct-14
17:20
16:20
17:30
17:30
17:30
17:40
17:40
17:45
18:50
16:15
16:20
14:45
18:45
16:40
17:35
17:35
17:40
17:40
17:40
17:55
18:00
18:30
18:35
19:00
7:10
12:15
7:30
7:30
7:35
7:40
7:40
3:00
4:30
4:30
16:30
18:55
19:00
14:25
15:28
15:54
13:20
13:20
11:06
12:35
146+800
186+200
193+600
193+600
193+600
192+850
192+850
191+000
166+800
172+250
176+450
139+600
143+000
180+600
192+810
192+810
192+600
192+600
192+600
186+400
188+400
192+850
193+200
182+400
146+000
134+000
193+200
193+200
193+200
193+200
193+200
125+700
147+000
147+000
157+800
144+200
144+200
177+600
193+400
193+800
142+000
142+000
125+300
132+000
Monthly O&M Report
LHS
LHS
RHS
RHS
RHS
RHS
RHS
LHS
RHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
LHS
LHS
RHS
RHS
RHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
LHS
RHS
RHS
RHS
RHS
LHS
LHS
RHS
RHS
LHS
LHS
RHS
LHS
TN01W 7878
TN04AH 6152
TN20CD 6556
TN09BW 3888
TN68C 2232
TN06F 8769
TN21AM 0734
PY01DD 2788
TN66H 9691
PY01BF5666
TN15 5578
TN32Q9559
PY01AN5890
TN28AE6629
KL01AX6901
TN09AV2428
TN22BH5720
TN01AU4272
TN30H6259
TN45AJ5353
TN21F7745
TN30A3535
TN28AC4829
TN31AJ8282
For Regn
TN05AM4777
TN22CM5128
TN64 0822
TN48Z8862
TN32C2151
TN10AS 1
TN09BM0986
TN04AM3481
TN09AV5979
TN31H1528
TN21AU2244
TN32H8070
TN31H6223
TN51 5942
TN32Z4129
TN32E6237
TN32Q9921
TN01AA886
TN32M2091
LORRY
EICHER VAN
CAR
CAR
CAR
CAR
LORRY
CAR
CAR
CAR
MINI BUS
LORRY
CAR
LORRY
CAR
CAR
CAR
CAR
CAR
CAR
LORRY
CAR
CAR
Tata Ace
Tractor
EICHER VAN
CAR
CAR
LORRY
Tractor
CAR
CAR
CAR
LORRY
CAR
CAR
Tata Ace
Tata Ace
CAR
Tractor
Tata Ace
Tata Ace
CAR
AUTO
Page 93
Ulundurpet Expressways Pvt. Ltd.
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
26-Oct-14
26-Oct-14
26-Oct-14
26-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
29-Oct-14
29-Oct-14
29-Oct-14
30-Oct-14
30-Oct-14
30-Oct-14
30-Oct-14
30-Oct-14
30-Oct-14
30-Oct-14
30-Oct-14
30-Oct-14
15:29
15:29
15:29
15:29
10:25
18:40
11:45
12:45
12:50
13:05
16:15
18:10
20:05
16:30
16:34
16:25
6:45
6:45
6:45
6:50
7:00
6:45
7:00
7:50
14:09
193+400
193+400
193+400
193+400
128+000
158+600
169+400
193+400
193+400
184+400
174+600
193+500
177+000
169+900
173+300
191+800
193+200
193+200
193+200
192+800
191+200
139+900
129+600
145+000
152+200
Monthly O&M Report
RHS
RHS
RHS
RHS
RHS
LHS
RHS
RHS
RHS
RHS
LHS
LHS
RHS
RHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
LHS
RHS
TN30AQ7346
TN37AJ2777
TN07AP7873
TN30AD2928
TN05AJ5097
TN03BJ7474
TN32F2624
TN32C4267
TN32J8108
TN78F7781
TN32L5181
TN32AW5780
TN32AW2644
TN32H5347
TN37BA2575
TN32L9374
TN47M666
TN07BU2513
TN32Y4541
TN58W1166
TN45AC0949
NO NUMBER
TN32J8029
TN32E3116
TN31AV8813
CAR
CAR
CAR
CAR
Tata Ace
CAR
Tata Ace
Tractor
Tractor
Tata Ace
AUTO
Tata Ace
LORRY
LORRY
CAR
VAN
CAR
CAR
Tata Ace
CAR
CAR
Tractor
Tractor
Tractor
LORRY
Page 94