West Berkshire Council Schools Health and Safety Needs Assessment 2014 Distribution List: Head Teacher Health & Safety Governor Deputy Director & Head of Education Chief Internal Auditor Chair of Governor’s Schools Business Manager Schools Senior Improvement Advisers Head of Finance School School Contact Details Responsible Person Auditor Name/s and Contact Details Date of Audit Overall Audit Score Curridge CE Primary School Katharine Andrews Marilyn Dollard Headteacher Katharine Andrews (SBM) Laura King 02/12/2014 82.5% Good Introduction and Scope This Schools Health & Safety Needs Assessment is designed to examine all general and site specific health & safety management and property safety issues relating to Schools. The audit is conducted using a process of objective evidence gathering including a review of safety management documentation, discussions with relevant managers and staff and a tour / inspection of site. The audit should help: To provide a supportive and practical framework for the continual improvement of the management of health and safety. To gather examples of best practice to share with similar schools to assist with continual improvement. To measure performance and effectiveness of school premises safety management systems. To assist schools and West Berkshire Council to meet their respective statutory duties to manage and monitor health and safety provision. Needs Assessment Summary Report The Schools Health & Safety Needs Assessment Summary Report of score, findings and recommendations can be found on the last page of this assessment report and will be provided to local, area and senior management as appropriate. Audit Scoring and Results The following benchmark scores, along with comments and recommendations will be used to score each question of the audit and to provide an overall score: Benchmark Score Description Outstanding 4 Evidence and competence that demonstrates outstanding management of health and safety. Good 3 Evidence exists that demonstrates good management health & safety. Requires 2 There is some evidence that indicates some management of health & safety but improvement is required in many Improvement areas. Inadequate 1 There is minimal evidence that indicates health & safety is being managed to appropriate standards and urgent improvements are required. Not Applicable 0 The question is not applicable and the overall possible score will be reduced accordingly. (N/A) There are 20 questions each carrying a maximum of 4 marks each giving a total maximum score possible of 80. Any question marked as not applicable (N/A) will reduce the total maximum score possible accordingly. The overall audit score matrix is set out in the Table below. Benchmark Outstanding Good Requires Improvement Inadequate Overall Score 92%+ 80% to 91% 55% to 79% Not Applicable (N/A) N/A Up to 54% Description Evidence and competence that demonstrates outstanding management of health and safety. Evidence exists that demonstrates good management health & safety. There is some evidence that indicates some management of health & safety but improvement is required in many areas. There is minimal evidence that indicates health & safety is being managed to appropriate standards and urgent improvements are required. The question is not applicable and the overall possible score will be reduced accordingly. Completing the Audit Tool This questionnaire will be used by the West Berkshire Health & Safety Team advisors to carry out the needs assessment. During the audit, inspection and discussions the auditor will score relevant questions subjectively and in good faith based on evidence seen and answers provided by the audittees. It may assist schools that the auditor will use the bulleted comments in italics as a guide and representative of the type of documented evidence required in order to determine the appropriate level of scoring. Where all bulleted points are not in evidence for each question a full score is unlikely to be possible. Evidence As an important part of the needs assessment, the Health & Safety Team advisor will request to see a range of health and safety documentation and evidence including the following list which is not exhaustive: o Evidence of oversight and governance of health and safety issues by School Governor’s o Evidence of leadership on health and safety issues by the Head Teacher and others. o Current health and safety policy o Evidence of effective management of health & safety (Health & Safety Management System) o Evidence of structured systems for provision/sharing of health and safety information o Evidence of methods for provision of relevant health & safety information with visitors o Local School policies or procedures addressing health and safety issues, tasks & activities including: o Asbestos management including an asbestos register on site, procedures for bringing relevant information to the attention of relevant people, permit to work systems etc. o o o o o o o o o o o o o o o o o o o o Fire safety including fire risk Assessment, fire emergency plan, Personal Emergency Evacuation Plans (PEEPs) where relevant, fire and evacuation drill records, evidence of planned, preventative maintenance and test records for fire alarms, emergency lighting, fire fighting equipment etc. Legionella management & related documentation including L8 risk assessment with schematic drawings and following a legionella management plan set out in the risk assessment e.g. temperature checks, regular flushing long pipe runs, cleaning shower heads etc. Control of Substances Hazardous to Health (COSHH) including COSHH safety data sheets and risk assessments for all hazardous substances on site. Access to and use of CLEAPPS etc. Security & local lock-up/unlock procedures. Visitors safety on site Contractors safety on site First aid risk assessments Violent incidents (WEBRISK ) Accidents and other incidents (WEBRISK) Working at height Traffic management Hot surfaces and hot water protection Swimming pools- correct training in maintenance, risk assessments Health and Safety training needs analysis and plan Health and safety training records including evidence of training and refresher training Emergency planning and response Current risk assessments including general premises, activity & task risk assessments, special risk assessments (e.g. New and expectant mothers, young people, work experience), display screen equipment (DSE) workstation assessments for all users, manual handling risk assessments etc. Periodic premises inspection records including scheduled structure and follow-up actions Electrical safety procedures (Hard wiring inspection certification and code 1&2 defects resolved. PAT testing for portable electrical equipment. The auditor would like to take the opportunity to thank all management and staff for their assistance, contribution and hospitality throughout the audit process and I hope that you find the report helpful. Please do not hesitate to contact me using the contact details supplied above and we will be happy to assist you further. Leadership, Governance & Management No Question / Standard 1. Evidence of oversight and governance of health and safety issues by School Governor’s e.g. Governor appointed for H&S, H&S Governor competent Attendance at safety inspections, Regular safety performance review at Governor’s meetings etc. 4 x 3 Score 2 1 N/A Comments Governance There is a H&S Governor (Dr Jo Marchant). This governor works for the environment agency and undertakes H&S as part of her job role. Recommendations & Target N/a The Safeguarding and the Environment Committee (SEC) are responsible for the discussion of H&S. Via review of agendas held on site we verified that H&S is a regular agenda item. The H&S governor completes a termly walk around for which a report is produced. The report is provided to the Headteacher and SBM and the results of the report are discussed at SEC meetings. The SBM completes weekly site inspections as part of the fire checks. These are visual and not documented. Leadership 2. Evidence of leadership on health and x safety issues by the Head Teacher and others e.g. Knowledge of H&S issues in school H&S is an agenda item at SEC meetings. Minutes were provided to N/a evidence this. Minutes show discussion of H&S including issues, fire drill results and structural repairs due to identified issues. Content and detail is good. Evidence of effective H&S management Agenda item on relevant meetings Committed to continual improvement in H&S management If issues are identified during weekly or termly checks these are brought to the attention of the Headteacher and SBM and action taken. Also discussed at SEC meetings. 3. 4. Health and Safety policy in place and reviewed in the last three years. Dated and signed Statement of intent Organisation section Roles and responsibilities Arrangements Evidence of implementation Evidence of safety procedures Safe systems of work Previous audit recommendations carried out x Is there a management system in place to support, review & develop H&S policies/issues? x Management H&S policy dated 11/03/2014 and this is reviewed annually. N/a Whilst the policy is not based on the WBC model structure it is robust and contains a statement of intent (although not named as such) and an alphabetical breakdown of each item we would expect to find addressed i.e. working at height, accident reporting, first aid, fire, manual handling and so on. Teaching staff meetings are held weekly. H&S is a regular agenda item at staff meetings. N/a H&S committee in place Evidence through examples Are governors and staff involved in There is a communications book held in the school office which staff can use to record issues within the school which they have noticed. This is then reviewed daily by the Headteacher and SBM and items dealt with. Results are reported at staff meetings and the communications book is taken to staff meetings in order to discuss items recorded. Communication There is a H&S notice board in N/a staff room. It displays the H&S poster and can be used to display relevant items. H&S issues, inspections etc. Evidence of effective planning for H&S management including diary of key dates / issues etc. 5. 6. Is there a system to ensure that staff, volunteers and visitors are provided with relevant H&S information? Standard agenda item at staff meetings Use of a H&S notice board Evidence of provision of information. H&S poster displayed with correct information. Relevant information explained to visitors etc. Any relevant policy, procedures or rules are communicated effectively. Safety Training, Planning and Competence. x Visitors are provided with a visitor badge which documents emergency procedures and evacuation in addition to a laminated plan of the school showing all exits. x Competence There is no formal training plan or record in place in 1. We recommend that a formal training plan be devised Are training needs, including safety, indentified. Is there a training plan. Induction for new staff Are training records available Is refresher training considered, where required Are certificates for relevant courses available e.g. First Aiders etc. Have relevant staff received specialist training such as: DSE Assessors, Manual Handling, Personal safety, Stress Accident reporting/investigation Safeguarding, Child protection, Work at height Asbestos awareness Physical restraint Fire wardens Evac-chair etc. Permit to work respect of H&S training. Therefore it was not possible to determine when training was last undertaken and when it was due for renewal. We verbally confirmed that the following training has been completed by the following staff: Headteacher & SBM: Legionella, asbestos, fire training (no designated fire wardens, no current DSE Assessor, Risk Assessment, EVC training re educational visits, permits to work, COSHH (these are not up to date), safeguarding and child protection, physical restraint, epipen, (this is up to date). The following training has not been completed: Working at Height, Manual Handling, accident reporting and investigation, stress management. In respect of induction, staff are provided with the handbook which records key items such as emergency to ensure staff have had all appropriate training and that refreshers are completed where necessary. The plan should consider all training options and include a full suite of courses to include: Risk Assessment, DSE Assessment, Accident investigation, use of Webrisk, working at height, fire warden and fire awareness and so on. NOTE: we can provide the school with a full list of recommended training upon request. Timescale: 1 month 7. 8. procedures, fire procedures, accident reporting/recording, first aid etc. There is also a key policies file. Policies are read by new staff and a document signed to evidence this. Additionally there is verbal discussion and a tour of the school site. Housekeeping, Welfare, Access and Egress Are housekeeping and welfare x The staff room is well N/a arrangements well managed including: equipped with suitable facilities for heating and Adequate welfare facilities cooling food. Adequate facilities for staff to heat up food and water Sanitary facilities we hygienic Adequate facilities to eat meals and adequate. Is lighting, heating and ventilation adequate The school is set well back Is there safe access and egress from the road up a lane and to and from the site parents are not permitted to Are pedestrians and traffic drive up to the school. They adequately separated park at the WI and walk their Are sanitary facilities adequate children through. and clean Accidents and Incidents Are there effective systems for x General teaching staff do not 2. We recommend that recording, reporting, investigating and complete the accident book. Universal Services are chased analyzing accidents and incidents. All accidents and incidents are to ensure that the annual dealt with and reported by inspection timetable in respect Staff understand the need and First Aiders. General staff are of play equipment is reinstated how to report accidents informed of the process and and completed on time in Accident/incident reporting is the location of the accident future. encouraged book should they need to Incidents of verbal or physical abuse are reported and dealt with appropriately Reporting procedures in place and used (Webrisk) Evidence of accident investigation and actions arising Accident statistics and information reviewed Staff understand the procedures for reporting accidents/incidents report however this is unlikely as there are 5 first aiders in school with only 105 pupils. The Headteacher uses Webrisk to report serious incidents. Near misses are not reported. There is a page in the accident book to report these however this has not had to be used in recent times. There was a serious incident July 2014 and this was discussed with H&S governor. The play equipment where the accident occurred and the surrounding safety surface checked straight away. No defects were noted. This was raised at the next SEC meeting and documented in minutes. We do note however that the equipment was overdue for its annual inspection by Universal at this time as the prior inspection was completed 14/03/2013. The school have contacted Universal to chase the inspection. SBM does review the accident Timescale: 1 month 3. We recommend that the accident book and Webrisk information are regularly reviewed by the SEC to ensure that any common issues are identified and dealt with appropriately. Timescale: 1 month book however this has not been undertaken for some time. The H&S governor also reviews the book. No trends have been identified thus far. First Aid 9. Has a First Aid risk assessment been completed detailing the number of appropriately trained first aiders (including paediatric) required. First aiders appointed and training/certification in date Name and location of first aiders displayed First aiders aware of accident/incident reporting First aid kits adequately stocked and checked regularly x Via discussion with the SBM we found there is currently no First Aid risk assessment in place. 4. We recommend that the school has in place a suitable and sufficient first aid risk assessment. There are currently 5 trained first aiders of which 2 are paediatric trained. All training is up to date with one exception. The SBM verbally confirmed that a refresher has been booked for this staff member. Timescale: 1 month First aiders have not had accident reporting training. See also recommendation 1 under section 6 above. There is an accident book on site with forms to be completed and provided to parents. If the information is required to go on Webrisk then the Headteacher inputs this. 6. We recommend that a tick sheet be introduced to ensure that checks completed of the first aid kit are recorded. The main first aid area is in the school office with a bed. There is a box that can go out 5. We recommend that first aiders complete accident reporting and investigation training. Timescale: 3 months Timescale: 1 month on the playground but normally the pupil is brought to the office to be treated. The first aiders keep a check on the contents of the first aid kits. There is no tick sheet in place to confirm kit checks. Fire 10. Is there a suitable and sufficient fire safety management in place including: Suitable and sufficient fire risk assessment Evidence it is being used effectively Fire action plan Evidence of review e.g. review of drills etc. Site plans near fire alarm including isolation points for gas, electric, water, hazardous substances and gas cylinders marked clearly along with means of escape etc. Emergency contact details and system in place PEEPs in place if required Means to assist persons requiring a PEEP in place e.g. Evac-Chairs etc. Regular drills completed and reviewed. Fire alarm testing & maintenance x We were provided with the fire log book which is the WBC version. There are plans of the site included which show all fire exits, call points, detectors, isolation switches etc as required The last fire risk assessment was completed by NIFES 20/11/2007. A note is attached to the results stating that a new risk assessment will be requested after remedial works summer 2014. The SBM verbally confirmed that NIFES completed a new fire risk assessment summer 2014, however no report has been provided to the school. The school have requested this from WBC property services and this is currently on going. 7. We recommend that the school ensure the contractor undertaking checks of emergency lighting provides evidence of the annual full discharged test. Timescale: immediately (contractor should have this information to hand) See also recommendation 1 under section 6 above 8. We recommend that the fire drill record is kept up to date with no gaps. Timescale: immediately 9. We recommend that the contractor is contacted to complete the annual fire extinguisher checks as soon as possible. A record should be maintained in the fire log to Emergency light testing Fire fighting equipment testing Fire signage is clear Fire doors and exits lead to place of reasonable or total safety No smoking policy implemented Emergency exit routes are clear Doors can be operated easily by the building occupants. The school do not have an arson policy although a section on arson control is incorporated into the H&S policy. Looking at the fire log it would suggest that fire awareness training was last completed in April 2008. Furthermore we established there are no fire wardens. Although the fire drill record table is not completed, the Headteacher writes a summary report regarding fire drills. Reports were held for June 2014, April 2014 but then there is a gap dating back to March 2013. The recent reports record how long the drill took and any notes for improvement. Fire drill results are reported to the SEC. Means of escape general site walk through records had been consistently completed. Call point checks are completed by the SBM and evidence that checks have been completed. Timescale: 1 week this is recorded in the fire log. Last checked 01/12/2014. Fire alarm last tested by the SBM 20/11/14. Westronics complete the annual fire alarm maintenance. Last checked 05/06/2014. The fire extinguisher record has not been completed. A note is attached stating that extinguisher checks were due to be booked for June 2014. SBM confirmed this was completed Sep 2014. The emergency lighting record has not been completed since 20/02/2013. The last job sheet held on file states checks were completed 01/10/2012. From review of this and prior job sheets we could not establish whether a full discharge had been completed. Works commenced July 2014 to upgrade fire alarm and therefore new lighting installed. A new contract has been taken up with Westronics who will complete checks moving forward. Via discussion with the SBM we established that the alarm system was upgraded to L2 in 2013. During our site inspection we found that site plans were displayed by the alarm panels. Asbestos 11. Are there effective procedures in place to manage asbestos containing materials (ACM), if required. Suitable and sufficient asbestos survey completed ACM labelled where practical Asbestos register of known presumed ACM used appropriately. Asbestos register brought to the attention of relevant person e.g. contractors, staff etc. ACM condition checks carried out and recorded to ensure they remain in good condition Evidence of information being reviewed and communicated appropriately Procedures in place for dealing with incidents/emergencies Staff aware, where relevant x The school have an asbestos 10. We recommend that the register which is provided to H&S governor completes contractors to review and sign. checks of the condition of ACM within the school as part The last refurbishment and of the site inspections demolition survey was undertaken. completed July 2014 for specific works to the roof by Timescale: at next site Oasis. Prior to that a inspection management survey was completed 17/09/2013 11. We recommend that the covering the whole site by school ensure there is a plan WYG. in place which documents the actions to be taken should WBC have yet to label ACM ACM be disturbed. on site. Timescale: 3 months Staff are not aware of the location of asbestos. 12. We recommend the school chase WBC Property team to No routine checks are made of visit site and label ACM. the condition of ACM on site. Timescale: 1 month 12. Work at height is appropriately planned and managed. Policy / procedures in place Understood by all staff Risk assessments completed before work at height Appropriate equipment available Ladders inspections completed Controls in place to ensure work at height is controlled x Work at Height There is currently no working at height (WAH) risk assessment in place. No staff on site have undertaken WAH training. Although WAH is not routinely carried the H&S policy does incorporate a section on WAH and states that ladders are provided for specific activities. The policy states instructions for safe use of ladders is attached to the ladder itself. No formal periodic checks are completed of ladders but prior to each use the staff member will check ladder and report if not to the SBM if it not found to be in good order. 13. We recommend that at least one staff member completes WAH training in order that they can disseminate information where required to staff who need to WAH occasionally. Timescale: 1 month 14. We recommend that regular ladder checks are completed and documented. These could be undertaken once per term. Timescale: by start of spring term 2015 Kitchens 13. Is kitchen well managed and maintained. Contractor or staff appointed Staff competent Contract being managed, where relevant Risk assessments and safe system of work in place x The school buy back catering 15. We recommend that the via the WBC contract with ISS. location of isolation switches in the kitchen be established During our site inspection we and communicated to kitchen found that the kitchen is clean staff. and in good order with cabinets earthed where Timescale: 1 month applicable. 14. Gas/electric isolation points clearly marked and accessible Kitchen appears clean, organised and tidy Evidence of EHO inspection, where relevant Suitable emergency arrangements in place Suitable fire fighting equipment in place and staff competent Metal worktops are earthed Kitchen equipment is suitably maintained The last environmental health inspection was 10/06/2014 and the kitchen was rated 5. We could not find the electric isolation switch in the kitchen and via discussion with the cook she was not aware of its location. Fire extinguishers were nearby and Co2 as required. The kitchen is also fitted with fire shutters. The COSHH & RA file had been removed from site at the time of our inspection and therefore we could not review this. Electrical, Mechanical, PUWER and Play Equipment Are there effective arrangements in x The SBM has in place a PPM place for maintenance and testing of and Reactive Maintenance installations and equipment including: file. This is split into sections for each item with a log sheet Gas safety inspection within last which is completed to show 12 months when checks have been Legionella risk assessments undertaken and the results of covers water system includes these checks. Follow up schematic drawings actions are indentified where Recommendations from appropriate and legionella risk assessment implementation of these completed recorded. System and procedure in place 16. We recommend that the school obtain a report from Greenheat produced from the annual boiler service. Timescale: 1 month 17. We recommend that the school contact the WBC Insurance Team to ensure Allianz attend site to complete checks on play equipment and the boiler. for flushing water system and cleaning spray heads e.g. showers Temperature checks carried out and recorded Staff appropriately trained and know what to do in the event of concern. Inventory of portable electrical equipment Procedure to report defects and take equipment out of service Portable appliance testing carried out in reasonable time Fixed electrical testing completed every 10yrs or on recommendation Recommendations completed appropriately Work equipment suitable assessed prior to purchase e.g. consider noise, vibration, suitability, fit for purpose etc. Inspection, maintenance and testing in place for pressure vessels (boilers), water tanks, fuel storage tanks, fire detection and warning, fire fighting and means of escape etc. Insurance engineering inspections and recommendations completed Play equipment is inspected by There is no gas on site. Timescale: 1 month There are no water storage tanks on site. The school use wood pellet heating and therefore there is also no oil on site. The boiler is serviced as part of contract with Greenheat but no report is provided to school. The SBM does record the dates of services – last service recorded as August 2014. Allianz have never attended site to inspect the boiler. The last fixed wiring check was completed by Nurse Electrical 27/08/2013. 18. We recommend that quarterly descaling of recommended outlets is undertaken in line with the requirements of the legionella risk assessment. Results should be recorded on the log to evidence completion. Timescale: 1 month 19. We recommend that a member of staff completes daily playground equipment to ensure the equipment and surrounding area are safe and free of debris. Timescale: 1 week PAT testing is completed annually by Wyllie Maintenance. Last checked 07/05/2014. Playground and gym equipment is inspected by Universal Services and was last checked 14/03/2013. The school have contacted the Universal to arrange the 2014 check. The school do not 20. We recommend that the spray tap in the kitchen be regularly descaled. Timescale: 1 month a competent person every 1-3 months and appropriate records kept Appropriate plan in place to ensure maintenance schedules complied with. complete daily checks of playground equipment. Allianz have never attended site to check play and gym equipment. Fire shutter in kitchen are serviced by Oliver Door Systems. Last checked 17/01/2014. There is no work equipment on site. If anything requires doing where tools will be used a contractor will be bought in to complete. For fire escapes, means of escape etc see fire section above. Westronics complete the annual fire alarm maintenance. Last checked 05/06/2014. Intruder alarms are checked by Network Security & Alarms Ltd. Last check 11/11/2014. The SBM maintains a Legionella file which contains a schematic drawing of the school. The school have a water quality policy which was last reviewed and approved 24/09/2014. Envex completed the legionella risk assessment 03/04/2008. No serious issues were identified but some recommendations were made. Via discussion with the SBM we found that the recommendations are being implemented as follows: Weekly flushing of little used outlets is completed by the SBM and recorded on the log sheet. Last completed 24/11/2014. Monthly temperature checks are also completed by the SBM and recorded on the log sheet. Last check November 2014. Quarterly descaling had been completed in line with the recommendations of the risk assessment to the required outlets. This is recorded on the log. Last completed March – May 2014 and therefore overdue for completion. The SBM does not descale and disinfect the spray tap in the kitchen and this has not been raised on the risk assessment. 15. Procedures in place for selection and management of contractors Competence of contractors checked prior to work Hazards on site brought to the attention of contractors Contractors required to submit risk assessments and method statements prior to work Risk assessments and method statements checked for suitability prior to work Supervision of contractors whilst on site e.g. permit to work systems Contractor Management Most contractors are appointed on the basis of recommendations from other schools within the link group. x N/a Where British Standards are required this would be checked and the membership of the contractor to official bodies. The SBM has completed managing contractors training. The majority of work is booked for outside of school hours. CRB is checked where applicable. Or if urgent and in a vulnerable area during school time the contractor would be supervised. Security 16. Is security appropriately managed. Security procedures in place Segregation of clients/pupils from staff areas Segregation of clients/pupils from hazardous areas/items Emergency arrangements x Security procedures in place. And a lock down procedure is included in the critical incident plan. Now that the school have the new fire alarm in place a practice will be completed in the new year to ensure pupils recognise the 21. We recommend that the school have in place a suitable and sufficient lone working risk assessment. Timescale: 3 months See also recommendation 1 developed and understood Staff aware of security arrangements Lone worker procedures in place Security discussed and communicated Emergency contacts and procedures Security drills practiced if appropriate alarm and what to do. Staff and pupil areas are clearly segregated with the staff room being on the first floor and pupil areas on the ground floor. Keys are held by all teaching staff and the SBM and Headteacher. Teaching staff only have door keys and an alarm code whereas the Headteacher and SBM have a complete set of site keys. WBC have a list of emergency contacts for the school. This consists of the HT, Deputy Headteacher and SBM. A list is not provided to the police. Via discussion we found that lone working does regularly occur. There is a policy in place but no risk assessment. The policy states that the staff member should contact a trusted friend/family member when they arrive at site and when they have returned home and also that doors are locked when lone working is occurring. under section 6 above. 17. Suitable and sufficient arrangements in place to ensure risk assessments are completed, implemented effectively and regularly reviewed. Suitable and sufficient risk assessments in place for relevant tasks / activities Risk assessments communicated and understood Effectively implemented Reviewed to remain valid and current Risk assessments completed for off site activities, non routine activities e.g. maintenance, repairs, events etc. EVOLVE DSE assessment completed Manual handling assessments, where relevant New and expectant mothers Young persons Traffic management Play equipment and areas Vulnerable persons List of risk assessments to ensure reviews are completed Have safe systems of work x The security policy is one of the key policies which must be signed for when new staff start at the school. Risk Assessment The SBM did complete risk assessment training but this was some time ago. No refresher has been undertaken however from review of risk assessments on file we found that they are of good quality. 22. We recommend that the school ensure risk assessments are in place for the following: WAH, manual handling, DSE, Lone working and First aid. Timescale: 3 months We reviewed the risk See also recommendation 1 assessment file and found that under section 6 above. assessments had last been completed July 2013 and were therefore due for review. Via discussion with the SBM we established this is due to be undertaken by the SBM and H&S governor in the new year. The school will be allowing teachers to complete classroom risk assessments based on a pro-forma provided by the school which is robust. Risk assessments are filed by location and activity. There were also some individual assessments for special circumstances i.e. a been developed from risk assessments where required Has safety equipment been supplied to complete tasks as necessary Has PPE been supplied where required Is PPE fit for purpose pupil temporarily in a wheelchair. There have been no recent new and expectant mothers or young persons on site. Traffic management is not an issue as parents park away from site and walk their children up the lane to school. In respect of offsite activities the school uses EVOLVE. SBM has had EVLOLVE training. There are no risk assessments in place in respect of DSE and manual handling. COSHH 18. Are procedures in place to manage hazardous substances etc. List of any hazards substances on site Manufacturers safety data sheets (MSDS) available COSHH assessments match MSDS but specific to task COSHH assessments suitable and sufficient Communicated to relevant x The school buy back into the WBC cleaning contract. During our site inspection we looked in the cleaner’s cupboard but could not locate the COSHH or Risk Assessment files. 23. We recommend that the school ensure the cleaner has an appropriate COSHH and Risk Assessment file. This should be retained on site by the cleaner and be available for inspection by the school. The SBM maintains the COSHH register for the school. There is a summary sheet created by the SBM Timescale: 1 month persons Hazardous substances appropriately secured and protected Spill kits available Methods for safe disposal in place CLEAPPS used showing all identified items, their hazards and precautionary measures. Each chemical then has a section within the file with the MSDS. SBM reviews the register annually. Last dated 26/08/2014. The school also buy back into CLEAPPS. Stress 19. Evidence that stress is considered and management. Awareness of stress Open to discussion Understanding of warning signs / symptoms Stress risk assessments used where appropriate Appear to understand the issue and have an appropriate approach x The Headteacher has completed stress management training. There is no stress management policy however this is incorporated into the well being appendix of the H&S policy (appendix 3). The school is close knit and therefore all staff have someone they can talk to and if the issue was serious this would be passed up the line to be dealt with. The Headteacher is very approachable and has an open door policy. N/a 20. Driving mini-buses or other school owned/leased vehicles is well managed including: List of persons competent to drive vehicle MOT, Tax and appropriate insurance. Driver license checks to ensure valid/clean license held. Vehicle serviced and maintained. Vehicle checks completed. Has a tree survey been carried out? Have recommendations been actioned? Have the trees been inspected regularly, where necessary? Swimming pools well managed and maintained, if relevant Does the pool have a Pool Safety Operating Procedure that consists of: Normal Operating Plan x There has never been a need to complete a risk assessment for a member of staff as issues have been well managed in house and have not been of a serious nature. Other issues The school do not have a minibus. There is no swimming pool on site. The school buy back into the WBC Tree Management contract. The last tree survey was completed July 2013 and is undertaken biannually. The school did request a visit to attend to some overhanging branches indentified by staff and this work was completed August 2014. N/a Emergency Action Plan Changing facilities Associated plant and equipment. Are the chemicals used liquid or tablet Has the Site Manager (or person responsible) had adequate training Does the school follow/have a copy of HSG179 Unusual equipment or facilities well managed and maintained, if relevant Advisers to add any other issues: Notes / Comments Overall Health and Safety is well managed by the SBM and Headteacher. All aspects are taken seriously and good robust records and policies are maintained. Documentation is well organised and maintenance schedules are in place and being adhered to with only minor exceptions. It was a pleasure to visit the school and I would like to thank the SBM and Headteacher for their time and assistance during my visit. Total Score Possible Total Score Achieved 80 66 Percentage 82.5% Good