Terms of Reference Delivery of Metering Infrastructure Procedure no. __/__/AZU/000___/12 TERMS OF REFERENCE public procurement procedure – utilities contract – conducted pursuant to the Act of 29 January 2004 entitled the Public Procurement Law, following the unlimited tender procedure, for: delivery of Metering Infrastructure to ENERGA – OPERATOR S.A. Procedure no.: P/_/AZU/000__/1_ CONTRACTING AUTHORITY: ENERGA – OPERATOR S.A. with its registered office in Gdańsk Gdańsk, ___.___.2012 1/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 TABLE OF CONTENTS SECTION I. DEFINITIONS ............................................................................................... 3 SECTION II. INFORMATION ON THE CONTRACTING AUTHORITY ......................................... 3 SECTION III. TYPE OF PROCEDURE. ................................................................................. 3 SECTION IV. PROCEDURE NO. ........................................................................................ 3 SECTION V. NOTICE ...................................................................................................... 4 SECTION VI. DESCRIPTION OF THE SUBJECT MATTER OF THE PROCUREMENT ORDER ........... 4 SECTION VII. INFORMATION ON PARTIAL BIDS, VARIANT BIDS AND SUPPLEMENTARY ORDERS ....................................................................................................................... 4 SECTION VII. SUBCONTRACTORS. ................................................................................... 4 SECTION IX. PROCUREMENT ORDER PERFORMANCE DEADLINE .......................................... 4 SECTION X. INFORMATION ON THE METHOD OF COMMUNICATION BETWEEN THE CONTRACTING AUTHORITY AND THE CONTRACTOR AND OF TRANSMITTING REPRESENTATIONS AND DOCUMENTS ............................................................................. 4 SECTION XI. CONDITIONS OF PARTICIPATION IN THE PROCEDURE AND DESCRIPTION OF HOW THEIR FULFILMENT WILL BE EVALUATED .................................................................. 5 SECTION XII. LIST OF REPRESENTATIONS AND DOCUMENTS TO BE PROVIDED BY CONTRACTORS TO CONFIRM THAT THEY ARE NOT EXCLUDED FROM THE PROCEDURE AND THEY MEET THE CONDITIONS FOR PARTICIPATION IN THE PROCEDURE AND THE CONTRACTING AUTHORITY'S REQUIREMENTS .................................................................. 6 SECTION XIII. REQUIREMENTS FOR THE BID DEPOSIT. .................................................... 14 SECTION XIV. PROPOSAL VALIDITY PERIOD ................................................................... 15 SECTION XV. EXPLANATIONS OF THE ToR CONTENT AND ITS MODIFICATION .................... 15 SECTION XVI. DESCRIPTION OF THE BID PREPARATION METHOD ..................................... 15 SECTION XVII. PLACE AND DATE OF SUBMITTING AND OPENING THE BIDS ....................... 16 SECTION XVIII. DESCRIPTION OF PRICE CALCULATION METHOD ...................................... 16 SECTION XIX. DESCRIPTION OF THE BID EVALUATION CRITERIA ..................................... 17 SECTION XX. DESCRIPTION OF THE BID EVALUTION METHOD IN THE PROCEDURE ............. 18 SECTION XXI. SETTLEMENTS BETWEEN THE CONTRACTING AUTHORITY AND THE CONTRACTOR ............................................................................................................. 21 SECTION XXII. REQUIREMENTS FOR THE GOOD PERFORMANCE BOND .............................. 22 SECTION XXIII. MODEL AGREEMENT, TERMS AND CONDITIONS FOR AMENDING THE AGREEMENT ............................................................................................................... 22 SECTION XXIV. INFORMATION ABOUT LEGAL REMEDIES AVAILABLE TO THE CONTRACTOR IN THE COURSE OF THE PROCEDURE ................................................................................. 22 APPENDICES. .............................................................................................................. 23 2/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. __/__/AZU/000___/12 SECTION I. DEFINITIONS 1. The terms used hereinunder in the Terms of Reference mean: 1.1. Bid - should be understood as a bid form along with a complete set of documents, attachments, representations, the sample mentioned in Section XII item 8.3, including the packaging, to be filed by the Contractor in the course of the Procedure; 1.2. Procedure - should be understood as this procedure aimed at entering into the Agreement; 1.3. Document Types Regulation - should be understood as the Regulation issued by the Prime Minister on 30 December 2009 on the types of documents that a contracting authority may demand from a contractor and the forms in which these documents may be submitted (Journal of Laws of 2009, No. 226, item 1817), 1.4. ToR - should be understood as these Terms of Reference with Appendices hereto; 1.5. Agreement - should be understood as the agreement to be concluded after this Procedure is resolved; 1.6. Act - should be understood as the Act of 29 January 2004 entitled the Public Procurement Law (consolidated text: Journal of Laws of 2010, No. 113, Item 759, as amended). 2. The terms not defined above should be understood in agreement with the definitions specified in the Model Agreement which constitutes Appendix No. 1 to the ToR. SECTION II. INFORMATION ON THE CONTRACTING AUTHORITY 1. The Contracting Authority is ENERGA-OPERATOR S.A. with its registered office in Gdańsk. 1.1. National Court Register – Register of Entrepreneurs kept by the District Court for Gdańsk-North, 7th Economic Division of the National Court Register under file number KRS 0000033455; 1.2. NIP:583-000-11-90; 1.3. REGON: 190275904-00075; 1.4. Share capital of PLN 603,301,400.00 fully paid up; 1.5. Website: http://bip.energa-operator.pl; 1.6. E-mail: energa-operator@energa.pl; 1.7. Phone nos.: +48 58 347 38 00, +48 58 347 38 01, +48 58 347 38 02. 2. The procedure is organized and conducted by: ENERGA-OPERATOR S.A. 2.1. Mailing address: Gdańsk 80-870, ul. Reja 29; 2.2. E-mail of the contact person: stanislaw.hejna@energa.pl; 2.3. All the correspondence regarding the Procedure should be sent to the mailing address specified above, using one of the methods of communication with Contractors permitted by the Contracting Authority. The correspondence should state the name and number of the procedure, which are stated on page one of the ToR. SECTION III. TYPE OF PROCEDURE The procedure is conducted as an unlimited tender pursuant to Article 39 and subsequent articles of the Act. SECTION IV. PROCEDURE NO. 1. The procedure to which this document refers has been assigned number P/_/AZU/000__/1_. 2. The Contractors must mention this procedure number in all the documents filed with the Contracting Authority in relation to this Procedure. 3/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 SECTION V. NOTICE 1. The notice of the tender has been provided to the Publications Office of the European Union, electronically and according to the form and procedures provided on the website specified in the directive mentioned in Article 12 section 2 of the Act. 2. The notice of the tender was published on _______.2012 in the Official Journal of the European Union under file number 2012/S_____. SECTION VI. DESCRIPTION OF THE SUBJECT MATTER OF THE PROCUREMENT ORDER 1. The subject matter of the procurement order is the delivery of the Metering Infrastructure to EnergaOperator S.A. in the Installation Area specified by the Contracting Authority in Appendix 4 to the Model Agreement [Installation Area] (Model Agreement constitutes Appendix 1 to the ToR), to the extent of and on the terms and conditions described in the Model Agreement (Model Agreement constitutes Appendix to 1 to the ToR). 2. A detailed description of the subject matter of the order and the technical and quality requirements are described in Appendix 3 to the Model Agreement [List and Description of deliverables] 3. The form of the Agreement constitutes Appendix 1 to the ToR [Model Agreement]. 4. CPV codes: Main code: 4.1. 38551000-2 Energy meters Additional codes: 4.2. 48513000-7 Modem software packages 4.3. 72212513-8 Modem software development services 4.4. 4.5. 38554000-3 Electricity meters 4.6. 65500000-8 Meter reading service 4.7. 48610000-7 Database systems 4.8. 64216110-7 Electronic data exchange services 4.9. 32552410-4 Modems SECTION VII. INFORMATION ON PARTIAL BIDS, VARIANT BIDS AND SUPPLEMENTARY ORDERS 1. The Contracting Authority does not permit the filing of partial bids. 2. The Contracting Authority does not permit the submission of any variant bids. 3. The Contracting Authority does not envisage granting supplementary orders. SECTION VII. SUBCONTRACTORS In the Bid, the Contractor must specify the part of the procurement order that it will subcontract. SECTION IX. PROCUREMENT ORDER PERFORMANCE DEADLINE The procurement should be performed: – in terms of deliveries of the Metering Infrastructure: in accordance with the Schedule set forth in Appendix 8 to the Model Agreement [hereinunder the Schedule] and in particular the first batch of deliveries should be executed up to ______ weeks after the signing of the Agreement and the successive delivery batches) respectively from the _ month after delivery of the first batch up to_ months after delivery of the first batch,- – in terms of Workshop services: in the period of 4 (four) years after the date of the Agreement. SECTION X. INFORMATION ON THE METHOD OF COMMUNICATION BETWEEN THE CONTRACTING AUTHORITY AND THE CONTRACTOR AND OF TRANSMITTING REPRESENTATIONS AND DOCUMENTS 1. The procedure will be conduced in Polish. 2. In the course of the Procedure, Contracting Authority and the Contractors will transfer any representations, requests, notifications and information in writing. 4/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 3. The Contracting Authority allows the transmission of representations, requests, notifications and information in the Proceedings by e-mail. If a representation, request or notification is transmitted by e-mail then, upon request of the transferring Party, the other party will promptly acknowledge its receipt. 4. In the Bid, the Contractor must specify its e-mail address that will be used for communication between the Contractor and the Contracting Authority. 5. Any representations, requests, notifications and information will be transmitted by Contractors: in writing – to the mailing ENERGA-OPERATOR S.A., Gdańsk 80-870, ul. Reja 29, with a note: address: "Procedure for the delivery of Metering Infrastructure to ENERGA OPERATOR S.A. – case no.: P/_/AZU/000__/12”, by e-mail to the following stanislaw.hejna@energa.pl, with the following note in the subject of address: the message: "Procedure for the delivery of Metering Infrastructure to ENERGA OPERATOR S.A. – case no.: P/_/AZU/000__/12”. 6. In order to simplify communication, the Contracting Authority suggests that while transmitting any representations, requests, notifications and information in writing or by e-mail, the Contractor simultaneously sends their content by e-mail in an editable form compatible with MS Office. The above does not apply to the submission of the Bid. SECTION XI. CONDITIONS OF PARTICIPATION IN THE PROCEDURE AND DESCRIPTION OF HOW THEIR FULFILMENT WILL BE EVALUATED 1. The Procedure is open for the Contractors that meet the conditions relating to: 1.1. knowledge and experience related to the subject matter of the order and proportionate to the subject matter of the order, i.e. if during the three years prior to the Bid submission deadline, and if the period of operation is shorter - during that period, duly executed at least 1) one delivery with a net worth of at least PLN 1 million (one million) in which all of the following were provided: i) ii) delivery of electricity meters and concentrators, delivery and installation of utility software used for the parameterization and reading of electricity meters and concentrators, iii) provision of technical consultation services concerning the use of the deliverables described in items i) and ii), - where the condition set out in item 1) may only be met by proving a single delivery which met all the requirements specified above, including those in sub-items i)-iii); aggregating smaller deliveries in order to meet the above requirements is not acceptable . and 2) a single delivery or deliveries of at least 200,000 (two hundred thousand) electricity meters in the period of 12 months, - and with respect to the requirement described in item 2), the Contracting Authority permits the aggregation of deliveries with volumes not exceeding 200,000 meters; 1.2. having personnel capable of performing the order (in addition to the Contractor submitting a relevant representation, the Contracting Authority does not set any specific requirements in this regard); 1.3. economic and financial standing: 1) financial capacity - the Contractor must have the financial resources or credit capacity of at least PLN 5 million (five million zloty); 2) economic capacity: i) The Contractor must have a liability insurance for its professional activity related to the subject matter of the order in the amount of at least PLN 5 million (five million zloty); ii) The Contractor must demonstrate a turnover of at least PLN 20 million (twenty million zloty) per year over the last three financial years and if the period of operation is shorter – during that period. 2. The Contracting Authority will evaluate whether the Contractors meet the conditions for taking part in the Procedure based on the analysis of relevant documents and representations mentioned in Section XII. 5/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 SECTION XII. LIST OF REPRESENTATIONS AND DOCUMENTS TO BE PROVIDED BY CONTRACTORS TO CONFIRM THAT THEY ARE NOT EXCLUDED FROM THE PROCEDURE AND THEY MEET THE CONDITIONS FOR PARTICIPATION IN THE PROCEDURE AND THE CONTRACTING AUTHORITY'S REQUIREMENTS 1. Documents submitted by Contractors with their registered offices or places of residence in the Republic of Poland – confirming that they are not subject to exclusion from the Procedure under Article 24 sec. 1 of the Act The documents listed and lined up with the respective requirements in the table below, must be provided in order to confirm that the Contractor having its registered office or place of residence in the Republic of Poland is not excluded from the Procedure under Article 24 sec. 1 of the Act. Type of requirement for Contractors Document to prove that the requirement has been met Grounds for excluding Contractors under Article 24 sec. 1 of the Act 1. there are no grounds to exclude a Contractor from the Procedure in the circumstances mentioned in Article 24 sec. 1 of the Act; 2. no damage caused as a result of a failure to perform an order or an improper performance of an order, if the damage has been confirmed by a court judgment, which became final in the 3 years before the Procedure was initiated (Article 24 sec. 1 item 1 of the Act); representation that there are no grounds for exclusion (according to the model constituting part of the Bid Form Appendix 2 to the ToR); 3. no termination of a public procurement contract with the Contractor by a Contracting Authority and no withdrawal from a public procurement contract, due to circumstances for which the Contractor is liable if the termination of or withdrawal from the contract occurred in the period of 3 years before the Procedure was initiated and the unfulfilled order value was at least 5% of the contract value (Article 24 sec. 1 item 1a of the Act); 4. no liquidation of the Contractor and no declaration of Contractor's bankruptcy, with the exception of the Contractors who, after bankruptcy, entered into a composition approved by a final court decision, provided that the composition does not provide for the satisfaction of creditors through liquidation of the bankrupt's assets (Article 24 sec. 1 item 2 of the Act); (a) current copy of the relevant register, if separate regulations require registration, issued not earlier than 6 months before the Bid submission deadline; 5. no arrears in the payment of taxes, except where the Contractor has obtained an exemption, deferral, installment arrangement for overdue payments or full suspension of a decision of a competent authority as prescribed by the law (Article 24 sec. 1 item 3 of the Act); current certificate issued by the head of the relevant tax office confirming that the Contractor is not in arrears with the payment of taxes, or a certificate that the Contractor has obtained an exemption, deferral, installment arrangement for overdue payments or full suspension of execution of a decision of a competent authority as prescribed by the law – issued no earlier than 3 months before the Bid submission deadline; 6. no arrears in the payment of social security or health insurance contributions, except where the Contractor has obtained an exemption, deferral, installment arrangement for overdue payments or full suspension of a decision of a competent authority as prescribed by the law (Article 24 sec. 1 item 3 of the Act); current certificate issued by the relevant branch of the ZUS Social Security Company or the KRUS Agricultural Social Security Company duly confirming that the Contractor is not in arrears with social security or health insurance contributions, or a certificate that the Contractor has obtained an exemption, deferral, (b) for natural persons – a representation relating to Article 24 sec. 1 item 2 of the Act (according to the model constituting part of the Bid Form Appendix 2 to the ToR); 6/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 installment arrangement for overdue payments or full suspension of execution of a decision of a competent authority as prescribed by the law – issued no earlier than 3 months before the Bid submission deadline; 7. absence of the prerequisite under which the following are excluded from the procedure (Article 24 sec. 1 items 4-8 of the Act): (a) natural persons who have been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense; current information from the National Criminal Register to the extent prescribed by Article 24 sec. 1 items 4-8 of the Act – issued no earlier than 6 months before the Bid submission deadline; (b) general partnerships of which a shareholder has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense; (c) professional partnerships of which a shareholder or a management board member has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense; (d) limited partnerships and limited joint stock partnerships of which the general partner has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense; (e) legal persons of which a current member of the managing body has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association 7/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 aiming at committing an offense or fiscal offense; 8. absence of the prerequisite which excludes from the procedure the collective entities prohibited by the court from competing for procurement orders based on the regulations on liability of collective entities for acts prohibited under penalty (Article 24 sec. 1 item 9 of the Act). current information from the National Criminal Register to the extent prescribed by Article 24 sec. 1 items 4-8 of the Act – issued no earlier than 6 months before the Bid submission deadline – applies to the Contractors who are collective entities within the meaning of the Act of 28 October 2002 on liability of collective entities for acts prohibited under penalty (Journal of Laws No. 197, Item 1661, as amended). 2. Documents filed by the Contractors having registered office in the Republic of Poland concerning the persons referred to in Article 24 sec 1 items 5-8 of the Act, residing outside of the Republic of Poland This item concerns only the documents filed to confirm that the exclusion from the Procedure under Article 24 sec. 1 items 5-8 of the Act does not apply. The requirement to submit documents described in this item does not exclude the obligation to submit documents confirming the absence of grounds for exclusion mentioned in the table in item 1. In order to confirm the absence of grounds for exclusion mentioned in Article 24 sec. 1 items 5-8 of the Act, the following must be submitted: Type of requirement for Contractors Document to prove that the requirement has been met Grounds for excluding Contractors under Article 24 sec. 1 items 5-8 of the Act 1. absence of the prerequisite under which the following are excluded from the Procedure (Article 24 sec. 1 items 5-8 of the Act): (a) general partnerships of which a shareholder has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense; (b) professional partnerships of which a shareholder or a management board member has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense; (a) a certificate issued by the competent juridical or administrative authority of the country of residence concerning the good behavior of those persons, within the scope defined in Article 24 sec. 1 items 5-8 of the Act – issued no earlier than 6 months before the Bid submission deadline; (b) if no such certificates are issued in the place of residence of such persons, they will be replaced by a document containing a representation confirmed by a notary, an adequate juridical or administrative authority or a professional or economic selfregulatory body of the place of residence of such persons. The document should be issued no earlier than 6 months before the Bid submission deadline. (c) limited partnerships and limited joint stock partnerships of which the general partner has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association 8/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 Type of requirement for Contractors Document to prove that the requirement has been met aiming at committing an offense or fiscal offense; (d) legal persons of which a current member of the managing body has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense. 3. Documents submitted by Contractors with their registered offices or places of residence outside of the Republic of Poland – confirming that they are not subject to exclusion from the Procedure under Article 24 sec. 1 of the Act The following must be submitted to confirm that the Contractor having its registered office or place of residence outside of the Republic of Poland is not excluded from the Procedure under Article 24 sec. 1 of the Act: Type of requirement for Contractors Document to prove that the requirement has been met Grounds for excluding Contractors under Article 24 sec. 1 of the Act 1. there are no grounds to exclude a Contractor from the Procedure in the circumstances mentioned in Article 24 sec. 1 of the Act; representation that there are no grounds for exclusion (according to the model constituting part of the Bid Form Appendix 2 to the ToR); 2. no liquidation of the Contractor and no declaration of Contractor's bankruptcy, with the exception of the Contractors who, after bankruptcy, entered into a composition approved by a final court decision, provided that the composition does not provide for the satisfaction of creditors through liquidation of the bankrupt's assets (Article 24 sec. 1 item 2 of the Act); a document or documents issued in the country where the Contractor has its registered office or a place of residence, confirming that no liquidation has been opened and no bankruptcy declared, issued not earlier than 6 months before the expiry of the deadline for the submission of tenders; 3. no arrears in the payment of taxes, except where the they have obtained an exemption, deferral, installment arrangement for overdue payments or full suspension of a decision of a competent authority as prescribed by the law (Article 24 sec. 1 item 3 of the Act); a document or documents issued in the country where the Contractor has its registered offices or a place of residence, confirming that the Contractor is not in arrears with the payment of taxes or that it has obtained an exemption, deferral, installment arrangement for overdue payments or full suspension of execution of a decision of a competent authority – issued no earlier than 3 months before the Bid submission deadline; 4. no arrears in the payment of social security or health insurance fees or contributions, except where they have obtained an exemption, deferral, installment arrangement for overdue payments or full suspension of a decision of a competent authority as prescribed by the law (Article 24 sec. 1 item 3 of the Act); a document or documents issued in the country where the Contractor has its registered offices or a place of residence, confirming that the Contractor is not in arrears with social security or health insurance contributions or that it has obtained an exemption, deferral, installment arrangement for overdue payments or full suspension of execution of a decision of a competent authority – issued no earlier than 3 months before the Bid 9/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 submission deadline; 5. absence of the prerequisite under which the following are excluded from the procedure (Article 24 sec. 1 items 4-8 of the Act): (a) natural persons who have been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, briberyrelated offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense; a certificate issued by the competent juridical or administrative authority of the country of registration or residence of the person to whom the documents apply, within the scope specified in Article 24 sec. 1 items 4-8 of the Act – issued no earlier than 6 months before the Bid submission deadline; (b) general partnerships of which a shareholder has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense; (c) professional partnerships of which a shareholder or a management board member has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense; (d) limited partnerships and limited joint stock partnerships of which the general partner has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense; (e) legal persons of which a current member of the managing body has been convicted by a final court decision for any offense committed in connection with a procurement procedure, offense against the rights of persons performing gainful employment, environmental offense, bribery-related offense, an offense against business transactions or any other offense committed with a view to deriving pecuniary gain, and for any fiscal offense or offense involving participation in an organized group or association aiming at committing an offense or fiscal offense; 6. absence of the prerequisite which excludes from the a document or documents issued no 10/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 procedure the collective entities prohibited by the court from competing for procurement orders based on the regulations on liability of collective entities for acts prohibited under penalty (Article 24 sec. 1 item 9 of the Act). earlier than 6 months before the Bid submission deadline in the country where the Contractor has registered office or place of residence, confirming that no prohibition to pursue procurement orders has been issued against the Contractor. If in the place of residence of a person or in the country where the Contractor has its registered office or place of residence, the documents mentioned in this table are not issued, they will be substituted with a document containing a representation made before a notary, a competent juridical or administrative authority or a professional or economic self-regulatory body of, respectively, the place of residence or the country where the Contractor has its registered office or place of residence. The issue date of such a document should correspond to the dates specified in this table. In case of doubt as to the contents of any document submitted by a Contractor having its registered office or place of residence outside the territory of the Republic of Poland, the Employer may request the pertinent authorities of the place of residence of the relevant person or the country in which the Contractor has its registered office or place of residence to provide necessary information on such submitted document. 4. Documents required to confirm that the Contractor meets the conditions for participation in the Procedure and to confirm that services and deliveries offered meet the Contracting Authority's requirements In order to confirm that the Contractor meets the conditions for participation in the Procedure, the following must be submitted: Type of condition for Contractors Document to prove that the condition has been met Conditions mentioned in Article 22 sec. 1. of the Act 1) knowledge and experience related to the subject matter of the order and proportionate to the subject matter of the order, i.e. execution of the following in the period of three years prior to the Bid submission deadline, and if the period of operation is shorter during that period: a) one delivery with a net worth of at least PLN 1 million (one million) in which the following were provided: i) delivery of concentrators, electricity meters and ii) delivery and installation of utility software used for the parameterization and reading of electricity meters and concentrators, (a) the list of deliveries made, as required to demonstrate that the condition concerning knowledge and experience in the period of 3 years before the Bid submission deadline has been satisfied, or, if the period of the Contractor’s business activity is shorter, then during such a period, stating the value, subject matter, completion dates and buyers (according to the model constituting part of the Bid Form – Appendix 2 to the ToR); (b) documents confirming that the deliveries have been duly made; iii) provision of technical consultation services concerning the use of the described in items i) and ii) deliverables and b) a delivery or deliveries of at least 200,000 (two hundred thousand) electricity meters in the period of 12 months; 2) having at its disposal the people capable of executing the procurement order (Article 22 sec. 1 item 3 of the Act); Contractor's representation constituting part of the Bid Form – Appendix 2 to the ToR; 3) economic and financial standing (Article 22 sec. 1 item 4 of the Act): a) financial capacity: the Contractor must have the financial resources or credit capacity of at least PLN 5 million (five information from a bank or cooperative savings and loans which the Contractor keeps its confirming the amount of from a union in account, financial 11/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 million zloty); resources held by the Contractor or its credit capacity – issued no earlier than 3 months before the Bid submission deadline. b) economic capacity: i) The Contractor must have a liability insurance for its professional activity related to the subject matter of the order in the amount of at least PLN 5 million (five million zloty); paid policy, and in case of its absence, other document confirming that the Contractor holds liability insurance pertaining to its activity related to the subject matter of the procurement order. ii) The Contractor must demonstrate a turnover of at least PLN 20 million (twenty million zloty) per year over the last three financial years and if the period of operation is shorter – during that period. profit and loss account or, if the financial statements are audited by a chartered auditor in accordance with the accountancy law, also the opinion about the profit and loss account or, in the case of contractors that are not obligated to prepare financial statements, other documents specifying the turnover and the liabilities and receivables – for the period of the last three financial years, or if the period of business activity is shorter then for that period. 5. The Contractor must submit a written representation that it meets the conditions of participation in the Procedure, according to the model constituting part of the Bid Form – Appendix 2 to the ToR. Contractors jointly participating in the Procedure must submit a written representation that all the Contractors jointly meet the conditions of participation in the Procedure, according to the model constituting part of the Bid Form – Appendix 2 to the ToR. Each of the Contractors jointly participating in the Procedure must submit a representation that there are no grounds for excluding the Contractor from the Procedure, according to the model constituting part of the Bid Form – Appendix 2 to the ToR. 6. If the Contractor, following the principles set forth in Article 26 sec. 2b of the Act, while demonstrating that it meets the conditions for participating in the Procedure, relies on the knowledge and experience and on the persons capable of performing the procurement order or financial capacity of other entities, regardless of the legal relationship between them, then in such a situation the Contractor must prove to the Contracting Authority that it will have at its disposal the resources necessary to execute the procurement order, in particular by presenting a written undertaking of those entities to provide the necessary resources to the Contractor for the period of using them for the execution of the procurement order (according to the model constituting part of the Bid Form – Appendix _ to the ToR). If the Contractor, while demonstrating that it meets the condition for participation in the procedure concerning the Contractor's financial capacity, relies on the financial capacity of other entities following the principles set forth in Article 26 sec. 2b of the Act, it is required that it submits information from a bank or from a cooperative savings and loans union in which the other entity keeps its account, confirming the amount of financial resources held by that entity or its credit capacity – issued no earlier than 3 months before the Bid submission deadline. 7. If the documents mentioned in this Section contain amounts expressed in foreign currencies then the Contracting Authority will convert them into Polish zloty using the average NBP exchange rate in effect, respectively, on the date of: completion of the delivery; issue of information; issue of the policy; reparation of financial statements. 8. In order to confirm that the deliveries and services offered conform to the requirements specified by the Contracting Authority, the Contractor must attach the following to the Bid: 8.1. PRIME Alliance certificate (PRIME - PoweRline Intelligent Metering Evolution) and the Contractors whose offered devices have no such certificate should attach a representation of the manufacturer or the Contractor confirming that the devices offered conform with the PRIME specification constituting item III of Appendix 3 to the Model Agreement [List and Description of Deliverables] (Model Agreement constitutes Appendix 1 to the ToR) for: a) 1-phase meter described in Appendix 3 to the Model Agreement [List and Description of Deliverables] (Model Agreement constitutes as Appendix 1 to the ToR), b) 3-phase meter described in Appendix 3 to the Model Agreement [List and Description of 12/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 Deliverables] (Model Agreement constitutes as Appendix 1 to the ToR), 8.2. representation of the manufacturer or the Contractor – confirming that the offered Concentrator and Balancing Meter Sets conform with the PRIME specification constituting item III of Appendix 3 to the Model Agreement [List and Description of Deliverables] (Model Agreement constitutes Appendix 1 to the ToR) for Concentrator and Balancing Meter Sets described in item VII of Appendix 3 to the Model Agreement [List and Description of Deliverables] (Model Agreement constitutes as Appendix 1 to the ToR); 8.3. a sample in the form of two identical copies of each offered: a) 1-phase meter, b) 3-phase meter, c) Concentrator and Balancing Meter Set (a device which performs functions of a balancing meter and a Concentrator). The sample must be prepared as follows: 1) The sample must include the devices mentioned above and: a) testing and diagnostic software to support all the devices (the Contracting Authority permits a separate testing and diagnostic software to be delivered for respective device types), b) technical documentation and user manuals for devices of each type, peripherals needed for each technology, such as photo-electric couplings, dongles, license keys or other essential devices or components guaranteeing seamless communication between the devices and achievement of the objective referred to in item 4) - individually by Contracting Authority's representatives. This requirement does not include power supply cables to connect the devices with the 230V network. 2) testing and diagnostic software for the devices must allow the Contracting Authority to use the software during the entire course of the Procedure: no less than 150 days, in accordance with the distribution policy of the software developer or distributor (licenses, sublicenses, use of software medium, open source licenses, etc.) and the software must be available for operation on the Contracting Authority's computers with the Windows 7 operating system, 3) testing and diagnostic software (including user interfaces), technical documentation and user manuals must be in Polish, 4) the whole sample described in item 1) must support testing, diagnostics and parameterization of the devices constituting the sample and execution of the examination within the scope described in Section XIX item II of the ToR, 5) the following registers with the items stated below, described in accordance with the OBIS code, must be configured in all the devices constituting the sample: 6) Register Requirement/value C.1.0 ID no. 1.8.0 E:Input-active.Energy.Profile of counter states. 1.8.1 E: Input-active.Energy.1-strefa Any value >0 1.8.2 E: Input-active.Energy.2-strefa Any value >0 1.8.3 E: Input-active.Energy.3-strefa Any value >0 1.6.0 E: Input-active.Pmax.round-the-clock Any value >0 0.9.1 Current time Current time 0.9.2 Current date Current date 0.2.2. Tariff The register should contain data (samples from 63 days while ensuring a 15-minute profile) C12a all the devices constituting the sample must be parameterized in such a way that the following is possible when using the testing and diagnostic software: reading of registers prepared according to item 5) above and change of parameters described in points 0.9.1; 0.9.2; 0.2.2 of the table in item 5) above, 7) OBIS code give the "disengage" command and the "engage" command. the devices do not need to be certified or hold a MID certificate, and do not have to meet the requirements described in the document: "Communication standard between the AMI 13/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 Application and the Metering Infrastructure" referred to in item IV of Appendix 3 to the Model Agreement [List and Description of Deliverables] and the requirements described in item V, sub-item 6 of Appendix 3 to the Model Agreement [List and Description of Deliverables] After being delivered, the sample will be tested to check whether the devices offered meet to the requirements specified by the Contracting Authority. All the components of the sample should be prepared in such a way that enables the examination as described in Section XIX of the ToR. The complete sample should be submitted along with the Bid in room 106 (mailing office) in the Energy Management Center [Centrum Zarządzania Energią] building at 80-870 Gdańsk, ul. Reja 29. All the components of the sample (excluding the testing and diagnostic equipment) should be packaged together, secured against opening (packaged and sealed) and marked with the Contractor's name and the number of the Procedure (which should be accessible without the need to open the sample itself). Testing and diagnostic software should be provided on a CD-rom or a DVD-rom. The data medium should be packed in a closed envelope separated from the rest of the sample, sealed and marked with the Contractor's name and the number of the Procedure (which should be accessible without the need to open the sample itself). The sample and the envelope with testing and diagnostic software will be publicly opened when the bids are opened. 9. In the event the Contractor makes an effective disclaimer that the delivered sample is the Contractor's corporate secret, access to the sample for other people (including other Contractors) will be limited to the moment when the bids (and samples) are opened when such persons will be able to determine that the Contractor has actually delivered the sample and how it looks on the outside. 10. If the devices delivered are the "dual-use goods" referred to in Article 21a-21c of the Act of 29 November 2000 on foreign trade in goods, technologies and services of strategic importance to national security and to the maintenance of international peace and security (consolidated text: Journal of Laws of 2004, No. 229 Item 2315, as amended) and the Prime Minister's regulation of 15 September 2004 on the application form to report the intention to import dual-use goods (Journal of Laws of 2004, No. 208 Item 2119), at the written request of the Contractor, the Contracting Authority will provide a written representation according to the model constituting Appendix 3 to these ToR. 11. The representations and documents not listed in the Document Types Regulation are attached to the Bid as an original or a copy certified for compliance with the original by the Contractor. SECTION XIII. REQUIREMENTS FOR THE BID DEPOSIT 1. A Contractor submitting a Bid is obligated to make, before the elapse of the bid submission deadline, a bid deposit of PLN 2,000,000 (two million). 2. The bid deposit may be made: 2.1. in cash: by transfer to the Contracting Authority’s bank account number 05 1240 6292 1111 0010 3648 1593, with a note “Bid deposit – procedure for delivery of Metering Infrastructure P/_/AZU/000__/12”; 2.2. in other forms: a) bank sureties or sureties issued by credit unions, the latter necessarily being cash sureties; b) bank guarantees; c) insurance bonds; d) sureties granted by entities referred to in art. 6b sec. 5 item 2) of the Act of 9 November 2000 on the establishment of the Polish Agency for Enterprise Development (Journal of Laws No. 109 Item 1158, as amended), considering, however, that if the bid deposit is made in a non-pecuniary form, the original document of surety or guarantee should be delivered to the Contracting Authority to room no. 106 (administrative office) in the building of Centrum Zarządzania Energią, Gdańsk 80-870, ul. Reja 29 until the elapse of the bid submission deadline. 3. In the case of a bid deposit made in cash, the date of crediting the Contracting Authority’s bank account will be regarded as the date of the deposit payment. 4. The surety or guarantee provided as a bid deposit must be unconditional and irrevocable, payable at each demand of the Contracting Authority and must cover liability for all the cases resulting in a loss of the bid deposit by the Contractor as defined in art. 46 sec. 4a and 5 of the Act, and be valid for the entire bid validity period as defined in ToR. 5. The Contracting Authority will return bid deposits to all the Contractors immediately after selecting the most favorable bid or canceling the Procedure, apart from the Contractor whose Bid has been found to be the most favorable, to whom the Contracting Authority will return the bid deposit immediately after concluding the Agreement. 6. If the bid deposit is made in cash, the Contracting Authority will return it together with the interest resulting from the bank account agreement for the account in which it was kept, decreased by the 14/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 account maintenance costs and the bank’s commission for the transfer of cash to the Contractor’s account. 7. The Contracting Authority will retain the bid deposit together with the interest if the Contractor in reply to the summons referred to in art. 26 sec. 3 of the Act failed to submit the documents or representations referred to in art. 25 sec. 1 of the Act, or powers-of-attorney, unless the Contractor proves that the failure resulted from reasons not attributable to it. 8. The Contractor whose Bid has been selected will lose its bid deposit in favor of the Contracting Authority together with the interest if: 8.1. the Contractor refuses to sign the Agreement on conditions specified in the Bid; 8.2. the Contractor has failed to provide the required good performance bond for the Agreement; 8.3. it becomes impossible to conclude the Agreement for reasons attributable to the Contractor. 9. If the Bid is withdrawn before the elapse of the bid submission deadline, this does not cause a Bidder to lose its bid deposit. SECTION XIV. PROPOSAL VALIDITY PERIOD 1. The Bidder is bound by its bid for the period of 90 days. 2. The bid validity term begins as soon as the bid submission deadline elapses. 3. The Contractor may, on its own or at a request of the Contracting Authority, extend the bid validity term, with the restriction that the Contracting Authority may only once, at least 3 days before the elapse of the bid validity term, ask Contractors to give consent to extend the term for a specified period, not longer, however, than 60 days. 4. An extension of the bid validity term is acceptable only with a simultaneous extension of the bid deposit validity term or, if this is impossible, with making a new bid deposit for the extended bid validity term. If the bid validity term is extended after providing the Contractors with information about the Contractor whose Bid has been decided to be the most favorable, the duty to extend the bid deposit or make a new one will only concern the Contractor whose Bid has been decided to be the most favorable. SECTION XV. EXPLANATIONS OF THE ToR CONTENT AND ITS MODIFICATION 1. During the Procedure, the Contractor may ask the Contracting Authority to provide explanations about the ToR content. The Contracting Authority will provide the explanations immediately, but not later than 6 days before the bid submission deadline, provided that the request to explain the ToR content was received by the Contracting Authority not later than by the end of the day on which half of the set bid submission deadline elapses. 2. An extension of the bid submission deadline does not affect the course of the period for submitting a request for explanation of the ToR content. 3. If a request for explanation of the ToR content was received after the elapse of the period for submitting the request as referred to in item 1 or concerns explanations provided, the Contracting Authority may provide further explanations or leave the request not reviewed. 4. The Contracting Authority will provide the content of requests with explanations to all the Contractors to whom ToR have been provided. The Contracting Authority will not disclose the authors of the requests. 5. In justified cases, the Contracting Authority may, before the elapse of the bid submission deadline, modify the content of ToR. The modification of ToR will be provided by the Contracting Authority immediately to all the Contractors to whom ToR have been provided. 6. If additional time is needed to introduce changes to Bids as a result of a modification in the content of ToR, the Contracting Authority will extend the bid submission deadline, informing about it all the Contractors to whom ToR have been provided. SECTION XVI. DESCRIPTION OF THE BID PREPARATION METHOD. 1. A Contractor may submit only one Bid. If a Contractor submits more than one Bid, all the Bids submitted by the Contractor will be rejected. 2. The Bid must be signed by a person authorized to represent the Contractor pursuant to the entry to the appropriate register or a person to whom a power-of-attorney has been granted by authorized persons. If a Contractor is represented by a proxy, the Bid will be appended with the original or a copy of the power-of-attorney signed by a person authorized to represent the Contractor. If some changes have been made to the composition of the management board or the rules for representing the Contractor as compared to the extract from the National Court Register (KRS) attached to the Bid, the 15/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 Contractor is obligated to attach to the Bid also other documents confirming the authorization of the person signing the Bid to represent the Contractor. 3. Contractors participating jointly in the Procedure are obligated to appoint a proxy to represent them in the Procedure or to represent them in the Procedure and conclude the Agreement, and are obligated to present with the Bid the original power-of-attorney or a copy of it certified by a notary. 4. To prepare a Bid, it is recommended to use the Bid form which constitutes Appendix 2 to the ToR. 5. The Procedure is conducted in Polish. The Contracting Authority does not give consent to submitting a Bid, representations or other required documents in a language other than Polish. 6. The Bid should be submitted in 2 copies – the first, in hard copy, marked as “THE ORIGINAL” and wire-bound, and the second, marked as “A COPY”, in electronic form (on a CD or DVD), containing faithful color scanned images of the original. In both copies of the Bid, separate sections should be found marked as company secret; in the original, these sections should be separately wire-bound and in the copy, they should be on a separate data carrier. While verifying and evaluating the Contractor’s Bid, the Contracting Authority will take into consideration the substantive content of the two copies of the Bid, but if there are any discrepancies between the original and the copy of the Bid, the original will prevail. 7. The Bid preparation manner with regard to a sample has been described in Section XII item 8.3. of ToR. 8. Subject to art. 93 sec. 4 of the Act, the Contractor will incur all the costs connected with preparing and submitting the Bid. The Contracting Authority does not plan to return costs of the participation in the Procedure. SECTION XVII. PLACE AND DATE OF SUBMITTING AND OPENING THE BIDS. 1. Bids should be submitted in the Centrum Zarządzania Energią building, Gdańsk 80-870, ul. Reja 29, room no. 106 (administrative office), by ______ by 10:00. 2. Bids will be opened in public in the Centrum Zarządzania Energią building, Gdańsk 80-870, ul. Reja 29, room no. 233, on the date of the bid submission deadline at 11:00. 3. A Bid submitted after the deadline will be returned by the Contracting Authority unopened, after the elapse of the term provided for bringing an appeal. SECTION XVIII. DESCRIPTION OF PRICE CALCULATION METHOD. 1. The Contractor will indicate in the price table found in the Bid’s form: 1.1. for a single-phase meter with communication interface: a) unit net price; b) VAT rate; c) VAT amount; d) unit gross price, e) total net price of all the offered meters with communication interfaces calculated as the product of the meter’s unit net price and the number of these meters as indicated in Appendix 3 to the Model Agreement [List and Description of Deliverables]; f) total gross price of all the offered meters with communication interfaces calculated as the product of the meter’s unit gross price and the number of these meters as indicated in Appendix 3 to the Model Agreement [List and Description of Deliverables]; 1.2. for a three-phase direct meter with communication interface: a) unit net price; b) VAT rate; c) VAT amount; d) unit gross price; e) total net price of all the offered meters with communication interfaces calculated as the product of the meter’s unit net price and the number of these meters as indicated in Appendix 3 to the Model Agreement [List and Description of Deliverables]; f) total gross price of all the offered meters with communication interfaces calculated as the product of the meter’s unit gross price and the number of these meters as indicated in Appendix 3 to the Model Agreement [List and Description of Deliverables]; 1.3. for Concentrator and Balancing Meter Sets, the Contractor will indicate: a) unit net price; b) VAT rate; c) VAT amount; 16/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 d) unit gross price; e) total net price of all the offered Concentrator and Balancing Meter Sets calculated as the product of a Concentrator and Balancing Meter Set’s unit net price and the number of these Concentrator and Balancing Meter Sets as indicated in Appendix no. 3 to the Model Agreement [List and Description of Deliverables]; f) total gross price of all the offered Concentrator and Balancing Meter Sets calculated as the product of a Concentrator and Balancing Meter Set’s unit gross price and the number of these Concentrator and Balancing Meter Sets as indicated in Appendix no. 3 to the Model Agreement [List and Description of Deliverables]. 1.4. for a Workshop (per each Workshop Completion Certificate issued for a participant) as referred to in the Model Agreement constituting Appendix no. 1 to ToR: a) unit net price; b) VAT rate; c) VAT amount; d) unit gross price; e) total net price of all the offered Workshops calculated as the product of a Workshop’s unit net price and the number of these Workshops as indicated in Appendix no. 3 to the Model Agreement [List and Description of Deliverables]; f) total gross price of all the offered Workshops calculated as the product of a Workshop’s unit gross price and the number of these Workshops as indicated in Appendix no. 3 to the Model Agreement [List and Description of Deliverables]. g) The unit price for a Workshop should take into account the total value of the Contractor’s services needed to train one training participant to such an extent that the participant is entitled to receive a Workshop Completion Certificate. 2. In appropriate line items of the price table from the Bid Form, the Contractors should give the Bid’s total gross and net price, resulting from adding the total net and gross prices of all the price elements. 3. The unit net and gross prices and the VAT amount should be given to a precision of 2 significant digits. 4. Settlements between the Contracting Authority and the Contractor will be made in PLN. 5. If regulations regarding VAT rate are amended as compared to these binding at the date of submitting the Bids, the unit net price will remain unchanged for the entire Agreement term, while the unit gross price will be adjusted by the Parties appropriately to the amended provisions of tax law. 6. Bids not rejected by the Contracting Authority will be evaluated on the basis of the Bid evaluation criteria specified below. SECTION XIX. DESCRIPTION OF THE BID EVALUATION CRITERIA 1. Bids will be evaluated on the basis of the criterion of the Bid’s total gross price – the weight of 100%. 2. The total score granted the given Bid will equal the score obtained by the Bid and defined by the following formula: P = PCmin / PC x 100 where: P – the score granted the evaluated Bid within the criterion of the Bid’s total gross price. PCmin - the lowest total gross price of a Bid among the valid and evaluable Bids. PC - the Bid’s total gross price offered in the evaluated Bid. 3. The Contractor may, before the elapse of the bid submission deadline, change or withdraw its Bid. The Contracting Authority will immediately inform the Contractor about submitting the Bid after the deadline and – if it is possible to bring an appeal against this action – return the Bid after the elapse of the deadline for bringing an appeal. 4. The course of the bid validity term will be suspended when an appeal is made after the bid submission deadline in accordance with the rules defined in art. 182 sec. 6 of the Act. 5. The content of the Bids will be inaccessible before the date of opening them. The opening of the Bids will be public and will immediately follow the elapse of the bid submission deadline; the day in which the bid submission deadline elapses will be the date of opening the Bids. 6. Directly before opening the Bids, the Contracting Authority will announce the amount that it intends to earmark for financing the order and during the opening of the Bids it will give the Contractors’ (brand) 17/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 names and addresses as well as information about the price and the order performance period, the guarantee period and payment terms included in the Bids. 7. The above information will be provided immediately to the Contractors not present when the Bids were being opened, at their request. SECTION XX. DESCRIPTION OF THE BID EVALUTION METHOD IN THE PROCEDURE I. FORMAL VERIFICATION 1. In the course of reviewing and evaluating the Bids, the Contracting Authority may require from the Contractors to provide explanations about the content of the submitted Bids. It is unacceptable to hold negotiations between the Contracting Authority and a Contractor about the submitted Bid and, subject to the provisions below, to make any changes in the Bid. 2. The Contracting Authority will correct in a Bid: 2.1. obvious typing errors, 2.2. obvious arithmetic errors, taking into account the arithmetic consequences of the corrections, 2.3. other mistakes involving discrepancies between the Bid with the terms of reference not resulting in any material changes to the content of the Bid, - immediately informing the Contractor whose Bid has been corrected about the corrections made. 3. The Contracting Authority will verify submitted Bids to judge whether there are any reasons to reject the Bid as defined in art. 89 of the Act. 4. The Contracting Authority will verify whether the devices offered by the Contractor have the functionalities, quality and technical parameters defined by the Contracting Authority in the terms of reference, during tests of samples to be conducted in accordance with the rules described below. II. OPERATIONAL TESTS OF SAMPLES General Principles 1. The Contracting Authority will verify whether the devices offered by the Contractor have the functionalities, quality and technical parameters during tests of samples to be conducted by the Contracting Authority’s qualified staff. 2. Operational tests of samples will be conducted at a place indicated by the Contracting Authority in the territory of Poland. 3. Operational tests of samples of particular Contractors will be conducted in the order of Bid submission. The Contractors will be informed about the date and time and the precise place of the tests be e-mails sent to the addresses indicated in their Bids. The first tests will take place on the third business day counting from the date of opening the Bids at the earliest (for the needs of testing the samples, Saturday is not regarded as a business day). 4. Each test of a sample will be conducted during a one-day session lasting, according to our estimates, from 2 to 8 hours. The tests will be conducted on business days. 5. A Contractor may request to change the time or the date and time of the test set by the Contracting Authority before the elapse of the date and time set only if there occur circumstances making it impossible for the Contractor’s representatives to participate in the test as a result of an event independent of the Contractor on which it had no control and which it could not prevent or counteract (force majeure). The Contractor is obligated to notify the Contracting Authority immediately about the occurrence of the force majeure, presenting evidence for its existence and its nature. The request to change the (date and) time of the test is not binding for the Contracting Authority, who is not obligated to grant it. If a request is granted, the original order of the tests of samples will remain unchanged, which means that the dates and times of all the later tests will be accordingly delayed, of which the Contracting Authority will notify the Contractors. 6. The testing and diagnostic software provided by the Contractor will be installed by the Contracting Authority on the computer selected for testing samples before the test. The Contractor is obligated to provide any explanations about the testing and diagnostic software during the test of the sample. 7. Operational tests of samples are public unless the Contractor has made a reservation in its Bid that the sample is a company secret. If there is such a reservation, the test of the sample may be attended exclusively by representatives of the Contractor who provided the sample and representatives of the Contracting Authority. If there is no such reservation, the test of the sample may be attended by representatives of other Contractors and other persons but, considering spatial and organizational limitations, not more than 2 representatives of a Contractor. Representatives of other Contractors and other persons take only a passive part in the test of a sample – they may only observe the actions, they cannot ask questions, touch devices, record the demonstration or the test (apart from taking notes) or influence in any way its course. 18/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 8. The course of the test of each sample will be recorded by the Contracting Authority. A Contractor may not record the course of the test (except for taking notes). The Contractor (and also other persons if the sample is not reserved as a company secret) will be able to familiarize themselves with the record according to the rules of access to a report of the Procedure. 9. Persons participating in a test on behalf of Contractors must hold powers-of-attorney to represent the Contractor or other Contractors (if they are permitted to participate in these operations in accordance with the rules described above) at least in the scope of taking part in the test. The Contracting Authority will verify the content of the powers-of-attorney and the identities of the persons participating in these operations before they are allowed to enter the room. Conducting the tests 1. The model single- and three-phase meters included in the sample will be tested as follows: 1.1. The Contracting Authority will connect a selected meter, both single- and three-phase one, to one of the Concentrator and Balancing Meter Sets included in the sample and then, using the testing and diagnostic software, will perform the following operations through the Concentrator and Balancing Meter Set: Ite m Operation Expected result 1. Sending a command for metering data from the registers described in the table from Section XII item 8.3. sub-item 5) of ToR. All the data from all the registers have been transferred. 2. Sending a command for changing parameters described in items 0.9.1; 0.9.2; 0.2.2 of the table from Section XII item 8.3. sub-item 5) of ToR. Parameters have been changed according to the request. 3. Sending a “switch off” Verification of the meter status. command. The switch status – off. 4. Sending a “switch on” Verification of the meter status. command. The switch status – on. 1.2. After completing the tests of single- and three-phase meters connected to the Concentrator and Balancing Meter Set delivered by the Contractor as part of the sample, the Contracting Authority will repeat the test in the scope described in item 1.1 sub-tem 1 with the use of concentrators compliant with PRIME: a) concentrator made by Current, model CURRENT 9253 MPA, b) concentrator made by ZIV, model 4CCT-EA6-334104BC. 2. The Concentrator and Balancing Meter Sets included in a sample will be tested in the following way: 2.1. The Contracting Authority will connect a Concentrator and Balancing Meter Set to power supply, and then, using the testing and diagnostic software included in the sample, perform the operations described in item 1.1 sub-item 1; 3. Representatives of the Contractor should support the Contracting Authority in testing the sample by providing explanations and consulting the operations performed by the Contracting Authority’s team. 4. In the case of a failure/error of the software or the devices included in the sample, the Contracting Authority may order a break to repair or eliminate the failure/error. A delay in testing caused by a failure/error of the software or the devices included in the sample cannot exceed 15 minutes. Elimination of the failure/error must not involve replacement of the software or devices or their parts. All the Contractor’s operations connected with elimination of the failure/error will be recorded by the Contracting Authority. Before the elapse of the time for eliminating the failure/error, the Contracting Authority may use the remaining devices included in the sample. 5. For each type of the devices included in the sample, at least one must pass the tests, i.e. operations performed by the Contracting Authority should bring the expected results, according to the description above. If the Contracting Authority, while the sample is tested, finds that the devices offered by the Contractor do not have the functionalities tested within the above procedure or the devices do not show the above features (e.g. because of a failure), this will be the grounds for rejecting the Contractor’s Bid as not complying with the terms of reference pursuant to art. 89 sec. 1 item 2 of the Act. 6. If there arise doubts about the working of devices or software included in a sample, the Contracting Authority may require from the Contractor to provide explanations about the sample. Returning the sample 1. Pursuant to art. 97 sec. 2 of the Act, at a request of a Contractor whose Bid has not been selected, the devices included in the sample, together with software, will be returned to the Contractor. The Contracting Authority will not bear responsibility for destroying or damaging devices, except in the 19/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 cases of willful misconduct or gross negligence on the part of the Contracting Authority. The devices will be returned, together with the software, within 14 days of the date of the Agreement conclusion date or Procedure cancellation (after a possible decision of the National Chamber of Appeal [Krajowa Izba Odwoławcza] upholding the Contracting Authority’s decision), unless a complaint is brought to a Court against the decision or verdict of the National Chamber of Appeal. 2. The devices included in the sample of the selected Bid will not be returned. III. ELECTRONIC AUCTION 1. If there are at least three Bids submitted by Contractors within the Procedure which have not been rejected, the Contracting Authority, after evaluating the Bids in the manner defined in item I and item II of Chapter II of ToR, will conduct an electronic auction in order to select the most favorable Bid. 2. The Contracting Authority will invite, by electronic means, all the Contractors who submitted unrejected Bids to participate in the electronic auction. The invitation will be sent by the Contracting Authority by e-mail, making use of the contact data provided in the Bid. In the invitation to participate in the electronic auction, the Contracting Authority will inform the Contractors of: 2.1. the position of the Bids submitted by them and the received scores; 2.2. minimum increment values submitted within the electronic auction; 2.3. opening date of the electronic auction; 2.4. closing date of the electronic auction and the conditions for closing it; 2.5. the manner of evaluating the Bids in the course of the electronic auction; 2.6. the date of a test auction. 3. With the invitation to the auction, the Contracting Authority will provide the Contractor with the Rules for participating in the auction as well as an identifier and password for logging in the system. The auction will be conducted on the auction platform: .https://zakupy.energa-operator.pl/servlet /HomeServlet. Technical information connected with the organization of the auction is provided by: Ms. Alicja Fornalska, tel. 58 347-38-39, e-mail: alicja.fornalska@energa.pl; Stanisław Hejna, tel. 58 745-78-41, e-mail: stanislaw.hejna@energa.pl. 4. A Contractor should have IT equipment satisfying the following technical requirements: 4.1. a computer with a 233 MHz processor or faster, and at least 128 MB RAM, 4.2. an operating system: MS-Windows XP or a newer version, 4.3. Internet Explorer (minimum 6.0) with ActiveX or Mozilla Firefox with Java, 4.4. at least 64 kbps broadband Internet connection per one user. To make it possible for the Contractors invited to participate in the Internet auction to familiarize themselves with the way that the auction platform operates, the Contracting Authority will conduct a test auction on the rules similar to those for the electronic auction proper as defined in ToR and the Rules referred to in item 3 above. The test auction will be conducted on the date indicated in the invitation to participate in the electronic auction. The Contracting Authority will provide the Contractors with information needed to participate in the test auction. 5. In the course of the electronic auction, the Contractors, using the form found on the website referred to in item 3, which makes it possible to enter necessary data online, will submit further more favorable bids (increments), which will be subject to automatic evaluation and classification. The increments should be appended with a secure electronic signature verified by a valid qualified certificate; otherwise they will be invalid. 6. The criterion for evaluating a bid in the course of the electronic auction will be the Bid’s total gross price – the weight of 100 %.The total score granted the given Bid will be calculated on the basis of the following formula: P = Cmin / C x 100 where: P - the score granted the evaluated Bid in the course of the electronic auction within the criterion of the Bid’s total gross price; Cmin - the lowest total gross price of a Bid among the valid and evaluable Bids in the course of the electronic auction; C - the Bid’s total gross price offered in the evaluated Bid in the course of the electronic auction. 7. In the course of the electronic auction, the Contracting Authority will provide each Contractor, on an ongoing basis, information on the position of the Bid submitted by it, the granted score and the score received by the most favorable Bid. Until the electronic auction is closed, the Contracting Authority will not disclose any information making it possible to identify the Contractors. 8. A Bid submitted by a Contractor is no longer binding as long as the Contractor submits a more 20/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 favorable bid in the course of the electronic auction. The Bid validity term will continue to run uninterrupted. 9. The Contracting Authority will evaluate the Bid of a Contractor who did not join the electronic auction or failed to submit valid increments during the auction on the basis of the total gross price of the Bid submitted by the Contractor on the Bid form. IV. SELECTION OF THE MOST FAVORABLE BID 1. The Contracting Authority will select the Bid of the Contractor which will receive the highest score as the most favorable. 2. If a Contractor submits a Bid whose selection would lead to the establishment of tax obligation for the Contracting Authority pursuant to provisions about value added tax with regard to intra-Community acquisition of goods then, in order to evaluate such a Bid, the Contracting Authority will add the value added tax which would have to be paid pursuant to the binding regulations to the price stated in the Bid. 3. In order to find whether a Bid includes a grossly understated price for the subject matter of the order, the Contracting Authority will ask the Contractor to provide, within a specified period, explanations about the Bid’s elements affecting the quoted price. 4. Evaluating the explanations, the Contracting Authority will take into consideration objective factors such as, in particular, an economical method of the order performance, selected technological solutions, exceptionally favorable conditions for the order performance for the Contractor, the originality of the Contractor’s design and the influence of public aid granted on the basis of separate regulations. 5. The Contracting Authority will reject the Bid of a Contractor who failed to provide explanations or if the assessment of the provided explanations and evidence confirms that the Bid includes a grossly understated price for the subject matter of the order. 6. If the Contracting Authority selects a Bid as the most favorable one, the Contractor that submitted that Bid undertakes to conclude an Agreement with the Contracting Authority consistent with the Model Agreement constituting Appendix no. 1 to ToR, completed based on the content of ToR and the content of the Bid submitted by the Contractor. 7. Immediately after selecting the most favorable Bid, the Contracting Authority will simultaneously inform the Contractors who have submitted Bids about: 8. 7.1. the selection of the most favorable Bid, giving the (brand) name and the full name, the seat or the place of residence and address of the Contractor whose Bid has been selected, justification for the choice and (brand) names or full names, seats or places of residence and addresses of the Contractors who submitted Bids with scores granted them; 7.2. the Contractors whose Bids have been rejected, providing factual and legal justification; 7.3. the Contractors excluded from the Procedure, providing factual and legal justification, 7.4. the deadline by which the Agreement may be concluded. Immediately after selecting the most favorable Bid, the Contracting Authority will simultaneously inform the Contractors who have submitted Bids about: SECTION XXI. SETTLEMENTS BETWEEN THE CONTRACTING AUTHORITY AND THE CONTRACTOR. 1. The Contractor’s settlements with the Contracting Authority will be made in unit gross prices. 2. If an electronic auction has been conducted, settlements of the Contracting Authority with the Contractor will use unit gross prices calculated in the following manner: 2.1. unit gross price of appropriate elements of the price, indicated by the Contractor in a written Bid form (unit gross price of single-phase meters, unit gross price of three-phase meters, unit gross price of the Concentrator and Balancing Meter Set, as well as unit gross price of Workshops), is divided into the Bid’s total gross price indicated by the Contractor in the Bid form; the obtained value makes up a co-efficient of the participation of the gross unit price of the given price element in the Bid’s total gross price; 2.2. the Bid’s total gross price, offered by the Contractor in the course of the electronic auction, is multiplied by the appropriate co-efficient of the participation of the unit gross price of the given price element in the Bid’s total gross price, calculated pursuant to item 2.1.; 2.3. the value of appropriate price elements, calculated according to the rules described in the items above, constitutes the unit gross price of these price elements which will be used for settlements between the Contracting Authority and the Contractor. 3. Settlements between the Contracting Authority and the Contractor will be made in PLN. 21/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 SECTION XXII. REQUIREMENTS FOR THE GOOD PERFORMANCE BOND. 1. The Contractor whose Bid is selected as the most favorable one will be obligated to make, before concluding the Agreement, a good performance bond at the amount of 10% of the Bid’s gross price. 2. The bond may be made at the Contractor’s discretion in one or several of the following forms: 3.1. in cash; 3.2. as bank sureties or sureties issued by credit unions, the latter having to be cash sureties; 3.3. bank guarantees; 3.4. insurance bonds; 3.5. as sureties granted by entities referred to in art. 6b sec. 5 item 2) of the Act of 9 November 2000 on the establishment of the Polish Agency for Enterprise Development. 4. The bond made in cash will be paid by the Contractor by transfer to the Contracting Authority’s bank account number 05 1240 6292 1111 0010 3648 1593, with a note “Good performance bond – procedure for delivery of Metering Infrastructure for Energa Operator S.A., P/_/AZU/000__/12”. 5. If the bond is made in cash, the Contracting Authority keeps it in an interest-bearing bank account. The Contracting Authority will return the bond made in cash together with the interest resulting from the bank account agreement for the account in which it was kept, decreased by the costs of maintaining the account and the bank commission for the transfer of cash to the Contractor’s bank account. 6. If the Contractor has made a bid deposit in cash, then, at the Contractor’s request, the bid deposit with the interest will be recognized against the good performance bond. 7. If the Contractor is making the good performance bond in the form of a bank guarantee or an insurance bond, the content of the bank guarantee or the insurance bond must clearly show: 7.1. the guarantor’s (a bank, an insurance company) obligation to make payment up to the amount defined in the guarantee, irrevocably and unconditionally, at the first request of the Contracting Authority, containing a statement about the occurrence of circumstances connected with a failure to perform or inadequate performance of the Agreement; 7.2. the guarantee validity term, 7.3. the place and date for returning the guarantee. 8. The bond will be returned by the Contracting Authority by the following deadlines: 8.1. 70 % of the bond amount – within 30 days of the date of the order performance and the Contracting Authority’s assessment of the order as adequately performed, 8.2. the remaining amount – at the latest, on the 15th day after the elapse of the period of warranty for defects for the last device delivered. SECTION XXIII MODEL AGREEMENT, TERMS AND CONDITIONS FOR AMENDING THE AGREEMENT 1. The Model Agreement is found in Appendix no. 1 to ToR [Model Agreement]. 2. It will be possible to amend the Agreement in the circumstances defined in Appendix no. 1 to ToR [Model Agreement]. SECTION XXIV. INFORMATION ABOUT LEGAL REMEDIES AVAILABLE TO THE CONTRACTOR IN THE COURSE OF THE PROCEDURE. 1. A contractor as well as some other entity having now or in the past an interest in concluding the Agreement and has suffered or may suffer a damage as a result of violating provisions of the Act by the Contracting Authority, are entitled to legal remedies defined in Section VI of the Act. 2. If the Contracting Authority, in the course of the Procedure, performs an action inconsistent with provisions of the Act or fails to perform an action to which the Contracting Authority is obligated pursuant to the Act, this action or omission may be appealed. 3. The appeal should indicate the Contracting Authority’s action or omission which is accused to be contrary to provisions of the Act. The appeal should also include a brief presentation of charges, specify what is demanded and point out factual and legal circumstances justifying the appeal. 4. The appeal is submitted to the President of the National Appellate Chamber in writing or via e-mail provided with secure electronic signature verified through a valid qualified certificate. 5. The appealing party will send a copy of the appeal to the Contracting Authority before the elapse of the deadline for submitting the appeal in such way so that it could familiarize itself with its content before the elapse of that deadline. It is assumed that the Contracting Authority has been able to familiarize itself with the content of the appeal before the elapse of the deadline for bringing it if a 22/23 Terms of Reference Delivery of Metering Infrastructure Procedure no. P/_/AZU/000__/12 copy of the appeal has been sent before the elapse of the deadline for bringing it using one of the means listed in art. 27 sec. 2 of the Act. 6. The Contracting Authority will, immediately, but not later than within 2 days of receiving a copy of the appeal, send it to other Contractors participating in the Procedure, summoning the Contractors to join the appellate procedure. 7. A Contractor may apply for joining the appellate procedure within 3 days of the date of receiving a copy of the appeal, indicating the party which the Contractor joins and the interest in obtaining a resolution in favor of that party. The application for joining the procedure will be handed to the President of the National Chamber of Appeal in writing or in electronic form with a secure electronic signature verified by a valid qualified certificate, and a copy of the appeal shall be sent to the Contracting Authority and the Contractor bringing the appeal. 8. The Contractors who have joined the appellate procedure become participants of the procedure if they have an interest in resolving the procedure in favor of one of the parties. 9. The Contracting Authority or an appealing party may raise an objection to another Contractor joining the procedure not later than by the time of opening the trial. The chamber shall accept the objection if the entity declaring it provides some evidence for the claim that the Contractor has no interest in obtaining resolution in favor of the party which it joined; otherwise the Chamber will reject the objection. 10. Actions of a participant of the appellate procedure cannot contradict actions and representations of the party which it joined, apart from raising an objection as referred to in art. 186 sec. 3 of the Act by a participant who joined the procedure on the side of the Contracting Authority. 11. An appealing party or a Contractor summoned pursuant to item 6 cannot subsequently take advantage of the legal remedies against the Contracting Authority’s actions performed in accordance with the verdict of the National Chamber of Appeal or a court or pursuant to art. 186 sec. 2 and 3 of the Act. 12. The parties to and participants in the appeal proceedings may submit a complaint to the court against the award of the Chamber. The complaint will be brought to the Regional Court in Gdańsk, within 7 days of the date of receiving the Chamber’s decision. APPENDICES. 1. Appendix 1. Model Agreement 2. Appendix 2. Bid Form 3. Appendix 3. Model statement concerning dual-use goods Provisions of the Act will be applicable to issues not governed by these ToR. 23/23