Minutes of the ESSNet Standardisation WP3 Meeting (5) 18th October 2013 Paris Attendees: Mr. Zoltán Vereczkei (HCSO) Csaba Abry (HCSO) Nomeda Bratcikoviene (SL) Nadezda Fursova (SL) (replacing Ignis Miskinis (SL) Becki Aqulina (ONS) Jan Thomas (ONS) 1. Welcome and review of last meeting minutes and actions The minutes of WP4 meeting were agreed and there were no comments 2. Work Package 3 Plan – Review of activities (Discussion) The work package plan was reviewed. The majority of tasks are on plan or complete. The next steps are to complete the evaluation plan and conduct interviews and agree the format of the final report. The headings of the final report need to be considered by all members and all members are asked to propose suitable heading suggestions (suggestions below). 3. Progress reports on Case study interviews Case study interviews have been progressing well. All interviews are expected to be complete by the end of October 2013. SL had previously requested an extension until Friday 18th October, which was agreed and stated they are on track to be complete by the extended deadline. 4. Discussion on Report format headings/structure for Evaluation/Justification Report Template – HCSO suggested using the life cycle proposal from the sponsorship and BPMP as headings for the evaluation template. This was agreed as consensus by WP3 members. These were also being use by the standard setting process steps in WP 2. Final Report – it was recommended that the final report be based on the five major points, and structured as follows; 1. Background and Introduction 2. Establish the need 3. Develop 4. Adopt 5. Disseminate, apply 6. Maintain, review 7. Summary of lessons learned 8. Conclusion 9. Annex with completed questionnaires. 5. Quality Assurance It was agreed that the combined case study report will be QA’d across the Workpackage 3 team by mid January 2014 and then by the wider project by the end of January 2014. 6. Arrangements for next Workpackage Meeting The next workpackage meeting will take place via video conference during the last week of November. ONS will send the agenda and invites shortly. Action: ONS to send out agenda and invites for WP3, meeting 6 in advance of the meeting. 7. Next Steps The next steps for this workpackage are: Finalise reports by the end of November 2013 and circulate to other WP3 members for comment/feedback before Christmas and formal QA by Mid January 2014. Proposal for final report to be issued, to include lessons learned. 1 Confirmation, comments and agreement on the Final Report format proposal (all to send suggestions to ONS) 8. Any Other Business (AOB) None raised Becki Aquilina Classifications and Harmonisation Unit Strategy and Standards Division ONS Titchfield Room 2400 - Titchfield 4017 00 44 (0) 1329 - 44 – 4017 Becki.aquilina@ons.gsi.gov.uk October 2013 2