Technology Plan 10-11

advertisement
dmlkZSBhIGtleWJ
/w EWAgLIr8vDA
MO DEPT ELEMENTARY AND
SECONDARY EDUCATION
Run Date: 10-29-2010
Run Time: 14:24:09
EPEGS
Submitted
Not Submitted
Date:
Education Technology Plan
SCHOOL YEAR: 2009 - 2010
DISTRICT: 049-132 CARL JUNCTION R-I
The mission of the Carl Junction R-1 School District, in partnership with the Community, is to provide each
Mission
student a positive learning environment that promotes quality and excellence. Our mission also assures each
Statement: student opportunities to become a literate, skilled, creative, confident, and healthy individual prepared for life,
work, citizenship, and change in an ever-expanding society.
Local
Needs:
The district met AYP in 2/10 subgroups. The Primary 2-3 School Building met AYP targets while the Junior
High met and is not in "Delay" status. The Intermediate Building improved the percentage of IEP
students scoring proficient or advanced but did not meet attendance rate for that subgroup. The high
school met in all categories except for Graduation Rate. MAP/EOC Index Scores showed continual
improvement and the district scored 14/14 on the APR. District composite ACT scores were among the
highest in the area and were above both the state and national composite scores in all content areas.
1. Goal: Develop and enhance quality educational/instructional programs to improve performance and enable students to
meet their personal, academic, and career goals.
1. Objective: The percentage of students who meet technology literacy standards by the end of eighth grade will
increase, by 3 percentage points per year as measured by local assessment.
MSIP Standard: 6.1,6.4,6.8
Progress Measure:
School Year
Baseline
Progress
Target
-1 - 0
2008 - 2009
2009 - 2010
90%
93%
2010 - 2011
96%
2011 - 2012
99%
2012 - 2013
Target Met
95%
N/A
95%
N/A
93%
Yes
N/A
N/A
100%
N/A
Comments: As measured by our local assessment for 8th grade technology literacy and report with the
June MOSIS.
1. Strategy: With the assistance of technology, students at all grade levels will improve MAP and EOC test scores by
at least 5% per year per tested grade level.
MSIP Standard: 6.1,6.3,6.4
Persons Responsible: Classroom Teachers, Administrators, Technology Director
Funding Source Name: Local Funds
Date to Implement Strategy: 07/01/2009
Date of Completion: 06/30/2012
1.Action Step: Purchase Smart Board and/or projection devices for all classrooms depending on teacher
preference and/or ties to curriculum.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
2.Action Step: Emphasize technology as a professional development goal by offering technology-related inservice workshops.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
3.Action Step: All students in grades K-9 will have access to computer based assessments to meet grade level
expectations for AYP in reading.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
2. Strategy: All students will engage in rigorous instruction driven by technology-enriched curriculum that meets
students' assessed needs, results in high levels of academic achievement and performance, and fosters life-long learning.
MSIP Standard: 6.1,6.2,6.3,6.4
Persons Responsible: Curriculum Director, Teachers, Administrators
Funding Source Name: Local Funds
Date to Implement Strategy: 07/01/2009
Date of Completion: 06/30/2012
1.Action Step: Conduct curriculum training sessions with the teachers to make sure they are aware of the
curriculum competencies related to their grade level or subject area.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
2.Action Step: Provide high quality professional training for each grade level in the elementary grades and
subject areas in the secondary grades to instruct teachers in the skills necessary to help the student achieve the
competencies outlined in the curriculum.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
3. Strategy: Student keyboarding and software application skills will improve by 5% per year over the next three
years as determined by local assessment.
MSIP Standard: 6.2,6.3,6.4
Persons Responsible: Keyboarding Teachers, Technology Director, Curriculum Director
Funding Source Name: Local Funds
Date to Implement Strategy: 07/01/2009
Date of Completion: 06/30/2012
1.Action Step: Emphasize proper keyboarding techniques in the 2nd and 3rd grades in the computer lab using
typing software. Introduce word processing skills.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
2.Action Step: Continue the instruction of proper keyboarding skills in the 4th and 5th grade using software
and introduce word processing using Microsoft Word and Inspiration software.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
3.Action Step: Provide a keyboarding class for all 6th graders taught by a qualified keyboarding teacher.
Prepare reports and other documents and teach document formatting skills.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
grade.
4.Action Step: Provide a keyboarding class at the Junior High that continues the skills introduced in the 6th
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
5.Action Step: Beginning in the 2nd grade and continuing through high school, students will begin attending
computer classes receiving formal training in software applications.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
6.Action Step: The district will migrate towards Internet-based computing applications.
Date To Implement Action Step: 07/01/2010
Date of Completion: 05/31/2013
7.Action Step: The district will provide computer lab time for our students outside the normal school day.
Date To Implement Action Step: 07/01/2010
Date of Completion: 05/31/2013
4. Strategy: Use technology to improve administrative data management and communication processes.
MSIP Standard: 6.4
Persons Responsible: Administrators, Technology Director
Funding Source Name: Local Funds
Date to Implement Strategy: 07/01/2009
Date of Completion: 06/30/2012
1.Action Step: Upgrade technology equipment and software using a 3-tier budget plan: 1) Based on current
funding levels; 2) Based on stretch goals; 3) Based on dream goals.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
2.Action Step: The district will develop a standard technology package to be budgetd for and installed in all
new construction as well as remodeled classrooms and building additions.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
2. Goal: Recruit, attract, develop, and retain highly qualified staff to carry out the LEA (local educational agency)/District
mission, goals, and objectives.
1. Objective: All staff will participate in High Quality Professional Development activities.
MSIP Standard: 6.3,6.4,6.7
Progress Measure:
School Year
Baseline
2007 - 2008
Progress
Target Met
N/A
2008 - 2009
2009 - 2010
Target
98% C
100%NC
2010 - 2011
100% C
No
100% NC
N/A
100% C/NC
N/A
98% C
99% C
2011 - 2012
No
Comments: Percentage taken from submitted HQPD survey which only includes certified staff. Noncertified staff baseline 09-10 is 100% based upon documentation provided by non-certified staff supervisors.
Certified="C"; Non-certified="NC"
1. Strategy: Strengthen the incorporation of technology into the curriculum and delivery of instruction.
MSIP Standard: 6.3,6.4
Persons Responsible: Teachers, Administrators, Curriculum Director, Technology Director
Funding Source Name: Local Funds, Basic Formula - State Monies
Date to Implement Strategy: 07/01/2009
Date of Completion: 05/31/2013
1.Action Step: Teachers will continue high-quality training through in-service workshops.
Date To Implement Action Step: 07/01/2009
Date of Completion: 05/31/2013
2.Action Step: The district will create the position of Technology Coordinator. The position will incorporate a
variety of technology-related duties.
Date To Implement Action Step: 07/01/2009
Date of Completion: 05/31/2013
3.Action Step: Teachers will develop technology related activities that align with the state standards.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
3. Goal: Provide and maintain appropriate instructional resources, support services, and functional and safe facilities.
1. Objective: Carl Junction School District facilities will meet MSIP standards.
MSIP Standard: 2.1,6.4,8.10,8.11,8.15
Progress Measure:
School Year
2007 - 2008
Baseline
Progress
98%
Target
Target Met
N/A
2008 - 2009
98%
Yes
2009 - 2010
98%
Yes
2010 - 2011
99%
2011 - 2012
N/A
100%
N/A
Comments: District goal is to meet 100% of the MSIP standards aligned with facilities, support and
instructional resources.
1. Strategy: Provide and maintain technological resouces and support services.
MSIP Standard: 6.3,6.4
Persons Responsible: Technology Director, Administrators
Funding Source Name: Local Funds
Date to Implement Strategy: 07/01/2009
Date of Completion: 06/30/2012
1.Action Step: The district will provide opportunities for staff to teach technology workshops.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
2.Action Step: Decrease the student/computer ratio by purchasing more computers.
Date To Implement Action Step: 07/01/2009
Date of Completion: 06/30/2012
3.Action Step: The district will provide the opportunity for staff to attend advanced technology training.
Date To Implement Action Step: 07/01/2010
Date of Completion: 06/30/2012
4.Action Step: The district will begin moving towards one-to-one student computing devices.
Date To Implement Action Step: 07/01/2011
Date of Completion: 06/30/2014
4. Goal: Promote, facilitate, and enhance parent, student, and community involvement in LEA/District educational
programs.
1. Objective: At least 95% of parents will be involved in school activities and student work.
MSIP Standard: 6.2,6.4,7.5,8.10,8.5,8.8
Progress Measure:
School Year
Baseline
2008 - 2009
Progress
Target
86%
Target Met
N/A
2009 - 2010
90%
No
2010 - 2011
87%
N/A
2011 - 2012
90%
2012 - 2013
N/A
95%
N/A
Comments: Data is taken from the percentage of parents that attended district parent/teacher
conferences in October (K-12). Progress measure adjusted October 2010.
1. Strategy: Technology will be used to communicate with parents, students and the community.
MSIP Standard: 6.4
Persons Responsible: Administrators, Teachers, Technology Director
Funding Source Name: Local Funds
Date to Implement Strategy: 08/01/2006
Date of Completion: 05/31/2013
Additional Elements:
The No Child Left Behind Act (NCLB) states that districts must have long-range education technology plans to apply for
program funds and that the plan address specific evaluation requirements. Describe the process and accountability
measures the district will use to evaluate the extent to which activities funded by an NCLB program are effective in
integrating technology into curricula and instruction, increasing the ability of teachers to teach, and enabling students to
reach challenging State academic standards.
Disseminating the technology plan will be ongoing with progress reports being generated yearly to all stakeholders. All
teachers will have access to the technology plan. Building principals will be given a copy of the plan. The Superintendent's
office will have a copy of the technology plan as will each school board member. The plan can also be found on the district's
Web site: www.cj.k12.mo.us. Monitoring the plan is also an ongoing project of the technology committee, administrators,
and staff members. The technology director handles the purchasing of computer hardware and software and is able to
ensure that what is being ordered will meet the requirements of the networking infrastructure and meet our technical
specifications. This also requires reviewing and analyzing the progress towards our CSIP goals. Evaluating the data that is
collected yearly is reviewed to both assess the plan's effectiveness and appropriateness and if warranted, the plan is
modified. Data that is reviewed include yearly MAP and ACT scores, Census of Technology reports, service records, budgets,
purchases, and teacher and student surveys. The technology department reports to the board of education yearly on the
status of technology in the district. These results are summarized and are contained in the minutes of the school board
which can all be found at www.cj.k12.mo.us.
The Universal Service Fund E-rate Program states that district long-range plans must address five essential elements. The
district provides assurances to DESE that the technology plan contains the following:
• Clear goals and realistic strategies for using telecommunications and information technology to improve education
services;
• Professional development strategies to ensure that staff know to use these new technologies to improve education
services;
• Assessment of the telecommunication services, hardware, software, and other services that will be needed to improve
education services;
• Sufficient budget to acquire and support the non-discounted elements of the plan: the hardware, software, professional
development and other services that will be needed to implement the strategy; and
• Evaluation process that enables the school to monitor progress toward the specified goals and make mid-course
corrections in response to new developments and opportunities as they arise.
Download