Dynamic Information (c)Quality: - For the month of July 2012 Quality Control test during 21st May to 20thJune 2012 S. No. 1 1.1 1.2 1.3 1.4 1.5 2 2.1 2.2 2.3 2.4 Description of Item Borrow area MDD/OMC LL/PL/PI Gradation Free Swell index CBR M15 (PCC) M20 (RCC) M35 (RCC) M35 (RCC, Pile) No. of tests required as per frequency 1 for 1500 m3 29 1 for 1500 m3 29 1 for 1500 m3 29 1 for 1500 m3 29 1 for 3000 m3 25 Concrete cube strength MORTH sec. 1700 17 MORTH sec. 1700 100 MORTH sec. 1700 160 Fail 29 29 29 29 25 29 29 29 29 25 ------ 15 15 15 15 8 17 100 160 17 100 160 ---- 5 25 45 -- -- -- -- Every Batch/10000 Bags ,, ,, 4 4 4 -- 2 ,, ,, 4 4 4 -- 2 4 4 4 4 4 4 --- 2 2 5 5 5 -- 2 5 5 5 -- 2 9 9 9 -- 5 30 30 30 30 30 30 --- 12 6 30 30 30 -- 10 30 30 30 -- 8 280 280 280 100 100 100 3.1 3.2 Consistency IST & FST 3.3 3.4 3.5 5 5.1 Soundness ,, ,, Fineness ,, ,, Compressive ,, ,, Strength 3 Days Compressive ,, ,, Strength 7 Days Compressive ,, ,, Strength 28 Days Coarse Aggregate (Concrete Works) Sieve analysis As Required Flakiness Index As Required Aggregate Impact As Required Value (AIV) Fine Aggregate Sieve analysis As Required 6 6.1 Embankment 6.2 Sub grade 4 4.1 4.2 4.3 Witness by IE Pass -- Cement 3.7 Ref. of RFI for fail tests. Conducted MORTH sec. 1700 3 3.6 Required Field Density 1set of test (6test) /1000 m2 1set of test (6test) /500 m2 30 -- 15 Site Safety for the month of July 2012 The Road Safety measures on the project does not show much improvement with respect to necessary signage Concessionaire was informed to take up safety measures as per provisions of IRC: SP:55. Concessionaire was further advised to create working zones and regulate the Traffic in these zones properly to avoid any happenings. The project area where Embankment construction is in progress should be suitably barricaded with concrete/New Jersey Barriers or either with Wooden Barriers or Metal Sheet. Concessionaire has been repeatedly told to discontinue use of sand filled bags. The Project corridor should be suitably reflected by use of reflective tapes in the night time and Diversion Board should be installed at all diversions to guide the motor able traffic at Diversion Location. As structural locations electric switches were not found suitably covered which very cause accidents labor engaged at site were found using PP Equipment like helmets, Shoes & Safety Jackets etc. Shifting of Electric has commenced at site. Concessionaire has carried out crossing of cables at various locations. Concessionaire has also erected approx 45 no. of Poles in the private land where land never has allowed them to do so.