Operations Management & Performance Modeling 1 Operations Strategy 2 Process Analysis – – Class 2a + 2b: Process Flow Analysis Class 3a: Capacity Investment » » 3 4 5 6 7 OM&PM/Class 3a The Product Mix problem National Cranberry Coop. Lean Operations Supply Chain Management Capacity Management in Services Total Quality Management Business Process Reengineering 1 Product Mix Decisions: Kristen Cookies offers 2 products Sale Price of Chocolate Chip Cookies: Cost of Materials: $5.00/dozen $2.50/dozen Sale Price of Oatmeal Raisin Cookies: Cost of Materials: $5.50/dozen $2.40/dozen Maximum weekly demand of Chocolate Chip Cookies: Maximum weekly demand of Oatmeal Raisin Cookies: Total weekly operating expense OM&PM/Class 3a 100 dozen 50 dozen $270 2 Product Mix Decisions Total time available in week: 20 hrs Processing Times Mix & Dish Chocolate Chip 8 mins. (6+2/tray) 1 9 Oatmeal Raisin 5 mins. (3+2/tray) 1 14 Resource You RM+Oven Oven OM&PM/Class 3a Load Oven Bake Cool & Set Pack Receive Total 5 2/tray 1 26 2 2/tray 1 25 RM RM 3 Product Mix Decisions Margin per dozen Chocolate Chip cookies = $2.50 Margin per dozen Oatmeal Raisin cookies = $3.10 Margin per oven minute from Chocolate Chip cookies = $2.50 / 10 = $ 0.250 Margin per oven minute from Oatmeal Raisin cookies = $3.10 / 15 = $ 0.207 OM&PM/Class 3a 4 LP for Optimal Product Mix Selection xcc: xor: Dozens of chocolate chip cookies sold. Dozens of oatmeal raisin cookies sold. Max 2.5 xcc + 3.1 xor subject to 8 xcc + 5 xor < 10 xcc + 15 xor < 4 xcc + 4 xor < xcc xor OM&PM/Class 3a < < 1200 1200 1200 Technology Constraints 100 50 Market Constraints 5 National Cranberry Cooperative OM&PM/Class 3a 6 National Cranberry Cooperative Weigh Color Grade 2 Samples x bbls/hr Truck arrivals Truck Queue Dry 30% Kiwanee Dumpers 4000bbls 16@250bbls Bin 1-16 2000bbls 8@250bbls Bin 17-24 1200bbls 70% 2250 bbls/ hr = 5 dumpers Wet average 75 bbls/truck 10 min/truck,dumper (= 450 bbls/hr,dumper) OM&PM/Class 3a Bin 3@400bbls 25-27 4500bbls/hr 3@1500bbls/hr 4500bbls/hr 3@1500bbls/hr 600bbls/hr 3@200bbls/hr 1200bbls/hr 3@400bbls/hr Destoning Jumbo Separator Dechaffing Drying 7 Class 3a Learning Objectives Effect of product mix decisions on process capacity – marginal contribution per unit of bottleneck capacity used Process flow charts with multiple products Backups may not occur in front of a bottleneck Bottleneck may shift on adding capacity diminishing returns to capacity investment OM&PM/Class 3a 8