SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report Updates from Winter 2015 Meeting Mohsen Shavandi Virgilio Garcia SC 17 Report Winter 2015 • • • • • • • Appointed liaisons with Materials group, International Standards, Industry Standardization 28 document (7 New), 14 TRs (8 New TR) 17A (RP) – Design and Operation of Subsea Production Systems – Under revision – SRRR submitted for Annex A and Annex I to be a separate documents (proposed TR13 and TYR14) – Material section to be reviewed and revised 17D (Spec) –Subsea Wellhead and Christmas Tree Equipment – Addendum for Annex O being balloted – Ballot closed for removal of PSL 3G for wellheads 17E (Spec) –Subsea Umbilicals – Draft will be sent for comment and ballot 17F (Std) –Subsea Production Control Systems – 3rd edition published in May 2014 – SRRR submitted to start the next edition to address issues from previous edition 17G (RP) –Completion Workover Risers – 6th draft will be completed by end of February – The next revision is recommended to be balloted as Standard rather than Specification – Document size reduced by 20% SC 17 Report Winter 2015 • • • • • • 17H (RP) – ROTs and Interfaces n Subsea Production Systems – Incorporate 17M (17M is withdrawn) – SRRR submitted and accepted for next revision – Will issue errata now for figure 20 (Hot stab dimensions) Deep Star Task report: – API agreed to accept report as Donated work from Deep Star – Deep Star grants API permission to issue report under SC17, but retain ownership of report – Document will be under API 17H umbrella 17K (Spec) –Bonded Flexible Pipe – Up for review, the industry input due by Q1 2015, work will extend into Q1 2016 – Established input requirements and task group (29 SMEs) 17N (RP) - Subsea Reliability – Incorporate existing 17Q content to introduce TQ process – RP due for next revision 17P (RP) –Subsea Structures and Manifolds – SRRR submitted to update and rationalize the materials section – Next meeting to be scheduled 17R (RP) –Flowline Connectors and Jumpers – Resolved comments from ballot; will send out for recirculation and publication SC 17 Report Winter 2015 • • • • • • 17S (New RP) – Subsea Multiphase Flow Meters – Ballot closed in December 2014 – In comment resolution, will be submitted for re-ballot 17U (New RP) –Wet and Dry Thermal Insulation of Subsea Flow Lines and Equipment – In publication process 17V (New)- Subsea Safety – Ballot comments reviewed and incorporated – In final circulation; to be published in February 17Y (New RP) –Subsea Chemical Injection – SRRR submitted in June 2014 – Work in progress 17X (New RP) – Subsea Boosting – Under development (started Jan 2013) – Expect the first draft by April 2015 17Z (New RP) –Boded Composite Pipe for Offshore Applications – SRRR submitted in June 2014 – TG to formed by end of Q1 2015 and the draft is targrted for end of Q3 SC 17 Report Winter 2015 • TR7- Connectors (except flowline connectors) – Annex I to be completed and recirculated – Waiting on 17G technical team to free up – SC16 encouraged to get involved in review • TR8 – HPHT Design Guidelines – Passed ballot; 1st edition to be published in February – Motion passed for SRRR to get CSOEM to put aside $345,000 to perform independent analysis and material testing – Motion passed to start the 2nd edition – ASME Section VIII Div 3 task group is helping with the material section – We encourage SC 18 to participate TR9 –Subsea Umbilical Termination Selection and Sizing Recommendations – Document to be completed in April 2015 TR10-Subsea Umbilical Termination Design Recommendations – recommended to be re-balloted due to addition of two complete sections TR12– In final review; 2 negative votes being addressed • • • SC 17 Report Winter 2015 THANK YOU!