Quarterly Progress Report No. 17 2nd Quarter 2012

advertisement
Quarterly Progress Report No. 17
2nd Quarter 2012
(April – June 2012)
Table of Acronyms
ADB
Asian Development Bank
ADR
Arthur D Riley
APM
Acting Project Manager
ATS
Automatic Transfer Switch
AusAID
Australian Agency for International Development
CDC
Cabinet Development Committee
CEO
Chief Executive Officer
CSO
Community Service Obligation
DSR
Debt-service Ratio
EA
Executing Agency
EARF
Environmental Assessment and Review Framework
EI
Egis International
EPC
Electric Power Corporation
ESU
Environment and Social Unit
GoS
Government of Samoa
IA
Implementing Agency
ICB
International Competitive Bidding
IEE
Initial Environmental Examination
IRR
Internal Rate of Return
JBIC
Japan Bank for International Cooperation
JICA
Japan International Cooperation Agency
km
kilometre
kV
kilo Volt
kVA
kilo Volt-Ampere
kW
kilo Watt
LARF
Land Acquisition and Resettlement Framework
LARSF
Land Acquisition and Resettlement Screening Form
MAN
MAN Diesel Australia Ltd
MCIL
Ministry of Commerce, Industry and Labour
MNRE
Ministry of Natural Resource and Environment
MOF
Ministry of Finance
MOU
Memorandum of Understanding
MV
Medium Voltage
MWCSD
Ministry of Women Community and Social Development
NCB
National Competitive Bidding
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 2 of 55
NPV
Net Present Value
PEAR
Preliminary Environmental Assessment Report
PM
Project Manager
PMC
Project Management Committee
PMU
Project Management Unit
PPMS
Project Performance Monitoring System
PSEP
Power Sector Expansion Project
PSC
Project Steering Committee
PUMA
Planning & Urban Management Agency
REA
Rapid Environmental Assessment
SLC
Samoa Land Corporation
SMEC
Snowy Mountain Engineering Consultant
STEC
Samoa Trust Estate Corporation
SWA
Samoa Water Authority
TA
Technical Assistance
TER
Tender Evaluation Report
USD
American Currency
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 3 of 55
Distribution List
Hon. Manualesagalala Enokati Posala
Minister of Works, Transport and Infrastructure
Anthony Maxwell
Team Leader Asian Development Bank
Wen Zhand
ADB South Pacific Infrastructure Specialist
Heather Dixon
2nd Secretary Development Cooperation Australian
High Commission
Yoshifusa Shikama
Resident Representative JICA
Sachie Terasaki
Pacific Division JICA
Hon. Afoafouvale J. Moors
Associate Minister, EPC
Tologata G.L.T. Tuimalealiifano
General Manager Electric Power Corporation (EPC
BOARD MEMBER ex Official)
Fa‟aolesa Katopau T. Ainu‟u
EPC Board Member and Chairman
Papalii Ryan
EPC Board Member
Fiu Peni Asi
EPC Board Member
Leiataua Daryl Clarke
EPC Board Member
Fanene Mark Betham
EPC Board Member
Ale Vena Ale
EPC Board Member
Fiu Taligi
EPC Board Member
Tupa‟imatuna Iulai Lavea
Chief Executive Officer Ministry of Finance (EPC
BOARD MEMBER & PSC CHAIRPERSON)
Aumua Ming Lang Wai
Attorney General (PSC MEMBER)
Taulealea Malua
Chief Executive Officer MNRE (PSC MEMBER)
Tainau Taputoa Titimaea
General Manager SWA (PSC MEMBER)
Kuiniselani Toelupe Tago
Chief Executive Officer MWCSD (PSC MEMBER)
Vui Lance Lameko
Manager, Corporate Services, EPC (PMC
MEMBER)
Peseta Saepate
Acting Manager, Distribution Section, EPC (PMC
MEMBER)
Vagana Stephanie Lomitusi
Manager, Savaii EPC (PMC MEMBER)
Toleafoa Tony Atilua
Manager, Generation, EPC (PMC MEMBER)
Tagaloa Patricia Fruean
HR Manager, EPC (PMC MEMBER)
Amelia Fa‟asau
Manager, Legal Department, EPC (PMC MEMBER)
Faumui Iese Toimoana
Manager, Utilization, EPC, (PMC MEMBER)
Sam Kava
Manager, ICT, EPC, (PMC MEMBER)
Masoe Tautua
Manager, Retail, EPC, (PMC MEMBER)
Amituanai Faimanu Tausisi
Internal Auditor, EPC, (PMC Member)
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 4 of 55
Table of Contents
1. EXECUTIVE SUMMARY...................................................................................................................... 6
2. INTRODUCTION ................................................................................................................................. 17
3. PROJECT IMPLEMENTATION............................................................................................................ 17
3.1
Project Management Unit Staff Movement.................................................................................. 17
3.2
PMU Actual Personnel Movement during 2nd Quarter and Plan for 3rd Quarter.......................... 19
3.3
Implementation Consultants Personnel Movement...................................................................... 21
3.4
Egis International Personnel Movement during this Quarter and Plan for next Quarter.............. 22
3.5
Implementation Progress .............................................................................................................. 23
SCADA .................................................................................................................................................. 27
NEW SUBPROJECTS........................................................................................................................... 27
4. RISKS AND ISSUES ............................................................................................................................ 28
A. PMU Organization Structure ............................................................................................................ 28
B. Staff Recruitment .............................................................................................................................. 28
C. Prepayment Meters............................................................................................................................ 28
D. Vending and Card System................................................................................................................. 29
E. Fiaga Power Plant Access Road, Pipeline and Fence ........................................................................ 29
F. Land transfer to EPC.......................................................................................................................... 29
G. Claims against EPC........................................................................................................................... 29
5. EPC PERFORMANCE MONITORING ............................................................................................... 30
7. LOAN EFFECTIVE MILESTONES (Electric Power Corporation) ..................................................... 37
8. RESETTLEMENT (updated quarterly) ................................................................................................. 37
9. ENVIRONMENT (updated quarterly)................................................................................................... 41
10. LOAN DRAW DOWN TO DATE (1 Jan - 31 March 2012) ................................................................ 44
11. LAST ADB REVIEW MISSION .......................................................................................................... 45
12 APPENDICES ....................................................................................................................................... 45
13. ATTACHMENTS .................................................................................................................................. 45
Appendix 1 – INVESTMENT PLAN Revised June 2012 ..................................................................... 46
Appendix 2 – DISBURSEMENT PLAN ............................................................................................... 49
Appendix 3 - Revised Project Schedule to end June 2012..................................................................... 50
Appendix 4 - Electricity Receivables..................................................................................................... 52
Appendix 5 – Prepayment Meter Installation Projection & Actuals...................................................... 52
Appendix 6 - System Average Interruption Duration Index (SAIDI) Monitoring................................. 53
Appendix 7 – System Average Interruption Frequency Index (SAIFI) ................................................. 54
Appendix 8: - PMU Current Organisational Structure........................................................................... 55
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 5 of 55
1. EXECUTIVE SUMMARY
This is the Quarterly Progress Report No. 17 and it covers the project activities and progress for
the 2nd Quarter 2012 from April 1 to June 30, 2012.
Here is a summary of the progress of each subproject at end of Quarter 2, 2012:
1.1 Core Subprojects
Hospital Feeder Upgrade Stage 1 – Contractor was Bluebird Ah LAL JV

Project is complete.
Prepayment Meters – Contractor is A D Riley NZ Ltd





Total number of Prepayment meters installed by ADR up to end of June 2012 is 19,616;
1,384 left to complete ADR‟s contract. Total number of PPM to be installed in ADR‟s
contract is 21,000. Contract includes lowering of meters. Total of 3,845 meters have been
lowered so far.
There are 31,909 active meters at end of June; 22,932 Prepayment Meters and 8,977 still
on induction meters.
71.87% of total active meters are on Prepayment; this leaves 3.13% to achieve project
goal of having 75% of total number of active meters on Prepayment Meters.
ADR repaired 1,064 defective meters with blank screen; 786 are contract meters and 278
EPC installed meters. They replaced a component in defective meters. It was thought this
would solve the blank screen problem. But it didn‟t. EPC is very concern of the defect
and have pressured ADR for a solution. Worse is that customers continued to receive
power even if meters are blank screens. This is a loss to EPC of customers with this kind
defective meters will continue to receive free power.
Tests continued of an alternative prepayment meter from another supplier, Joy Electric
Ltd Company. Test is if meter can work with tokens from existing vending system
installed by A D Riley. If tests prove successful, this will give EPC another supplier of
these meters.
Consultancy Services





Implementation Consultant, Egis International, is continuing to complete Feasibility
Studies of 5 hydro schemes and tender documents of 3 of the 5 schemes.
PMU still has 2 individual consultants hired. Replacement of 3 rd individual consultant who
resigned was replaced with a local hired Distribution Engineer.
PMU to submit to ADB proposal for additional consultants required to complete project.
ADB approved to hire short term experts to assist with detailed commissioning of these
subprojects; Fiaga power plant, SCADA, and Fuluasou Substation.
ADB approved to fund as part of PSEP a short term individual consultant to conduct a
Cost of Service and Tariff Study. Request for Proposal for solicitation will be issued
soon.
1.2 Candidate Subprojects
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 6 of 55
Upolu Generation
1.2.1 Tanugamanono Plant Noise and Emission Controls




No activity this Quarter.
May not need to do this subproject because new Board of Directors approved to relocate
all 4 base load generators from Tanugamanono power station to the new power station in
Fiaga.
New power station is built with only 3 generators to be relocated to Fiaga new power
station. To also relocate 4th generator would require major redesign and construction
work to accommodate the 4th generator.
Main critical reason for keeping one generator in Tanugamanono is for backup to the
main hospital and critical government facilities in middle of Apia, if transmission line from
Fiaga power station to Fuluasou Substation and Tanugamanono is down on a fault. Main
feeder which supplies power to main hospital and rest of critical facilities in Apia is
connected to Tanugamanono power station.
Refurbishment of Alaoa Hydro Plant



Project is complete.
Plant is back in operation.
One change order from civil contractor is approved. Change is for extra length of stairway
they built alongside penstock to use by maintenance crew.
Fiaga Power Plant Lot A – Contractor is Blue Bird Ah LAL in association with
Woods Pacific Ltd and Mitsubishi Heavy Industry (BBA/Woods/MHI)





This project include; powerhouse, 4 new generators, drainage, ring road, single stack,
water system, fire fighting system, wastewater system, workshops, electrical reticulation
in power plant, fence, earth grid system, and water storage tanks.
70% of contract is completed.
Commission of generator is scheduled at end of October this year.
Installation of generators continued.
6 additional change orders were approved this quarter. This brings accumulated value of
all change orders to 4.73% of original contract amount. There are still other change
orders being considered.
Fiaga Power Plant Electrical Lot B – Contractor is North Power NZ Ltd




This contract involves design, manufacture, supply, installation and commissioning of 415
volts, 11kV, 22kV, and 33kV electrical switchgear, 6 power generators, 2 local supply
transformers, and backup generators.
Installation is 90% complete. Remaining work is dependent on completion of work by
others. Pre-commission tests are successfully completed with no problems.
Tender Board also approved Change Order No 2 and submitted to Cabinet for approval.
Change Order No 2 covers 110VDC and battery bank system and SCADA interface
equipment.
Fuel Tanks – Contractor is Fuelquip NZ Ltd/GMA Construction Ltd JV

Tank bunds are completed. All 6 tanks are completed, arrived and installed.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 7 of 55


Pipe work and pumps to connect tanks to power station is not part of contractor‟s
contract. Variation for this is approved. Contractor preparing design and construction
drawings
Estimate completion is in October 2012.
Fiaga Access Road/Pipe/Fence – Contractor is Silva Transport Ltd



Contract is complete and being closed out.
Change Order No 2 is approved. This is for additional fill materials used for construction
of road.
Punch list of defects is prepared for contractor to fix.
Relocation of Generators 5A, 7A and 9A from Tanugamanono to Fiaga Power Plant






Actual moving of the 3 generators has not started, but some of work associated with
relocating the 3 generators to Fiaga has been done as part of Fiaga power plant.
Bluebird Ah LAL JV, contractor for powerhouse, completed construction of foundation for
the 3 generators.
North Power NZ Ltd under Fiaga Power Plant Lot B contract supplied and installed 3
power transformers, cable racks and power cables. Also the 11kv switchgear circuit
breakers for the 3 generators are included in 11kV switchgear for entire power plant.
Work is done.
PMU started preparation of tender for relocation of 3 existing generators.
New Board of Director approved to relocate all 4 Mirrlees generators from
Tanugamanono to Fiaga. Design and construction of Fiaga power station did not allow for
the 4th generator to be relocated.
Original decision to keep the 4th generator (Unit No. 12) was critical to provide backup for
main hospital and Government critical office in Apia.
Hospital Feeder Stage 2 – by Bluebird Ah LAL JV



70% of construction is complete; worked stopped awaiting arrival of certain materials.
Vaults are installed and connectors inside vaults installed and cables terminated and
connected to connectors.
North Power NZ Ltd will install terminations of underground cables of feeders to connect
to new 22kv switchgear in Tanugamanono power station.
Improvements included in this subproject are:
a) Upgrade voltage Hospital Feeder from 6.6kV to 22kV;
b) replace eighteen (18) 6.6kV transformers with 22kV transformers;
c) replace the main 500 kVA transformer which supply the National Hospital
d) Install two padmount Automatic Transfer Switches (ATS) at the National
Hospital‟s two electricity supply points. ATSs enable two distribution
feeders to be connected to the hospital substations so that if the primary
feeder is off, the ATS will automatic switch to 2nd feeder;
e) Replace the 22kV overhead lines of Hospital Feeder with 22kV
underground cables from Tanugamanono power station to Savalalo;
f) Construct a dedicated underground transmission line to connect the
Samasoni hydro plant direct to Tanugamanono power station; and
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 8 of 55
g) Connect dedicated transmission line for Alaoa and Fale ole Fee hydro
plants direct to 22kv switchgear in Tanugamanono power station instead of
feeding through East Coast distribution feeder.
33kV Transmission Line – Construction by EPC






This 33kV transmission line connects the new Fiaga power plant to the new Fuluasou
Substation and continues to Tanugamanono power station. This line becomes the 33kV
backbone transmission line that links power stations to substation. There are two 33kV
circuits connecting Fiaga Power Plant to Fuluasou Substation; one underground and one
overhead. Reason is to improve reliability of transmission line during major cyclone or
earthquake. Line continued underground from Fuluasou Substation to Tanugamanono
power station.
Construction of 33kv overhead line started. Construction is done by EPC and supervised
by Distribution Engineer. EPC introduced use of pre-stressed concrete poles for this
important transmission line. EPC used to use wooden poles.
Underground 33kv cables will be run inside Golf Course to Substation. Samoa Land
Corporation approved to run underground cables inside the Golf Course fence.
Materials started to arrive. Cables are expected to arrive in September. Factory testing of
cable is scheduled on September.
Consultations with affected people and survey of powerline route are finished.
Total length of trenching for underground cable from Fiaga power station to Fuluasou
substation 15 kilometers. EPC will contract out excavation and EPC crew only lay and
install cables. .
22kV Underground Cables from Fuluasou Substation to Apia – by EPC




Rest of materials supplied as part of 33kv TL contract. Contract has been awarded to 2
suppliers.
Design of interconnection of customers along Vaitele Road is complete.
Construction has not started.
All conduits and vaults for this underground feeder have been built and installed under
another earlier contract.
Fuluasou Substation – by North Power NZ Ltd




Construction continued; about 50% of civil work and 50% of building and transformers
bund are completed. Subcontractor is Fletcher Construction Ltd. All medium volt
switchgear has arrived in Apia. Factory testing of all main transformers is done. There are
tests that did not pass, manufacturer are resolving failed tests. Two PMU engineers
attended FAT.
EPC reduced scope and cost of this Contract. Replacing the Lalomauga hydro plant
22/33 kV substation for 33kV tie and interconnecting 33kV switchgear is taken out of
contract. These changes are included in Change Order 1.
CO1 is with ADB for their review and approval.
NPL conducted computer modelling of EPC‟s electric network with addition of the Fiaga
Power station 4 new generators. This will enable Mitsubishi to design protection system
for the 4 new generators in Fiaga.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 9 of 55

Completed factory testing of transformers in Schneider‟s (supplier) factory Indonesia.
EPC sent 3 engineers to witnessed tests. Transformers are now shipped due to arrive at
end of August.
Low Voltage System Improvements (Upolu)



Feasibility Study is approved by ADB.
About 70% of materials have arrived; rest is ordered with 33kv line materials.
Construction is carried by EPC.
22kV Overhead line Reconductoring – Contractor is GMA Construction Ltd



Construction continued. Work is 55% complete.
Work slowed down due to shortage of materials. Additional materials are ordered 33kv
materials contracts. Contracts for supply of materials have awarded to INTRACOR and
SOUTH AUSTRAL.
Contractor filed a SAT$1,126,076.84 claim loss of revenue due to stoppage of work due
to lack of materials. Acting Project Manager disapproved this claim twice. Contractor is
now requesting dispute to taken to Adjudicator.
Refurbishment of Salelologa Power Station and construction of new power station
in Vaiaata.





Feasibility Study and Resettlement Plan have been submitted to ADB for review /
approval.
MOF approved Resettlement Plan.
Evaluation report for consultant to conduct resistivity study is submitted to ADB for
review/approval. ADB will not approve it until Feasibility Study is approved.
EPC is considering to incorporate a bio-diesel plant (by others) in planning of power
plant in Vaiaata. Bio diesel plant will be built and operated by somebody else, not EPC.
EPC main involvement is buying bio fuel to use in power station.
PMU decided to implement Salelologa Substation separately from Vaiaata Power Plant
due to deteriorating conditions of electrical switchgear in Salelologa power plant and long
implementation time of the Vaiaata power plant. PMU started to prepare bid for
substation. Substation will be housed inside old power plant building.
Puapua to Asau 22kV (Savaii) overhead line upgrade – Contractor is Tenix NZ Ltd


Project is 100% complete.
There is still a section of HV powerline (102 spans) that conductors need replacing.
Materials for reconductoring of these additional spans are ordered with 33kV line
materials. Work will be done by EPC crew.
Stream Flow Gaging & Test Equipment


Project is 100% complete.
Stream gauging station in Tiavea is shutdown and equipment removed. Adequate data
has been collected.
Refurbishment of Generators 7A and 9A in Tanugamanono Power Station –
Contractor is MAN Diesel Australia Ltd
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 10 of 55

Contract is complete with recent commissioning of generator 7A. A new crankshaft was
installed in 7A as well as major overhaul. Unit 7A replaced Unit 5A in original contract to
overhaul generators 9A and 7A.
SCADA – Schneider Electric Ltd




Contract is awarded to Schneider Electric Ltd. Contract agreement is signed.
Design work starts.
Schneider engineers visited on April 10 - 13 to start data collection and finalize contract
agreement.
Signing of contract is delayed due to a few legal and technical issues. PMU / Office of
Attorney General continued to work on contract.
Vending System for Prepayment Meters


EPC and National Bank of Samoa launched a new system this year for customers to buy
top up tokens by a texting system to NBS and payment of token is deducted direct from
customer account in NBS. Cost of each transaction is 1 Tala, and is paid by customer.
Money collected is automatically deposited in EPC account with NBS. Already 1000 new
customers have signed up with NBS for this new service.
A new prepayment meter from another supplier is being tested if can work in existing
vending system. If it works, this will give EPC an option of another supplier.
Taelefaga, Lalomauga, and Samasoni Hydro Plants and Tanugamanono Power
Station 22kv Switchgear Refurbishment

Contract is 100% complete. Plants are back in operation.
Hydro Development



Hydro development of schemes in Savaii and Upolu are combined under this subproject.
Implementation Consultant (Egis International) continued with preparation of Feasibility
Studies of 5 hydro schemes; which are: Faleseela, Fuluasou, Tiapapata, and Tafitoala on
Upolu and Faleata-Palauli on Savaii. They are also preparing design built tenders of 3
schemes (Fuluasou, Faleseela, and Tiapapata).
Summary of capital costs and annual electricity generated from each of the 3 selected
schemes. There isn‟t enough funding in the present budget to build all 3 schemes.
Additional funding is needed.
Hydro
Schemes
Fuluasou
Tiapapata
Falese‟ela
Total
Installed Capacity
MW
1.15
0.6
0.5
2.25
Annual Generation
kWh million
4.061
3.478
1.776
11.315
Capital Costs
US$million.
$13.057
$6.177
$4.910
$24.144
Vaipu Pump Scheme


Decision from ADB and EPC to start implementation of this project is still pending.
ADB funded study under a Technical Assistance TA: 7121 SAM – Afulilo Environmental
Enhancement Project Phase 1 Report by SMEC is complete. Report has been reviewed
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 11 of 55




and discussed by various Government agencies. EPC is presently planning to conduct
consultation with 6 villages of Fagaloa District to present findings of the Study.
Unpleasant smell of hydrogen sulphide odour generated at Afulilo Dam continues to be of
major concern to the people of the village of Taelefaga where the discharge water from
the hydro plant flow through. Kids affected by the smell ended up in hospital from
vomiting and headache.
EPC has decided to implement recommendations of Study Report to mitigate the smell. A
new subproject outline to implement these recommendations will be submitted to EPC
Board for approval. It is also brought to ADB for their review and approval.
Plan is to: 1st install concrete pipes in the ocean to pipe the water from hydro plant to
discharge in deep part of bay. 2nd is install pumps or air compressor to improve the
circulating of deep water in dam up on surface to expose to oxygen.
A USD$300,000 is left over from the TA used for SMEC study. ADB is requested to
reprogram this money towards the budget for implementation of remedy to the odour
problem.
Taelefaga Hydro Plant Governor System Replacement



Revised Evaluation Report was submitted to ADB for final consideration.
ADB and Government granted approval to award contract to North Power NZ Ltd for total
price of US$914,967.75 or SAT$2,091,354.86.
Contract replaces existing control system of two hydro generators in the Taelefaga hydro
station.
Training






This is subproject of its own, with a budget of US$0.235million.
EPC Board approved outline of this subproject; budget is US$0.235 million.
PMU is preparing Training Plan
Plan will include setting up a computer based Asset Management Program (AMP) to
plan, schedule and manage maintenance of all facilities. PMU reviewed an existing
maintenance schedule that was used by EPC if suitable for AMP.
PMU prepared bid for installation of Asset Management Program, bid has not been
issued until evaluation of an existing program is done.
It also include of EPC linemen, mechanics, SCADA technicians and engineers, and
operators and power system controllers.
PMU Staffing




Project Manager‟s position is still vacant. Generation Engineer Consultant continued as
acting project manager. EPC advised position locally and internationally. Interview has
been done.
All positions are now filled except for PM.
PMU to submit proposal for additional consultancy services needed to see PSEP to
completion.
EPC hired Distribution Engineer for PMU. 30 EPC linemen are also assigned work under
PMU for construction of power distribution subprojects. This include: 33kv underground
transmission line from Fiaga power station to Fuluasou substation, 33kv overhead
transmission line from Fiaga power station to Fuluasou substation, 33kv underground
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 12 of 55


transmission line from Fuluasou substation to Tanugamanono power station, 22kv
overhead distribution line from Fiaga power station to Fuluasou substation, 22kv
underground feeder from Fuluasou substation to Apia, connecting Samasoni hydro 22kv
transmission line to Tanugamanono power plant, connecting Alaoa/Fale ole Fee hydro
transmission line to Tanugamanono power station and other powerline work.
ADB concurred to conduct EPC cost of service and tariff study and funded under PSEP
loan.
ADB also concurred to hire short term experts for commissioning of Fiaga power plant,
SCADA and Fuluasou Substation.
Investment Plan Revision


Revised Investment Plan is submitted to ADB for approval. Same plan has been
approved by Project Steering Committee, and Project Management Committee.
Project original Plan had 19 subprojects. 11 new subprojects were added under the same
budget. No subproject was dropped.
Financial Report at end Quarter 2, 2012
Financial Report to end of 2nd Quarter 2012
No.
1
Details
Amounts in USD
Total Project Budget
USD$100 million
2
Total Amount Obligated/Committed
USD$79.156 million
3
Total Claimed (Withdrawal Application)
US$54 million
4
Total Amount Already Disbursed
(Loan+Grant)
US$51.675 million
5
Total Amount Paid Out from:
ADB Loan
ADB Grant
JICA Loan
AusAid
EPC
(US$4.5m include interest payment during
construction of SAT$2.8million, Principal
repayment has not started until 2013 or 5 yrs
from start of project in May 2008)
US$15.3 million
US$ 6.4 million
US$22.9 million
US$ 6.6 million
US$ 4.5 million
6
Original Funding Sources:
ADB Loan
ADB Grant
JICA Loan
AusAid Grant
EPC
EPC PMU
nd
US$26.61 million
US$15.39 million
US$38.00 million
US$8.00 million
US$12.00 million
2 QUARTER 2012 PROGRESS REPORT
Page 13 of 55
Notes:
1. ADB informed Govt. and EPC during their Mission in May of an increase of US$18 million
of JICA‟s contribution to Project. EPC will provide a list of subprojects to use this fund on.
2. ADB Mission preferred to keep hydro development subprojects in PSEP under a different
development package to seek funding from other sources.
EPC Funded Projects
These subprojects which are also managed and implemented by PMU are funded under EPC‟s
local budget:
Generator No. 5A major overhaul – TBA (pay to EPC)


Overhaul was bided out. Evaluation report was approved by EPC Project Management
Committee and Board.
ADB and Government approved award of contract to MAN Diesel Ltd for price of
AUD$274,114.23 or SAT$682,046.98.
Salelologa No. 8 and 9 Major Overhaul

EPC did not go ahead with major overhaul. EPC is consideration other options to improve
generation in Salelologa before completion of new power station in Vaiaata.
RENEWABLE ENERGY
Solar Samoa Ltd
 Power Purchase Agreement between SSL and EPC has been signed. Project will be
launched in July with first 1MW installation in Faleolo Airport.
 PPA has been approved by the Regulator.
BIOGen3




There has been a long delay due to approval of Environmental Impact Assessment (EIA).
Company had plans to import power millet to raise here for feed stock for gas
manufacturing. MNRE/PUMA did not approve. Company proposed giant grass instead.
Approval is being processed as part of EIA.
As a starter, Company plans to import glycerine grade liquid fuel to run the generators
first awaiting production of gas. Company is seeking land on Apia Wharf to build storage
tanks for the imported glycerine. This has not been approved.
Company said they secured a 10 acre block in Nuu for the plant. We have not received
confirmation.
JICA 400kw Solar Project



This project is funded by a US$3.6M grant from Japanese Government to all Forum
Countries.
Main condition is that the (i) main contractor MUST be a Japanese incorporated
company; (ii) all major components of the PV systems must be Japanese made and
brand; and (iii) Major components are: solar panels, inverters, and power transformers
and switchgear.
Project involves installation of 400kw or more of total capacity solar systems to generate
electricity and feed into EPC‟s grid.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 14 of 55



Bid for construction is advertised. Bid closes on 27 of August 2012.
There are 3 EPC sites considered for installation. They are Vaitele Depot,
Tanugamanono power plant, and Salelologa power plant sites.
Prebid meeting is completed. There are a few bidders who took bid documents.
ProCom Solar PV System Proposal





Received proposal from ProCom for installation of a 3.5MW Independent Power Producer
(IPP).
Cabinet approved for National Energy Coordinating Committee (NECC) to investigate
ProCom proposal whether it is needed by EPC.
EPC main concern of too much solar generation is the impact on system stability. Total
solar generation should not exceed 20% of EPC‟s noon peak. The 20% limit in solar
generation capacity is already maxed out with Samoa Solar Ltd‟s 3-4MW proposal. So
EPC cannot approval anymore solar PV system connected to EPC grid.
ProCom original offered a feed in tariff of 57 sene/kWh; later they raised to 65 sene/kWh.
EPC notified National Energy Committee that EPC cannot approve to connect any more
Solar System to grid. 20% limit of system noon peak has maxed out with Samoa Solar
Ltd installations.
Renewable Energy Systems Interconnection to EPC system


Draft Rules/ Regulations for interconnection agreement has been submitted to Power
Regulator and Attorney General for their review and comments. Received Regulator
comments.
Same with interconnection agreement also submitted to Regulator and AG.
Biodiesel

NECC approved to ask developer to provide a formal proposal on setting up bio diesel
plants in Samoa.
Expressional of Interest (EOI)

National Energy Coordinating Committee (NECC) of Government approved to issue EOI
for investment for development of renewable energy. EOI is for (i) development of
biodiesel, (ii) solar hybrid systems with storage batteries for generation of electricity,
Withdrawal Applications
Table 1 below provides a summary of Withdrawals Application and Disbursements at end of 2nd
Quarter 2012:
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 15 of 55
WITHDRAWAL APPLICATIO N S A ND DI SBURSEMENTS AS AT 30TH JUNE 2012
ADI LOAN ·LOAN 2368
ADII GIIANT - ADII 0017
AUSM> GIIANT- AilS 0101
.1CA LOAN- L8232
I SAM-1'1
EPC
TOTAL OIS8URSEO
PROJECT/ CONTllACTS
US$
Equivalent
CONTllACT NO'S
Value
Date
US$
Equivalent
Value
Dllte
I
US$
Equivalent
Value
Date
US$
Equivalent
Value
Dllte
FU NDS ·
LOANS+6RANT
COUNTDIPAIIT TOTAL PAYMENT
RNANONG
PER PROJECT
VARIANCES
TOTAL BUDGET PER PROJECT
VAR
IANCES (S)
(%)
I
TOTAL PROJECT FUNDS
26610 000
16390,000
PROJECT MANAGER
0
IMPLEMENTATION & INDIVIDUAL CONSULTANTS
-
L -
SINGLE AND THREE PHASE PREPAYMENT METERS
,L 1,612,483
-
-
0
88,000,000 12,000,000
-
100,000,000
100,000,000
52,937
323,441
376,378
750,000
373,6 22
50%
OL -
OL -
2,367,934
272,312
2,640,247
3,181,458
541,211
17%
769 557L -
,L 2,430,087
-
5,170,926
336,110
5,507,036
6,142,688
635,653
10%
2,367,934 L 358 799 L -
0
'
-
-
1,318,100
85,676
1,403,776
1,893,637
489,86 1
26%
640,576
-
1,345,781
87,476
1,433,257
1,697,378
264,121
16%
30,293L -
133,775L -
304,244
95,837
400,080
503,029
102,949
20%
9,132 L -
19,568L -
62,199L -
131,314
8,535
139,850
170,497
30,647
18%
82o,4o1L -
1
185,172 · -
396,631L -
1,289,128L -
2,691,331
174,937
2,866,267
2,861,391
393,872L -
192, 413L -
87,o59L -
6o3,895L -
1,277,238
83,020
1,360,259
1,677,825
91,825
5,969
97,794
91,825
4,797,608
311,845
5,109,453
7,040,000
2,199,791
142,986
2,342,778
2,314,104
28,066,024
2,074,292
30,140,316
35,305,078
5,164,76 2
15%
1,069,381
569,510
1,638,891
5,690,000
4,051,109
7 1%
-
2,167,150
140,865
2,167,150
3,680,000
1,512,850
41%
118,o62L -
250,218
16,264
250,218
250,218
23,028,079
51,134,652
4,588,210
55,706,598
6 1%
58%
-
91:736 r--=
196,500
412,509
-
93,131 L -
199,566L -
-
1 14,180 ·
-
REFURBISHMENT OF ALAOA HYDRO POWER STATION - CIVIL WORKS
-
-
409,111
REFURBISHMENT OF ALAOA HYDRO POWER STATION - MECHANICAL ELECTRICAL
MEASUREMENT EQUIPMENTS & POWER SYSTEM PLANN
ING SOFTWARE
52,93)-
38,000000
620,752
HOPITAL FEEDER STAGE ONE,ALAOA AND PUAPUA FEEDER
-
8000000
125,995
40,415
REFURBISHMENT OF SWITCHGEARS - TAELEFAGAILALOMAUGAISAMASONIIT/NONC
(4,877)
0%
REFURBISHMENT OF TINONO GENERATORS 9A AND 7A
CASHPOWER - VENDING SYSTEM REIMBURSEMENT
-
'
28 466L
6428 L -
13 774L
'
HOSPITAL FEEDER STAGE 2 & 22Kv UPGRADING
1,556,140
22Kv UNDERGROUND CABLE - FULUA SOU SUBSTATION TO APIA WHARF AREA
687,279
FIAGA DIESEL POWER STATION
8,804,992
33Kv - FIAGA PS TO FULUASOU 55 TO TANUGAMANONO PS
334,418
FULUASOU 22KV SUBSTATION
664,432
-
-
-
344:766 r=::
739,050
368,868 L -
112,656L -
·'
2,026,286
-
242 177 L -
01
470:858 r--=
0
-
43158L
'
1,030,988
-
-
13,214,284L -
-
-
19%
-
2,343,089
,L
4,020, 462
317,56 6
498,08s'
1,031,860
-
(5,969)
1,930,547
(28,674)
-7%
27%
-1%
UPOLU LOW VOLTAGE
n,3ooL -
I
TOTAL DISBURSEMENTS A S AT 30TH JUNE 2012
% OF FUNDS ALREADY DISBURSED
REMAIN
ING PROJECT FUNDS A S AT 30TH JUNE 2012
% OF REMAINING PROJECT FUNDS
TOTAL FUNDS ALREADY COMMiffiD FOR AWARDED CONTRACTS
% OF FUNDS ALREADY COMMITTED FOR AWARDED CONTRACTS
16,303,380
58% 1
11,306,620
% OF FUNDS AVAILABLE FOR NEW PROJECTS
37 4o2L 6,622,518
I
83% 1
42% 1
9,018,587
59% 1
1,377,482
17% 1
I
I
I
19,747,000
74% 1
9,240,000
60% 1
6,863,000
26% 1
I
EPC PMU
6,371,413
I
41% 1
I
REMAIN
ING PROJECT FUNDS AVAILABLE FOR NEW PROJECTS
17,454 L -
7,969,000
I
6,160,000
100% 1
39% j
36,866,348
42%
7,411,790
62%
40% 1
I
I
56%
44%
71,166,000
81%
8,000,000
67%
79,166,000
90%
16,844,000
4,000,000
20,844,0001
3,800,000
10%
Page 16 of 55
19%
33%
-
44,293,402
34,200,000
I
31,000
0% 1
2"d QUARTER 2012 PROGRESS REPORT
14,971,921
38%
0%
79%1
21% 1
-
2. INTRODUCTION
This is the Quarterly Progress Report No. 17 and it covers the project activities and progress for
the period from beginning of April to end of June 2012 (2nd Quarter 2012 Progress Report).
This Report provides progress report of each subproject highlighting work completed to date,
problems encountered and planned solutions. It also provides financial situation of Project, of
total funds obligated, claims received, withdrawal application processed and submitted to ADB
and amount of money paid to contractors. It also gives status of spending.
3. PROJECT IMPLEMENTATION
3.1
Project Management Unit Staff Movement
PMU has a total of 22 staff; 20 EPC local staff and 2 ADB recruited Individual Consultant
engineers (Civil and Generation Engineers).
Total staff includes: 1 Project Manager (vacant since July 2011), 3 Engineers, 4 Graduate
Engineers, 1 Mechanical Supervisor, 1 Project Accountant, 1 Attorney, 1 Social and Land
Resettlement Staff, 1 Environmentalist, 1 Public Relation Staff, 1 Secretary, a driver, 1 linemen
assistant, 1 Store-person and 3 store assisting staff, and 2 Renewable Energy staff. RE section
is now incorporated as part of PMU. A JICA engineer was with PMU for 3 months assisting with
SCADA project. .
EPC hired a local Distribution Electrical Engineer to replace the International TD engineer who
resigned after 4 months of work here. 30 EPC linemen were also assigned to work with PMU for
construction 33kv transmission line from Fiaga power station to Fuluasou Substation and to
Tanugamanono power station. They also completed other power distribution subprojects under
Power Sector Expansion Project.
The Project Manager position is still vacant. Newly hired Generation Engineer has been acting
Project Engineer since beginning of this year. It is critically important the appointment should be
made as soon as possible.
PMU staff:
Generation engineer/Acting Project Manager
Generation Electrical Engineer,
TD Electrical Engineer, locally hired and to join PMU in start of 3rd Quarter.
System Planner Graduate Engineer,
SCADA/Graduate Engineer,
Civil Engineer
Electrical Graduate Engineer,
Civil Graduate Engineer,
1 Environmentalist
1 Land Resettlement Specialist,
1 Legal Advisor,
1 Public Relation Coordinator,
1 Project Accountant,
1 Secretary,
1 Administrative Assistant / Store Keeper,
1 Lineman, and 3 Store assistants, and
1 driver.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 17 of 55
3 Meter inspectors were transferred back to EPC‟s Utilization Section.
Fifteen (15) subprojects were under construction this quarter. The status of construction of each
subproject at end of 2nd Quarter 2012:
1. Access road and water pipeline to Fiaga new power plant – 100% complete.
2. Construction of security fence around Fiaga property – 100% complete.
3. Upgrading of the Hospital Feeder to 22kv and undergrounding medium voltage cable
from Tanugamanono power plant to Apia – 80% complete.
4. Reconductoring of all 22kv overhead line feeders in Upolu – 60% complete.
5. Civil work of refurbishment of Alaoa hydro plant – 90% complete; work that can be
done.
6. Reconductoring of Puapua to Asau 22kv Overhead line – 100% complete.
7. Fiaga power plant fuel and oil storage tanks and off loading facility – 60% complete
8. Construction of Alaoa and Fale ole Fee hydro plants dedicated 22kv transmission line
from the hydro plants to Tanugamanono power station is in progress – 80% complete
9. Construction of Samasoni hydro plant dedicated transmission line to Tanugamanono
power station is in progress – 80% complete.
10. Refurbishment of the 9A and 7A generators in Tanugamanono – 100% complete.
11. Fiaga New Power Plant and Generators Lot A – construction of power house is 90%
completed, installation of generators 60% complete, civil work (road, drainage, fence,
etc) 60% complete, water tanks, collection, and water distribution system 60%
complete.
12. Fiaga Power Plant MV Electrical Switchgear Lot B – switchgear installation and precommissioning testing is 95% complete.
13. Construction of 33kv overhead transmission line from Fiaga power plant to Fuluasou
substation started with training on handling and setting up of pre-stressed concrete
poles. Underground 33kv line has not started, waiting on arrival of cables and
materials. Work is done by EPC. 30 EPC linemen are assigned to this project and
other power distribution projects. 33kv line continues to from Fuluasou to
Tanugamanono.
14. 22kv underground cable from Fuluasou to Apia wharf – 70% of installation of
electrical conduits is completed. This was done as part of the 4 lane road corridor
project with Ott Transport as main contractor. Materials were ordered and started to
arrive. Cable installation has not started – 0% complete.
15. Prepayment meters – 91.29% of meters under A D Riley‟s contract have been
installed. Defective meters with blank screens continued to rise. Defective meters with
blank screens are the biggest concern on this project. Worse, is customers with blank
screen meters continue to receive electricity without paying top up. Contractors have
been asked many times to fix problem. Factory of these meters have not come up
with a technical solution.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 18 of 55
3.2 PMU Actual Personnel Movement during 2nd Quarter and Plan for 3rd Quarter
2nd QUARTER 2012 ACTUAL
DESIGNATION
START
FINISH
Acting Project Manager
1 April 2012 Jun 30, 2012
& Individual Consultant
Generation Engineer
Transmission&
1 April 2012 Jun 30, 2012
Distribution Engineer
Generation Electrical
1 April 2012 Jun 30, 2012
Engineer
Graduate Engineer 1 April 2012 Jun 30, 2012
Power System Planner
Project Accountant
1 April 2012 Jun 30, 2012
3rd QUARTER 2012 PLAN
START
FINISH
1 July 2012
Sept 30, 2012
1 April 2012
Moetuasivi Asiono
Legal Environment
Advisor
Land Acquisition DFC
Specialist
PRCS
Iosefa Aiolupo
NAME
Fonoti Perelini
Taulealea
Aumalaga Tiotio
Tupai Mau Simanu
1 July 2012
Sept 30, 2012
1 July 2012
Sept 30, 2012
1 July 2012
Sept 30, 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
Environmental Specialist
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
Raema S. Adam
Graduate Engineer –
SCADA
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
Roberto
Pamingtuan
Sila
Individual Consultant
Civil Engineer
Electrical Inspector
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
Oikumene
Apprentice
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
Posi Moe
Linesman
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
Nuulopa Pereira
Faalepo Solofa
Mathew Lemisio
Seukeva Asi Tuuau
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 19 of 55
COMMENTS
Will be available for whole 3rd
quarter
Appointed as Deputy General
Manager Operation and left PMU.
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
Was away on maternity leave for
most of 2nd quarter, but will return to
work in 3rd quarter.
Will be available for whole 3rd
quarter
Transferred to EPC Utilization
Section in 2nd quarter.
To transfer to EPC Utilization
Section in 3rd Quarter.
Will be available for whole 3rd
quarter
Elisapeta Collins
Secretary
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
Alfred Matatia
Graduate Civil Engineer
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
John Rimoni
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
Venisini Iese
Graduate Electrical
Engineer
Project Assistant/Store
keeper
Storeman
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
Iosefa Leota
Storeman assistant
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
Puleia Tuiloma
Storeman assistant
1 April 2012
Jun 30, 2012
1 July 2012
Sept 30, 2012
Penelope Tupuola
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 20 of 55
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
Will be available for whole 3rd
quarter
3.3
Implementation Consultants Personnel Movement
The Implementing Consultant (Egis International) remaining task under their contract is
completion of feasibility studies of 5 hydro schemes and tender documents of 3 schemes. Only 3
experts are involved in this remaining task. Completing this task is late.
There was little progress during this quarter in completing FS and tenders. Project Manager is
putting pressure on IC to complete the FS and tenders.
Table below provides number of days worked in each month and combined for 2nd Quarter 2012
for each of IC personnel and remaining man months.
Team Members
Hydro Expert
Civil Engineer
Environmentalist
Social and Land Resettlement
EPC PMU
nd
Contract
Person-mnth
person-mnths worked in Q2
Q4 2011
2012
0.526
0
0.89
0
(0.37)
0
(0.1)
0.37
2 QUARTER 2012 PROGRESS REPORT
Remaining
man- months
0.481
0.604
0
0
Page 21 of 55
3.4
Egis International Personnel Movement during this Quarter and Plan for next Quarter
NAME
Dominique
Giraud
Peri
Perelini
Sam
Sesega
Sam
Sesega
EPC PMU
DESIGNATION
Hydro Expert &
Coordinator
National Civil Engineer
National
Environmentalist
National Resettlement
Specialist
nd
2nd QUARTER 2012 ACTUAL
START
FINISH
1 Apr 2012
31 Jun 2012
1 Apr 2012
31 Jun 2012
1 Apr 2012
31 Jun 2012
1 Apr 2012
31 Jun 2012
2 QUARTER 2012 PROGRESS REPORT
PLAN for 3rd QUARTER 2012
START
FINISH
COMMENTS
1 Jul 2012 30 Sept 2012 Continued working to complete
feasibility studies of 5 hydro schemes.
1 Jul 2012 30 Sept 2012 Continued working to complete
tenders of 3 schemes.
1 Jul 2012 30 Sept 2012 Continued working to complete
feasibility studies of 5 hydro schemes.
1 Jul 2012 30 Sept 2012 Continued working to complete
feasibility studies of 5 hydro schemes.
Page 22 of 55
3.5
Implementation Progress
All implementation activities or tasks are reflected in measuring implementation progress
against the subprojects implementation schedules and referred to as “project progress”. All
pre-implementation activities or tasks are considered in calculating subproject implementation
progress. These activities or tasks include preparation of the Subproject Outline, Feasibility
Study, Rapid Environmental Assessment, Initial Environmental Examination, Screening for
Land Acquisition and Resettlement, Tender documents, Evaluation of tenders and preparation
of awards and contracts. Each task in the implementation schedule is weighted according to
its overall contribution (using time as a reference) to progress of subproject implementation.
These weights are used to calculate the percentage of subproject progress along the entire
time span of the project. This is to provide a holistic view of the pace on implementation. Due
to the magnitude of the Power Sector Expansion Project and the number of its subprojects, it
is not practical to list all the tasks or activities. Therefore only milestones are listed for the
purpose of simplicity of subprojects progress but more details can be obtained from the Project
Schedule Gantt Chart of each respective subproject. Refer to Appendix 2 for Project
Monitoring.
A. Core Subprojects:
1. Hospital Feeder Upgrading Project Stage 1
Project is complete.
2. Single and Three-Phase Prepayment Metering (PPM)
A total of 218 prepayment meters were installed during 2nd Quarter; 29 are new installations
and 189 conversions from induction to prepayment meters. This brought the total number of
meters installed under this contract at end of the 2nd Quarter is 19,722 or 93,91% of 21,000
meters to be converted under this Contract in AD Riley Contract.
Total number of active meters at end of 2nd Quarter is 31,909; made up of 22,932 prepayment
meters and 8,977 induction meters. This brings total percentage of customers with
prepayment meters to 71.87% or 3.13% short of target is 75%. Remaining meters to be
installed by A D Riley will bring total percentage to 75%. All new installations are installed with
prepayment meters.
Besides converting to PPMs, contractor also lowered the meters; 36 meters were lowered to
1.6 meters this 2nd Quarter bringing the total number of meters lowered to 3,715.
Most CRITICAL issue with this Contract of installing Prepayment meters is:

Blank screen defective meters is still unresolved. A D Riley has been replacing
defective meters under warranty. But main concern is that customers with blank screen
meters continue to receive power with topping up their meter with more credit resulting
in loss of revenue. ADR have not found a solution on this defect. EPC has written
strong letters to ADR related to issue. EPC will eventually claim from ADR its loss of
revenue due to blank screen meters.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 23 of 55
A D Riley had two technicians here in May to carry out repairs to 786 contract meters and 278
meters installed by EPC. These meters had blank screens. An electronic component was
replaced in all these defective meters. However, the repair didn‟t eliminate defect which
caused blank screens.
At end of this 2nd Quarter 2012, a total of 19,616 meters have installed by ADR under their
contract, leaving 1,384 meters remained to be installed to complete their contract.
Table below shows meters installed during the 1st and 2nd Quarter 2012:
No.
Subcontractors
Total
installed
since
start
Meters
installed
in Jan
2012
Meters
installed
in Feb.
2012
Meters
installed
in Mar.
2012
Meters
installed
in Apr.
2012
Meters
installed
in May.
2012
Meters
installed
in Jun.
2012
1
All Electrical
5,201
0
0
0
0
0
0
2
McLean Electrical
9,278
113
152
60
51
106
69
3
Telecom. Tronics
Ltd.
5,243
0
0
0
0
0
0
Total meters installed
each month
19,722
113
152
60
51
106
69
Breakdown below are meter lowered during 1st Quarter of 2012 and 2nd Quarter of 2012:
Categories
Cable length
Q1 – 2012
Quantity
Q2 – 2012
Quantity
1
0-5 meters
57
68
2
5-10 meters
6
14
4
6
no cable needed
0
0
Lowered during
maintenance
0
0
Total meters
lowered
70
95
 10 meters
3
4
Included in meter count above are meters that were lowered during maintenance.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 24 of 55
Only 3,715 meters have been lowered so far by ADR. This is 19.38% of total number of
meters converted plus new ones ( or 19,171 at end of 4th Quarter) installed by A D Riley under
its present contract. So there are still about 81% of the meters to be lowered. Beside ADR‟s
subcontractor lowering meters as they convert them, EPC is lowering meters already
converted on request by consumers. All new meters are installed at 1.6 meters.
B. Candidate Subprojects:
1. Upolu
a. Generation
(i). Tanugamanono Power Station Noise & Emission Control
No activity.
(ii). Refurbishment of Alaoa Hydro Power Station
Completed.
(iii). Fiaga Diesel Power Station
Powerhouse and Generators (Lot A)
Bluebird Ah LAL JV/Woods/MHI continued with construction of powerhouse. About 90% of
building is complete. Installation of generators and all associated equipment continued. 5
change orders were approved. This includes; water tanks, external water system, extra
excavation, and strengthening of floor of switch room. There are additional change orders
under review.
Fiaga power station electrical switchgear (Lot B)
North Power NZ Ltd completed 95% of construction and installation of all electrical switchgear,
and transformers and testing. Final installation will be done when Bluebird Ah LAL JV
completed electrical installation of generators. This includes power cables from generators
to11kv switchgear. One change order was approved for upgrade of DC system and supply and
installation of SCADA interface equipment. They filed two claims for cost for not accessing site
during Easter weekend and extra storage cost due to delay in accessing the switchgear room
to install generators. Project Manager disapproved both claims.
Fiaga Access Road, Water Pipeline and Fence
Project is complete. The only outstanding item is approval by ADB and Government of Change
Order No 2 for supply of base course materials for construction of road. It is now approved and
official closure of project is now being processed.
Fiaga Pumped Water Source
Tender is prepared to pump water from Samoa Water Authority‟s water system to Fiaga power
plant. Bid is with ADB for approval. SWA system is 4 km away from the power plant and an
elevation climb of about 250 meters. Because of the high elevation of the power plant at 520
meters, it requires 4 booster pumps to pump water to the power plant. Sites of 4 pumps are
selected and a consultation with Samoa Land Corporation who owns the land and lessees is
underway.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 25 of 55
(iv) Refurbishment of 9A and 7A Generators at Tanugamanono Power Plant
Project is complete and both generators are back in operation. .
(v) Taelefaga, Samasoni, and Lalomauga hydro plant and Tanugamanono power station
new 22kv switchgear
Project is complete.
b. Transmission
(i). Upgrade of Alaoa 6.6kV Transmission Line to 22kV
Project is complete.
(ii). 33 kV Underground Cable from Fiaga Power Station to Fuluasou Substation
Materials for this project started to arrive. There are two suppliers; INTRACOR and South
Austral. The 33kv transmission line has 2 circuits; underground and overhead. This will
improve reliability of this critical line against cyclones and earthquakes. Construction of
overhead line by EPC crew started.
(iii). Hospital Feeder Upgrading Stage 2
This project is under construction; 80% of work is completed. Remaining work is energizing of
cable and replacement of 18 x 6.6kv transformers with 22kv ones. Same subproject included;
Samasoni hydro underground transmission line and connection to Tanugamanono power
station of Alaoa/Fale O le Fee transmission line. Conduits and underground feed to main
hospital 2nd substation.
(iv) 22kV Fuluasou Substation
This project is under construction. Construction by subcontractor, Fletcher Construction
continued and is progressing well. Building and civil work (road, drainage, transformer bunds,
etc) is 60% complete. Switchgear arrived and is being stored until moved into building.
Shipping delayed some of materials for construction.
One change order which reduces scope and adding some other items of contract has been
approved by ADB and Government. We took off replacing of 33kv tie substation in Lalomauga
hydro plant. PMU is preparing tender for construction of river bank protection rock rep rap; this
is not part of North Power‟s contract. Construction will be scheduled during dry season next
year.
(v). Upolu Low Voltage Network Improvements
Construction has not commenced. 50% of materials have been received. Remaining 50% is
included with rebid materials. Construction will be done by EPC.
(vi). Fuluasou Substation to Apia Wharf Area 22kV Underground Cable
Installation of cable and equipment has not started. Cables and materials are arriving.
Conduits and vaults for this project from Lepea bridge to Apia is already laid as part of the
main Vaitele road. There is a 1.7km section from Fuluasou substation to Lepea bridge that has
not been done. Excavation of this 1.7km is included as part of another contract which included
the 33kv underground cable.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 26 of 55
(vii). 22kV Overhead Conductor Upgrading Program
This project is under construction. Contractor, GMA Construction Ltd, continued with
construction. About 60% of work is completed and invoiced. This contractor submit a claim of
about SAT$1.1M for loss of revenue from September 2011 to February 2012 due to shortage
of materials according to them. Acting Project Manager disapproved this claim twice. Dispute
is now transferred to Adjudication Process. This is contractor who hired 17 linemen from EPC.
Linemen returned to EPC in July 2011. This greatly affected its work production because they
did not have qualified linemen and engineer to perform.
2. Savaii
a. Generation
(i) Hydropower Scheme
Savaii hydropower scheme is included under „Hydro Developments‟. One Savaii hydro
scheme is included. This is scheme in Faleata, Vailoa, Palauli. Sili Scheme is on hold.
Only activity this quarter is completion of Feasibility Study by Egis International,
Implementation Consultant.
b. Distribution
(i). Puapua-Asau 22kV Distribution Line Reconductoring
Project is complete. No work on this subproject this Quarter.
There are still some sections of distribution system (102 spans of 22kv lines) with conductors
that needs replacing with larger ones. Poles and other items will be replaced at same time.
Materials are included in rebid materials. EPC will do the work.
(ii). Power Factor (PF)
Completed.
(iii). Low Voltage Network Improvement Program in Savaii
Materials are ordered and received. Work has not started.
3. Measurement Equipment:
(i). Steam Flow Gauging Equipment
Completed.
(ii). HV Testing Equipment
Completed.
SCADA
Contract started; contractor is Schneider Electric (Australia) Ltd. Completed field survey and
study of option of network. Continued with design.
NEW SUBPROJECTS
Listed as follows are approved new subprojects:
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 27 of 55
(i). Public Dissemination
On going.
(ii). Vending System Expansion
System is in operation.
Only activity is testing of a prepayment meters from Joy Electric Ltd supplier if they work on
current vending system. Also getting ITRON manufactured meters to undergo same tests. If
successful, this will give EPC other suppliers to buy meters from.
(iii). Power System Planning Software
On-going updating of system as changes are completed.
(iv). Refurbishment of Salelologa Power Station
New power plant is built in Vaiaata, not Salelologa. Only substation and mini control centre is
located in Salelologa depot. ADB approved FS and Resettlement Plan. Due to deteriorating
conditions of existing electrical switchgear in Salelologa and long delay in completing Vaiaata
Power Plant, it was decided to separate bid for Salelologa new substation from Vaiaata Power
Plant bid. Tender for Salelologa Substation was prepared and submitted to ADB for final
review before issuing bid.
Resistivity study is carried out in Vaiaata site. Similar geotechnical study will be carried out.
(v). Refurbishment of Taelefaga and other power plants 22kV Switchgears
Project is complete.
(vi). Refurbishment of Tanugamanono Diesel Generators
Involves Unit 9A and 7A. Refurbishments are completed. Contract is closed out.
(vii). Vaipu Pumping Scheme
No decision on this yet if to go ahead.
$300,000 is left over from ADB Technical Assistant used for SMEC study on Afulilo. Request
is with ADB to reallocate this fund for implementing of solution to odour problem from water
from Afulilo Dam that discharges from Taelefaga hydro plant. There is a separate mitigation
subproject to solve smell problem. Tender is prepared.
.
4.
RISKS AND ISSUES
A. PMU Organization Structure
No further action is needed. PMU continued with present organization structure.
B. Staff Recruitment
Project Manager‟s position is vacant since middle of 2011; position and is being advertised
locally and internationally. A local TD engineer is hired. .
C. Prepayment Meters
Major issue is blank screen defective meters that is continuing to increase. Contractor is yet to
find a solution even though they are replacing defective meters as part of guarantee. But
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 28 of 55
worse problem is customers with blank screen meters continuing to receive power without
topping up their meter.
D. Vending and Card System
There are no issues. Tests of prepayment meters from other suppliers if working on vending
system is on-going. Two new suppliers provide test samples.
E. Fiaga Power Plant Access Road, Pipeline and Fence
Only outstanding item was approval of final Change Order No 2, which was finally approved by
ADB and Government. Contract Agreement addendum is in process. Project is complete and
is being closed out.
F. Land transfer to EPC
Official transfer of 97 acres in Fiaga and 100 acres in Vaiaata for new power plants is still
outstanding. A third piece of land (5,059 square meters) in Tuanaimato for the Fuluasou
substation was approved by Minister of Environment to be used by EPC. Samoa Land
Corporation also approved lease of four 20m x 20m lots of access road to Fiaga Power Plant
to install booster water pumps.
G. Claims against EPC
There are two contractual claims against EPC. One is from GMA Construction Ltd with 22kV
overhead line reconductoring. Claim is for lost of revenue when work slowed down due to
shortage of materials. Total claims is SAT$1,126,076. Acting Project Manager disapproved
claim twice. Case is now refereed to Adjudication. Our counter arguments are: GMA did not
have qualified linemen since 17 EPC linemen returned to EPC; contract is for work completed;
some qualified is excessive; contractor delayed work from beginning as they were finding
some qualified linemen and engineer.
Second claim is from North Power NZ Ltd for extra cost associated with their contract of Fiaga
Power Plant Lot B. Extra cost is for additional storage charges due to delay in completion of
switchgear room in Lot A contract for construction of powerhouse. Second part of this claim is
extra cost for non accessing power plant during public holiday during Easter weekend.
Again, Acting Project Manager disapproved claims on ground they supposed to coordinate
work with power house contractor.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 29 of 55
5.
EPC PERFORMANCE MONITORING
Design Summary
Impact
Access to sustainable
and reliable electricity
services at affordable
prices
Outcome
Improved quality,
reliability, and costeffectiveness of
power supply
Performance
Targets/Indicators
Current Status
Consumer satisfaction
ratings of EPC‟s
services
Complaints to EPC‟s
consumer service
division
Initial Consumer Confidence Survey (CCS) is
scheduled for 2011
System Average
Interruption Duration
Index (SAIDI) Baseline
established and
verified on 4th Quarter
of 2008 and reduced
by 20% by 2015
Baseline SAIDI established on 3rd Quarter 2008:
Annual SAIDI for Upolu: 1515 min
EPC reactivated service order tracking system in
Daffron System to track all customers requests..
Annual SAIDI for Savaii: 2622 min
Quarterly SAIDI for Upolu: 379 min
Quarterly SAIDI for Savaii: 656 min
2nd Quarter 2012 SAIDI:
Total Annual SAIDI for Upolu: 380
Annual Unplanned SAIDI Upolu:104
Annual Planned SAIDI Upolu: 276
Total Annual SAIDI for Savaii: 340
Annual Unplanned SAIDI Savaii: 312
Annual Planned SAIDI Savaii: 28
Total Quarterly SAIDI for Upolu: 95
Quarterly Unplanned SAIDI Upolu: 26
Quarterly Planned SAIDI Upolu: 69
Total Quarterly SAIDI for Savaii: 85
Quarterly Unplanned SAIDI Savaii: 78
System Average
Interruption Frequency
Index (SAIFI) Baseline
established and
verified on 4th quarter
2008 and reduced by
20% by 2015
Quarterly Planned SAIDI Savaii: 7
Baseline SAIFI established on 3rd Quarter 2008
Annual SAIFI for Upolu: 26
Annual SAIFI for Savaii: 44
Quarterly SAIFI for Upolu: 6.5
Quarterly SAIFI for Savaii: 11
SAIFI on 2nd Quarter 2011
Annual SAIFI for Upolu: 5.2
Annual SAIFI for Savaii: 24
Quarterly SAIFI for Upolu: 1.3
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 30 of 55
Design Summary
Performance
Targets/Indicators
Current Status
Quarterly SAIFI for Savaii: 6
Refer to Appendix 8 for SAIDI monitoring
Refer to Appendix 9 for SAIFI monitoring
Outputs
1. EPC‟s investment
plan meets
demand
requirements
2. Operational
efficiency of EPC
improves
Cost of generation
established and
published by 1st
Quarter of FY 2009
Cost of Generation established and reported to
Power system capacity
for energy and power
meets demand
requirements on Savai‟i
and Upolu
Baselines for technical
system losses are
established and
verified by 4th Quarter
of 2008 and are to be
reduced by 10% by 4th
Quarter 2010 and 20%
by 4th Quarter 2012
Project Implementation Plans meet estimated
demand per survey. Planned expansion of power
generation is based on N-2 criteria.
Baseline for nontechnical system
losses established and
verified by 4th quarter
2008 and reduced by
10% by 2010.
3. The financial
performance of
EPC PMU
Consistent application
nd
EPC Board as part of FY 2008 Budget process
Baselines figures of Total System losses
established on a 12 month moving average at
September 2008 are:
Upolu:
15.7%
Savaii:
18.2%
EPC :
15.9%
Updated 12 month moving average of total system
losses now reported monthly to the Board. End of
December 2008 are:
Upolu:
17.1%
Savaii:
18.2%
EPC :
17.2%
Not possible to calculate Technical losses due to
lack of metering and dedicated resources.
Not possible to calculate non-technical losses - this
can only be calculated as “total system loss –
technical loss”
Technical loss is established to be 13.5% from
studies by the Japanese Volunteer and PMU in 4th
Quarter 2008.
Change in non technical loss can be monitored as
technical loss level generally remains static
Finance Department have begun diagnostic review
of causes of non-technical loss as basis for
implementation of reduction measures
Procedures reviewed in August 2008 and revised
procedures implemented. Refer to Customer aging
2 QUARTER 2012 PROGRESS REPORT
Page 31 of 55
Design Summary
EPC improves
Performance
Targets/Indicators
Current Status
of disconnection policy
report below.
Fuel audits conducted
on all EPC‟s diesel
power stations
Fuel Audit‟s at both Upolu and Savaii Generation
Stations introduced 1 May 2008 and now routinely
conducted monthly. Results reported monthly to
Board.
Refer to Fuel Report below for Period of June 2011
to June 2012
Timeliness of tariff
adjustments in
response to cost
Base Tariff decrease of 3.6% effective from 1
August 2012, and 2% discount for all prepayment
meter customers top up purchases. This changes
were incorporated in FY 2012/13 approved Budget
which is already implemented. EPC planning to hire
a consultant to conduct a cost of service and tariff
review before end of 2012.
EPC‟s
collection
performance improves
such
that
accounts
receivables are below 2
months of sales
Customers‟ arrears on 2nd Quarter of 2012 were:
Debtor days as = 45.4 days
% Government Debt (of total debt) = 19.45%
% Government Sales (of total sales) = 10.63%
Government
consumers‟ share of
EPC‟s accounts
receivables reduced
from 55% in 2007 to
less than their share of
total sales by 31
December 2009
EPC PMU
nd
Debt/Sales Ratio:1.83
Reference Appendix 5
2 QUARTER 2012 PROGRESS REPORT
Page 32 of 55
4. Effective regulation of
the power sector is
established
Electricity Act Reform to
govern the power sector
was established by 31
December 2009
Not within Scope of this Project
Amendments of the EPC
Act consistent with the
Electricity Act by 31
December 2009
Regulatory agency
established by 31
December 2010.
5. Energy demand-side
management
Energy conservation and
demand-side
management public
awareness campaign
implemented
Not within Scope of this Project
6. Development of clean
energy
Number of projects by
energy subsector financed
by the clean energy fund
Not within Scope of this Project
Number of projects by
energy subsector eligible
for clean development
mechanism
Electricity produced by
clean energy resources
(baseline of 45
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 33 of 55
89.91%
62.399%
37.59S%
0.006%
ElSTOCK RECONCILIATION ASAT 30JUNE 2012
Lilres
I
s
SAYM
Lilres
1
s
TOTAL
I
liln!s
368,106
s
1.115,997
FuelCon!uqJtion(Urs)
IElllll!dl!dFuel Slid end ..........
EPC PMU
2"d QUARTER 2012 PROGRESS REPORT
Page 34 of 55
GovemmatilldPrivateSa:taEla:trAicrrm
MoothEIIII'g
By Cnll!lerCa1egxy
SEP
am
JJNE
2011
SXXl
s:xxJ
s:xxJ
l.laith.
11
Milltrls
I
»3
state-Owned 8ltiies
23
317
C g) Street Lijltilg
1 015
HiS
T!tal Gam1111nt
1,5al
Prtfa1eSector
Dill Note
GraiiiT!ta l
By ADe oc Prdi
Cnnt
1 ·(lysarrears
31·60 Qlysarrmrs
61·90 (lysa rrmrs
owril(lys arreall
Dill Note
Taal
ARREARS lexd ClrrSJ II
12 moothtotalsaes
KEY mro /ACEIJC.UOR
c rtamarroo Tatr
DEC
1
.R
JN
2012
FEB
2012
12
[(X)
KOO
KOO
112
•
y JJNE
2012 2012
SYIJ
160
1Qn
5
1.21'
3,008
1,29)
611
133
1,151
826
6,861
824
9,879
11,183
10,787
3, 1
1,214
$1
4,103
t190
4,616
1,280
4,4l!
1,221
553
680
m
483
m
J11
3,198
5
3,2
833
826
824
9,879
5}16
$80
11,183
6,507
$80
10,787
6,355
llll
]lll
1]t
1:002
Z009 1!&
01)
1,\Q4
1 11.11
l063
1,111
1
1 014
m
11,002
9,49
1,11
4
11
294
\111
10,329 101
I
4,122
4pol a
1)83 1H21
1,
611
634 6JII
.t6
491 tM
,214
2r445 23111
1,014
912 9.411
9:940 10,329 101
97
1
2 224
l411
311
l-601
oos
079
2$00
0$
l,f!h
t
6.]33
6
1,551
su
833
9466
9,519
.6
t,lro
67l
9,519
5)642
$00,001 .000
94ffi
54ff
•t J[I
563
$8).
JWW
I
'
1..Q2
66
su
hm
(JI
OmJ
121
851
liAY
135 Ull
203 211
U11 15!BI
80
496
2,211
JLNVS
SOOl
II
31
169
20
..
.lln-12
465
3
1,133
11,002
7,034
.000
1)11
585
418
5I
\903
2!11
\063
9A94
5,X()
$80
-
.,,
41&
,.
1
• $8l
&lDAn
42
9,9«1
5.818
Jlmm J[UJI]
9.11
1211
ll9l
!111
110
0111
42
.llll
5,826
$80.1»J
Jllbrou J1I .
-
4i.l rBJ
I
1! GoP.nJMnt r&otas
lR %
l(l%
. _
% GMrment r&ot
% GMrments
c rtamarroo TarQet
EPC PMU
I
@.W%
.% r&os
2"d QUARTER 2012 PROGRESS REPORT
Page 35 of 55
6.
COMPLIANCE WITH LOAN COVENANTS (Beneficiary)
Covenant
The Beneficiary shall carry out the project with due
diligence and efficiency and in conforming with
sound administrative, financial, engineering,
environmental and public utilities practices
In carrying out of the Project and operation of the
project facilities the Beneficiary shall perform or
cause to be performed, all obligations set forth in
schedule 5 of the Financing Agreement
Status
Complied
Comments
PMU is carrying out
project with due
diligence
Complied
PMU new office at
TTTE Bldg is being
provided with all
facilities
Yes, Beneficiary
committed
personnel, funds,
and other
resources to
support the project.
The Beneficiary shall make available promptly, as
needed, the funds, facilities, services, land and
other resources which are required in addition to
the proceeds of the ADB Loan and Grant, and the
JBIC Loan and the Government of Australia Grant,
for carrying out of the Project and for the operation
and maintenance of the Project facilities.
The Beneficiary shall enable ADB‟s representatives
to inspect the Project, the goods financed out of the
proceeds of the ADB Loan and the Grant and the
JBIC Loan and the Government of Australia Grant,
and any relevant records and documents.
Complied
Complied
Yes, ADB Mission
here on Sept 5 to 7.
The Beneficiary shall take all action which shall be
necessary on its part to enable EPC to perform it‟s
obligations under the Project Agreement and shall
take or permit any action which would interfere with
the performance of such obligations.
Complied
Yes, EPC provided
resources to
support Project.
The Beneficiary shall exercise its rights under the
Subsidiary Financing Agreement in such a manner
as to protect the interests of the Beneficiary and
ADB and to accomplish the purpose of the Loan
and Grant, and the JBIC Loan and the Government
of Australia Grant.
Complied
Yes, regard claims
against project and
managing of
contracts.
No rights or obligations under the Subsidiary
Financing Agreement shall be assigned, amended,
or waived without the prior concurrence of ADB.
Complied
ALL changes to
contracts are pre
approved by ADB
including less than
15% of contract
amount changes.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 36 of 55
7. LOAN EFFECTIVE MILESTONES (Electric Power Corporation)
Details
Settlement of Government arrears as of 30 September 2007
Status
Complied
Subsidiary Financing Agreement with EPC
Establishment of the Project Steering Committee (PSC)
Establishment of the Project Management Committee (PMC)
Establishment of Project Management Unit
Complied
Complied
Complied
Complied
Hire of Implementation Consultant
IC contract expired except
completion of 5 hydros
feasibility study
Project Manager
To be appointed
Restructure of PMU
Maintained old flat org.
chart. It works.
Project Accountant
Generation Engineer
Transmission & Distribution Engineer
Power System Planner
Public Relation & Community Liaison Specialist
SCADA Engineer
PMU Secretary
Establishment of Environment and Social Unit
Legal / Environment Advisor
Environment Specialist
Land & Acquisition Specialist
Effectiveness of the JBIC Loan Agreement
Commitment of the Government of Australia Grant
Legal Opinion from the Attorney General‟s Office
8.
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied, Aussie Aid grant
is used up
Complied; all contracts
need AGO clearances.
RESETTLEMENT (updated quarterly)
Official transfer or lease of Fiaga 97 acres, Vaiaata 100 acres and additional land in
Tuanaimato for Fuluasou Substation is still pending; but not affecting progress of project.
These will be addressed towards end of the Project. However, Cabinet had approved all 3
properties for EPC to use for power sector facilities. Samoa Land Corporation also approved
lease of four 20m x 20m lots to install booster water pumps for Fiaga power plant water
supply.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 37 of 55
Status of land acquisition and resettlement for subprojects at end of 2nd Quarter 2012:
Subproject
Temporary
Land
Acquisition
Permanent
Land
Acquisition
Percentage
Obtained
Commentary on
Negotiations and
Compensation paid
%
1) Hospital Feeder
Upgrading Stage 1
N/R
N/R
N/R
N/R
2) Single & Three
Phase PPM
N/R
N/R
N/R
N/R
3) Tanugamanono
Power Station Noise
& Emission Control
N/R
N/R
N/R
N/R
4) Refurbishment of
Alaoa Hydropower
Station
N/R
N/R
N/R
N/R
5) Fiaga Diesel
Power Station
NO
YES
100%
Official transfer or lease of
land to EPC is outstanding
6) Upgrade of Alaoa
6.6 kV Transmission
Line to 22kV
N/R
N/R
N/R
N/R
7) Fiaga Diesel
Power Station to
Fuluasou Substation
33KV Underground
Cable
N/R
N/R
N/R
Cable route is inside road
reserve but 30% of
existing road is outside of
legal road reserve. People
planted crops inside legal
road reserve. Held
consultations with affected
people and their crops will
be compensated.
8) Hospital Feeder
Upgrading Stage 2
N/R
N/R
N/R
Cable is laid inside road
legal reserve. Have sorted
out all land issues. 100%
cable is laid.
9) 22kV Fuluasou
Substation
NO
YES
50%
Use old EPC hydropower
station land. Cabinet
approved 500sq meters of
extra land for substation.
Land is registered.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 38 of 55
10) Low Voltage
Network
Improvement
Program
11)Fuluasou
Substation to Apia
Wharf Area 22kV
Underground Cable
12) Fuluasou
Substation to
Leulumoega via
Vaigaga 22kV
Underground Cable
N/R
N/R
N/R
N/R
N/R
N/R
N/R
Underground feeder will
terminate at corner of
Vaitele and Falealili Road
N/R
N/R
N/R
N/R
13) 22kV Overhead
Conductor
Upgrading Program
N/R
N/R
N/R
N/R
14) Hydro Schemes
YES
YES
YES
YES
15) Puapua-Asau
Transmission Line
22kV
Reconductoring
N/R
N/R
N/R
N/R
16) Power Factor
Improvement
Program
N/R
N/R
N/R
N/R
17) Low Voltage
Network
Improvement
N/R
N/R
N/R
N/R
18) Fiaga water
booster pumps
N/R
YES
90%
SLC approved 4 lots for
pump sites
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 39 of 55
18)Stream Flow
Gauging
Equipment
19)HV/LV Testing
Equipment
N/R
N/R
N/R
20)Supply,
Installation &
Operation of
SCADA System
NO
YES
50%
21)Public
Dissemination
N/R
N/R
N/R
N/R
23)Power System
Planning Software
N/R
N/R
N/R
N/R
24) Refurbishment
of Salelologa
Power Station
N/R
N/R
N/R
Old power plant will be
replaced with a new power
station at Vaiaata. Old plant
will be converted to a
substation and a Mini Control
Center for Savaii system.
25) Refurbishment
of Taelefaga
Switchgears
N/R
N/R
N/R
N/R
26)Refurbishment
of Samasoni
Switchgears
N/R
N/R
N/R
N/R
27) Refurbishment
of Tanugamanono
Generators
N/R
N/R
N/R
N/R
28)Vaipu Pumping
Scheme
YES
YES
0%
Yes, would need approval of
land for pump and pipeline
N/R
N/R
N/R
N/R
NCC included in Fuluasou
Substation at old Fuluasou
hydro site. Mini NCC in
Salelologa Depot.
22)Vending System
Expansion
30) Refurbishment
of Taelefaga hydro
governor system
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
N/F
Page 40 of 55
9. ENVIRONMENT (updated quarterly)
PUMA approved development consents of all subprojects that are now under construction.
PMU is monitoring construction in accordance the DC and reported to PUMA. Inspectors from
PUMA also visited construction sites to carry out their own independent inspection of these
projects.
ADB approved feasibility study of Vaiaata power plant. Included in FS is Resettlement Plan and
Initial Environmental Examination.
Subproject
Constraints
Activities
Action Taken
Comments
1) Hospital Feeder
Upgrading Stage 1
NIL
NIL
NIL
Completed
2) Single & Three
Phase PPM
NIL
NIL
NIL
93.4% of meters have
installed. This brings
total number of
consumers with PP to
71.87%. Target is
75%.
3) Tanugamanono
Power Station Noise
& Emission Control
NIL
NIL
NIL
Started Feasibility
Study; not finished.
Project is complete.
4) Refurbishment of
Alaoa Hydropower
Station
NIL
NIL
NIL
5) Fiaga Diesel
Power Station
NIL
YES
YES
6) Upgrade of Alaoa
6.6kV Transmission
Line to 22kV
NIL
NIL
NIL
Completed. Followed
existing line a long
side of road.
7) Fiaga New Diesel
Power Station to
Fuluasou Substation
Underground Cable
NIL
NIL
NIL
Contracts are
awarded for supply of
materials. EPC will do
construction. 33kv
Transmission Line is
changed to have one
circuit overhead and
other underground.
8)Hospital Feeder
Upgrading Stage 2
NIL
NIL
NIL
Construction
continued; 100% of
trenching and
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 41 of 55
installation of ducts is
complete. Cables
being pulled and
installed terminations.
9) 22kV Fuluasou
Substation
YES
NIL
NIL
Cabinet approved 500
sq meters of land for
Substation. Land
survey has been
registered with
MNRE.
10) Low Voltage
Improvement
Program
NIL
NIL
NIL
Received all materials
11) Fuluasou
Substation to Apia
Wharf Area 22kV
Underground Cable
NIL
NIL
NIL
Contracts were
awarded for supply of
materials. Vehicles,
tools, equipment and
other material have
arrived.
12) Fuluasou
Substation to
Leulumoega via
Vaigaga 22kV
Underground Cable
NIL
NIL
NIL
NIL
13) 22kV Overhead
Conductor
Upgrading Program
NIL
NIL
NIL
Construction
continued. 40% is
complete. New
powerline along East
Coast Road require
easements and social
resettlement of
affected trees.
No IEE required
14) Hydro Scheme
5 Feasibility Study
reports are finalized.
15) Puapua-Asau
Transmission Line
22kV
Reconductoring
NIL
NIL
NIL
Project is complete.
16) Power Factor
Improvement
Program
NIL
NIL
NIL
Assessment
completed. PF is
good. No further work
required.
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 42 of 55
17) Low Voltage
Improvement
program
NIL
NIL
NIL
18) Stream Flow
Gauging Equipment
19) HV/LV Testing
Equipment
NIL
NIL
NIL
Rapid Environmental
Assessment has been
prepared and
submitted to ADB.
No IEE required
Completed.
NIL
NIL
NIL
NIL
20) Supply,
Installation &
Operation of SCADA
System
21) Public
Dissemination
22) Vending System
Expansion
NL
NIL
NIL
NIL
NIL
NIL
NIL
23) Power System
Planning Software
NIL
NIL
NIL
NIL
24) Refurbishment of
Salelologa Power
Station
YES
YES
YES
25) Refurbishment of
Taelefaga
Switchgears
26) Refurbishment of
Samasoni
Switchgears
NIL
NIL
NIL
NIL
NIL
NIL
NIL
27) Refurbishment of
Tanugamanono
Generators
NIL
NIL
NIL
NIL
28) Vaipu Pump
Assisted Scheme
NIL
NIL
NIL
Need to complete IEE
and prepare tender
for construction.
29) Upolu hydro
schemes
EPC PMU
Report of Tender
submitted to ADB for
approval.
ADB approved
Feasibility study &
Resettlement Plan of
Vaiaata power plant
NIL
Implementation
Consultant revising
Faleseela Feasibility
study and continued
with rest of FS for
other 4 schemes and
tender of 3 schemes.
nd
2 QUARTER 2012 PROGRESS REPORT
Page 43 of 55
10.
10
No.
LOAN DRAW DOWN TO DATE (1 Jan- 31 March 2012)
LOAN DRAW DOWN TO DATE (31December 2010)
TITLE OF SUBPROJECTS
ADB categ•
Schedule Date Revised Actual Contract
Price
Contract Award Contract
Budaet
USD$M
ADB Loan
ADB Grant
JICA Loan
Ausaid Grant
Contract
Number
Actual Date
Contract
Awarded
Draw Down to
date
Balance
26.61
15.39
38.00
8.00
12.00
100.00
EPC
CORE SUBPROJECTS
1Project Manager (0,37 + 0,38 unallocated)
Pr oject r mplementatr on consultant: EBI(73 man.
2 m onths)
3 Hosprtal Feeder Upgradr ng Project- Stage 1
Smgle.and Thr ee-Phase Prepayment Metenng
4 Pro·ect
4
Q4 2007
0.75
0.37
CO N-0108
30th Oct 2 007
0.06
4
Q 1 2008
2.67
2.67
CON-05058
2 Ma y 2008
1.74
0.93
3
Q 1 2009
0.60
1.94
·1.34
3
Q3 2008
5.67
4.90
0.77
3
Q4 2009
0.17
0.00
0.17
3
Q3 2009
1.34
SAM·PSEP -03
0.00
1.34
3
Q1 2010
22.27
35.88 SAM·PSEP -08
6.10
29.78
3
Q3 2009
1.14
SAM·PSEP -02
3
Q1 2010
3.12
3
Q4 2009
3.20
3
Q2 2010
2.93
2.93
3
Q2 2010
1.29
1.29
3
Q2 2012
0.00
0.00
3
Q2 2012
2.78
3
Q3 2009
6.03
16 Hydropower Scheme
3
Q3 2012
10.65
SAVAI'I Transmission
Puapua-Asau Transmrssron Line 22 kV
17 Reconductonna Pr oect
18 Low- Voltage Network Expansion Progr am
3
Q3 2009
1.24
3
Q2 2010
0.56
19 Stream Flow Gaugrng Equrpment
3
Q3 2008
0.05
SAM·PSEP -04
23rd Oct 08
0.06
-0.01
20 Electrical Test Equipment Equr pment
3
Q3 2008
0.06
SAM·PSEP -05
23rd Oct 08
0.07
-0.01
21 SCADA
3
Q4 2009
3.48
16.12
53.88
0.10
0.15
SAM·PSEP·02
5.89
PP M1207
30 July 2008
0.69
CANDIDATE SUBPROJECTS
UPOLU Generation
T anugamanono Power StatJon Noise and Em1ss1on
5 Control Proaram
6 Refur brshment of Alaoa Hydropower Statron
7 Fraga New Dresel Power Station Project
UPOLU Transmission
Upgrade of the Aa
l oa 6.6 kV Transmrssr on Line to 22
8 kV Pro·ect
Upolu Diesel Power St ation to Fuluasou Substatron
9 Underaround Cable Pro·ect
10 Hosprt al Feeder Upgradr ng Project- Stage 2
11 22 kV Fuluasou Substatr on Project
12 Low- Voltage Network Expansion Program
Fuluasou Subst ation to Apr a Wharf Area 22 kV
13 Underaround Cable Pro·ect
Fuluasou Subst ation to Leulumoega via Vaigaga 22
14 kV Underaround Cable Proect
15 22 kV Overhead Conductor Upgradrng Program
-0.80
3.12
SAM·PSEP -09
0.84
2.36
2.78
SAM·PSEP -09
0.41
5.62
SAVAII Generation
10.65
0.00
SAM-PSEP-02
1.24
0.56
Measurement Equipment
CORE AND CANDIDATE SUBTOTAL
70.00
3.48
44.81
APPROVED NEW SUBPROJECTS
22 Vendrng System
3
Q 1 2009
0.25
23 Public Dr ssemr natron
24 Power System Plannrng Sof tware
3
Q 1 2009
0.10
3
Q3 2008
0.06
SAM·PSEP -06
25 Refurbrshment of Taalefaga and Samasonr SW1tchgea
3
Q2 2009
1.60
26 Refurbrshment of Salelologa Power Statr on
3
Q2 2009
27 Refurbrshment of Tanugamanono Two Generators
l Hydro
28 Upou
3
Q3 2009
3
Q ! 20 10
3.51
29 Contrngency (Var pu Assrsted Pumprng Scheme)
3
Q 1 2010
0.50
NEW SUBPROJECTS SUBTOTAL
GRAND TOTAL
EPC PMU
0.10
23rd Oct 08
0.06
0.00
1.97
-0.37
5.90
SAM·PSEP -07
SAM-PSEP-10
0.75
SAM-PSEP-08
0.47
5.90
0.28
3.51
0.50
12.67
0.00
82.67
44.81
2"d QUARTER 2012 PROGRESS REPORT
2.60
18.7
Page 44 of 55
10.07
63.95
LIST OF WITHDRAWAL APPLICATIONS OUTSTANDING AT END OF Q2, 2012
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
11.
WA No
WA 0269
WA 0270
WA 0271
WA 0272
WA 0273
WA 0274
WA 0275
WA 0276
WA 0277
WA 0278
WA 0279
WA 0280
WA 0281
WA 0282
Contractor
A D Riley
A D Riley
BBA JV /Woods / MHI
A D Riley
A D Riley
A D Riley
A D Riley
Northpower NZ Ltd
Northpower NZ Ltd
INTRACOR
INTRACOR
INTRACOR
INTRACOR
INTRACOR
Contract No
PPM 1207
PPM1207
12/03A
PPM1207
PPM1207
PPM1207
PPM1207
14/01
14/01
13/02A
13/02A
13/02A
13/02A
13/02A
Lot
LOT 5
LOT 3
LOT 5
LOT 1
LOT 1
Claim No
Claim 5
Claim 9
Claim 1
Claim 1
Claim 2
Claim 2
Claim 1
Currency
SAT
USD
USD
SAT
USD
SAT
USD
NZD
NZD
USD
USD
USD
USD
USD
Amount
$
$
$
$
$
$
$
$
$
$
$
$
$
$
46,303.95
4,040.43
351,163.87
18,661.02
1,579.02
16,341.92
1,342.16
435,889.66
62,676.23
54,218.64
99,120.00
42,075.25
5,559.68
45,778.07
LAST ADB REVIEW MISSION
No ADB Mission during this Quarter. Next Mission is schedule towards middle of year.
12 APPENDICES
13. ATTACHMENTS
EPC PMU
nd
2 QUARTER 2012 PROGRESS REPORT
Page 45 of 55
Appendix 1 - INVESTMENT PLAN Revised June 2012
REVISED INVESTMENT PLAN (Revised): JUNE 2012, WITH ADDITIONAL SUBPROJECTS
No
Contractors I
Consultants
Contract Description
Location
Estimate
Cost
mi(USD)
Subproject Number
%Completed
CORE PROJECTS
1
Upolu
Hospital Feeder Upgrade Stage 1
Bluebird Ah LAL JV
0.700
SAM PSEP 02/01A
2
Upolu/Savaii
Single & three phase Prepayment Metering
AD Riley
6.143
SAM PSEP 1207
3
Upolu
Project Manager
TBA
0.750
4
Upolu
Consultant Services (Note 1)
Implementation
consultant
2.67
Individual consultants
1.50
100%
Installation is 91% complete; 73% of All
active customers (31, 730) have
Prepayment Meters
Vacant
Egis International & Individual
CON 0508
Consultants, short term consultants,
COS and Tariff Study
Individual consultants, short term
experts for commissioning, cost of
servce & tariff review
CANDIDATE SUBPROJECTS
Upolu Generation
5
Upolu
T'manono Power Station noise and em iss ion control program
6
Upolu
Refurbishment of Alaoa Hydro Power Station:
a Electrical- Mechanical
7
Upolu
b Civil Works
Fiaga Power Plant
0.170
0%
535,847.309
Tenix NZ Ltd
Silva Transport Ltd
1.291 SAM PSEP 03
100%
0.536
SAM PSEP 03/01
90%, reduced scope
28.015
SAM PSEP 12/3A
Bldg-70%; Equip. Supply-80%; Equip.
insta11-70%
SAM PSEP 12/38
a LOT A (Generators & Powerhouse)
Bluebird/Woods/MHI
b LOT B (Electrical SWitchgear)
Northpower NZ Ltd
3.437
c Survey work
Sepulona Surveyor
0.041
d Level power plant site
PPG Construction
0.071 SAM PSEP 12/28
100%
e Access Road/fence/water pipeline
Silva Transport Ltd
1.420 SAM PSEP 12/2A
f Fuel & Oil Tanks
Fuelquip/GMA JV
1.200 SAM PSEP 12/04
100%
Tank manuf-100%; Design-100%;
g Water booster pumping system & tanks
EPC
0.400
EPC
0.032
i Relocate Units SA, 7A, & 9A to Fiaga
TBA
3.00
j Lube oil supply
TBA
0.560
h Water well drilling
EPC PMU
TBA
2"d QUARTER 2012 PROGRESS REPORT
Construction-100%; Equip Supply 90%;
Equip. Install 95%
100%
SAM PSEP 12/06
Construction-GO%
Bid doc-100%;with ADB to review
SAM PSEP 12/05
construction 30%, bid preparing
0%
Page 46 of 55
Upolu Transmission
8
Upolu
9
Upolu
Alaoa Feeder Upgrade 6.6 to 22kV
33kV Transmission Line from Fiaga to Fuluassou Substation
Bluebird AhlAL JV
0.440
EPC
SAM PSEP 02/02A
a Survey services
b Trench excavation contract
Sepulona SS Ltd
TBA
5.690 SAM PSEP 13/03
0.007
1.500 SAM PSEP 13/02
c Equipment rental
EPC
0.043
Bluebird AhLAL JV
3.753
SAM PSEP 09/01A
SAM PSEP 12/01
10
Upolu
Hospital Feeder Upgrade- Stage 2
11
Upolu
Fuluasou Substation
a River bank riprap protection
100%
10%
100%
biding
continuing
construction 100%, installation 70%
Northpower NZ Ltd
3.103
TBA
0.652
construction 70%, installation 5%
preparing bid
materials supply 100%, construction 0%
12
Upolu
Low Voltage System Improvements
EPC
0.162
13
Upolu
22kV UG Fuluasou Substation to Apia Wharf
EPC
1.430 SAM PSEP 10/01
14
Upolu
22kV Overhead conductor upgrading program
GMA Construction Ltd
3.360
SAM PSEP 09/28
construction 60%
SAM PSEP 02/028
100%
construction 30%, installation 0%
Savaii Transmission
15
Savaii
Puapua- Asau 22 kV line reconductoring
Tenix NZ Ltd
0.754
16
Savaii
Low Voltage Network Improvements
EPC
0.534
materials supply 100% construciton 9%
17
Savaii
Reconductor remaining spans (102)
EPC
0.096
0%
100%
Measurement Equipme nt
18
Upolu/Savaii
Measurement equipment: stream flow gauging
EPC
0.062
19
Upolu/Savaii
EPC
0.058
19
Upolu/Savaii
Measurement equipment: electric HV/current
SCADA System
Schneider Electric Ltd
3.548
Contingency, 5%
100%
SAM PSEP 12/05
0%
0.177
APPROVED NEW SUBPROJECTS
20
Savaii
Vaiaata Power Station and Salelologa Substation
TBA
7.683
Separate bids
a Resistivity study
Northpower NZ Ltd
0.010
start on 15/9/12
b Geotechnical study
TBA
0.020
c Surveying
d Prepare access rd and clear site
Sepulona
TBA
0.003
0.050
start on11/9/12
0%
21
Upolu/Savaii
Vending System
AD Riley
0.162
100%
22
Upolu/Savaii
EPC
0.100
Continuing
23
Upolu
Northpower NZ Ltd
2.731
24
Upolu
Public dissemination
Taelefaga/Lalomauga/SamasonifTanugamanono Power stations
Switchgear Refurbishment
Power System Planning Software
Northpower NZ Ltd
0.051
MAN Diesel
1.678
25
Upolu
Refurbishment of Generators 9A and 7A in Tanugamanono Power
Station
26
Upolu
Vaipu Pumping Scheme
EPC PMU
await EPC/ADB
approval
2"d QUARTER 2012 PROGRESS REPORT
SAM PSEP -07
100%
100%
SAM PSEP -08
0.477
Page 47 of 55
100%
FS-100%;EIA-80%; Bid-0%
27
ALL
Training
TBA
28
Upolu
Taelefaga Power station Hydro Governor System Upgrade
Northpower NZ Ltd
Linemen & other trainings &
0.238
0.90
computerized maintenance program
SAM PSEP 17/01
Contract awared
Hydro Development
29
Upolu/Savaii
Hydro Developments- Feasibility Study & tender doc.
SUBTOTAL
refer below
91.37
Packaged separately & refer NEW
PROJECTS below
investment costs
CONTINGENCY (Physical)
3.42
contingencies
LOAN INTERES T PAYMENT DURING CONSTRUCTION
5.21
loan interest during construction
TOTAL
100.00
NEW SUBPROJECTS PENDING APPROVAL
30
31
32
33
34
35
Afulilo Dam Environmental hazard Mitigation
0.75
Design and tender
Refurbish hydro m/c control system of 3 hydro plants (Samasoni, FOF, Lalomauga)
1.80
EPC Board to approve
Refurb. Penstock, valves, etc. of 4 hydros- Taelefaga, Lalomauga, Samasoni & FOF.
Refurbish Tanugamaono diesel generator Unit 12
2.40
0.40
EPC Board to approve
EPC Board to approve
0.50
getting EPC Board approval
Refurbish 3 Cummins generator in Salelologa
Hydro developments
TOTAL
13.15
I
I
19.00
1 Include IC completion of hydro study, independent consultants, short term commission consultants, cost of service and tariff study
2 Total funds needed for 5 hydras is $48m, and $25m for 3 hydras (Fuluasou, Tiapapata, and Faleseela) tender being prepared now.
3 No decision yet on Vaipu Pump Scheme;assign USD300K from TA in SMEC contract to prepare design/tender.
4 TBA- To be announced
5 Proposed new subprojects for additional funds of US$19 million.
EPC PMU
2"d QUARTER 2012 PROGRESS REPORT
Page 48 of 55
Appendix 2 - DISBURSEMENT PLAN
POWER SECTOR EXPANSION PROJECT
DISBURSEMENT PLAN- AS OF 2ND QUARTER 2012
TITLE OF SUBPROJECTS
AOB
Amrd
'D"o'te'
cottg•
Re
21118
2009
2010
2011
2012
2013
2014
Budgol
CORE SUBPROJECTS
1
PrCljectManagef (0,37 +0,38ooaloc ed)
4 04:m7
2
PrCljectifllllemert ion coosuftart EB (13 mal} rrontrn)
3
Hospttal Feeder Up!JadingProject stae 1
4 01 xoo
3 01 JDi:l
4
Sif)Jie- aOOThree-Pha>ePrepa'y!TlertMeterio;J Project
300ml
,.
Tan ,. JamaooooPcwer st ionNClise nl Emissioo CClltrCli
3 Q4JD9
O.il
RefiJtlishmenlr:t )l,laoaHydroptwef Station- CMiliiiOfo:
3 00 Jll9
1.31
3 01 Xl10
222?
O JJ3
OJJ3
OJJ3
0 06
028
0.1U5
0
O.D&'S
0
0
OD625
O.D625
OD625
0!1625
O.HIS
O.HIS
0.1145
O.HIS
0211'9
0111'9
0111'9
OlH<J
0.2m
0.271
0 .15
0.15
0 .15
0.15
0.3189
0.3189
0.3189
0.31 00
0.3100
0.31113
0.31&3
0.31 00
0.31 8
ODl%
0.02al
O.Onl
O.OW
O.CWJ
O.lll8
O.JJ1
0.1621
0.1621
0.1621
0.1621
0.1621
0.16 27
0.1627
3.3105
U831
1.1831
1.1831
1.1831
oro
018
0.00
0561
0.3189
0.15
261
oro
0.31 8
0 .31 8
CANDIDATE SUBPROJECTS
""
""
""
""
'"
UPOUJ Gt11ention
0 .11
"'
RefiJtlishment r1 AtaoaHydropcwef Station- ElectrciMech.
9
UpctJOies eiPowefPia"lt- Geoerat XandPcwerhClUSe
na gaPcwer Plani - EiectrK:al9111itctgeOJ"
10
na gaPPFuei&Ciitlar1\s
1.1831
1.1101
1.1101
1.1101
1.1101
1.1 831
1.1 831
1.1 831
1 .1831
1.183
1.183
1.183
01 Xl10
01 Xl12
11 FiagaPPao:essroad,pipeine& feoce
Q2 Xl11
12 naa \lli te em 8oostef PlmJ:S
13 naalllbe cMis upply
03
Xl12
UPOUJ Transrrlssion
Up17aOe the Naoa 6.6kV Tr smission Lioeto22 kVPrctect
3 00 Jll9
UpokJOiffi elf'owefSiaiOOilFLiJ: >ooSUtsloi:ionUndef!1CN.m:l
3
14
0.,
01 Xl10
Olffi
16 HospHaiFeeOerUpgradirJ9Project-stage2
3 Q4JD9
3 02 Xl10
17 3V!22kVFUU:fl ou SUtsloi:ionPr ect
3 Q2
FUuasouSutGta1ontoApiaWhaI' Area22kVUnOer!1000d
3
02ffi
oro
oro
3
0.0
05U
2.
Xl10
Q2 Xl12
3 02
21
3 00 Jll9
•ro
3 03 Xl12
10.65
Xl12
1H
05U
3.12
05
05U
OJ325
0.1325
0.1325
0.13
0.16125
0.161 25
1)_16125
0.161
016ro
016i'll
o.llro
32
0.161
0.161
1)_161
293
12'3
0.161
000
19 CablePrrliect
20 FUuasooSuffita1ontoLaloma allia TalliJ;lamanono
22 kV Ovefhe adCorJO.rctCli Upgr adin g Progra-n
Olffi
3.12
15 33kVCablePI"Clject
1)_183
o.s l81
0.188
026ro
016ro
13.ll7
0.267
0 >31
02<J
02<J
O .HJ
ou
011
0 11
0 .3911
0.1111
0.391
02<J
0267
01670
132670
02670
O.ll?O
02£1
02£1
159H
1293£
1293£
1.29
1293
1293
603
SA VAll Generation
1293
1293
SA VAl, Transrrlssion
Puapua----AsauTrarnmissbn lile 22kV Reom:lucXt i'lgProject
23
24 LcwVoftae Neb.o\l((k E>; anson ProJam
0.186
3 02
Xl10
300ml
0
3 00ml
OIJl
l7 SCADA
3 Q4Jil9
30
0.3513
I.H
3 02 Jll9
3 01 JD9
100
3{) Pl.biK: Oisse!Tina1oo
3
0 .100
31
3 02 JD9
01 ;mg
0.25
0008
0056
"''
0"'
0056
0."'
0.
"'
0.
005
005
OIJl
1.11
I.S l
1.61
Ul
l.ll
0.9i'5
0.9i'5
0.00
0.00
0.31636
0.316 36
0.316 36
0.3163636
1.•
"'
Ul
0001
0001
APPROVED NEW SUBPROJECTS
2B Ref l..l'bishment r1 Sau-a l D iese l Power sta1oo
29 Ve!ldio;JSy.>tem
0056
O.llilti55
0.316ll
6361
l.l!
121
0.3513
0056
lUI
CORE AND CAIIDIDATE SUBTOTAL
0.3513
0..,
Meilsurarent ECJ.iiprrart
2s Stream FlcwG augingEquipmert
26 Electrica iTffii Eiflert EIJlipmert
TaalefaiJ3, Samasooi,et:swtchQE!ars
Ol195
0 .16
0008
0.00
0.00
t.ro
021
031
0.31636361 0.31636361 0.31 636361 0.31 636 1 0.31 6361
ur
0.31
3.16
l.ll
l.ll
1.!6
l.ll
0.001
0.001
0.001
ooot
'"
'"
'"
3.131
lHl
U7i
Ull
000<
000<
000<
0001
0001
0001
0001
0001
0001
03
03
03
0001
0001
0001
025
"'"
3 01 Xl10
05)
0.
ro
"
ore
APPROVED BY EPC & ADB,NEW
SUBPROJECTS
3p32009
71.81
1B
051
0001
ore
32 PtwefS)stemPimio;ISoflware
B V3ipUP\rfllli'lgScheme
34 Retlt812T anono0iesel Generaors
""
3 00 Jll9
0 .125
0.1125
01125
0 .125
01125
01125
0.811
0.87
0 .125
05
0.125
0.15
0.2
3sTrai
36 Retll*.tlimertofT{l(1efagah)tto!PIIerraccrtrol
37 AILJiiO m Ernlirc:m ffl!a hazard mitigation
3B Retlt8Nmert ofotfer 3 h\'df'05QO¥e!TXX' c::cctrOI
022012
oro
0.
1.00
NOT YET APPROVED EPCI ADB,NEW
SUBPROJECTS
39 Retlt:81me1o!T<mgam<n:n:JN012Lrlit
0.0
40 Retttt.:hnB1of3Saleblcgageneratocs
41 Ret.rtmnffi h)tto pertod< pes
42 UpokJHyt:lroGeoeratioo
09l
GRAND TOTAL
EPC PMU
2<
3
01 2010
3.51
!U&
I.H
1.3!
1.n
1.61
1.61
Ul
'·"
2"d QUARTER 2012 PROGRESS REPORT
0.87
'·"
351
0.131
5.13
ur
2 JI
Page 49 of 55
2JI
U1
1.!6
,.
'"
'"
'"
l.U
1.31
o
Appendix 3- Revised Project Schedule to end June 2012
NO
IStatus
TITLE OF SUBPROJECTS
2008
1
2
2009
3
2
1
4
2010
3
CORE SUI
Hospital Feeder Upgrading Project- Stage1
3
liP
CON"
4
Project implementation consultant: EBI (73 man-months)
CONT
2011
3
2
1
4
2012
3
2
1
4
2013
3
4
2
1
2014
3
4
2
1
2015
3
1
4
...
COM
Single- and Three-Phase Prepayment Metering Project
Project Manager (0,37 + 0,38 unallocated)
2
2
1
4
'Ill
-.11
• SUBPROJECTS
UPOLU Generation
5
6
7
8
9
,""""""' '""" ...,.••••••' Noise and Emission Control Program
t of Alaoa Hydropower Station
FSIP
Upolu DieselPower Station Project (LotA and Lot B)
CIP
Fiaga Access Road, Pipeline,and Fence
CIP
Fiaga Fuel and oH tanks
C)p
CIP
10
Fiaga;
·system
11
Relocate Gen SEts 5A, 7A & 9A to Fiaga Power Plant
12
Upgrade of the Alaoa6.6 kV ·
•
PL
.ine to 22 kV Project
1 line from Fiaga to Fuluasou Substation
...
C)p
CIP
33kv
Iline from Fuluasou ss to·
15
18
HospitalI
1 Project- Stage 2
Samasonihydro
ltrans line to Tanugamanono
22 kV Fuluasou Substation
I •Network iml
CIP
CIP
CIP
PL
19
Fuluasou
CIP
>Apia Wharf Area22 kV
...
COMP
14
16
·
I•
....
UPOLU
13
:"!..
'4
COM
ICable
20
22 kV Overflead Conductor Upgrading Program
CIP
21
Alaoa & FOF hydros ·
CIP
i 1linetoT<
I
I
I
I I
I
I
I
I
I
I
I
I
I
I
I I I I I I I I I I
I I I I I I I I I I I
... •
'-4
...
...
-. ,...
•
SAVAll
OH
22
SAVAI'I Transmission
1 Transmission Line 22 kV
23
24
1 Project
Low-Voltage Network 1m1
...
CIP
PL
Measurement
25
26
27
l=n..inn..•nt
Stream Flow Gauging Equipment
COMP
ElectricalTest Equipment
COMP
SCADA
,...
..
'4..
...
CIP
'Ill
NEW SUI
28
·station
PL
29
Sal,.oloaa Substation
TP
31
Public Dissemination
32
Refurbish Taaletaga, & others 22kv switchgears
COMP
33
Power System Planning Software
COMP
tof
34
35
Vaipu Pumping Scheme
36
Upolu hydro
ONG
• Generators 9A and 7A
Refurbish Taeletaga hydro plant govemor control system
CA
TP
I
I
I
I
EPC PMU
'Ill
I
I
I
NEW
TP
; ;d = tocks, valves , etc ror 1ae1eraga, am as om, Lalom auga,
42
I
I
PL
Refurbish No 12 gen in T'manono &3 gens in Salelologa
Refurbish governor & generator controls of FOF, Lalom auga &
Samasoni hydro stations
:
I
I
I
FSIP
Afulilo Dam Environmental Hazard Mitigation
rraining
41
I
PL
·Fuluasou, Tipapata, Faleseela, & Tafttoala
38
40
I
CIP
37
39
...
NEW
2nd QUARTER 2012 PROGRESS REPORT
Page 50 of 55
2
2016
3
4
1
2
3
4
NOTES & KEY
1
Completion date -actual & planned
2
Original subprojects & implementation schedules from RRP Report
3
8
9
New subprojects NOT in original RRP Report
Completed
Construction in Progress
Planning
Installation in Progress
Feasibiilty Study in Progress
On-Going
10
11
12
13
Contract Award
On Hold
Tender Preparation
New, pending approval
4
5
6
7
EPC PMU
2"d QUARTER 2012 PROGRESS REPORT
COMP
CIP
PL
INP
FSIP
ONG
AG
OH
TP
NEW
Page 51 of 55
Appendix 4 - Electricity Receivables
Refer to Receivable Rport in Page 36.
Appendix 5 – Prepayment Meter Installation Projection & Actuals
Project Target is to get 75% of consumers on Cash Power Meters at end of project in 2016.
19,616 meters have converted by A D Riley under their contract. At end of 2nd Quarter of 2012,
71.87% of active consumers have been converted or installed with prepayment meters. There
is 3.13% needed to meet target. About 1,384 meters are left to be installed under A D Riley‟s
contract. 75% will be reached with these meters. EPC is still testing a new meter from another
supplier, Joy Electric Ltd. Another supplier is sending test meters to be tested on A D Riley
vending system. If successful, this will give EPC new suppliers beside A D Riley. There has not
been any technical solution on blank screen defective meters. ADR is asked for a solution.
They have gone back to factory of CP meters. No word from them.
POWER SECTOR EXPANSION PROJECT
Customers Converted to Prepayment Meters
Month
Oct-08
Nov-08
Dec-08
Jan-09
Feb-09
Mar-09
Apr-09
May-09
Jun-09
Jul-09
Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
Feb-10
Mar-10
Apr-10
May-10
Jun-10
Jul-10
Aug-10
Sep-10
Oct-10
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Apr-12
May-12
Jun-12
Total to date
EPC PMU
All
Electrical
136
249
5
203
207
254
595
542
510
194
109
30
55
70
68
79
439
436
390
127
131
185
163
24
-
5,201
McLean
Electrical
198
212
162
348
366
233
286
459
583
509
419
190
106
11
129
134
99
304
498
447
433
345
246
289
236
278
235
192
131
127
131
59
83
71
47
48
31
38
14
113
152
60
51
106
69
9,278
Tel
ADR Total Installed
Tronic
this Month
130
464
335
796
5
172
200
751
215
788
233
322
862
495
1,549
473
1,598
370
1,389
223
836
149
448
125
261
218
284
156
355
197
399
209
387
351
1,094
328
1,262
486
1,323
186
746
60
536
431
3
455
7
267
278
235
192
131
127
131
59
83
71
47
48
31
38
14
113
152
60
51
106
69
5,243
19,722
nd
No of customers
on Cash Power
20,990
21,268
21,503
21,695
21,826
21,953
22,084
22,143
22,226
22,297
22,344
22,392
22,423
22,461
22,475
22,588
22,740
22,800
22,906
22,932
2 QUARTER 2012 PROGRESS REPORT
Page 52 of 55
Appendix 6- System Average Interruption Duration Index (SAlOl) Monitoring
WOOr--------------------------------------------------------------------------------UPOI.U ACTUAl TOTAL QUARTERLY & ANNUAUY SAlOl MONITORING
5000
AnnuliSAlO l buline
OI.atttity SAlOl tw..m.
-
OutnerlySAIDI
--+-- AMuat( SAIDI
r----------------------------------------------------------------------------------,
SAYAll ACTUAlTOTAl Q UARTERLY & ANNUAUY SAlOl MONITORING
3500
3000
2500
Ar.ru..&ISAIDIbu.tliM
=Ouon'"Y SAlOl bmine
2000
-
0\wttltf SAlOl
-+--ArinudySAIDI
1500
1000
500
•
•
SAlOl to be reduced by 20% by 2015
Plan interruption is included since 1st Quarter 2009.
EPC PMU
2"d QUARTER 2012 PROGRESS REPORT
Page 53 of 55
Appendix 7- System Average Interruption Frequency Index (SAIFI)
lmU ACJIIAL TUIAL QUAJIIBII.Y I Alf«JALL.YSAIA
c:::::ak.':::• S}Slt e
CJil.'"!'"!."..)':E b!S!l"t
.------------------------------------------------------------------------------,
SAYAll ACTUAlTUIAL QUARlBlY IAitfUALI.Y SAIA
c:::::l. !llb!set
c::::::JQ:!"-':t"..Y itc"t
ll.c-,y Afl
.........\:a::::!ly.'i:
•
•
SAIFI to be reduced by 20% by 2015
Plan interruption is included since 1st Quarter 2009.
EPC PMU
2"d QUARTER 2012 PROGRESS REPORT
Page 54 of 55
Appendix 8: PMU Current Organisational Structure
EPC PROJECT MANAGEMENT UNIT
Revised 14 Sept 2012
EPC Hoard of
Directors
General
Tologata Tile Tuimalealiifano
Manager
Project
Manager
§
-----+-----[! = Se c re ta rvi:]P!eta Collins & 1 driver
Generation
Engineer
lndivid.
Consultant
Perelini
Perelini
Transmission &
Distri buti on
Engineer
Generation Elec.
Engineer
Lafai ele. J.
Pe eira
Mau
Simanu
Telecom
Engneer
Civil Engineer
Asolima
Noted
Perelini Perelini a nd Roberto P a mingtuan are 2 individua l consultants
fonoti Perelini S. Perelini (Acting Project Manager)
A red
M tatia
Grad. Elec.
Engineer
John
Rimoni
ESU
Legal
Advisor
Mathew
Lemisio
Project
Accountant
faalepo
Solofa
Preinspection
Overseer
Underground
Overseer Line
Construction
Overseer Line
Construction
Crewl
Crew 2
Crew 3
Draftsman
EPC PMU
2nd QUARTER 2012 PROGRESS REPORT
ESU
Social
Resettlement
Officer
Asi
Tuuau
Page 55 of 55
Renewable
Energy
Manager
Public Relation
I Community
Officer
R pa
Yo ng
Moe
Asi
RE Assoc.
Technician
Bobby
Williams