BACKGROUND INFORMATION WHAT IS ASBESTOS? IT IS: – A NATURALLY OCCURING MINERAL – FOUND THROUGHOUT THE WORLD BACKGROUND INFORMATION HOW IS ASBESTOS PRODUCED? – STRIP/OPEN MINING HOW DOES IT GET ITS NAME? – GREEK ADJECTIVE• INEXTINGUISHABLE – GREEK MIRACLE MINERAL BACKGROUND INFORMATION WHERE IS ASBESTOS PRODUCED? – – – – FORMER SOVIET UNION CANADA SOUTH AFRICA LIMITED IN USA BACKGROUND INFORMATION WHO USES ASBESTOS NOW? – – – – EUROPEAN, ASIAN COUNTRIES CANADA AND MEXICO SOUTH AMERICA UNITED STATES • NO CURRENT BAN • ONLY A BAN ON VISIBLE EMMISSIONS • REGULATORY IMPLICATIONS LIMIT USE BACKGROUND INFORMATION GROUPS OF ASBESTOS – SERPENTINE • SHEET/LAYERED • CHRISOTILE (95%) – AMPHIBOLE • • • • • • CHAIN LIKE AMOSITE CROCIDOLITE ANTHOPHYLLITE TREMOLITE ACTINOLITE Amphibole Serpentine BACKGROUND INFORMATION FRIABLE VS. NON-FRIABLE – FRIABLE • CRUMBLED BY HAND PRESSURE • SANDED,GROUND • ABILITY TO BE AIRBORNE – NON-FRIABLE • HARD/ROCK LIKE Friable Non-Friable BACKGROUND INFORMATION CATEGORIES OF ACBM/PACM – SURFACING • SPRAY/TROWLED – THERMAL SYSTEM • INHIBIT HEAT TRANSFER – MISCELLANEOUS • ANY OTHER MATERIAL BACKGROUND INFORMATION PROPERTIES OF ASBESTOS – – – – – – FIRE RESISTANT THERMAL QUALITIES ACOUSTICAL PROPERTIES ELECTRICAL INSULATOR TENSILE STRENGTH CHEMICALLY REST BACKGROUND INFORMATION COMMON USES OF ASBESTOS – – – – – – – – PIPE INSULATION BOILER BREECH/LAGGING BOILER DOOR FIRE PROOFING DEC/ACOUSTICAL CEILING TILE ROOFING ELECTRICAL INSULATION HEALTH EFFECTS HARMFUL PROPERTIES – SIZE OF FIBER – DURABILITY • FIBERGLASS 2-3 YEARS • ASBESTOS >100 YEARS – SHAPE OF FIBER – BODIES ABILITY TO BREAK DOWN – NO PROOF ON DIFFERENT TOXICITY HEALTH EFFECTS MAN-MADE MATERIALS – FIBERGLASS ROUTES OF ENTRY – INHALATION – INGESTION HEALTH EFFECTS RESPIRATORY SYSTEM – NATURAL DEFENSE • • • • • • NASAL HAIRS MUCUS SILIVA CILIA TRACHEA PRIMARY BRONCHI – DEEP LUNG • ALVEOLI • EXCHANGE OF GASES ASBESTOS RELATED DISEASES ASBESTOSIS – LUNG DISEASE CALLED ASBESTOSIS DIAGNOSED IN 1900 – SCARING OR FIBROSIS OF THE LUNG TISSUE • IMPAIRS ELASTICITY RESTRICTS O2 INTAKE – LATENCY PERIOD:15-30 YEARS – IRREVERSIBLE WITH NO CURE ASBESTOS RELATED DISEASES LUNG CANCER – MALIGNANT TUMOR OF THE BRONCHI COVERING – LATENCY PERIOD: 20-30 YEARS ASBESTOS RELATED DISEASES MESOTHELIOMA – CANCER OF THE MESOTHELIUM • LINING OF CHEST/ABDOMEN – AT TIME OF DIAGNOSES USUALLY FATAL – NO DOSE RESPONSE EFFECT – LANTENCY PERIOD: 30-40 YEARS OTHER DISEASES HEALTH EFFECTS – SYNERGISTIC RELATIONSHIP BETWEEN ASBESTOS AND SMOKING – 20 CIGARETTES/DAY – 10X FOR LUNG CANCER • ASBESTOS ONLY – 5X FOR LUNG CANCER • CIGARETTES + ASBESTOS 90X GREATER REGULATIONS AHERA (For all K-12 Public and Private) – INSPECTION – REINSPECTION – SAMPLING • ANALYSIS – – – – ASSESSMENT ASSESSMENT CATEGORIES TRAINING MANAGEMENT PLAN REGULATIONS DEPARTMENT OF HEALTH AND FAMILY SERVICES – DHFS – STATE EPA – WORKER CERTIFICATION DEPARTMENT OF COMMERCE OPERATIONS & MAINTENANCE PROGRAM PURPOSE – MAINTAIN ACM NON-FRIABLE – RESPOND TO DAMAGED ACM MAJOR COMPONENTS – DECON/CLEANING – GENERAL MAINT/CLEANING OPERATIONS & MAINTENANCE PROGRAM EMERGENCY RESPONSE PROCEDURES PERIODIC SURVEILLANCE REINSPECTION RECORD KEEPING – WASTE MANIFEST – O&M FORMS OPERATIONS & MAINTENANCE PROGRAM • REFER TO INSP/MGMT PLAN/SURV. • IF IN DOUBT - SAMPLE • REFER TO D.P. O&M vs. PLANNED ABATEMENT – INTENT – BLUEPRINTS – QUANTITY • ONE GLOVEBAG OPERATIONS & MAINTENANCE PROGRAM – REMOVE ONLY WHAT IS DAMAGED – FLOOR TILE – EXAMPLES • COIL REPLACEMENT • UNIVENT LEAK • ROOF LEAK ASBESTOS REMOVAL PLANNED ABATEMENT: – – – – – – STATE NOTIFICATION NEGATIVE PRESSURE CONTAINMENT DECONTAMINATION SUITE CERTIFIED WORKERS PROPER TECHNIQUES CLEARANCE AIR TESTING OPERATIONS & MAINTENANCE PROGRAM EMERGENCY RESPONSE – MINOR RELEASE • < 3 FT2 OR 3 LF • IN-HOUSE – MAJOR RELEASE • > 3FT2 OR 3LF • PROJECT DESIGN/RESPONSE ACTION – ISOLATE AREA – SHUT DOWN HVAC – CALL EMC