Norwegian Society of Maintenance WWW.NFV.NO WWW.TFSK.NO Updated program - 20th may 2014 SUBSEA OPERATIONS AND MAINTENANCE The value chain from framework to the experiences 26th – 27th May 2014 Thon Hotel Kristiansund, Norway PROGRAM Photo: Statoil Monday 26th May 09.30 17.00 Registration / Coffee Chairmen: Jon Einar Kleppe, Statoil and Stig Aune, AS Norske Shell 10.00 Opening 10.15 Subsea installations and environmental challenges -chemicals and leakage detection Hilde Knapstad, Senior Engineer, Miljødirektoratet 10.45 Subsea Well Response Project enhances international well incident intervention capabilities Keith Lewis, Project Manager Subsea Well Response Project, Shell 11.15 Coffee Break 11.30 Pipeline Integrity Management – Shell’s Perspective • Pipeline Integrity Process • Pipeline Integrity as a life cycle approach Pieter Swart, AS Norske Shell 12.15 Lunch Heidi Hægeland Halvorsen, Senior Engineer, Subsea Technology, DNV GL 17.45 Oppsummering og avslutning dag 1 19.00 Fellesmiddag Tuesday 27th May Chairmen: Ragnhild Gjelsvik, GE Oil & Gas and Jan André Furnes, AS Norske Shell 08.30 Subsea Integrity Management is More than Pipelines. • Historical issues on the Control System. • Proactive measures put in place. • Challenges for the future. Roddy Maclachlan, Principal IRM Engineer, Shell U.K. Limited 09.15 Maintenance in FMC and possibilities in the future • How do we identify and perform maintenance on tools • How do we identify and perform maintenance on installable equipment • How can performance data tracking improve accuracy of maintenance in the future Sverre Undeland, Maintenance Execution Manager, FMC Technologies 10.00 Coffee Break 10.15 Seabed Intervention Services for IMR • Seabed assessment and equipment utilization • Incorporation and interface with vessel and ROV operations • Equipment and solutions new to the market Odd Gustav Kvalvåg, Managing Director, Deep C Solutions AS 11.00 Subsea Competence and support in 2020 perspective • Draugen & Ormen Lange status • Pipeline, Anchor hooking and inspection • Competence needs and where will the jobs be Jan Furnes, Subsea IMR Team Lead KSU, AS Norske Shell 11.45 Coffee Break 12.00 Challenges of implementing new subsea technology • Åsgard Subsea Gas Compression introduces new technology and heavy equipment in the Midgard area • A biref introduction of the facilities • How will this new and heavy equipmet affect the way the operator organize operation and maintenance? • Base facilities and IMR-support Rune Ramberg, Chief Engineer, Statoil 13.30Un-bonded Flexible Risers – Recent Field Experience and Actions for Increased Robustness Jan Muren, Advisor Flexible Riser Technology, 4subsea 14.15Subsea production systems and pipelines on the Norwegian Continental Shelf – material challenges • Experiences from 30 years operation • More complex production units on the seabed • Inspection and monitoring Roy Johnsen, Professor, Department of Engineering Design and Materials, Norwegian University of Science and Technology – NTNU 15.00 Coffee Break 15.15 Subsea instrumentation for Condition Based Maintenance and Enhanced Lift time • Subsea Leak Detection: Early detection of unwanted releases • Subsea Acoustic & Electric Monitoring of Advanced Subsea Machinery Stian Bentsen, Commercial Manager, Naxys - A GE Company 16.00 16.45 Standardised Workover Control System • Aker Solutions has over the last few years developed a standardised workover control system (WOCS). • multiWOCS™ enable operators to get faster operations, more automated sequences and higher utilization of workover systems through usage across fields and from any rig. • The following topics will be highlight: - Design for maintainability - Maintenance philosophy - Operational experience Jørgen Bru, -Senior Engineer – Workover Systems, Aker Solutions Coffee Break Joining Forces to Limit Offshore Leakages • Leak detection is a challenge facing the industry. And who wants hydrocarbon leakage at their field? • JIP Offshore Leak Detection will give a methodology for designing an integrated system including functional requirements and general specification 12.45 Closing / Adjourn / Lunch 13.45 Bus transports to the Airport or Statoil Vestbase 14.00 Factory Visit - Statoil Vestbase Lasse Kroknes, Statoil 16.00 Bus transports from Statoil Vestbase to the Airport