A Minutes American Petroleum Institute SUBCOMMITTEE ON INSPECTION TASK GROUP ON SCI CODES AND STANDARDS 8:30 am – 4:30 pm Monday November 10, 2014 Sheraton Downtown Denver Denver, Colorado D. Wang, Chairman J. Krynicki, Vice Chair 1. OPENING/INTRODUCTIONS/ATTENDANCE SHEET/ROSTER Attendees: Greg Alvarado – Mobideo Keith Ben – Northern Tier Energy Paul Blanda – Hess Carl Bortmas – HMT John Britton – DNV John Campo – Pinnacle Mark Carte – Stress Engineering Amanda Cherry – ESI Richard Cook – Intek Steve DeVillier – Trinity Bridge Robert Dolejs – UOP Ben Dulban – B H Billiton Virginia Edley – Trinity Bridge Todd Edward – Team Mike Farris – Huntsman Charles Geiger – Petroleum Inspection Services Mark Geisenhoff – FHR Allison Hardy – LyondellBasell Travis Harrington – Chevron John Harville – BP Jay Hawkins – Marathon Kelsey Hevner – Quest Integrity Greg Herbert – CF Industries D. T. Holder – Applus RTD Dave Kelley – Intertek Ray Konet – Valero Joe Krynicki – ExxonMobil -1- D. Wang 2. Mark McConnell – Pinnacle Terry McLane – Holly Frontier Nolan Miller – Sasol Justin Monroe – Chevron Andrew Morey – Dow Mike Murray – Team Grady Natton – Versa Integrity Group John Nyholt – BP Brent Ray – Marathon John Reynolds – Intertek Del Richie – Team Richard Roberts – Quest Integrity Clay Rodery – BP Dean Rueter – Sinclair Oil Tony Rutkowski – A. J. Rutkowski LLC Roy Schubert – Shell John Scott – LyondellBasell Michael Sens – Chevron Matt Skinner – GE Robert Sladek – Bayer Kelly Smith – Element Integrating Group Donald Stamps – Dow Theron Stancil – Pond & Company Kenneth Tam – Consultant Takayasu Tahara – Seikowave Suni Tohala-Sherven – Lloyd’s Register Kelly van Loon – Provenance Consulting David Wang – Shell Leslie Ward – Wood Group Kenny Clay White – Phillips 66 Kyle Wintz – Tank Consulting Inc. Josh Yoakam – Holly Frontier Lili Zhang – Plains Midstream Canada ANNOUNCEMENTS OF OTHER INSPECTION RELATED MEETINGS NDE Task Group / NDE Qualification Welcome Reception Task Group on RP 576 Task Force on RP 581, Risk-Based Inspection PERF – CUI Inspection Task Group on RP 580 -2- Mon, 4:30 pm – 6:00 pm Mon, 6:00 pm – 7:00 pm Tue, 7:30 pm – 11:30 am Tue, 8:00 am – 10:30 am Tue, 11:30 am – 12:30 pm Tue, 1:00 pm – 4:00 pm D. Wang SCAST Fabrication SG – 653 Ballots Manufacturers and Contractors Task Group on RP 572 RP 586 Development RP 578 Task Group New NDE Qualification Document (RP 587) Inspector Certification Task Group Subcommittee on Inspection – Joint Meeting 570/574 Task Force Inspector Certification Exam Construction Task Force on RP 581, Risk-Based Inspection Inspector Certification Exam Construction 3. Tue, 10:00 am Tue, 4:00 pm – 6:00 pm Wed, 7:30 pm – 9:00 am Wed, 7:30 am – 9:00 am Wed, 9:00 am – 10:00 am Wed, 9:00 am – 11:00 am Wed, 10:00 am – 12:00 pm Wed, 1:30 pm – 5:00 pm Thur, 7:30 am – 12:00 pm Thur, 7:00 am – 5:00 pm Thur, 8:00 am – 4:00 pm Fri, 7:00 am – 5:00 pm D. Wang APPROVAL OF AGENDA Approved 4. APPROVAL OF MINUTES FROM MAY 2014 D. Wang Approved 5. API 570/RP 574 BALLOT RESOLUTION D. Wang See 570 and 574 ballot resolution results in the two spreadsheets attached below. API 570 4th Ed API RP 574 4th Second Ballot 3322 - comments_vaer1.xls Edition Draft 1st Ballot 3321 comments-vaer1.xls 6. D. Wang NEXT MEETING Sheraton Seattle, Seattle, Washington, April 13, 2015 7. ADJOURN -3-