PACIFIC PARTNERSHIP 2012 18 JAN 12 OPT Brief This brief is classified: UNCLASSIFIED UNCLASSIFIED Roll Call • • • • • • • • • • • • • • • • CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 351st Civil Affairs Command DLA Troop Support - Pacific ETG 30th NCR HSC-21 DET 2 MCAST Blue: Normal participants not expected to attend VTC due to scheduling conflict. UNCLASSIFIED 2 UNCLASSIFIED PP 12 Weekly Planning Rhythm 1100W read ahead slides posted to APAN CPF N3 Semi-Monthly Update 1200W MED WG Sun Mon Tues Wed Thurs 1300-1500W OPT VTC 1000W COMMS WG 1200W ENG WG 1000W CA WG Sat 1430W Comm Integration WG 1300W LOG WG 1300W FP WG Every other week Effective 09 JAN Fri UNCLASSIFIED 3 UNCLASSIFIED Planning Timeline AUG JUL JUN MAY EXORD Mid Planning Conference Initial Planning Conference CPF RFF Interagency Coord (CPF N5) FSLO Letter NGO Coordination (CPF N5) MOU Letters Signed Partner Nations (CPF N5/C7F) Transit Plan (CPF/CDS) APR PLANORD MAR FEB Force Sourcing (CPFN3) JAN Meetings/Conferences (CPF/CDS) DEC NOV OCT SEP Mission Planning/CONOPS (CPF) PN Invitation letters Final Initial Funding/Authorizations (CPF) Communications (CPF N6) Requirements Assessment (CPF MAG) Systems Assessment plan Detailed CONOPS (CDS) PDSS/Advanced Echelon (CDS) PDSS Deployment (CDS) Advanced Echelon Deployment UNCLASSIFIED 4 UNCLASSIFIED ADF Planning Status General Planning • CJOPS Decision Brief for PP12 signed. Command • Nomination of O-5 for position of COMASC submitted. • Call for nominations for ASNCE staff sent via signal. Engineering • Two (2) ADF engineers participated in Indonesia PDSS. Still awaiting Post Activity Report. • Authorization to lead as FIE for Indonesia mission still to come from IPDIV. Medical • Awaiting nominations for ADF Health PP12 positions from Services. No Change UNCLASSIFIED 5 UNCLASSIFIED ADF Participation Australia • Command Element • Engineering Section • Medical Personnel contribution of 15 – 20 pers in each contingent Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia Health manning TBC in late November HQJOC Health PP12 POC: CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) kenneth.walters@defence.gov.au No Change UNCLASSIFIED 6 UNCLASSIFIED PP12 RFI Tracker Number Status Date Req Responsible Question ADF-001 Closed 11 Nov 11 PACFLT Request a copy of the Indonesian PDSS itinerary ADF-002 Open 11 Nov 11 PACFLT Status of Partner Nation invitation letter No Change UNCLASSIFIED Other 7 UNCLASSIFIED JSDF Planning Status • CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities - Decision after completion of PDSS Vehicles - JMSDF Ship (TBD×1) - JASDF Aircraft(C-130 or KC-767×1) Medical team - Approximately 20~30 No Change UNCLASSIFIED 8 UNCLASSIFIED JSDF Planning Status • PDSS -Request re-survey Philippines with U.S. survey team in FEB or MAR 2012 • Humanitarian community in Japan - Not yet access • POC PRI: LCDR Haga : j3haga@jso.mod.go.jp DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : j3yamaguchi_m@jso.mod.go.jp No Change UNCLASSIFIED 9 UNCLASSIFIED JSDF Planning Status Number Status date WG Requests/Questions JPN -001 19 OCT PDSS Draft plan of PDSS in Philippine and Vietnam JPN-002 30 NOV PDSS Req. re-survey with US survey member in FEB or MAR. No Change UNCLASSIFIED Comments 10 UNCLASSIFIED NZDF Planning Status Decision by COMD Joint Forces New Zealand is to deploy a small multidisciplinary health team for the duration of the deployment to Vietnam 10 – 24 Jul 12. Contingent: Plan to embark USNS MERCY in Subic Bay Philippines / disembark at the conclusion of mission in Vietnam. MAJ BROOKS – will attend Main Planning Conference (30 - 31 Jan in San Diego) as HQ JFNZ Rep. Now registered into APAN, awaiting membership to PP12 accounts. Medical Personnel contribution: Manning TBC in early December (8 – 12 pers) New HQJFNZ Health PP12 POC: MAJ Andrew BROOKS DDI: +64 4 529 6124 andrew.brooks@nzdf.mil.nz No Change UNCLASSIFIED 11 UNCLASSIFIED CPF FOPS Update Manning Update -FFC change in sourcing priorities -Augmentation package is now out for Joint Sourcing w/ a suspense of 23 Jan -Commitment received for med personnel -32 non-med personnel still outstanding -CPF PLANORD released UNCLASSIFIED 12 Medical Update • Medical WG Telcon held Tuesday, 17 January 2012, 1200 hrs • Identified Medical Planner to assist with Medical CONOPS development • Finalizing details for Medical Assessment visits to the Philippines and Cambodia 13 UNCLASSIFIED Engineering Update Site Survey Philippines Cambodia Indonesia Vietnam Projects Recommended 3 schools & 1 medical clinic 3 health centers 3 health centers & 1 school 2 health centers SMEE Request Seawall-Dr. Lin Bldg; P&E; CCAD Seismic; Disaster Disaster; Safety Australian Defence Force approval is approximately 90% complete. -ADF determination of FIE will follow site survey report Philippine Project Package preparation (ACB1 lead- BUC Sarmiento) Cambodia Project Package preparation (NMCB40 lead) Indonesia Project Package preparation (ADF lead/NMCB40 Alt) Vietnam Project Package preparation (NMCB40 lead) Completed On-track Off-Track/Recoverable UNCLASSIFIED Off-Track not recoverable 14 UNCLASSIFIED Engineering Update NALO Flight request submissions. - Confirm ability to land NALO C-130 at Talaud Airport, Indonesia. Inability will require using a combination of Manado Airport and commercial surface shipping. - Confirm ability to land NALO C-130 at Calbayog City, Samar Philippines. - Vietnam mission will require NALO C-130 to land at Hanoi IOT clear customs, movement of equipment and PAX to Nghe An Province via contracted trucks and passenger bus. Identify all customs and entry requirements for Indonesa, Philippines, And Vietnam. - Visa requirements for PAX (30+ days) - Required documents for tools and equipment (customs process and US Embassy customs POC Completed On-track Off-Track/Recoverable UNCLASSIFIED Off-Track not recoverable 15 UNCLASSIFIED Logistics Update • Logistics WG held 17 Jan 12 • Funding – APRI • MTF MERCY received $600K of required $1.9M • Pharmaceuticals and Consumables – Working with DLA to place initial orders • Donation Material • Next Logistics WG meeting scheduled for 24 JAN 12 UNCLASSIFIED 16 PP12 Supply and Logistics Status FUNDING (17JAN12) Item / Task Status Action Date Req Notes APRI CPF/ SUPPO 31JAN12 - APRI ($600K of $1.9M required received) ORF C7F/ SUPPO 07FEB12 - Requirements review in progress OCO CPF/ SUPPO 15APR12 - Requirements review in progress Completed On-track Off-Track/Recoverable Off-Track not recoverable 17 PP12 Supply and Logistics Status PHARMACEUTICALS and CONSUMABLES (17JAN12) Item / Task Status Action Date Req Notes Indonesia Load List SUPPO 03FEB12 - Load list developed pending MPC update(s). - Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Requisitioning of standard consumable items commencing week of 17 Jan 12 Philippines Load List SUPPO 03FEB12 - Load list developed pending MPC update(s) - Requisitioning of standard pharmaceutical and consumable items commencing week of 17 Jan 12 Vietnam Load List SUPPO 03FEB12 - Load list developed pending MPC update(s). - Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Requisitioning of standard consumable items commencing week of 17 Jan 12 Cambodia Load List SUPPO 03FEB12 - Load list developed pending MPC update(s) - Requisition of standard pharmaceutical and consumable items commencing week of 17 Jan 12 Completed On-track Off-Track/Recoverable Off-Track not recoverable 18 PP12 Supply and Logistics Status DONATION MATERIAL (17JAN12) Item / Task Status Action Date Req Notes Load Plan MSC/ SUPPO 31JAN12 - Load plan developed pending MSC MERCY approval - 240 pallet maximum established Project Handclasp SUPPO 15MAR12 - Preparations ongoing with POC LDS SUPPO 15FEB12 - Preparations ongoing with POC Worldwide VETs SUPPO 15MAR12 - Preparations ongoing with POC Completed On-track Off-Track/Recoverable Off-Track not recoverable 19 PP12 Civil Affairs WG Item / Task Status CJ-CMCC Concept Paper Dev CMCC Battle Rhythm and Wagon Wheel Sych Non-Medical SMEE CONOPS Draft Plan Operational Assessment Plan Date Req Notes DESRON 17 JAN - Awaiting chops from: DESRON , MERCY, - Chops received from PP 09, 10, 11 reps, COE-DMHA (IHC) -19 JAN CAWG will focus on final inputs DESRON 19 JAN - Discussed 13 JAN at C3F, awaiting DESRON battle rhythm to synch with. CAWG 23 JAN - On track MAR 12 - Assessment WG meeting 20 JAN to produce draft task list which will go out to all WG for validation. -Geared toward MOPs CAWG Strategic Assessment Plan NGO and Partner Nation Engagement Process Action CAWG Completed CAWG / CPF N5 On-track APR 12 MPC - Geared towards Theater Strategic Objectives - 80% plan post MPC but add-ins will be ongoing. Off-Track/Recoverable Off-Track not recoverable 20 PP12 CIS Information Systems Status (18JAN12) Item / Task Status Action Date Req Notes IT & Radio Operator Manning CPF N3/ CDS / 15JAN12 -Each MEDCAP = 1-IT (HERS) - JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC - 4+Remote MEDCAP manning review. -Ashore Command Center Annex K / COMM Plan CPF/ C3F/CTF PRE-MPC -76/CDS - IAW NTTP 3-57 Navy HCA OPS -Based on PN/HN COMM interoperability assessments and simultaneous missions. -OPTASK COMMS required. BGAN SATCOM CPF N6/ CDS - Not required for PDSS. (17OCT11 CDS-7 N6 email). - OPTEST CPF BGANs (FEB12). - Develop CONOPS for BGAN use. Host Nation Spectrum Mgt C7F/CTF PRE-MPC -76 /CDS Completed POSTMPC On-track -Determine frequency restrictions for each host nation. Off-Track/Recoverable Off-Track not recoverable 21 PP12 CIS Information Systems Status (18JAN12) Item / Task Status Action Date Req Notes PAO Network CPF PAO/N6 / CDS/ MERCY PRE-MPC -Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only. - Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT IATO cert. in progress at CYBERFOR. PN-NGO Business Center (SSC LANT CHARLESTON) CPF N6 APR12 / CDS /MERCY Partner Nation Interoperability CPF N6 / CDS POSTMPC -Verify Partner Nation (PN) CIS POCs. -Verify APAN accounts for all PN CIS WG team members. -PN CIS capability review. -Develop CIS Interoperability Matrix in Annex K. Humanitarian Electronic Record System CIS WG/ CDS N6 TBD -HERS funded by MARFORPAC Experimental Center (MEC) -System status: in development. Completed On-track -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. -MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. SOW in development (09JAN12). - CDS procure printer consumables for entire mission. -IA/business rules provided CDS-7 N6 03NOV11. Off-Track/Recoverable Off-Track not recoverable 22 PP12 CIS Information Systems Status (18JAN12) Item / Task Action Date Req Notes Remote MEDDENCAP /CC Comms Arch CDS / CPF PREMPC -UHF data and voice SATCOM/LOS Comms for CAP to air/ship. -Identify CIS Element architecture and inventory. Host Nation MIL C4 PDSS OIC PDSS AAR -PDSS OICs for assessment action. -Training provided to Blue Team 21OCT11. Host Nation CIVIL Comms PDSS OIC PDSS AAR -PDSS OICs for assessment action. -Training provided to Blue Team 21OCT11. Remote Site US Mission CIS Assessment PDSS OIC/ AOIC PDSS AAR -JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance. -Command Center (CC) Comms assessment. -Training provided to Blue Team 21OCT11. PDSS CIS Comms CPF/ CDS PDSS OICs No Change Status Completed PREPDSS On-track -Iridium Phones: CPF N6 issued phone to Blue OIC. -In country cell phones: MERCY to provide from PP10 mission phones. -Automated Data Collection (8 cell phones app) issued to OIC. Off-Track/Recoverable Off-Track not recoverable 23 PP12 CIS Information Systems Status (18JAN12) Item / Task Status Action Date Req Notes Knowledge Management /Data Protection CDS/ MERCY TBD -MEDCAP/CDS/Mission Data storage and protection Command Center Ashore CIS CDS PDSS AAR -Identify configuration and location in each country. IT SMEE Requests CDS PDSS AAR -PDSS determine scope (SYSADMIN, repair, training, etc.). SATCOM Requests C3F/ C7F/ CDS FEB12 -Standard USN process. Mission COMMs Readiness CDS / MERCY APR12 -Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite) Completed On-track Off-Track/Recoverable Off-Track not recoverable 24 PP12 CIS Information Systems Status (18JAN12) Item / Task Status Action Date Req Notes FSET on MERCY CPF / MSC TBD - Field Service Engineering Team (FSET) rqmt for San Diego to Hawaii cost estimate from SPAWAR requested 22NOV. Requested SOW status (10JAN12). -Funding transfer to SPAWAR TBD End of Mission CIS Exit Plan CPF/ CDS TBD - Hardware: Transfer custody of loaned CIS items back to CPF -Data Exit Plan: TBD VHF Handheld Radios CPF/ CDS FEB12 -CDS determine required quantities ADVON CIS CDS Pre-MPC -CDS determine requirements. Embarked Documentary Team CDS Ongoing -CDS determine requirements and set expectations -Afloat connectivity limited to NGO Business Center Completed On-track Off-Track/Recoverable Off-Track not recoverable 25 UNCLASSIFIED Force Protection Update • MFP sourcing drop dead date and branch plan • TA possibilities (hotels, routes, etc) • HN/In country coordination update • Pre-Deployment travel Requirements – – – – – – Updated ISOPREPs APACS iATP AOR location specific brief Level I ATFP SERE 100 B UNCLASSIFIED 26 UNCLASSIFIED Public Affairs Update - Admin • Mission PAO to DC 15-18 JAN for CHINFO/OSD/DOS meetings/coordination for mission roll-out - Media Coordination • CAPT Breslau, LCDR Lohmeyer will meet with Warner Bros. and NAVINFO WEST in LA 25 JAN UNCLASSIFIED 27 UNCLASSIFIED Public Affairs Update Item/Task Status PAG DC media trip/mission announcement NS PP Fact Sheet Smartphone SOP NS Online presence brief Completed Action Suspense Date Notes CDS PA CPF PA TBD Draft to CDRE 15 DEC Routing will happen D-30 to 45 days CDS PA APR 2012 CDS PA, CPF PA 30 DEC CIWG, CPF Social Media 15 MAR CDS PA, CPF PA 9 DEC On-track Off-Track/Recoverable UNCLASSIFIED Mission info to NAVINFO WEST for vetting Social media, websites, etc Off-Track not recoverable 28 UNCLASSIFIED Public Affairs Update Item/Task Status Action Suspense Notes Date CDS PA, NPASE PO&AM inputs CDS PA, CPF PA 14 DEC Media Training Plan CDS PA TBD Training to CDS leadership and mission participants COMREL purchase list CPF PA TBD Will request final approval after MPC Completed On-track TBD Dialogue initiated w/ MERCY on 04 JAN Equipment requirements Due to FOPS. PA-specific updates in progress Off-Track/Recoverable UNCLASSIFIED Off-Track not recoverable 29 UNCLASSIFIED PP12 Communication Integration • Finalizing products to support detailed communication planning and assessment for each location (due 30 JAN) • Coordinating communication assessment support for PP12 (MAY – SEP 12) – Include “baseline” and post-mission support • Next CIWG meeting scheduled for: 19 JAN 12 • AMEMB Cambodia, Vietnam Telecons being coordinated UNCLASSIFIED 30 PP12 Communication Integration Item / Task Status Action Date Req Notes Stakeholder Analysis CIWG 15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec. Characterize Information Environment CPF N2/N39 15 NOV – 30 JAN -Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 99%, Philippines 95%. Communication Strategy/ Implementation Plan CPF N2/N39 31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan. Identify/Coordinate key messaging events CIWG 15 JAN - Identified; coordinating CIWG support: -- ETG Leadership Training -- MPC Assessment planning -- SLV support Develop messaging products CIWG/ CPF N2/N39, PA 15 APR - Not started. Completed On-track Off-Track/Recoverable Off-Track not recoverable 31 PP12 Communication Integration Item / Task Status Action Date Req Notes Develop communication MOE Indicators CIWG/ N2/N39 15 JAN - Part of overall PP12 assessment effort. Define Communication assessment methodology CPF N2/N39 30 JAN - Part of overall PP12 assessment effort. Coordinate and monitor communication during execution CPF N2/N39 During PP12 - Not started. Part of overall PP12 assessment effort. Conduct communication assessment CIWG During PP12 - Not started. Develop AAR CPF N2/N39, PA 30 SEP - Not started. Completed On-track Off-Track/Recoverable Off-Track not recoverable 32 Planning Timeline UPDATED: 18JAN12 INDICATES UPDATE 33 Mission Commander Priorities • Country CONOPS Development – 23-Jan-12 COUNTRY CONOPS (DRAFT) TO CDRE – 30-Jan-12 MPC (PRESENT DRAFT CONOPS) – C2/Task Organization Proposal (next slide) • CMCC / ENG / MED / EST / Shore FP – requires additional C2 slides to show organization and relationships – Issues: • Dedicated medical planner – Prioritized list of MEDCAPs to aid in SOM development • Veterinarian – tasked w/ COBRA GOLD & day job; adversely affects contribution to CONOPS • Need refined SMEE list for each country • EAP input • Determining Medical contingent for ADVON / Mission – LT Owens – incorrect specialty code, may be ineligible for ADVON – CDR Currie – unable to participate in mission/deploy – LTJG Ward – only med planner 34 NOTE: CMCC, ENG, MED, EST, Shore FP – requires additional C2 slides to show organization and relationships 35 Mission Commander Priorities (continued) • MPC – Official agenda released in announcement message (CDS7 062325ZJAN12) – 29JAN12 – Civilian Participant Planning and Discussion (USNS MERCY) – 30-31JAN12 – MPC (Admiral Kidd Conference Center) DUE DATE COG 18-Nov-11CPF / CDS7 - N1 18-Nov-11CPF 2-Dec-11CDS7 - N3 TOPIC TASK DESCRIPTION MPC OBTAIN VENUE (RESERVATION) FOR MPC (ADMIRAL KIDD) MPC FUNDING APPROVED FOR MPC MPC OBTAIN DRAFT AGENDA FROM PREVIOUS MPC DV GIFT TRACKER (TBD - DEPENDS ON RFI TO CPF) - GIFT FOR MPC = 16-Dec-11CDS7 - CS1 RUBIO MPC COINS 16-Dec-11CDS7 - CS1 RUBIO MPC 16-Dec-11CDS7 - N3 MPC 16-Dec-11CPF - LCDR RIOS MPC 16-Dec-11CPF MPC 28-Dec-11CPF / CDS7 - N1 28-Dec-11CPF / CDS7 - N1 28-Dec-11CDS7 - N3 28-Dec-11CDS7 - N3 MPC MPC MPC MPC 28-Dec-11CDS7 - N3 28-Dec-11CDS7 - N3 11-Jan-12CPF MPC MPC MPC 11-Jan-12CPF MPC 20-Jan-12CPF / CDS7 - N3 MPC STATUS COMPLETED COMPLETED COMPLETED COMPLETED ORF FOR DV GIFTS (TBD - DEPENDS ON RFI TO CPF) IN PROGRESS SOCIAL - DETERMINE VENUE COMPLETED RFI: DV GIFTS (PRIVATE) - DETERMINE PROTOCOL / APPROPRIATENESS COMPLETED OBTAIN POC INFO FOR WELCOME LETTERS / PACKAGES COMPLETED SEND OUT MPC INVITATIONS [INCLUDE SOCIAL FEES, UNIFORM REQUIREMENTS, BRIEF SUBMISSION GUIDELINES, INTERPRETERS, POC INFO, RSVP DATE & TRAVEL INFO, NO HOST SOCIAL, ATTIRE, AGENDA, DELIVERABLES] COMPLETED LODGING ARRANGEMENTS [COURTYARD MARRIOT - LIBERTY STATION]COMPLETED SEND OUT ANNOUNCEMENT MESSAGE COMPLETED PROMULGATE AGENDA FOR PP12 MPC COMPLETED PROMULGATE BRIEF COLLECTION / TIMELINE FOR SUBMISSION (PLACE IN MSG - UNCLAS ONLY, NO FOUO) COMPLETED SOCIAL - RESERVATION COMPLETED GOV PURCHASE CARD / CONTRACT COMPLETED ARRANGE REFRESHMENT/SETUP PACKAGE (WATER, COFFEE, LINEN, PODIUM, MICROPHONE, PROJECTORS) COMPLETED ARRANGE VANS/TRANSPORTATION [6 VANS / 4X HN DV, 2X TRANSPORTATION] IN PROGRESS 36 Mission Commander Priorities (continued) • MPC - POA&M (continued) DUE DATE COG TOPIC TASK DESCRIPTION SOCIAL - TRANSPORTATION REQUIREMENTS (1 VAN 20-Jan-12CPF / CDS7 - N3 MPC REQUEST TO BE ROUTED) 23-Jan-12CPF MPC DV TRANSPORTATION / TRAVEL IDENTIFY DV ESCORTS [TENTATIVE LIST - PENDING FORMAL 23-Jan-12CPF MPC RSVP] 23-Jan-12CDS7 - N1 MPC ASSEMBLE PARTICIPANT LIST (RSVP) / POC LIST 23-Jan-12CPF MPC ARRANGE INTERPRETERS FOR PN / HOST NATION 23-Jan-12CDS7 - FPO MPC BASE ACCESS REQUEST VENUE PARKING ARRANGEMENTS [COORDINATE WITH 23-Jan-12CDS7 - N3 MPC ADMIRAL KIDD] 24-Jan-12CDS7 - PAO MPC CDRE OPENING / CLOSING REMARKS [SPEECH] 25-Jan-12CDS7 - N3 MPC STAFF PLAN (ROLES & RESPONSIBILITIES) 25-Jan-12CDS7 - N3 MPC VENUE SETUP PLAN SECURE ADDITIONAL PERSONNEL TO ASSIST WITH MPC EXECUTION: VAN DRIVERS, PARKING ATTENDANTS, CHECK25-Jan-12CDS7 - N3 MPC IN DESK, SET-UP/BREAKDOWN TEAM 27-Jan-12CDS7 - N1 MPC NAMETAGS / BADGES WELCOME PACKAGE: AGENDA, POC LIST, LOCAL 27-Jan-12CDS7 - N1 / N2 / PAO MPC ESTABLISHMENTS, MAPS/DIRECTIONS, SOCIAL EVENT INFO VENUE SETUP: SIGNAGE, CHECK-IN TABLE, FOOD TABLES, MAIN AREA, BREAKOUT SESSION, DV ASSIGNED SEATING/NAME PLACARDS, A/V, WHITEBOARDS / EASELS, 27-Jan-12CDS7 - N2 / N3 / PAO / N6 MPC DRY ERASE MARKERS [RFI - WHEN CAN SETUP BEGIN] 27-Jan-12CDS7 - N3 MPC DRAFT CONOPS PRINTED IN BINDERS FOR DVS CONFERENCE [SOCIAL] FEES / COLLECTION / PRICING / 30-Jan-12CDS7 - N1 MPC RECEIPT BOOK 30-Jan-12CDS7 - N1 MPC SOCIAL - FUNDING 30-Jan-12CDS7 - N6 MPC ELECTRONICS SETUP (PROJECTOR / LAPTOPS) 30-Jan-12CDS7 - PAO MPC PHOTO SESSION - EQUIPMENT, PHOTOGRAPHER, LOCATION DISTRIBUTE BRIEFS POST MPC (APAN) [UNCLAS ONLY, NO 3-Feb-12CDS7 - N3 MPC FOUO] STATUS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS COMPLETED IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS 37 Mission Commander Priorities (continued) • CMCC TTX (01FEB12) – Initial objectives: • Organization review • Job description assignment • Workspace familiarization • Communications familiarization • CMCC problem solving (scenario – walk-thru/talk-thru) – Participant List TBD • SLV preparations – Issues: • CPF participant requested • Vietnam visas • Agenda / KLE • Miscellaneous – Manning / Billet gaps – Proposed Mission Planning Rhythm in development – CMCC Watchfloor products in development: • SORM / SOPs • Watchbills • PPRs 38 UNCLASSIFIED Closing Questions/Comments • • • • • • • • • CPF Staff State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 • • • • • • • • 351st Civil Affairs Command DLA Troop Support - Pacific 30th NCR ETG HSC-21 DET 2 MCAST USNS MERCY CDS-7 UNCLASSIFIED 39