{Project Name} Construction Project Management Plan Section 7 Scope of Functions SCOPE OF FUNCTIONS, DUTIES AND RESPONSIBILITIES OF THE CONSTRUCTION PROJECT MANAGEMENT TEAM The role of the Construction Project Management Team (CPMT) in the various phases of the project cycle is being presented in this Construction Project Management Plan (CPMP). The project’s life cycle is divided into the following phases: 1. 2. 3. Pre-Construction Phase Construction Phase Post-Construction Phase While there is considerable overlap among the phases, each phase is treated individually. A. Pre-Construction Phase General In the Pre-Construction Phase, the Managing Director heading the Business Responsibility Unit (BRU) selects the Construction Project Management Team (CPMT) for the project in consideration of the requirements of the Customer. The assigned Construction Project Manager prepares the Construction Project Management Plan (CPMP) as a procedural guideline, including the procurement plan and policies specific to the construction project. The Customer should approve the CPMP including any deletions, additions or revisions thereon. Copies of the approved CPMP are distributed to the concerned parties. The Pre-construction stage may start with the preparation of the project schedule, the management of the design deliverables, preparation of a project budget and cost control, pre qualification of suppliers, the conduct of bidding and negotiation and ends once an award is made. 1. Project Schedule A baseline schedule is established by the CPMT to enable the monitoring of all project activities from the start to completion. This includes milestone dates of key events. Approval of the schedule is secured from the Project Technical Group (PTG). Copies of the approved document are furnished to the Customer and members of the PTG. Refer to WI-02DCI: Drafting the Project Schedule. 2. Prepared By: Design Coordination Design Coordinates, Inc. Approved By: {Customer} DCI-CMP rev.01 Page 1 of 10 design coordinates, inc. construction project managers suite 202, itc building, 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance {Project Name} Construction Project Management Plan Section 7 Scope of Functions Based on the design requirement and parameters set and confirmed with the Customer, the CPMT ensures that the various design documents are reviewed, coordinated and approved for issuance. 2.1 2.2 2.3 2.4 2.5 3. Establish through meetings the schedule of design deliverables such as design development, schematic design and contract drawings with Design Consultants. Refer to WI-02-DCI: Drafting the Project Schedule for completion of the various design stages. Review documents for completeness, constructability and coordination with other disciplines. CPMT may use “Redicheck” as reference. Call the attention of the Design Consultants for errors, deficiencies and mis-coordination of documents, if any. Prepare a written design or bid query. Secure approval from the Customer for the design considerations. Update DCI-DRL (Drawing Log) for any revisions. Issue approved documents for bidding and construction. If revisions result to a change order, refer to Section 7 items A-5 : Bidding, Negotiation and Award and/or B-4 : Change Order. Project Budget and Cost Control The CPMT shall ensure that the project budget, construction cost and any subsequent changes are approved and monitored. This section starts from the time CPMT receives the design drawing or Customer’s instruction of a possible revision in the project until the financial accounts are closed-out. The steps involved are as follows : 3.1 3.2 3.3 4. Establish budget structure and determine construction packaging based on the Customer’s requirements to include any changes that may arise during the life of the project. Refer to WI03-DCI: Preparation of Procurement Plan and WI-04-DCI: Preparation of an Office Estimate. Use form DCI-PRS (Procurement Schedule) and DCI-CCE (Construction Cost Estimate) Secure Customer’s budget approval and establish reporting schedules Monitor cost by period thru progress report. A Financial Report should be secured if QS is available. Pre-qualification of Suppliers (Contractors/Vendors) The CPMT shall ensure that only qualified suppliers are selected and invited to submit proposals for the construction packages or contracts. The Masterlist of Suppliers (Construction) must be periodically updated based but not limited to the following sources : Prepared By: a. List of Suppliers (Construction) of Completed and on-going projects. b. c. d. PCAB – Registered Contractors Directory of Construction Materials Manufacturers and Dealers Directory of Testing Laboratories for Construction Projects Design Coordinates, Inc. Approved By: {Customer} DCI-CMP rev.01 Page 2 of 10 design coordinates, inc. construction project managers suite 202, itc building, 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance {Project Name} Construction Project Management Plan e. f. Section 7 Scope of Functions Directories of Banks/Financing Institutions and Insurance Firms providing services to the construction industry. Philippine Construction Directory. To determine Supplier’s to be invited to submit a proposal and using the established procurement schedule as reference, the following steps are followed : 4.1 4.2 4.3 4.4 4.5 Meet with the PTG to prepare Long List of Suppliers. Consider suppliers recommended by the Customer and/or Consultants. Request for the Supplier’s Pre-qualification Documents. Useful references in pre qualifying a Supplier can be secured from: 4.4.1 Primer on Licensing of Contractors 4.4.2 Rules & Regulations Governing Licensing and Accreditation of Contractors 4.4.3 Guidelines for Registration and Classification of Contractors 4.4.4 P.D. 1594 and its Implementing Rules and Regulations Evaluate received pre qualification documents. Prepare a report on the pre-qualification process and secure the Customer’s approval of the pre-qualified suppliers prior to the issuance of invitations to bid or requests for proposal. In cases where the Customer has its own pre qualification system, an approved shortlist of suppliers is issued to the PMT for use in the project. 5. Bidding, Negotiation and Award The CPMT shall establish a procurement schedule to ensure that timely procurement is conducted based on the project schedule. 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 Prepared By: Prepare Procurement Schedule. Refer to WI-03-DCI: Preparation of Procurement Plan Prepare Bid Documents; refer to WI-05-DCI: Preparation & Issuance of Bid Documents Issue Invitation to Bid (DCI-ITB) based on the approved short list of bidders Issue Bid Documents. Refer to WI-06-DCI: Payment of Bid Documents Issue pertinent Bid Bulletins (DCI-BIB) during the conduct of bidding exercise Review the received bids for compliance to Instruction to Bidders. Refer to WI-07-DCI: Evaluating Proposals Conduct Clarificatory or Post Bid meetings. Refer to WI-15-DCI: Conducting a Meeting Prepare and submit Bid Evaluation Report. Negotiate and award. Assist the Customer in finalizing the Contract. Issue a Letter of Intent (DCI-LOI) or Notice of Award/To Proceed (DCI-NOA) or refer to WI-08-DCI: Finalizing Contract. Issue Letter of Regret (DCI-LOR) to all losing bidders. Design Coordinates, Inc. Approved By: {Customer} DCI-CMP rev.01 Page 3 of 10 design coordinates, inc. construction project managers suite 202, itc building, 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance {Project Name} Construction Project Management Plan Section 7 Scope of Functions Construction Phase General The Construction Phase is the longest stage in the life of a project. This starts after an award is made and extends until the issuance of certificates of completion and accounts are closed off. The CPMT ensures that the time, cost and quality concerns of the Customer are addressed thru the implementation of following sections : 1. Project Management Orientation An orientation or kick-off meeting is conducted by the CPM to inform the Supplier of the project’s ground rules prior to or during the Supplier’s mobilization at the project site. Refer to WI-09-DCI: Project Management Orientation. 2. Request For Information Any requests for clarification and/or additional information from Suppliers during the construction phase is made thru a Request for Information and is processed by the CPMT. Refer to WI-10-DCI : Request for Information. Copies are distributed to designated recipients and another kept on file. 3. Substitution Request A Substitution Request is done to ensure that all post-award substitution proposals by the Supplier (Contractor) is properly reviewed, evaluated and approved by the PTG prior to its implementation. Refer to WI-11-DCI : Substitution Request. To compensate, substitutions considered by the PTG are generally toward a higher quality without cost implication to the Customer or a new and better product is introduced in the market and a savings can be generated. Substitutions with cost implications are discussed with the Owner. Prepared By: Design Coordinates, Inc. Approved By: {Customer} DCI-CMP rev.01 Page 4 of 10 design coordinates, inc. construction project managers suite 202, itc building, 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance {Project Name} Construction Project Management Plan 4. Section 7 Scope of Functions Project Manager’s Instruction The CPMT documents all field orders given by the PMT regarding the interpretation, administration, alteration and modification of contract documents thru a Project Manager’s Instruction. Instructions may result to the issuance of a change order. Refer to WI-12-DCI: Project Manager’s Instruction. Project Manager’s Instruction Log (DCI-PML) is used to record and monitor issued PMI. 5. Change Order The CPMT documents all changes in contract documents affecting cost and/or time thru a Change Order. The Supplier (Contractor) should not perform any extra work for which payment is expected without a Change Order. An exception is during an emergency where work must be carried out immediately to prevent harm to personnel or damage to the structure. Refer to WI-13-DCI: Change Order. 6. Meetings Construction meetings facilitate coordination of work, resolution of issues and help prevent problems from occurring. Refer to WI-14-DCI: Preparation of Notice of Meeting and Agenda and WI-15-DCI: Conducting a Meeting. Some of the meetings conducted during the construction phase are as follows : 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 7. Project Orientation or Kick-off Meeting Project Technical Group (PTG) Meeting Construction Coordination Meeting Design Coordination Meeting Safety Meeting Special Meeting Close-out Meeting CPMT Staff Meeting Submittals A Submittal provides information about systems, equipment, materials, products and administrative matters necessary to ensure quality of the work and is presented by the Supplier for the PTG’s approval prior to implementation. Refer to WI-16-DCI: Submittal Transmittal. Prepared By: Design Coordinates, Inc. Approved By: {Customer} DCI-CMP rev.01 Page 5 of 10 design coordinates, inc. construction project managers suite 202, itc building, 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance {Project Name} Construction Project Management Plan Section 7 Scope of Functions Submittals should not be used to secure approval for unspecified products or modify the contract requirements. 8. Construction Schedule Management The CPMT periodically reviews the construction schedule prepared by the Supplier. Refer to WI-17-DCI : Review of Construction Schedule. 8.1 8.2 8.3 8.4 8.5 8.6 9. Site Safety and Environment Management 9.1 Review the Supplier’s Safety Program approved by Department of Labor and Employment (DOLE) for compliance with the contract documents. Refer to sample DCI Safety Manual. 9.2 A Safety Officer (SO) is designated from the CPMT to organize the Site Safety and Health (SSH) Committee composed of representatives from the Suppliers. Safety meetings are conducted on a regular basis, this is chaired by the SO. All suppliers are oriented and issued a copy of the DCI Safety Manual for reference in formulating their own. SO monitors the health and safety conditions at the site thru the Safety Inspection checklist (DCI-SIC). 9.3 9.4 9.5 Prepared By: The CPMT monitors compliance to the schedule based on Supplier’s weekly accomplishment report. The Supplier is advised of any delays noted and a catch-up schedule is requested. After the review, the CPMT endorses the complete and complying schedule to the Customer for approval. The approved schedule is reproduced and distributed. A copy is posted at the site office. Any revision in the dates of completion should be recorded as this may be grounds for the Supplier’s claim for extension of time (EOT). Evaluate the claim based on project records. EOT is valid if the activity falls on the critical path. Issue a Change Order if the Customer approves the EOT. Refer to WI-13-DCI : Change Order. If Supplier fails to complete the work on schedule, refer to the general conditions of contract for the application of liquidated damages (LD). Design Coordinates, Inc. Approved By: {Customer} DCI-CMP rev.01 Page 6 of 10 design coordinates, inc. construction project managers suite 202, itc building, 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance {Project Name} Construction Project Management Plan 9.6 9.7 10. Section 7 Scope of Functions SO issues a Safety Notice Report (DCI-SNR) or Incident Report (DCI-INR) for any violation/non-compliance with the SSH Program or incidents including any unsafe act and/or unsafe condition. Weekly, monthly and year-end Safety Reports are prepared by the SO to monitor the implementation and check effectiveness of the SSH Program until Completion and Turnover of the project. These are incorporated in the Progress Reports submitted to the Customer. Refer to sample Safety Report. Construction Observation, Inspection and Testing Observation, inspection and testings are conducted to ensure and control the quality of work. Refer to WI18-DCI: Observation, Inspection and Testing. A copy of the accomplished Inspection and Work Request form is kept on file. 11. Measurement and Payment This section ensures that Supplier’s requests for payment (billings) are correctly evaluated and processed within the pre-agreed durations as stipulated in the CPMP. 11.1 The CPMT conducts joint evaluation of work accomplishments upon advise of the Supplier. Refer to WI-19-DCI: Conducting Joint Evaluation. 11.2 The Administrative Assistant verifies completeness of the Supplier’s request for payment prior to receiving the documents. Refer to DCI-RPC (Request for Payment Checklist) form. Notify and return to Supplier if the submitted request is not complete. The AA monitors status of the document from the time it is received until it is endorsed to the Customer for payment. 11.3 The Administrative Assistant routes document to CPM for proper dissemination to the concerned staff. The CPA/E validates submitted work accomplishment against joint evaluation. Prepared By: 11.5 Based on the evaluated accomplishment, the AA updates the Contract Cost Report (DCI-CCR) and prepares the Recommendation for Payment (DCI-RFP) for CPA/E and CPM’s signature. If required, documents are also sent to Design Consultants for signature. 11.6 The Administrative Assistant transmits accomplished DCI-RFP with complete attachments to the Customer for payment by using Transmittal Cover Sheet (DCI-TCS). A copy is kept on file. Design Coordinates, Inc. Approved By: {Customer} DCI-CMP rev.01 Page 7 of 10 design coordinates, inc. construction project managers suite 202, itc building, 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance {Project Name} Construction Project Management Plan 12. Section 7 Scope of Functions Owner and Third Party Claims This section ensures that insurance coverage for the project is appropriate and updated based on the contract requirements. This section also ensures that any claims and disputes that arise in relation to the project are endorsed to the Supplier. 12.1 13. Prior to receiving the Supplier’s bonds and warranties, the Administrative Assistant verifies Contract stipulations with regard the following : 12.1.1 amount covered 12.1.2 validity period 12.1.3 policy number 12.1.4 terms and conditions 12.2 The AA receives the documents, logs information in the Bonds and Insurance’s Monitoring Log (DCI-BIM) and monitors claims and expiration dates. Supplier is notified at least a month before bonds is set to expire. 12.3 The AA transmits the original copy of bonds to the Customer and retains a photocopy of the bonds on file. 12.4 Any claims to the bond are endorsed to the Supplier. 12.5 Based on pre-agreed durations as stipulated in the Contract, the CPM recommends the release of bonds. Progress Reporting A formal report is prepared by the CPMT to provide the Customer an update on the progress of the project during a given period of time. Reports prepared by the CPMT during the construction phase are the weekly, monthly and the year-end report. Reports required from the Supplier are the daily and weekly report. Refer to Contractor’s Daily Report (DCICDR) and Weekly Progress Report (DCI-WPR). 13.1 13.2 Prepared By: Based on pre-agreed report submittal dates, the Administrative Assistant receives Supplier’s report. The CPA/E reviews the content of the Supplier’s report vis-à-vis actual site conditions. Supplier is advised to revise or augment submittal made, if required. Design Coordinates, Inc. Approved By: {Customer} DCI-CMP rev.01 Page 8 of 10 design coordinates, inc. construction project managers suite 202, itc building, 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance {Project Name} Construction Project Management Plan 13.3 13.4 13.5 14. Section 7 Scope of Functions The Administrative Assistant encodes Supplier’s validated submittal into the report format. Refer to sample Project Update. For monthly and year-end reports, an Executive Summary prepared by the CPM is included. After the CPM’s approval, the report is finalized by the Administrative Assistant and signatures are secured from designated signatories and reproduced to the pre-agreed number based on the CPMP. Copies are transmitted to pre-determined recipients on pre-agreed dates and a copy is kept on file. Completion, Turn-over and Contract Close-out This section establishes a comprehensive and thorough process to ensure a timely and orderly transfer of the completed project from the supplier to the owner. This section can extend to the Postconstruction phase. This section begins with the Project Teams establishment of close-out proceedings conducted prior to any turn-over and ends with the issuance of a Certificate of Completion and the closing out of Supplier’s accounts. 14.1 14.2 14.3 14.4 Meet with the Project Team to agree on procedure and schedule for turnover of the Work to the Customer. Refer to WI-22-DCI Project Close-out. If the Customer requires the early possession of an area before the pre-agreed turnover schedule, the Project Team conducts an inspection of the area/work to determine the balance of work and defects. Refer to WI-20-DCI: Punchlisting and WI-21-DCI: Review of ‘As-Built’ Drawings. The CPMT issues a Certificate of Owner’s Early Possession to the Supplier. Refer to sample Certificate of Early Possession form. The list of balance of works serves as an attachment to the certificate. The Supplier’s schedule to complete balance of work is agreed upon with the Project Team. The CPMT conducts final accounting of each Contract Package to reconcile Supplier’s accounts and ensure that there are no overpayments made or pending claims for change order and payments from the Customer. Update DCI-COR (Construction Cost Report). Secure Supplier’s and Customer’s concurrence on final accounts. Use Statement of Final Account (DCI-SFA). This will serve as an attachment to the Certificate of Completion. The CPMT prepares an inventory of all project related documents and records generated through out the span of the project to its completion related to the particular Contract Package. This is turned-over to the Customer together with the Certificate of Completion. Refer to QP-01-DCI : Control of Quality Records. Post-Construction Phase General The Post-construction phase of a project often times overlap with the Construction phase. Post Construction may start upon the issuance of the Certificate of Substantial Completion and end with the physical pull out of the Project Team and the termination of services. Refer to WI-22-DCI : Project Close-out. Prepared By: Design Coordinates, Inc. Approved By: {Customer} DCI-CMP rev.01 Page 9 of 10 design coordinates, inc. construction project managers suite 202, itc building, 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance {Project Name} Construction Project Management Plan 1. Project Close-Out (Termination of Services) 1.1 1.2 1.3 1.4 1.5 1.6 Prepared By: Section 7 Scope of Functions After all the final accounting of Supplier’s accounts is conducted and certificates of completions are issued, the CPMT prepares and submits the Final Project Report to the Customer. Refer to sample Final Report. The CPMT prepares the inventory of equipment and records for turnover to the Property Custodian for safekeeping. All diskettes shall be turned-over to QMD for disposition. Refer to QP-01-DCI : Control of Quality Records. The CPM advises HRASD of availability of CPMT personnel for transfer. The CPMT is demobilized. The site office is turned-over to responsible party and any outstanding accounts are settled. The CPM with the Managing Director conducts final Project Accounting with the Finance Department. The Managing Director shall evaluate the services rendered by the Construction Project Management Team through a customer feedback mechanism. Refer to QP-06-DCI : Product Realization. Design Coordinates, Inc. Approved By: {Customer} DCI-CMP rev.01 Page 10 of 10 design coordinates, inc. construction project managers suite 202, itc building, 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance