PRC-001-AB2-1 - Alberta Electric System Operator

advertisement
Reliability Standard Audit Worksheet
PRC-001-AB2-1
Protection System Coordination
Audit Summary
Registered Entity:
[Registered Entity name as it appears in the AESO ARS Registry]
Functional Entity:
[Functional entities for which the Registered Entity above was registered
throughout the audit period]
Audit Period:
From: [Audit start date or standard effective date, whichever comes later]
To:
[Audit end date or standard withdrawal/supersede date, whichever
comes first]
Audit:
[Scheduled (YYYY-QX) or Spot Check YYYY-MM-DD]
Compliance Monitoring
Entity:
Alberta Electric System Operator (AESO)
No
Suspected Non-Compliance
to the standard?
Date of Completion:
Yes
[If Yes, list the requirements with suspected contravention findings
e.g. R1, R2, R7]
[Use YYYY-MM-DD format]
Assessment Commentary
[Information (if any) relevant to audit findings below]
Findings
R1
[Summary of Findings]
R2
[Summary of Findings]
R3
[Summary of Findings]
R5
[Summary of Findings]
Документ1
Page 1 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
Findings (continued)
R6
[Summary of Findings]
R7
[Summary of Findings]
R8
[Summary of Findings]
Документ1
Page 2 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
Contact Information
Audited Entity
Compliance Primary
[Name]
[Title]
[Phone]
[Email]
Subject Matter Expert
[Name]
[Title]
[Phone]
[Email]
AESO Team
Lead Auditor
Auditor
Compliance Manager
Standard Owner
Документ1
Sign-off
[Name]
[Title]
[Phone]
[Email]
Date:
[Name]
[Title]
[Phone]
[Email]
Date:
[Name]
[Title]
[Phone]
[Email]
Date:
[Name]
[Title]
[Phone]
[Email]
Date:
Signature:
Signature:
Signature:
Signature:
Page 3 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
Applicability
This reliability standard applies to:
(a) the legal owner of a transmission facility that is:
(i) part of the bulk electric system; or
(ii) not part of the bulk electric system and which the ISO:
(A) determines is necessary for the reliable operation of either the interconnected electric system
or the City of Medicine Hat electric system, and
(B) publishes on the AESO website and may amend from time to time in accordance with the process
set out in Appendix 1;
(b) the legal owner of a generating unit that is:
(i) directly connected to the bulk electric system and has a maximum authorized real power rating
greater than eighteen (18) MW;
(ii) within a power plant which:
(A) is not part of an aggregated generating facility;
(B) is directly connected to the bulk electric system; and
(C) has a combined maximum authorized real power rating greater than sixty-seven point five
(67.5) MW;
(iii) a blackstart resource; or
(iv) regardless of maximum authorized real power rating, material to this reliability standard and to the
reliability of the bulk electric system as the ISO determines and publishes on the AESO website and
may amend from time to time in accordance with the process set out in Appendix 1;
(c) the legal owner of an aggregated generating facility that is:
(i) directly connected to the bulk electric system and has a maximum authorized real power rating
greater than sixty-seven point five (67.5) MW;
(ii) a blackstart resource; or
(iii) regardless of maximum authorized real power rating, material to this reliability standard and
to the reliability of the bulk electric system as the ISO determines and publishes on the AESO
website and may amend from time to time in accordance with the process set out in Appendix 1;
(d) the operator of a transmission facility that is:
(i) part of the bulk electric system; or
(ii) not part of the bulk electric system and which the ISO:
(A) determines is necessary for the reliable operation of either the interconnected electric
system or the City of Medicine Hat electric system; and
Документ1
Page 4 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
(B) publishes on the AESO website and may amend from time to time in accordance with the
process set out in Appendix 1;
(e) the operator of a generating unit that is:
(i) directly connected to the bulk electric system and has a maximum authorized real power rating
greater than eighteen (18) MW;
(ii) within a power plant which:
(A) is not part of an aggregated generating facility;
(B) is directly connected to the bulk electric system; and
(C) has a combined maximum authorized real power rating greater than sixty-seven point five
(67.5) MW;
(iii) a blackstart resource; or
(iv) regardless of maximum authorized real power rating, material to this reliability standard and
to the reliability of the bulk electric system as the ISO determines and publishes on the AESO
website and may amend from time to time in accordance with the process set out in in Appendix
1;
(f) the operator of an aggregated generating facility that is:
(i) directly connected to the bulk electric system and has a maximum authorized real power rating
greater than sixty-seven point five (67.5) MW;
(ii) a blackstart resource; or
(iii) regardless of maximum authorized real power rating, material to this reliability standard and
to the reliability of the bulk electric system as the ISO determines and publishes on the AESO
website and may amend from time to time in accordance with the process set out in Appendix 1;
and
(g) the ISO.
Документ1
Page 5 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
Compliance Assessment
R1
Requirement & Measure
R1 The operating personnel of each of
the ISO, the operator of a
transmission facility, the operator of
a generating unit and the operator of
an aggregated generating facility
must be familiar with the purpose and
limitations of protection system
schemes applied in its area.
MR1 Training records are available
that indicate training of staff who
operate the system in protection
system schemes and any remedial
action scheme applicable within their
system.
Evidence Submission
AR1 Please provide:
Evidence Description
Evidence
Assessment Approach
Auditor Notes
[Click and edit to enter description for
AR1(i) submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the list of operating personnel provided at [For AESO use only]
AR1 (i) for appropriateness.
(ii) the list of protection systems
[Click and edit to enter description for
schemes and remedial action
AR1(ii) submitted evidence]
schemes (RAS) applicable within your
system for the entire audit period; the
RASs should reference the Name and
Number as provided in the ISO RAS
Database.
[Click and edit to embed file or link to
evidence]
Review the list of protection systems schemes
and RASs provided at AR1 (ii) for accuracy.
(iii) records of training including the
purpose and limitations of the
protection systems schemes and
RASs as identified in AR1(ii) for all
operating personnel.
[Click and edit to enter description for
AR1(iii) submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the training records to determine whether [For AESO use only]
they cover all operating personnel as identified in
AR1 (i), and all applicable protection systems
schemes and RASs.
or any other evidence to demonstrate
compliance with requirement R1.
[Click and edit to enter description for any [Click and edit to embed file or link to
other submitted evidence]
evidence]
Review any other provided evidence to determine [For AESO use only]
whether operating personnel were trained and
familiar with the purpose and limitations of the
protection systems schemes and RASs applied
in their area.
(i)
the list of all operating personnel
throughout the audit period; if new
staff were added to the list of operating
personnel at any time during the audit
period, specify the dates when they
became operating personnel;
[For AESO use only]
Determine whether all RASs listed in the ISO
RAS Database as owned or partially owned by
the market participant have been included in their
AR1(ii) submission.
Findings
[For AESO use only]
Документ1
Page 6 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
R2
Requirement & Measure
Evidence Submission
Evidence Description
Evidence
Assessment Approach
Auditor Notes
R2 Each operator of a generating unit and
Intentionally left blank
operator of an aggregated generating facility
must do the following if a protective relay or any
equipment of a protection system of a
generating unit or an aggregated generating
facility that measures voltage, current or
frequency from the generating unit or the
aggregated generating facility to the
interconnected electric system, but excluding
the prime mover and associated control systems,
fails and such failure reduces transmission
system reliability:
MR2 Measures for this requirement are
identified in the subsections below:
R2.1 notify the operator of a transmission
facility in its area and the ISO as soon as
possible, but no longer than twenty four (24)
hours after receiving knowledge of such failure;
and
MR2.1 notifications exist for each failure as
specified in requirement R2.1.; and
Документ1
AR2.1 Please provide:
[Click and edit to embed file or link to
evidence]
Review the list provided at AR2.1(i).
(ii) information, such as incident reports or
[Click and edit to enter description for
event logs, showing the time and date of the AR2.1(ii) submitted evidence]
failure, a brief description, and the time and
date of receiving knowledge of the failure)
for each failure identified at AR2.1(i);
[Click and edit to embed file or link to
evidence]
Review the information provided at AR2.1 [For AESO use only]
(ii) for appropriateness.
(iii) evidence, such as operator logs, phone
[Click and edit to enter description for
records, electronic notification or other
AR2.1(iii) submitted evidence]
equivalent) of notification to the operator of
a transmission facility in its area and the
ISO showing the time and date for each
failure which reduced the transmission
system reliability as identified at AR2.1(i).
[Click and edit to embed file or link to
evidence]
Review the notifications sent to the ISO
and the appropriate transmission
facility operator(s) to determine whether
the notifications were sent within 24
hours of receiving knowledge of each
failure reducing the reliability of the
transmission system.
[Click and edit to enter description for
(i) a list containing all failures that qualify under AR2.1(i) submitted evidence]
[For AESO use only]
requirement R2;
or,
if during the audit period there were no such
failures, an attestation letter to this effect;
Page 7 of 17
[For AESO use only]
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
Requirement & Measure
R2.2 commence as soon as possible, and
proceed diligently thereafter, to correct such
failure.
Evidence Submission
AR2.2 Please provide:
(i)
the corrective actions identified on each of
the failures identified at AR2.1(i).
Evidence Description
Evidence
[Click and edit to enter description for AR2.2(i) [Click and edit to embed file or link to
submitted evidence]
evidence]
Assessment Approach
Auditor Notes
Review the corrective actions provided at [For AESO use only]
AR2.2(i) for appropriateness.
MR2.2 evidence exists that corrective actions
have been taken as specified in requirement
R2.2.
(ii) the dates and times when corrective actions [Click and edit to enter description for
have been initiated and completed for each AR2.2(ii) submitted evidence]
of the failures identified at AR2.1(i);
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR2.2
(ii) to determine whether the action items
are completed or being addressed as
soon as possible and diligently.
[For AESO use only]
or,
if any of the corrective actions has not been
completed, the corrective action plan.
Findings
[For AESO use only]
Документ1
Page 8 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
R3
Requirement & Measure
R3 Each operator of a transmission facility
must do the following if a protective relay or
equipment fails, and such failure reduces
transmission system reliability on the bulk
electric system:
Evidence Submission
Evidence Description
Evidence
Assessment Approach
Auditor Notes
Intentionally left blank
MR3 Measures for this requirement are
identified in the subsections below:
R3.1 notify the ISO, each directly affected
AR3.1 Please provide:
operator of a transmission facility and
interconnected transmission operator as soon (i) a list containing all failures that qualify
under requirement R3;
as possible, but no longer than twenty four (24)
hours after the earlier of receiving knowledge of
or,
or detecting such failure; and
MR3.1 notifications exist for each failure as
specified in requirement R3.1; and
Документ1
[Click and edit to enter description for
AR3.1(i) submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the list provided at AR3.1(i).
(ii) information, such as incident reports or
[Click and edit to enter description for
event logs, showing the time and date of
AR3.1(ii) submitted evidence]
the failure, a brief description, and the time
and date of receiving knowledge of the
failure) for each failure identified at
AR3.1(i);
[Click and edit to embed file or link to
evidence]
Review the information provided at AR3.1 [For AESO use only]
(ii) for appropriateness.
(iii) evidence, such as operator logs, phone
records, electronic notification or other
equivalent) of notification to the operator
of a transmission facility in its area and
the ISO showing the time and date for
each failure which reduced the
transmission system reliability as
identified at AR3.1(i).
[Click and edit to embed file or link to
evidence]
Review the notifications sent to the ISO
and the appropriate transmission
facility operator(s) to determine whether
the notifications were sent within 24
hours of receiving knowledge of each
failure reducing the reliability of the
transmission system.
[For AESO use only]
if during the audit period there were no
such failures, an attestation letter to this
effect;
[Click and edit to enter description for
AR3.1(iii) submitted evidence]
Page 9 of 17
[For AESO use only]
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
Requirement & Measure
R3.2 commence as soon as possible, and
proceed diligently thereafter, to correct such
failure unless otherwise directed by the ISO.
Evidence Submission
AR3.2 Please provide:
Evidence Description
Evidence
Assessment Approach
Auditor Notes
[Click and edit to enter description for
AR3.2(i) submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the corrective actions provided at [For AESO use only]
AR3.2(i) for appropriateness.
(ii) the dates and times when corrective
[Click and edit to enter description for
actions have been initiated and completed AR3.2(ii) submitted evidence]
for each of the failures identified at
AR3.1(i);
[Click and edit to embed file or link to
evidence]
Review the evidence provided at
[For AESO use only]
AR3.2(ii) to determine whether the action
items are completed or being addressed
in accordance with R3.2.
(i)
the corrective actions identified on each of
the failures identified at AR3.1(i).
MR3.2 evidence exists that corrective actions
have been taken as specified in requirement
R3.2.
or, if any of the corrective actions has not
been completed, the corrective action
plan.
Findings
[For AESO use only]
Документ1
Page 10 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
R5
Requirement & Measure
Evidence Submission
R5 Each legal owner of a generating AR5 Please provide:
unit and legal owner of an aggregated
generating facility must coordinate all (i) the list of all new protection systems
and all protection system changes
new protection systems and all
implemented during the audit period;
protection system changes with each
interconnecting legal owner of a
or,
transmission facility and the ISO.
Evidence Description
Evidence
Assessment Approach
Auditor Notes
[Click and edit to enter description for AR5(i)
submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the list provided at AR5(i) for
completeness.
[For AESO use only]
evidence demonstrating that your entity [Click and edit to enter description for AR5(ii)
coordinated all new protection
submitted evidence]
systems and all protection system
changes with each interconnecting
legal owner of a transmission
facility.
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR5(ii)
for appropriateness.
[For AESO use only]
(iii) evidence demonstrating that your entity [Click and edit to enter description for AR5(iii)
coordinated all new protection
submitted evidence]
systems and all protection system
changes with the ISO.
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR5(iii)
for appropriateness.
[For AESO use only]
MR5 Evidence exists including, but not
limited to, revised fault analysis study,
letters of agreement on settings,
notifications of changes, all of which
meets the requirements as specified in
requirement R5.
(ii)
if during the audit period there were no
new protection systems or
protection systems changes, an
attestation letter to this effect;
Findings
[For AESO use only]
Документ1
Page 11 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
R6
Requirement & Measure
Evidence Submission
Evidence Description
R6 Each legal owner of a
AR6 Please provide:
[Click and edit to enter description for
transmission facility must coordinate
(i) the list of all new protection systems and AR6(i) submitted evidence]
all protection systems including
all protection system changes
existing, new and modified protection
implemented during the audit period;
systems with each adjacent legal
owner of a transmission facility,
or,
affected legal owner of a generating
unit, affected legal owner of an
if during the audit period there were no
aggregated generating facility,
new protection systems or protection
affected interconnected transmission
systems changes, an attestation letter to
operators and the ISO.
this effect;
MR6 Evidence exists that could
include, but is not limited to, revised
fault analysis study, letters of
agreement on settings, notifications of
changes, that meets the requirements
as specified in requirement R6.
Evidence
Assessment Approach
Auditor Notes
[Click and edit to embed file or link to
evidence]
Review the list provided at AR6(i).
[For AESO use only]
[Click and edit to enter description for
AR6(ii) submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR6(ii)(iv) to determine whether protection
systems coordination with all affected
legal owners of generating units,
aggregated generating facilities and
interconnected transmission operators
occurred as appropriate.
[For AESO use only]
(iii) evidence demonstrating that your entity
[Click and edit to enter description for
coordinated all protection systems with
AR6(iii) submitted evidence]
each affected legal owner of a generating
unit, affected legal owner of an
aggregated generating facility and
affected interconnected transmission
operators; and
[Click and edit to embed file or link to
evidence]
[For AESO use only]
(iv) evidence demonstrating that your entity
coordinated all new protection systems
and all protection system changes with
the ISO.
[Click and edit to embed file or link to
evidence]
[For AESO use only]
(ii) evidence demonstrating that your entity
coordinated all protection systems with
each adjacent legal owner of a
transmission facility;
[Click and edit to enter description for
AR6(iv) submitted evidence]
Findings
[For AESO use only]
Документ1
Page 12 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
R7
Requirement & Measure
Evidence Submission
Evidence Description
Evidence
Assessment Approach
Auditor Notes
R7 Each operator of a generating unit,
operator of an aggregated generating
facility and operator of a transmission
facility must identify and coordinate
changes in generation, transmission, load
and/or operating conditions that require
changes in the protection systems of
others as follows:
MR7 Measures for this requirement are
identified in the subsections below:
R7.1 each operator of a generating unit
and operator of an aggregated
generating facility must identify changes
in each of its generation, load, or operating
conditions that may require changes in
protection systems of others, and notify
the ISO in advance of their changes;
MR7.1 evidence exists and shows that all
changes requiring protection changes were
made as specified in requirement R7.1;
AR7.1 Please provide:
[Click and edit to embed file or link to
evidence]
Review the list provided at AR7.1(i).
[For AESO use only]
[Click and edit to enter description for
AR7.1(ii) submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR7.1(ii)
for appropriateness.
[For AESO use only]
(iii) evidence of the notifications issued to the ISO (e.g. [Click and edit to enter description for
email to ops.coordination@aeso.ca) for all
AR7.1(iii) submitted evidence]
occurrences identified at AR7.1(i); this evidence
should include the date and time of each
notification to the ISO.
[Click and edit to embed file or link to
evidence]
Review the AR7.1(iii) provided evidence to [For AESO use only]
determine whether notifications were sent
to the ISO in advance of the changes
being implemented.
[Click and edit to enter description for
(i) a list containing all changes in generation, load, or AR7.1(i) submitted evidence]
operating conditions that may require changes in
protection systems of others during the entire
audit period. The list should contain the date and
time of each identified change;
or,
if no such changes have been identified, an
attestation letter to this effect;
(ii) evidence which describe the nature of the change
and identifies the specific protection systems of
others that may be impacted by the change;
Документ1
Page 13 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
Requirement & Measure
Evidence Submission
R7.3 each operator of a transmission
AR7.3 Please provide:
facility must identify changes in any of its
(i) a list containing all changes in transmission, load,
transmission, load or operating conditions
or operating conditions that may require changes
that may require changes in protection
in protection systems of others during the entire
systems of others, and provide reasonable
audit period; this list should contain the date and
prior notice to the ISO and each affected
time of each identified change;
operator of a transmission facility and
adjacent interconnected transmission
or,
operator of such proposed changes.
MR7.3 evidence exists and shows that all
changes requiring protection changes were
made as specified in requirement R7.3.
Evidence Description
Evidence
Assessment Approach
Auditor Notes
[Click and edit to enter description for
AR7.3(i) submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the list provided at AR7.3(i).
[For AESO use only]
[Click and edit to enter description for
AR7.3(ii) submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR7.3(ii)
for appropriateness.
[For AESO use only]
(iii) evidence of the notifications issued to the ISO (e.g. [Click and edit to enter description for
email to ops.coordination@aeso.ca) and each
AR7.3(iii) submitted evidence]
affected operator of a transmission facility and
adjacent interconnected transmission operator
for all occurrences identified at AR7.3(i); this
evidence should include the date and time of each
notification.
[Click and edit to embed file or link to
evidence]
Review the AR7.3(iii) provided evidence to [For AESO use only]
determine whether notifications were
provided to all applicable entities in
advance of the changes being
implemented.
if no such changes have been identified, an
attestation letter to this effect;
(ii) evidence which describe the nature of the change
and identifies the specific protection systems of
others that may be impacted by the change;
Findings
[For AESO use only]
Документ1
Page 14 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
R8
Requirement & Measure
R8 Each operator of a transmission
facility must monitor the status of each
remedial action scheme in its area,
and must notify each affected operator
of a transmission facility, operator of
a generating unit, operator of an
aggregated generating facility and
the ISO of each change in status.
Evidence Submission
AR8 Please provide:
Evidence Description
Evidence
Assessment Approach
Auditor Notes
[Click and edit to enter description for AR8(i)
submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the list provided at AR8(i) against [For AESO use only]
the ISO RAS Database.
MR8 Operator logs, voice recordings or (ii) evidence (e.g. SCADA data, alarms,
[Click and edit to enter description for AR8(ii)
other evidence exists that affected
procedures, etc.) to demonstrate
submitted evidence]
parties were notified as specified in
monitoring of the status of each RAS in
requirement R8.
its area.
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR8(ii)
for appropriateness.
[For AESO use only]
[Click and edit to enter description for AR8(iii)
submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR8(iii)
for appropriateness.
[For AESO use only]
(iv) evidence of notification (e.g. operator
[Click and edit to enter description for AR8(iv)
logs, voice recordings, etc.) of each
submitted evidence]
change in status which occurred during
the audit period.
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR8 (iv) [For AESO use only]
to determine whether the notification of
change of status was issued to all the
appropriate parties as per requirement
R8.
(i)
a list of all RASs in the entity’s area
that existed within the audit period; the
list provided should include all those
RASs identified in the ISO RAS
Database (which is published on the
ISO website) that the entity owns
(entirely or a portion of the RAS).
(iii) a list of the changes in status which
occurred during the audit period;
or,
if no such changes in status occurred,
provide an attestation letter to this
effect;
Findings
[For AESO use only]
Документ1
Page 15 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
R9
Requirement & Measure
R9 Each operator of a generating
unit and operator of an aggregated
generating facility must provide
reasonable prior notice to the operator
of a transmission facility and the ISO
of proposed changes to the arming
status (on, off and which generator) of
any remedial action scheme in their
facility.
Evidence Submission
AR9 Please provide:
Evidence Description
Evidence
Assessment Approach
Auditor Notes
[Click and edit to embed file or link to
evidence]
Review the list provided at AR9(i).
[For AESO use only]
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR9(ii)
for appropriateness.
[For AESO use only]
[Click and edit to enter description for AR9(iii)
submitted evidence]
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR9(iii). [For AESO use only]
(iv) Evidence of notification (e.g. operator
[Click and edit to enter description for AR9(iv)
logs, voice recordings, etc.) of each
submitted evidence]
change in status which occurred during
the audit period.
[Click and edit to embed file or link to
evidence]
Review the evidence provided at AR9(iv) [For AESO use only]
to verify whether the notification of
change of status was issued with
reasonable prior notice to the operator of
a transmission facility and the ISO.
(i)
a list of all armable RASs in your
facilities that existed within the audit
period; the list provided should include,
as a minimum, all those applicable
RASs identified in the ISO RAS
Database (which is published on the
ISO website) that you own (entirely or a
portion);
[Click and edit to enter description for AR9(i)
submitted evidence]
MR9 Operator logs, voice recordings or
other evidence exists that affected
parties were notified as specified in
requirement R9.
(ii) evidence (e.g. SCADA data, alarms,
[Click and edit to enter description for AR9(ii)
procedures, etc.) to demonstrate
submitted evidence]
monitoring of the status of each RAS(s)
in your facility(s);
(iii) a list of the changes in status which
occurred during the audit period;
or,
if no such changes in status occurred,
provide an attestation letter to this
effect;
Findings
[For AESO use only]
Документ1
Page 16 of 17
Version 2.0 – 2015-12-17
PRC-001-AB2-1
Protection System Coordination
General Notes
The AESO developed this Alberta Reliability Standard Audit Worksheet (RSAW) to add clarity and
consistency to the audit team’s assessment of compliance with this reliability standard, including the approach
elected to assess requirements.
Additionally, the RSAW provides a non-exclusive list of examples of the types of evidence a market
participant may produce or may be asked to produce to demonstrate compliance with the Alberta Reliability
Standard. A market participant’s adherence to the examples contained within this RSAW does not constitute
compliance with the applicable Alberta Reliability Standard.
This document is not an AESO authoritative document and revisions to it may be made from time to time by
the AESO. Market participants are notified of revisions through the stakeholder update process.
Notes to File
[For AESO use only: any observations, remarks or action items for future audits]
Revision History
Version
Issue Date
Description
1.0
May 1, 2015
Initial version of Worksheet
2.0
December 17, 2015
Revised content and template
Документ1
Page 17 of 17
Version 2.0 –2015-12-17