ASE261.Final

advertisement
Design of UAV Systems
Final report and briefing
© 2003 LM Corporation
Final report
Submittal requirements
Design of UAV Systems
Each team will make two (2) submittals
1. A written report - an update from mid term plus a
new air vehicle section
- Some sections will receive team grades
(1) Overall System (20%)
(% report weighting)
(7) ABET criteria (10%)
- Others will get individual grades
(2) ConOps (team lead)
(3) Communications (assigned student) (20% ea)
(4) Control station (assigned student)
(5) Payload (assigned student)
(6) Preferred* and alternative air vehicles (50%)
2. A briefing - also graded as team and individual
student contributions
* Identify if team or individual grade applies
© 2003 LM Corporation
Final report
Written report
Design of UAV Systems
• Describe your team UAV system concept suitable for use in a
proposal. Assume that I have released a request for proposal
(RFP) and that your team has been selected to write a proposal
section that describes your selected baseline concept. The
purpose of the write-up is to convince the customer (me) that you
have carefully thought through the system design concept issues
and that your system concept is viable.
• Note – there is no requirement that you stay with the starting system
concept described at mid-term. If you have found some problems
with the original concept and/or made improvements, describe the
changes and the accompanying rationale.
• Submit your team report as a MSWord email attachment by COB
Tuesday, May 6 and bring 2 paper copies with you on Wednesday
• For each section assigned to an individual, identify the name of the
student responsible (for individual grades)
• Remember – the proposal write up must convince me that you (1)
understand my requirements, (2) have a good understanding of
the issues and (3) have selected the best concept
© 2003 LM Corporation
Final report
Report outline
Design of UAV Systems
1.0 Overall system requirements – In your own words list what the
UAV system has to do (individual defined requirements). Include
follow-up responses to questions asked as defined requirements.
Also list system level derived requirements and rationale.
1.1 Overall system concept – describe your preferred system concept
that meets customer requirements. Include numbers of air vehicles,
payloads, control stations and communication ADTs and GDTs
required. Include graphic if needed.
1.2 Alternate systems concepts – describe any alternative system
concepts you considered since mid-term and your rationale for
selecting the preferred concept. Include graphics if needed.
2.0 Concept of operations – Describe the complete ConOps. Start at
home base and describe what each element does including,
numbers, speeds and altitudes, how missions are performed, how
payloads and air vehicles are controlled and communicate, how
and when they go back to base, etc.. Include graphics if needed
2.1 Alternate ConOps – describe any alternative ConOps considered
since mid term, their strengths and weaknesses and your rationale
for final selection. Include graphics if needed.
© 2003 LM Corporation
Final report
Outline (cont’d)
Design of UAV Systems
3.0 Communication system requirements – List the communication
system requirements identifying which are defined and which are
derived.
3.1 Communication system concept – describe the communications
system and how it operates (physical and functional description).
Include a description of how ranges, weights, power, etc. were
derived. Include graphics if needed.
3.2 Alternate communications systems concepts – describe any
alternative communications concepts considered since mid term
and your rationale for final selection. Include graphics if needed.
4.0 Control station requirements – List the control station
requirements identifying which are defined and which are derived.
4.1 Control station concept – describe the control station(s) and how
it (they) operate (physical and functional description). Include a
description of locations, functions, number and roles of operators,
weights, etc. and how they were derived. Graphics if needed.
4.2 Alternate control station concepts – describe alternative control
station concepts considered since mid term and your rationale for
final selection. Include graphics if needed.
© 2003 LM Corporation
Final report
Outline (cont’d)
Design of UAV Systems
5.0 Payload requirements – List payload requirements identifying which
are defined vs. derived.
5.1 Payload concept – describe all payloads and how they operate
(physical and functional description). Include a description of how
ranges, weights, power, etc were derived. Include graphics if needed
5.2 Alternate payload concepts – describe alternative payloads
considered since mid term and your rationale for final selection.
Include graphics if needed
6.0 Air vehicle requirements – List air vehicle requirements identifying
which are defined vs. derived.
6.1 Preferred air vehicle concept – briefly describe the air vehicle(s)
and performance on secondary/primary missions (physical and
functional description). Include a scaled PowerPoint drawing and a
summary description of key vehicle characteristics (see briefing)
6.2 Alternate air vehicle concepts – briefly describe the alternative air
vehicles considered and your rationale for selection of the preferred
concept. Include a scaled PowerPoint drawing of each concept
considered and summary descriptions of key vehicle characteristics
(see briefing)
© 2003 LM Corporation
Final report
Outline (cont’d)
Design of UAV Systems
7.0 ABET criteria – Address each of the following points and
document your conclusions. Note that not all of these issues may
be relevant to your project, but you should think about them
before concluding that they are irrelevant and justify your
decision. See ASE261.ABET.ppt for issue details. One
paragraph per issue
7.1 Economic Issues
7.2 Environmental Issues
7.3 Sustainability Issues
7.4 Manufacturability Issues
7.5 Ethics Issues
7.6 Political Issues
7.7 Health and Safety Issues
7.8 Social Issues
7.9 Global Impact
© 2003 LM Corporation
Final report
Briefing
Design of UAV Systems
Each team will present a PowerPoint briefing that describes the final
overall system concept and details the preferred and alternative air
vehicle concepts. The purpose of the briefing is to convince me that:
(1)Your team has carefully worked through the key overall
system/ConOps/air vehicle design issues and that the system and
preferred air vehicle concept(s) are technically viable and sized for, at
a minimum, the most cost effective operational loiter time (25%)
(2)Selection of the preferred vehicle concept was based on quantitative
analysis and that the preferred concept, in fact, represents the most
cost effective solution using air vehicle/engine/payload procurement
cost for 30 days of 24/7 operations as the figure of merit (25%)
(3) Each member of the design team understands the air vehicle
parametric design process and that the individual concepts were
reasonably optimized (including, at a minimum, doing aspect ratio,
wing loading and cruise speed trades vs. procurement cost) and sized
consistently (including, at a minimum, against consistent operational
loiter, speed and power margin, takeoff performance, climb and/or
dash criteria) (50%)
(% grade weighting)
© 2003 LM Corporation
Final report
Briefing schedule
Design of UAV Systems
Date : 7 May
Location : WRW 312
0900 - Penetrating UAV #1
0945 - Penetrating UAV #2
1030 - Maritime UAV
1115 - TUAV #1
1200 - 1255 Break
If you have schedule conflicts for
1300 - TUAV #2
the final, let Egbert know by the
1345 - Standoff UAV
Monday - latest
1430 - UCAV #1
1515 - UCAV #2
Questions about briefing or report
1600 - UCAV #3
requirements – by COB Next Friday
1645 - UCAV #4
1730 - End
© 2003 LM Corporation
Final report
Briefing content
Design of UAV Systems
System (team grade)
- Defined requirements (list)
- System level derived requirements (list)
- System description
- ConOps description
- Key issues and risks
Air Vehicle (team and individual grades)
- Defined requirements (list)
- Derived requirements (list)
- Preferred system concept (team or individual grade)
- 3-view drawing (reasonably scaled with summary data block*)
- Design data*
- Mission performance data*
- Design trades (minimum = operational loiter time, W0/Sref, AR, Vcr)
- Alternate system concepts (individual grades)
- Drawing (same as above)
- Design data*
- Mission performance*
* Description follows
- Design trades (present as requested)
© 2003 LM Corporation
Final report
Drawing requirements
Design of UAV Systems
Minimum 3-view drawing requirements
- Fuselage length (Lf) and equivalent diameter (De)
- Wing span (b)
- Engine location (hidden line)
- Payload bay location (hidden line)
- Landing gear location (hidden line) - see Raymer
- Approximate center of gravity location - see Raymer
Minimum drawing data block requirements
- Gross weight
- Empty weight
- Payload weight
- Fuel weight
- Propulsion type & Hp0 or T0
- Wing reference area
- Wing aspect ratio
- Wing thickness (t/c)
- Overall wetted area
- Maximum range
- Maximum endurance
© 2003 LM Corporation
Final report
Design data
Design of UAV Systems
Minimum requirements
- Weight statement
- Gross weight
- Fuel weight
- Wing
- Fuselage
- Payload weight
- Empty weight
- Airframe weight
- Landing gear weight
- Propulsion weight
- Systems + avionics weight
- Geometry
- Sref
- Sht
- Svt
- Swet
- Swet-fuse
- Swet-nacelle
© 2003 LM Corporation
- Design parametrics
- Hp0/W0 or T0/W0
- W0/Sref
- Fuel fraction
- Swet/Sref
- Swet/b^2
- Waf/Sref
- Volumes (required)
- Fuel
- Payload
- Landing gear
- Systems + avionics
- Total volume required
- Volume available (total)
Final report
Performance data
Design of UAV Systems
Minimum requirements (one chart for each mission)
- Operational endurance @ X nm - Operational loiter altitude
- Maximum range
- Operational loiter speed (EAS)
- Maximum endurance
- Operational loiter Cl
- L/D max
- Operational loiter SFC or TSFC
- Takeoff ground roll
- Operational loiter thrust available
- Takeoff distance over 50’
- Initial operational loiter drag
- (see Raymer)
- Ingress altitude
- Initial rate of climb
- Ingress speed
- Final rate of climb
- Ingress thrust available
- Initial cruise altitude
- Initial ingress drag
- Cruise speed
- Final cruise Cl
- Initial cruise Cl
- Final cruise L/D
- Initial Cruise L/D
- Landing loiter speed
- Initial cruise drag
- Landing loiter L/D
- Initial cruise thrust (uninstalled) - Landing loiter SFC or TSFC
- Initial cruise thrust available
- Overall cruise L/D
- Cruise SFC or TSFC
- Overall cruise range factor
- Initial cruise range factor
© 2003 LM Corporation
Final report
Evaluation criteria
Design of UAV Systems
• Report evaluation criteria (shoot for 10 pages)
• Understanding of the problem – 25%
• Logic and rationale – 25%
• Solution viability – 25%
• Clarity and conciseness – 25%
• Briefing evaluation criteria (maximum 45 minutes )
• Understanding of the problem – 20%
• Technical quality – 35%
• Briefing quality – 20%
• Demonstrated knowledge – 25%
© 2003 LM Corporation
Final report