Issues related to Technology & Spares Management A Presentation by ECL 20th January, 2015 Production built-up Program of ECL ECL’s share in 1 billion te coal by CIL in 2019-20 is 62 million te. Year Coal Prod (MT) Abs. Grwth. (MT) % Grwth 2013-14 36.05 2014-15 (Plan) 38.00 2015-16 (Proj) 42.03 4.03 10.60% 2016-17 (Proj) 46.94 4.91 11.68% 2017-18 (Proj) 51.68 4.74 10.10% 2018-19 (Proj) 56.56 4.88 9.44% 2019-20 (Proj) 62.00 5.44 9.62% Technology Requirement for UG Production Intermediate Technology Existing 2015-16 2016-17 2017-18 2018-19 2019-20 SDL Low Height 17 3 2 - 8 2 Standard Height 202 22 91 21 - 26 Standard Height (1.5 cum) 17 - 15 - - - Standard Height (3.0 cum) 7 2 - 2 1 2 Low Height 1 - - - - - LHD Technology Requirement for UG Production Mass Production Technology Existing 2015-16 2016-17 2017-18 2018-19 2019-20 (a) Cotinuous Miner Package (1 CM + 2 Shuttle Car + 1 LHD + Roof Bolter etc) Requirement of Std. Ht. CM 3 - - - 1 2 Requirement of Low Ht. CM - - 2 1 - - - 1 - - - 1 (b) Powered Support LW Requirement of PSLW Technological Issues for increasing UG Production Sl. No Issues Increasing working height of CM 1 Description At present, CM is permitted to extract seams up to 4.5 Mts. It should be increased to extract coal seams of more than 4.5 Mts - preferably up to 6.0 Mts; maximum upto 8m, in single lift Single stage extraction by CM (i.e., only Practised in other countries like South development by Room Africa & USA & Pillar method) Benefits Increase in % extraction of coal for higher production & productivity Low gestation period, Better % recovery Restriction in use of Diesel operated RAM -CAR/ SHUTTLE CAR in gassy mines Higher Productivity and of Degree -II & Degree -III for scale of Production Use of diesel operated coal transport 2 machine in gassy mines Restriction in use of Diesel Operated Reduced travel time will of higher degree Multi purpose Free Steered vehicle for improve effective man & material transport in gassy mines working hour and hence, of Degree-II & Degree-III productivity Technological Issues for increasing UG Production Sl. No Issues Description Benefits 3 Non availability of Top Coal Thick seam mining by Caving Equipment for thick Longwall method seam Long wall Mining Increase in % extraction of coal for very high scale of production 4 Coal extraction rate in High speed stowing/ depillaring panels is restricted void filling technology due to unavailability of high speed Stowing Technique Extraction of seams below water-logged and heavily built-up areas at increased rate 5 High speed drivage of i.e., Speed > 80 m per month incline Gestation period will reduce; early start of coal production; continuous coal evacuation through belt. 6 High speed Shaft Sinking & Deepening Fast access to deeper/ lower virgin seams High speed Shaft Sinking & Deepening Technology/HEMM requirement for OC Production Sl. No I 1 2 3 II 1 2 3 4 III 1 2 3 4 IV 1 2 Equipment Description ER SHOVEL 20 m3 10 m3 4.6/5 m3 HYD SHOVEL 10 m3 & above 4.5-5.5 m3 2.7-4.2 m3 1-2 m3 DUMPERS 170T/190T 100T 50T/60T 35T/40T CR DOZER 410HP 320HP 2015-16 (No) 2016-17 (No) 2017-18 (No) 2018-19 (No) 2019-20 (No) 1 1 4 - 2 1 - 3 0 - 1 4 4 3 2 1 3 - 2 3 - 2 - 4 7 14 18 3 13 8 4 21 3 5 3 5 37 4 4 0 0 4 8 1 5 6 3 Technology/HEMM requirement for OC Production Sl. No V Equipment Description 2015-16 (No) 2016-17 (No) 2017-18 (No) 2018-19 (No) 2019-20 (No) - - - - W DOZER 1 VI 410HP 1 RBH DRILL 1 250mm 1 - 0 - 2 2 160 mm 10 3 3 1 4 VII GRADER 280 HP 1 - 2 2 2 - - - 3 - - - 2 - 1 VIII 1 IX 1 CRANES More than 40T WATER SPRINKLER 28Kl 2 Issues with Equipment manufacturing Cos. BEML Performance of dozers and 35T dumpers requires improvement Frequent problem being faced with newly supplied D155 & D355 Dozers with Joy stick arrangement. Failure to supply spare parts within delivery time stipulated in Depot Agreement. Issue: To improve the quality of newly supplied equipment and ensure supply of spare parts within delivery time. L&T Performance of recently supplied hydraulic shovel It has gone down because of failures of major assemblies like cracking of boom, final drive failures, fast wearing of bucket assy., hoses etc. HEC Performance of recently supplied 5 cum electric rope shovel, model EKG 5A It is not upto the mark. There are number of failures of major sub-assemblies. HEC is also not supplying spares against Guaranteed Availability Contract in time. Issues with Equipment manufacturing Cos. Caterpillar Since it has taken over BE, they have to take care of supply of spare parts of Dragline and Electric rope shovel of Marion and BE making respectively. Joy Global Presently the Company takes 6 months to 9 year to supply spare parts after LC Long supply time : This hampers the availability of high capacity equipment like 10 Cum & 20 Cum electric rope shovel. Should make arrangement to supply spares within 3 to 4 months time. Not supplying PLC & SLC system components and spares for 20 cum rope shovel deployed in Rajmahal whereas they are supposed to support ECL for supplying these spares for whole life of the equipment. This is going to affect availability of 20 cum shovel, the main digging equipment at Rajmahal OCP. To rationalize price of Spares: The Company increases the price of spares at their will. This should be rationalized as per market trends. Issues of Technology upgradation Technology upgradation: Present Status (a) Higher capacity and technologically advanced equipment: being procured. (100 T dumpers have replaced 85T Dumpers & 190T dumpers have been proposed as replacement of 170T Dumpers) Issues to be addressed Proximity Warning Device in dumpers presently provides an audio- visual warning to the operator when it detects objects in front or rear of the dumper up to 8 meters from the sensor mounting. This should be enhanced to at least 25 to 30 meters. Tail Gate Protection system in dumpers is not full proof. It has to be redesigned by the OEMs in consultation with DGMS. (b) Equipment with self-diagnostic tools: being procured. (e.g., Vehicle Health Monitoring System, Payload Monitoring System, etc. which provide data to analyze and improve mine efficiency, reduce failure and improve maintenance practices.) (c) HEMM with more safety and comfort features: being procured. (e.g., AC cabin, proximity warning device, rear vision camera etc. for safety & productivity of the operator and the equipment.) Issues related to Maintenance & Spares Management Maintenance and Spare Parts Management: Present Status Issue to be addressed (a) Equipment Procurement in ECL is with one year warranty followed by two years guaranteed availability. to ensure that the bidder (both global & domestic) has sufficient service support & spares backup to ensure high availability of newly procured equipment to ensure smooth availability of spares to have sufficient time for finalizing spares procurement process (RC or Depot Agreement ) in case of new equipment model. Consignment Store concept for prompt supply of quality spares with zero inventory (like BEML consignment store at Rajmahal Area) - May be considered for other High Producing Areas or at some central location for a group of smaller Areas, by BEML and other major suppliers. (b) Depot Agreement: ECL is having depot agreement with all major OEMs to ensure smooth supply of spares. Issues of Technology upgradation 1. Extensive use of Surface Miner & Ripper especially near habitation & near to sensitive structures. 2. OB disposal through belt after sizing. 3. Transport of coal through tube conveyors. 4. Use of highwall technology wherever possible/feasible. Thank You