NHS SDU Route Map Event - Grantham Sustaining Success, Managing Risk The crucial role of independent assurance & verification in proving the performance of sustainability projects Ian Jeffries Head of Performance Management Nick Keegan Measurement & Verification Consultant About us We independently evaluate energy saving projects, and use the results to provide information services for the energy efficiency industry. Independent Measurement & Verification (M&V) Industry information services • Measure the savings achieved by demand reduction projects • Market data on the energy efficiency sector • Certainty in returns • In partnership with Bloomberg New Energy Finance • Enabler of third party finance EEVS Insight Ltd 2015 Equipment or Savings? Sustainability Policy Delivery has three levels: Strategic Tactical Operational Long-term policy • Energy/carbon goals • Release operating capital • Maintain/upgrade estate How policy will be achieved • Buy EE equipment • Energy Services Contract with Guarantee Tools that are used to run the Service Contract • M&V Plan • Savings Reporting EEVS Insight Ltd 2015 M&V ‘Measurement and Verification’ (M&V): The engineering discipline around isolating a saving from other factors that affect energy use Savings: defined as ‘avoided energy use’ Standard: IPMVP (International Performance Measurement & Verification Protocol Pedigree: US ESCO industry, now widely used internationally www.evo-world.org IPMVP: A framework for a standardised investment-grade evaluation of energy savings IPMVP Adherent evaluation carried out by a qualified CMVP Independent M&V: Remove the effect of vested interests, over-estimated savings claims, calculation errors EEVS Insight Ltd 2015 Electricity Market Reform A “negawatt revolution” “A core element of Electricity Market Reform, the Capacity Market will incentivise sufficient reliable capacity (both supply and demand side) to ensure a secure electricity supply even at Source: DECC Electricity Market Reform Capacity Market proposals times of peak demand.” Capacity required: X TW Supply Conventional sources Energy generation Renewables Demand Distributed generation Load shifting Demand response Permanent reductions Energy efficiency EEVS Insight Ltd 2014 Electricity Demand Reduction • Need to know ‘what we would have used’ • Bring in some of the standards used in the ESCO industry: IPMVP • Incentivise energy savings – ‘technology agnostic’, emphasis on performance Electricity Demand Reduction is at a pilot phase • Must be open to all • Prove savings against counterfactual baseline • Submit an M&V Plan before bidding in your savings Source: EVO See: DECC Electricity Demand Reduction Pilot web pages EEVS Insight Ltd 2014 Electricity Demand Reduction • Need to know ‘what we would have used’ • Bring in some of the standards used in the ESCO industry: IPMVP • Incentivise energy savings – ‘technology agnostic’, emphasis on performance Electricity Demand Reduction is at a pilot phase • Must be open to all • Prove savings against counterfactual baseline • Submit an M&V Plan before bidding in your savings Source: EVO See: DECC Electricity Demand Reduction Pilot web pages EEVS Insight Ltd 2014 Managing Energy Services Contracts Visibility I don’t know whether my savings have been achieved, so I don’t know whether to use the guarantee Recourse I have identified an underperformance but there is nothing I can do about it … Woolliness EEVS Insight Ltd 2015 Solutions Visibility Strong M&V Recourse Strong contract Pre-contract stage is critically important EEVS Insight Ltd 2015 Energy Services Contracts EEVS Insight Ltd 2015 Independent Assurance Roles Verification or Evaluation EEVS Insight Ltd 2015 Our work in the NHS …Verification of investment grade proposals & M&V Plans for Energy Performance Contract High level Contractual Review – for Carbon and Energy Fund (CEF) Project …EEVS Sit on Essentia’s Strategic Energy Advisory Framework with the Carbon Trust Verification and Contractual Review – for Energy Performance Contract …Verification of investment grade proposals & M&V Plans for Energy Performance Contract Verification – Gas Boiler Project Evaluation – Behavioural Change Project EEVS Insight Ltd 2015 Strategic Long-term policy • 20% ↓ CO2 by 2020 • £9.2 Million Cost Savings • Address £42 million Backlog Maintenance Tactical How policy will be achieved • HFO → Gas Boilers • Behavioural Change • Guaranteed & Shared Operational Tools that are used to run the EnPC • M&V Plan • Savings Reporting • Independent Verification EEVS Insight Ltd 2015 Behaviour Change impacts upon… – – – – – – – – Electricity Gas Steam Low Temperature Hot Water Water Waste Travel Paper Towels!!? EEVS Insight Ltd 2015 EEVS Insight Ltd 2015 EEVS Insight Ltd 2015 Independent Verification - Benefits EEVS Insight Ltd 2015 Thank you @EEVSInsight www.eevs.co.uk Next M&V training: July 2015 Ian Jeffries ian@eevs.co.uk Nick Keegan nick.keegan@eevs.co.uk