ACEC/MA 11th Annual State Markets Conference April 11, 2013 H. Sleiman, P.E., CCM Director, Capital Programs and Environmental Affairs Definition of Massport • Massport is an independent authority governed by a board of directors, appointed by the state’s governor • Massport owns and operates – – – – – – Boston-Logan International Airport Hanscom Field, Bedford, MA Worcester Airport Conley Container Terminal Black Falcon Cruiseport Various real estate assets 2 Capital Program Structure Facility Aviation • Logan Airport • Hanscom Field • Worcester Airport Maritime Agency Wide Program Aviation Logan Airside Logan Intermodal Logan Landside Logan Mitigation Hanscom Airside Hanscom Landside Worcester Airside Worcester Landside Maritime Black Falcon Conley Terminal Dredging Fish Pier Hoosac Pier Maritime Other Moran Terminal Other Development WTC/S. Boston Agency Wide/IT Administration Capital Programs Data Storage FARS Information Systems Network Operations System Operations Systems Security Telecommunications Project Project Status Funded Complete Ongoing Proposed Not Funded Private Contingent on Funding Source Unfunded Rolling 5-Year Program Program Evaluation Project Evaluation Criteria • Safety and Security • Asset Maintenance • Operational Efficiencies • System Enhancement/ Customer Service • HOV/Ground Access Improvements • Commitment to Surrounding Communities Financial Evaluation Criteria • Grants and Outside Funding • PFC Eligibility • Cost Recovery • Rates and Charges Impact • Credit Rating Impact FY13-17 Capital Program Total Projects 341 Massport Cash: Customer Facility Charge (CFC) Bonds and Cash: FAA and TSA Grants: Passenger Facility Charge (PFC) Funds (Including Commercial Paper): Revenue Bonds: Transportation Infrastructure Finance and Innovation Act (TIFIA) Loan: TOTAL Contingent On Funding Source (CFS) Projects: Unfunded: Private Funds: $391M $193M $161M $130M $238M $ 0 $1,113M $419M $242M $127M Capital Investments by Year Economic Impact by Year Estimated Job Creation (FTEs): Total 7,887 2,850 2,319 1,719 648 351 Facility Stewardship Investments by Project Type Investment by Facility (6%) Legend: 7% This Program (6%) Previous Program (87%) Consultant Selection Process In-house Designer Selection Panel – Horizontal projects – Feasibility studies – Non-building projects Panel Composition – – – – – – – Director of Capital Programs and Environmental Affairs, Chair Deputy Director of Capital Programs and Environmental Affairs Project Manager Facility representative IT Department representative A&F representative A/E Services representative Consultant Selection Process (cont.) Full Designer Selection Panel – Vertical projects Panel Composition – In-house panel members – Six (6) outside members representing: • The architectural and engineering communities • The construction management industry • Academia Delivery Methods Massachusetts General Laws • Traditional Design-Bid-Build • Construction Manager at Risk for Vertical Construction with value > $5 Million • Chapter 149A allows Design-Build on Horizontal Projects with value > $5 Million 12 Airside Program 2013-2017 Landside Program 2013-2017 Hanscom Program 2013-2017 Worcester Program 2013-2017 Conley Terminal Program 2013-2017 New Department Initiatives BIM Lean Invoicing- Existing Asset Management Invoicing- New Challenges • • • • • • • • Parking freeze at Logan Critical infrastructure resiliency Federal budget sequester Casino HOV enhancement Growth, especially international Airline mergers Etc. Facility ResiliencyClimate Change Is No Longer A Local/Regional Issue Boston Logan has Nonstop Domestic Service to 75 Destinations Facility ResiliencyClimate Change Is No Longer A Local/Regional Issue Boston Logan has Nonstop International Service to 33 Destinations Upcoming Design Opportunities (Next 12 Months) • • • • • • • • • • • • • Logan Express- Framingham Garage Cruise Terminal Warehouse Improvements Airside Engineering On-call Services Architectural/Engineering On-call Services- Authority-wide Architectural/Engineering On-call Services- Worcester Airport HVAC Master Plan and Design for Logan Airport Elevators/Escalators Upgrades Joint Operations Center Rehabilitation of West and Central Garages Southwest Airline’s Security Checkpoint Reconfiguration Conley Cranes Painting Program Seaport Boulevard Sidewalk Reconstruction Commissioning Consultant THANK YOU Sam Sleiman, P.E., CCM Director, Capital Programs & Environmental Affairs hsleiman@massport.com